Plan & Act MP Schedule Outage Boiler Turbine PT Merak Energi Indonesia 2021

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

PT.

Taihei Dengyo Indonesia


OUTAGE PT MERAK ENERGI INDONESIAN 2020 BOILER & TURBINE UNIT # 1
MEI Outage and maintenance work 2020
Preliminary Schedule
Aug-20 Sep-20 Oct-20 Nov-20
TOTAL
No Description 27 28 29 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8

BOILER SHUT DOWN UNIT-1


BOILER SHUT DOWN UNIT-2
1. DIRECT MAN POWER
A PREP. WORK MAN POWER
1. Prep ( Checking ) Tools and Equipment Plan 4 4 4 4 4 4 4 4 4 6 6 6 6 6 6 6 6 84
Act 3 3 3 4 3 4 2 2 3 3 3 2 5 2 2 3 4 4 55
Prog 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 10% 10% 100%
2. Safety Induction for Installl Temp. Shelter and Scaffolding
3. Safety Induction for Outage
TOTAL 1.A.: Plan 0 4 4 4 4 4 4 4 4 4 6 6 6 6 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 84
Act 3 3 3 4 3 4 2 2 3 3 3 2 5 2 2 3 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55
Prog 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 10% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%

B OUTAGE MAN POWER


1 Jasa Install Temporary Shelter, Toilet & Mushola
1. Mob. Scaff Material & Install Temp. Shelter, Toilet & Plan 6 6 6 6 12 12 12 12 12 12 12 12 120
Act 3 7 11 12 13 18 17 18 7 106
Prog 5% 5% 10% 20% 20% 10% 10% 10% 10% 100%
2. House Keeping duration Outage Plan 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 50
Act -
Prog 100%
3. Remove Temp. shelter & Demob Scffolding Material Plan 12 12 12 12 12 12 12 6 6 6 6 108
Act 8 5 5 5 4 27
Prog 0%

TOTAL B1 Plan 0 0 0 0 0 6 6 6 6 0 12 12 12 12 12 12 12 12 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0 0 12 12 12 12 12 12 12 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 278


Act 0 0 0 0 0 0 0 3 7 0 11 12 13 18 17 18 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 5 5 5 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 133
Prog 0% 0% 0% 0% 0% 0% 0% 5% 5% 0% 10% 20% 20% 10% 10% 10% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 66.7%

2 Jasa Instalation Scaffolding Boiler/Turbine # 1


1. Mob.themob / Transp. Scaff Material Plan 4 4 4 2 2 2 2 2 2 2 2 28
Act 3 2 6 6 4 6 3 6 6 42
Prog 5% 10% 20% 20% 20% 15% 10% 100%
2. Install and Remove Scaffolding Outside Boiler Plan 12 12 12 12 12 12 12 12 16 16 16 16 16 16 16 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 12 12 12 12 12 12 12 12 12 12 6 6 6 6 496
Act 17 18 17 20 20 20 20 20 18 18 10 10 18 23 15 13 14 291
Prog 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 100%
3. Install and Remove Scaffolding Inside Boiler Plan 10 10 10 10 10 34 34 34 34 34 34 34 34 34 34 34 34 458
Act 25 30 37 31 31 31 19 18 21 22 17 14 296
Prog 10% 10% 10% 20% 20% 20% 10% 100%

TOTAL B2 Plan 0 4 4 4 14 14 14 14 14 14 14 14 16 16 26 26 26 26 26 40 40 40 40 40 40 6 6 6 6 6 6 6 6 6 6 6 6 40 40 40 40 40 40 12 12 12 12 12 12 12 12 12 12 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 982


Act 0 0 0 0 0 0 3 19 24 6 21 26 20 20 23 20 0 18 18 25 30 37 31 31 31 19 18 21 22 27 24 18 23 15 13 14 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 629
Prog 0% 0% 0% 0% 0% 0% 5% 20% 30% 20% 30% 25% 10% 10% 20% 10% 0% 10% 10% 10% 10% 10% 20% 20% 20% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%

