Saudi Aramco Inspection Checklist
Saudi Aramco Inspection Checklist
Saudi Aramco Inspection Checklist
00 30-Jun-16
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
In all cases, workers are trained & capable of carrying out tasks. Typical SAES-B-006 Para
A3
teams have 1 sprayer, 2 troweller/rollers & 1 operator. 8.2.2
Qualified personnel are available who know the job specs & can monitor
mixing, density, substrate prep, wet & dry thicknesses, reinforcement SAES-B-006
A4
installation & surface finishing (top coat) as required. (API 2218, Para 9.4) Section 3.2
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Airless Spray equipment forces paint through a special design nozzle/tip
by hydraulic pressure (generated by air powered pump). Equipment with SAES-H-001,
B4
this method (tank, hoses, guns, nozzles, spray tips, & compressed air 5.4.5.9
powered pump) are in good working condition.
Conventional (pressure pot) spray equipment delivers paint at
regulated pressure (tank through fluid hose to spray gun). Equipment with
this method (tank, hoses, guns, nozzles, spray tips, agitators & SAES-H-001,
B5
compressed air motors are in good working condition. 5.4.5.9
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
High intensity flood or spotlights are available for poorly illuminated SAES-H-001,
D3
locations for visibility. Safe scaffolding as required to access areas Para. 8.1.5
E Equipment Safety
SAES-H-102,
Electrical lights, equipment & connections meet NEC, Class I, Division
E1 Para. 4.1.2
1, Group D explosion proof requirements (NEC Article 500).
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
REMARKS: *Always use latest approved revision of B-Std, not the Cut-off stds.
REFERENCE DOCUMENTS:
1. SAES-B-006, Fireproofing for Plants, (20 November 2011) See Remarks
2. SAES-H-001, Coating Selection & Application Requirements for Industrial Plants and Equipments (5 April 2016)
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED
ACTOR
RE-INSP DATE
ACTOR
RE-INSP DATE
ACTOR
RE-INSP DATE
Work Verified
Work Verified
Work Verified
ACTOR
RE-INSP DATE
YES N = NO F = FAILED