Develop Project: Wilmont’s Pharmacy Drone Delivery Document Revision: 1.

0
Date: 08 JULY 2020

CRITICAL PATH METHOD DIAGRAM


1.1.1 Meetings
with Review
1.4.2 Holding
F Capacity

1.3.1 Procurement X
A 1.1.2 Approval of
G
1.2.1 Internal
of the Drone
1.4.1 Flight
Project Charter
L N R
Meeting time area Z
V
1.3.2 Drone
C P Assembly S
H K 1.3 Drone 1.4 Drone
1.2 Internal
E 1.1.3 Assessment Allocation Design Flight Operation
1.1 Start- of Risk
1.3.3 Design
Up
Planning Q
Color and Logo W
1.4.3 Packaging A1
D T Design
I 1.2.2 Funding M
1.1.4 Allocation
of Funds
and Resources
O U
1.3.4 Trial Run of
the Drone
Y
B 1.4.4 Quality
Assurance Check

*note: Diagram Key is found in the last page.


1.1.5 Legal
Documentation
J
PREPARED BY: Chayl Jhuren F. Lopez
Chemical Engineer
1.5.3 System
Integration
1.8.1 Integration
A7
Z
A2
1.6.1 Integration 1.7.1 Executive to C4
1.5.2 Compatibility
Utility Training
C6
B6 B8
A8 C2
A5 B4 C1
1.5.1 Customization of A9
1.6 Customer 1.8 System Operations
1.5 Delivery System 1.7 Staff and Troubleshooting
the IT Interface System Order System Training
B7 C3
B1 B5 B9 C7

1.5.4 Customer’s 1.6.2 Final 1.7.2 Standard


C5
Data Privacy Validation Operating
B2 Procedures
A3
1.8.2 Final
1.5.5 Final Validation System Validation
A1 and Modifications
*note: Diagram Key is found in the last page.

PREPARED BY: Chayl Jhuren F. Lopez


Chemical Engineer
C6

1.9.1 Turnover of new drones to


Wilmont
D2

C8

D1 D4
1.9 Official Start of the Project 1.10 Project Closure 1.10.1 Performance Review

C9
D3
1.9.2 Documentation and
Guidelines for Operations
C7
Diagram Key
Activity Duration Activity Duration Activity Duration Activity Duration Activity Duration Activity Duration
(in (in (in (in (in (in LEGEND
weeks) weeks) weeks) weeks) weeks) weeks)
A 1 K 3 U 2 A5 1 B6 2 C7 2 Critical Path
B 2 L 2 V 2 A6 1 B7 1 C8 1
C 3 M 2 W 2 A7 1 B8 1 C9 1
D 2 N 2 X 1 A8 1 B9 1 D1 1
E 1 O 2 Y 2 A9 2 C1 2 D2 1
F 2 P 2 Z 1 B1 2 C2 2 D3 1
G 3 Q 1 A1 3 B2 3 C3 2 D4 1 Equation:
H 2 R 2 A2 3 B3 1 C4 2 Duration = Path 1+Path (n)
I 2 S 3 A3 2 B4 1 C5 2

PREPARED BY: Chayl Jhuren F. Lopez


Chemical Engineer
J 1 T 2 A4 1 B5 1 C6 2

PREPARED BY: Chayl Jhuren F. Lopez


Chemical Engineer