3 Jasa Man Power Supply ( MPS Rotating & Welder )


1. Welder Inspection Plan 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 25
Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21
Prog 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 100%
2. Mechanic Rotating Plan 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 50
Act 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 36
Prog 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 100%
3. Fitter Plan 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 75
Act 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 54
Prog 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 100%
4. Helper Plan 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 150
Act 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 108
Prog 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 100%
5. Welder Plan 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 75
Act 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 54
Prog 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 100%

TOTAL B3 Plan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 375


Act 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 273
Prog 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 0% 0% 0% 5% 5% 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%

4 Jasa Inspection and Overhaul Equip. Rotating Boiler Aux # 1


1. Inspection and Cleaning Bucket Elevator Plan 4 4 6 6 6 8 8 8 8 8 8 6 6 4 4 2 2 2 2 2 2 2 2 2 2 114
Act 5 5 5 5 20
Prog 20% 30% 30% 20% 100%
2. Inspection and Overhaul Chain Flight Conv. Plan 4 4 4 8 8 8 8 8 8 8 8 8 6 6 6 4 4 4 4 4 2 2 2 2 2 132
Act 7 7 7 7 7 7 7 6 6 6 6 5 2 80
Prog 5% 5% 10% 10% 10% 10% 20% 20% 5% 5% 100%
3. Inspection and Cleaning SA,FA,ID FAN Plan 4 4 4 6 6 6 6 8 8 8 8 12 12 12 12 12 12 12 12 12 12 12 12 12 12 6 4 4 4 4 2 2 2 2 266
Act 9 10 10 9 7 7 10 6 6 6 6 86
Prog 10% 10% 10% 10% 10% 10% 20% 10% 5% 5% 100%
4. Inspection and Overhaul Limestone Rotary Feed Plan 2 2 2 4 4 4 4 6 6 6 6 6 6 6 4 4 4 4 4 2 2 2 2 2 2 2 2 100
Act 4 4 4 12
Prog 30% 30% 40% 100%
5. Inspection and Cleaning Coal Feeder A,B,C,D Plan 2 2 4 4 4 4 6 6 6 6 10 10 10 10 10 10 10 10 10 10 10 10 6 6 6 6 6 6 6 6 6 6 6 6 2 238
Act 20 22 26 20 20 20 26 26 16 12 12 6 4 3 233
Prog 10% 10% 20% 10% 10% 10% 10% 10% 5% 5% 100%
6. Inspection and Overhaul Coal Crusher Plan 4 4 4 4 6 6 6 6 6 4 4 4 4 4 4 4 2 2 2 2 2 2 2 88
Act 8 8 8 8 8 8 8 8 8 6 6 10 10 10 2 2 2 120
Prog 10% 10% 10% 10% 10% 20% 15% 10% 5% 100%
7. Inspection and Overhaul Vibrating Screen Plan 4 4 4 4 6 6 6 6 6 6 6 4 4 4 4 4 4 2 2 2 2 2 92
Act 6 6 6 6 6 4 4 4 4 4 2 5 3 3 63
Prog 10% 10% 10% 10% 10% 20% 15% 10% 5% 100%
8. Bead Ash Screw Cooler ( Optional ) Plan 4 8 8 8 10 10 10 10 10 10 10 10 10 10 10 10 10 8 8 8 8 4 4 4 4 4 4 4 218
Act 24 12 13 13 13 12 13 13 12 13 12 13 13 12 5 3 3 3 202
Prog 5% 5% 5% 5% 5% 10% 10% 10% 10% 10% 5% 5% 5% 10% 100%

TOTAL B4 Plan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 14 26 36 38 42 54 54 56 58 60 60 62 60 58 56 52 48 42 40 40 38 32 26 28 26 24 20 20 20 16 14 10 10 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,248


Act 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24 12 63 71 79 71 70 59 67 63 52 47 45 18 14 17 6 16 16 0 0 0 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 816
Prog 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 5% 50% 70% 125% 120% 120% 80% 90% 70% 30% 20% 5% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%

