Engineering Project Management Scope Time and Cost Management Ass 5
Engineering Project Management Scope Time and Cost Management Ass 5
Engineering Project Management Scope Time and Cost Management Ass 5
0
Date: 08 JULY 2020
1.3.1 Procurement X
A 1.1.2 Approval of
G
1.2.1 Internal
of the Drone
1.4.1 Flight
Project Charter
L N R
Meeting time area Z
V
1.3.2 Drone
C P Assembly S
H K 1.3 Drone 1.4 Drone
1.2 Internal
E 1.1.3 Assessment Allocation Design Flight Operation
1.1 Start- of Risk
1.3.3 Design
Up
Planning Q
Color and Logo W
1.4.3 Packaging A1
D T Design
I 1.2.2 Funding M
1.1.4 Allocation
of Funds
and Resources
O U
1.3.4 Trial Run of
the Drone
Y
B 1.4.4 Quality
Assurance Check
C8
D1 D4
1.9 Official Start of the Project 1.10 Project Closure 1.10.1 Performance Review
C9
D3
1.9.2 Documentation and
Guidelines for Operations
C7
Diagram Key
Activity Duration Activity Duration Activity Duration Activity Duration Activity Duration Activity Duration
(in (in (in (in (in (in LEGEND
weeks) weeks) weeks) weeks) weeks) weeks)
A 1 K 3 U 2 A5 1 B6 2 C7 2 Critical Path
B 2 L 2 V 2 A6 1 B7 1 C8 1
C 3 M 2 W 2 A7 1 B8 1 C9 1
D 2 N 2 X 1 A8 1 B9 1 D1 1
E 1 O 2 Y 2 A9 2 C1 2 D2 1
F 2 P 2 Z 1 B1 2 C2 2 D3 1
G 3 Q 1 A1 3 B2 3 C3 2 D4 1 Equation:
H 2 R 2 A2 3 B3 1 C4 2 Duration = Path 1+Path (n)
I 2 S 3 A3 2 B4 1 C5 2