1. OPERATIONS
1.1 Request to be made to the site incharge of KPGI with details as follows:
a) Purpose
b) Location with sketch of distribution
c) Power consumption details
d) Earthing details
1.3 Site should be properly levelled and barricaded before commencement of the
installation job.
1.5 All the cable used shall be aluminium / copper armoured PVC insulated of
appropriate rating.
1.6 No single stranded shall be used for inter connection and lighting works.
1.7 Whenever cable joints are unavoidable, it shall be properly insulated or proper
junction box shall be used and as far as possible taken over ground with proper
supports giving adequate ground clearance.
1.8 All cable connections shall be through proper cable lugs, connectors and cable
glands.
1.10 All the DB’s, switch boards etc shall be properly earthen subsequently
connecting to the main earth pit.
1.11 After the completion of the works, installation shall be checked by the authorised
person and report submitted through the required checklist format.
1.12 Protection from rain and sun for DB’s switch boards.
2. CHECKLIST
2
2.1 Ensure proper cautioning with caution board regarding the danger due to
electricity.
2.2 Electrician working shall use proper safety shoes, rubber hand gloves, ear
defenders, electrician tool kit. Etc.
The above arrangements shall be checked and verified by the concerned execution
engineer / supervisor of KPGI and the system shall be reviewed at a periodical interval
by safety personnel of KPGI.
In case of identification of any of the lacunae / lapses, as described, the activities shall
be halted by safety / electrical personnel of KPGI and no risk / short cut whatsoever
shall be taken at any point of time.