5 Jasa Mechanical Static Work ( Inspect & Cleaning ) Boiler / Turbine # 1


1. Cleaning Boiler Auxilary unit # 1 Plan 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 10 10 10 550
Act 13 30 29 26 22 20 25 25 16 14 14 17 14 17 12 11 14 6 6 331
Prog 10% 20% 10% 10% 10% 5% 5% 5% 5% 5% 5% 10% 100%
Mechanical Static Work Boiler & Turbin # 1 -
1. Furnace & Separator Plan 4 4 6 6 8 8 8 8 8 2 2 2 2 2 2 6 2 2 82
Act 6 2 6 5 5 6 10 6 10 10 10 6 6 6 6 8 8 8 3 2 129
Prog 5% 5% 5% 5% 5% 5% 20% 10% 20% 20% 100%
2. Return Leg Separator Plan 5 4 4 2 2 3 3 2 25
Act 2 4 4 4 4 4 22
Prog 5% 15% 20% 20% 20% 20% 100%
3. Wind Box Plan 4 4 4 4 2 4 4 4 30
Act 4 4 4 4 16
Prog 30% 40% 30% 100%
4. Penthouse Area Plan 4 4 8 8 8 8 4 4 4 2 54
Act 5 4 4 4 4 6 27
Prog 20% 20% 20% 20% 20% 100%
5. HRA Inspection Plan 2 2 4 4 4 8 8 8 8 8 8 4 4 2 4 4 82
Act 5 4 10 5 5 5 5 6 8 8 8 3 6 78
Prog 5% 5% 10% 10% 5% 5% 10% 10% 20% 20% 100%
6. Steam Drum Plan 3 3 4 4 4 3 3 3 2 2 31
Act 2 4 4 6 8 24
Prog 30% 40% 30% 100%
7. Start Up Burner A/B/C Plan 4 4 4 2 2 2 4 4 2 28
Act 3 3 6
Prog 50% 50% 100%
10. ESP Unit Plan 6 6 6 6 6 4 4 4 2 2 2 2 2 2 2 3 3 3 3 3 3 4 4 2 84
Act 6 4 6 3 4 4 4 10 10 10 10 4 12 12 99
Prog 5% 5% 10% 5% 5% 5% 15% 10% 20% 20% 100%
11. Air Pre-Heater Plan 2 2 2 3 3 4 4 4 2 2 2 2 32
Act 4 6 3 4 4 4 4 4 4 37
Prog 10% 10% 10% 10% 20% 10% 10% 20% 100%
12. Chimney Inner Inspection Plan 2 2 2 3 2 4 4 2 21
Act 4 4 5 5 5 5 28
Prog 20% 20% 20% 20% 10% 10% 100%
13. Condenser Inspection Plan 2 3 3 4 4 2 2 2 2 2 4 4 3 3 2 42
Act 4 5 5 6 6 6 32
Prog 10% 10% 20% 20% 20% 20% 100%
14. Dearator Plan 4 4 4 2 4 4 4 4 3 4 4 6 47
Act 4 3 4 4 4 4 23
Prog 10% 10% 10% 20% 30% 20% 100%
15. Ball Screen A/B Plan 3 3 3 2 3 3 3 3 23
Act 3 4 4 4 4 4 4 27
Prog 10% 20% 30% 10% 10% 10% 10% 100%
16. Debris Filter A/B Plan 3 3 3 2 11
Act 3 4 4 4 4 4 4 27
Prog 10% 10% 10% 20% 20% 10% 20% 100%
17. Ganti Panel Tube Boiler & Built Up ( Optional ) Plan 20 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 20 1,000
Act 6 10 7 22 34 37 36 35 36 36 17 7 3 3 3 3 295
Prog 5% 5% 5% 10% 10% 10% 10% 10% 10% 10% 10% 5% 100%

TOTAL B5 Plan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 46 75 70 76 81 86 87 89 81 90 80 78 78 83 87 87 84 88 88 91 89 88 83 85 75 55 22 10 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,142


Act 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 66 62 96 104 106 102 115 101 101 77 62 23 38 39 32 25 14 14 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,201
Prog 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 15% 60% 125% 180% 250% 180% 140% 220% 135% 135% 145% 15% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%

TOTAL DIRECT Plan 0 8 8 8 18 24 24 24 24 18 32 32 34 34 44 46 58 116 154 165 175 192 197 200 204 164 173 165 161 159 162 162 158 149 151 151 152 178 171 168 168 156 132 54 42 38 38 34 34 30 24 24 24 12 12 12 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,109
Act 3 3 3 4 3 4 5 24 34 9 35 40 38 40 42 41 11 65 111 165 212 235 223 218 220 202 197 165 146 110 95 86 87 61 58 59 9 8 8 8 8 8 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,107

2 INDIRECT MAN POWER


Plan
0 0 2 4 4 4 4 4 4 0 11 11 11 11 11 11 16 17 17 17 17 17 17 18 18 18 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 13 12 12 12 12 11 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 681

1. Branch Manager Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


2. Site Manager SSA Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3. Site Manager TDI Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4. Asst Site Manager Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5. Finance Act 1 1 1 1 2 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1
6. Administration Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1
7. Site Coordinator Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8. Supervisor Mechanical and Piping Act 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 2 1 1 1
9. Supervisor Rigger Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
11. Project Control Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
12. Document Control Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
13. Doc.ISO Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
14. Welding Inspector Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
15. QC Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
16. Tool Keeper Act 1 2 2 2 2 1 2 3 3 3 3 2 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 1 2 2 2 2 2
17. Temporary Electrician Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1 1 2 2 2 2 1
18. Safety Officer and Safety Man Act 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 3 2 3 3 3 3 3 3 3 3 3 3 3 2 3 4 4 4 4 4 3 2 2 2 2 2 2 2
19. Driver and Operator Act 2 2 2 2 1 2 2 2 3 3 5 3 6 6 4 6 6 6 6 6 6 6 6 6 6 6 6 5 5 5 5 5 5 5 5 4 3 3 5 5 4 5 5
20. Covid Shelter Act 10 10 10 8 10 10 9 10 10 6 6 6 6 6 5 3
21. Parkir Act 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
22. Engineering Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

TOTAL INDIRECT Plan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -


Act 0 12 11 11 12 12 16 16 16 17 12 22 22 26 26 25 26 21 29 40 45 45 43 45 45 44 46 46 41 40 41 42 40 39 37 33 30 22 16 26 27 25 26 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,238

GRAND TOTAL Plan 0 0 8 10 12 22 28 28 28 28 18 43 43 45 45 55 57 74 133 171 182 192 209 214 218 222 182 193 185 181 179 182 182 178 169 171 171 172 198 191 188 188 176 152 67 54 50 50 46 45 35 24 24 24 12 12 12 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,790
Act 0 15 14 14 16 15 20 21 40 51 21 57 62 64 66 67 67 32 94 151 210 257 278 268 263 264 248 243 206 186 151 137 126 126 98 91 89 31 24 34 35 33 34 26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,345
Plan 0 0 8 18 30 52 80 108 136 164 182 225 268 313 358 413 470 544 677 848 1030 1222 1431 1645 1863 2085 2267 2460 2645 2826 3005 3187 3369 3547 3716 3887 4058 4230 4428 4619 4807 4995 5171 5323 5390 5444 5494 5544 5590 5635 5670 5694 5718 5742 5754 5766 5778 5790 5790 5790 5790 5790 5790 5790 5790 5790 5790 5790 5790 5790 5790 5790 5790 5790
Act 0 15 29 43 59 74 94 115 155 206 227 284 346 410 476 543 610 642 736 887 1097 1354 1632 1900 2163 2427 2675 2918 3124 3310 3461 3598 3724 3850 3948 4039 4128 4159 4183 4217 4252 4285 4319 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345 4345
Note
Plan
Actual

1
PT. Taihei Dengyo Indonesia
OUTAGE PT MERAK ENERGI INDONESIAN 2020 BOILER & TURBINE UNIT # 1
MEI Outage and maintenance work 2020
Preliminary Schedule
Aug-20 Sep-20 Oct-20 Nov-20
TOTAL
No Description 27 28 29 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8

BOILER SHUT DOWN UNIT-1


BOILER SHUT DOWN UNIT-2
1. DIRECT MAN POWER
A PREP. WORK MAN POWER
1. Prep ( Checking ) Tools and Equipment Plan 4 4 4 4 4 4 4 4 4 6 6 6 6 6 6 6 6 84
Act 3 3 3 4 3 4 2 2 3 3 3 2 5 2 2 3 4 4 55
Prog 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 10% 10% 100%
2. Safety Induction for Installl Temp. Shelter and Scaffolding
3. Safety Induction for Outage
TOTAL 1.A.: Plan 0 4 4 4 4 4 4 4 4 4 6 6 6 6 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 84
Act 3 3 3 4 3 4 2 2 3 3 3 2 5 2 2 3 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55
Prog 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 10% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%

B OUTAGE MAN POWER


1 Jasa Install Temporary Shelter, Toilet & Mushola
1. Mob. Scaff Material & Install Temp. Shelter, Toilet & Plan 6 6 6 6 12 12 12 12 12 12 12 12 120
Act 3 7 11 12 13 18 17 18 7 106
Prog 5% 5% 10% 20% 20% 10% 10% 10% 10% 100%
2. House Keeping duration Outage Plan 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 50
Act -
Prog 100%
3. Remove Temp. shelter & Demob Scffolding Material Plan 12 12 12 12 12 12 12 6 6 6 6 108
Act 8 5 5 5 4 27
Prog 0%

TOTAL B1 Plan 0 0 0 0 0 6 6 6 6 0 12 12 12 12 12 12 12 12 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0 0 12 12 12 12 12 12 12 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 278


Act 0 0 0 0 0 0 0 3 7 0 11 12 13 18 17 18 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 5 5 5 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 133
Prog 0% 0% 0% 0% 0% 0% 0% 5% 5% 0% 10% 20% 20% 10% 10% 10% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 66.7%

2 Jasa Instalation Scaffolding Boiler/Turbine # 1


1. Mob.themob / Transp. Scaff Material Plan 4 4 4 2 2 2 2 2 2 2 2 28
Act 3 2 6 6 4 6 3 6 6 42
Prog 5% 10% 20% 20% 20% 15% 10% 100%
2. Install and Remove Scaffolding Outside Boiler Plan 12 12 12 12 12 12 12 12 16 16 16 16 16 16 16 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 12 12 12 12 12 12 12 12 12 12 6 6 6 6 496
Act 17 18 17 20 20 20 20 20 18 18 10 10 18 23 15 13 14 291
Prog 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 100%
3. Install and Remove Scaffolding Inside Boiler Plan 10 10 10 10 10 34 34 34 34 34 34 34 34 34 34 34 34 458
Act 25 30 37 31 31 31 19 18 21 22 17 14 296
Prog 10% 10% 10% 20% 20% 20% 10% 100%

TOTAL B2 Plan 0 4 4 4 14 14 14 14 14 14 14 14 16 16 26 26 26 26 26 40 40 40 40 40 40 6 6 6 6 6 6 6 6 6 6 6 6 40 40 40 40 40 40 12 12 12 12 12 12 12 12 12 12 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 982


Act 0 0 0 0 0 0 3 19 24 6 21 26 20 20 23 20 0 18 18 25 30 37 31 31 31 19 18 21 22 27 24 18 23 15 13 14 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 629
Prog 0% 0% 0% 0% 0% 0% 5% 20% 30% 20% 30% 25% 10% 10% 20% 10% 0% 10% 10% 10% 10% 10% 20% 20% 20% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%

3 Jasa Man Power Supply ( MPS Rotating & Welder )


1. Welder Inspection Plan 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 25
Act 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21
Prog 0%
2. Mechanic Rotating Plan 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 50
Act 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 36
Prog 0%
3. Fitter Plan 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 75
Act 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 54
Prog 0%
4. Helper Plan 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 150
Act 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 108
Prog 0%
5. Welder Plan 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 75
Act 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 54
Prog 0%

TOTAL B3 Plan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 375


Act 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 273
Prog 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 113%

4 Jasa Inspection and Overhaul Equip. Rotating Boiler Aux # 1


1. Inspection and Cleaning Bucket Elevator Plan 4 4 6 6 6 8 8 8 8 8 8 6 6 4 4 2 2 2 2 2 2 2 2 2 2 114
Act 5 5 5 5 20
Prog 20% 30% 30% 15% 95%
2. Inspection and Overhaul Chain Flight Conv. Plan 4 4 4 8 8 8 8 8 8 8 8 8 6 6 6 4 4 4 4 4 2 2 2 2 2 132
Act 7 7 7 7 7 7 7 6 6 6 6 5 2 80
Prog 5% 5% 10% 10% 10% 10% 20% 20% 5% 5% 100%
3. Inspection and Cleaning SA,FA,ID FAN Plan 4 4 4 6 6 6 6 8 8 8 8 12 12 12 12 12 12 12 12 12 12 12 12 12 12 6 4 4 4 4 2 2 2 2 266
Act 9 10 10 9 7 7 10 6 6 6 6 86
Prog 10% 10% 10% 10% 10% 10% 20% 10% 5% 5% 100%
4. Inspection and Overhaul Limestone Rotary Feed Plan 2 2 2 4 4 4 4 6 6 6 6 6 6 6 4 4 4 4 4 2 2 2 2 2 2 2 2 100
Act 4 4 4 12
Prog 30% 30% 40% 100%
5. Inspection and Cleaning Coal Feeder A,B,C,D Plan 2 2 4 4 4 4 6 6 6 6 10 10 10 10 10 10 10 10 10 10 10 10 6 6 6 6 6 6 6 6 6 6 6 6 2 238
Act 20 22 26 20 20 20 26 26 16 12 12 6 4 3 233
Prog 10% 10% 20% 10% 10% 10% 10% 10% 5% 5% 100%
6. Inspection and Overhaul Coal Crusher Plan 4 4 4 4 6 6 6 6 6 4 4 4 4 4 4 4 2 2 2 2 2 2 2 88
Act 8 8 8 8 8 8 8 8 8 6 6 10 10 10 2 2 2 120
Prog 10% 10% 10% 10% 10% 20% 15% 10% 5% 100%
7. Inspection and Overhaul Vibrating Screen Plan 4 4 4 4 6 6 6 6 6 6 6 4 4 4 4 4 4 2 2 2 2 2 92
Act 6 6 6 6 6 4 4 4 4 4 2 5 3 3 63
Prog 10% 10% 10% 10% 10% 20% 15% 10% 5% 100%
8. Bead Ash Screw Cooler ( Optional ) Plan 4 8 8 8 10 10 10 10 10 10 10 10 10 10 10 10 10 8 8 8 8 4 4 4 4 4 4 4 218
Act 24 12 13 13 13 12 13 13 12 13 12 13 13 12 5 3 3 3 202
Prog 5% 5% 5% 5% 5% 10% 10% 10% 10% 10% 5% 5% 5% 10% 100%

TOTAL B4 Plan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 14 26 36 38 42 54 54 56 58 60 60 62 60 58 56 52 48 42 40 40 38 32 26 28 26 24 20 20 20 16 14 10 10 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,248


Act 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24 12 63 71 79 71 70 59 67 63 52 47 45 18 14 17 6 16 16 0 0 0 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 816
Prog 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 5% 50% 70% 125% 120% 115% 80% 90% 70% 30% 20% 5% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 99%

5 Jasa Mechanical Static Work ( Inspect & Cleaning ) Boiler / Turbine # 1


1. Cleaning Boiler Auxilary unit # 1 Plan 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 10 10 10 550
Act 13 30 29 26 22 20 25 25 16 14 14 17 14 17 12 11 14 6 6 331
Prog 10% 20% 10% 10% 10% 5% 5% 5% 5% 5% 5% 90%
Mechanical Static Work Boiler & Turbin # 1 -
1. Furnace & Separator Plan 4 4 6 6 8 8 8 8 8 2 2 2 2 2 2 6 2 2 82
Act 6 2 6 5 5 6 10 6 10 10 10 6 6 6 6 8 8 8 3 2 129
Prog 5% 5% 5% 5% 5% 5% 20% 10% 10% 20% 90%
2. Return Leg Separator Plan 5 4 4 2 2 3 3 2 25
Act 2 4 4 4 4 4 22
Prog 5% 10% 20% 20% 20% 20% 95%
3. Wind Box Plan 4 4 4 4 2 4 4 4 30
Act 4 4 4 4 16
Prog 30% 30% 30% 90%
4. Penthouse Area Plan 4 4 8 8 8 8 4 4 4 2 54
Act 5 4 4 4 4 6 27
Prog 10% 20% 20% 20% 20% 90%
5. HRA Inspection Plan 2 2 4 4 4 8 8 8 8 8 8 4 4 2 4 4 82
Act 5 4 10 5 5 5 5 6 8 8 8 3 6 78
Prog 5% 5% 10% 10% 5% 5% 5% 10% 20% 20% 95%
6. Steam Drum Plan 3 3 4 4 4 3 3 3 2 2 31
Act 2 4 4 6 8 24
Prog 30% 30% 30% 90%
7. Start Up Burner A/B/C Plan 4 4 4 2 2 2 4 4 2 28
Act 3 3 6
Prog 0%
10. ESP Unit Plan 6 6 6 6 6 4 4 4 2 2 2 2 2 2 2 3 3 3 3 3 3 4 4 2 84
Act 6 4 6 3 4 4 4 10 10 10 10 4 12 12 99
Prog 5% 5% 10% 5% 5% 5% 10% 5% 20% 20% 90%
11. Air Pre-Heater Plan 2 2 2 3 3 4 4 4 2 2 2 2 32
Act 4 6 3 4 4 4 4 4 4 37
Prog 10% 10% 10% 10% 20% 10% 10% 10% 90%
12. Chimney Inner Inspection Plan 2 2 2 3 2 4 4 2 21
Act 4 4 5 5 5 5 28
Prog 20% 20% 20% 20% 10% 10% 100%
13. Condenser Inspection Plan 2 3 3 4 4 2 2 2 2 2 4 4 3 3 2 42
Act 4 5 5 6 6 6 32
Prog 10% 10% 20% 20% 20% 10% 90%
14. Dearator Plan 4 4 4 2 4 4 4 4 3 4 4 6 47
Act 4 3 4 4 4 4 23
Prog 10% 10% 10% 20% 30% 20% 100%
15. Ball Screen A/B Plan 3 3 3 2 3 3 3 3 23
Act 3 4 4 4 4 4 4 27
Prog 10% 20% 30% 10% 10% 10% 10% 100%
16. Debris Filter A/B Plan -
Act 3 4 4 4 4 4 4 27
Prog 10% 10% 10% 20% 20% 10% 20% 100%
17. Ganti Panel Tube Boiler & Built Up ( Optional ) Plan -
Act 6 10 7 22 34 37 36 35 36 36 17 7 3 3 3 3 295
Prog 5% 5% 5% 10% 10% 10% 10% 10% 10% 10% 10% 5% 100%

TOTAL B5 Plan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26 35 30 36 41 43 44 49 39 50 39 36 38 43 47 47 44 51 48 51 49 45 43 45 35 35 22 10 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,131


Act 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 66 62 96 104 106 102 115 101 101 77 62 23 38 39 32 25 14 14 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,201
Prog 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 15% 50% 125% 155% 200% 130% 140% 210% 130% 125% 125% 5% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 88%

TOTAL DIRECT Plan 0 0 8 8 8 18 24 24 24 24 18 32 32 34 34 44 46 58 96 114 125 135 152 154 157 164 122 133 124 119 119 122 122 118 109 114 111 112 138 128 128 128 116 112 54 42 38 38 34 34 30 24 24 24 12 12 12 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,098
Act 0 3 3 3 4 3 4 5 24 34 9 35 40 38 40 42 41 11 65 111 165 212 235 223 218 220 202 197 165 146 110 95 86 87 61 58 59 9 8 8 8 8 8 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,107
Plan 0 0 8 16 24 42 66 90 114 138 156 188 220 254 288 332 378 436 532 646 771 906 1058 1212 1369 1533 1655 1788 1912 2031 2150 2272 2394 2512 2621 2735 2846 2958 3096 3224 3352 3480 3596 3708 3762 3804 3842 3880 3914 3948 3978 4002 4026 4050 4062 4074 4086 4098 4098 4098 4098 4098 4098 4098 4098 4098 4098 4098 4098 4098 4098 4098 4098 4098
Act 0 3 6 9 13 16 20 25 49 83 92 127 167 205 245 287 328 339 404 515 680 892 1127 1350 1568 1788 1990 2187 2352 2498 2608 2703 2789 2876 2937 2995 3054 3063 3071 3079 3087 3095 3103 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107 3107
Note
Plan
Actual