Energy Investment&Technical Services

J.S.C
Dong Xuyen Industrial Zone,Rach Dua Monthly Report
Ward, Vung Tau, VN Phong Phu Solar Farm

January-2021

1.Project Information

Project Phong Phu O&M Provider Etic


Owner SOLARCOM Report by Hieu.DT
O&M Contractor Trina Accepted by Mr.Hung
Reviewed by Ella Report date 5-Feb-21

2.O&M Personal

No. Name Position Phone Number Email


1 Ella O&M Manager 0858747670 qiaomei.shi@trinasolar.com
2 Lam.VD O&M Engineer 0965410732 lam.vd@energyservices.vn
3 Hieu.DT O&M Engineer 0908440281 hieu.dt@energyservices.vn

3.Excutive Summary

_Transformer 1 (T07) has been tripped 2 times this month.


_Replaced PE board of UPS 3, 4, 5.
_7-Jan-2021: Received 20 monitors, 1 new monitors had damamged port. Replaced 16 monitors. Sent back 17 damaged
monitors to supplier.
_Cleaned PV panels at MVPS 1.

4.Safety Performance

No. Content Yes No Note


1 Safety training x

2 Safety testing equipment x

Personal Protective All Engineers and technicians had been provided with full
3 x
Equipment (PPE) PPE
4 The risk at Site x
5 Work accident x

5.O&M Highlights

Tx1 tripped
2 times
SCB monitor
Replaced 16 SCB monitors
UPS 3,4,5
Replaced PE board

6.Site Contractor/Visitor

Date Name Company Note Image

1
Energy Investment&Technical Services
J.S.C
Dong Xuyen Industrial Zone,Rach Dua Monthly Report
Ward, Vung Tau, VN Phong Phu Solar Farm

January-2021

7.Manpower

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Working days
Ella 1 1 2
Lam 1 1 1 1 1 1 1 1 8
Hieu 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 31
Trina Solar 3 3 6
Working days
2
8
31
6

2
Energy Investment&Technical Services
J.S.C
Dong Xuyen Industrial Zone,Rach Dua Monthly Report
Ward, Vung Tau, VN Phong Phu Solar Farm

January-2021

1.Weather Condition

Bev-Energy-Day
8
7.2969 7.2188 7.3438
7.1094 7.0938 7.2188 7.0000 7.2344 7.1094 7.0938 7.1563 7.1094 7.0938
6.9531 6.8907 6.9062 7.0157
7 6.7344 6.8438 6.7969 6.7032
6.5000
6.2031 6.1094
6
5.5313
5.1094
4.9687 4.8750
5

3.9219
4 3.5625

3 2.6406

0
2-Jan

10-Jan

12-Jan

13-Jan

15-Jan

18-Jan

20-Jan

23-Jan

25-Jan

26-Jan

28-Jan

31-Jan
1-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

8-Jan

9-Jan

11-Jan

14-Jan

16-Jan

17-Jan

19-Jan

21-Jan

22-Jan

24-Jan

27-Jan

29-Jan

30-Jan
BEV-Energy day (kWh/m2) Average (6.3659 kWh/m2)

Reason Low Irradition:


Date Reason
1-Jan-21
4-Jan-21 Cloudy, rainy weather
22-Jan-21

2.Daily Production

Daily Production (4 Meters)


300000 8

256,331 7
250000 258,319
256,761 260,353
251,539 239,883
247,912 235,085
241,453 240,979 240,240 222,788
230,074 6
225,020
218,003 204,599
209,430 209,400 212,283
200000 203,833 201,885
199,676
190,912 193,430 5
187,998 184,556 184,701 187,621

150000 4
138,415 138,429

3
100000
98,059

50000
1

0 0
3-Jan

6-Jan

9-Jan

10-Jan

13-Jan

16-Jan

19-Jan

22-Jan

23-Jan

25-Jan

28-Jan

29-Jan

31-Jan
1-Jan

2-Jan

4-Jan

5-Jan

7-Jan

8-Jan

11-Jan

12-Jan

14-Jan

15-Jan

17-Jan

18-Jan

20-Jan

21-Jan

24-Jan

26-Jan

27-Jan

30-Jan

Meter Reading Yields (kWh) Average (159405.1 kWh) BEV-Energy day (kWh/m2)

Note: This value is got from Meter readings (471+472+473+474)


Reason Low Production:
Date Reason
Low irradiation
1-Jan-21
Limited by A0 from 8:14 to 13:30
3-Jan-21 Limited by A0 from 10:40 to 13:30
4-Jan-21 Low irradiation
7-Jan-21 Limited by A0 from 10:30 to 12:45
8-Jan-21 Limited by A0 from 10:58 to 12:38
9-Jan-21 Limited by A0 from 10:57 to 12:45
10-Jan-21 Limited by A0 from 8:50 to 12:53
11-Jan-21 Limited by A0 from 10:30 to 12:45
12-Jan-21 Limited by A0 from 8:50 to 13:45
13-Jan-21 Limited by A0 from 9:33 to 13:45
14-Jan-21 Limited by A0 from 8:15 to 13:53
15-Jan-21 Limited by A0 from 9:35 to 12:30
16-Jan-21 Limited by A0 from 9:50 to 12:47
17-Jan-21 Limited by A0 from 9:24 to 12:51
Limited by A0 from 9:45 to 12:30
18-Jan-21
Tx1 was tripped from 11:01 to 12:46
19-Jan-21 Limited by A0 from 11:02 to 12:54
20-Jan-21 Limited by A0 from 10:24 to 13:02
22-Jan-21 Low irradiation
24-Jan-21 Limited by A0 from 10:40 to 13:39
25-Jan-21 Limited by A0 from 10:53 to 12:37
26-Jan-21 Limited by A0 from 10:36 to 13:02
27-Jan-21 Limited by A0 from 11:29 to 12:27
28-Jan-21 Limited by A0 from 10:54 to 11:54
Limited by A0 from 10:23 to 13:16
29-Jan-21
Tx1 was tripped from 13:12 to 14:02
30-Jan-21 Limited by A0 from 10:47 to 12:07
31-Jan-21 Limited by A0 from 9:30 to 14:56

3.Performance Ratio

Performance Ratio (4 meters)


90%
85% 82.77% 82.13%
79.97%
78.51%
78.49% 77.15% 77.40% 77.92%
80% 76.97% 76.41%
74.60% 74.78% 75.18% 74.42% 74.60%
75% 71.36% 72.43% 72.11%
69.08% 69.14% 68.18%
70% 66.46%
68.55%
66.94% Monthly PR 4 meters (%)
63.83%
65% 60.66% 60.60%
60.96%
58.41% 57.92%
60% 56.53%
55%
50%
45%
40%
35%
71.11%
30%
25%
20%
15% ▲ 26.87%
10% vs. previous month
5%
0%
1-Jan

2-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

8-Jan

9-Jan

11-Jan

12-Jan

13-Jan

14-Jan

15-Jan

16-Jan

17-Jan

18-Jan

19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

24-Jan

25-Jan

26-Jan

27-Jan

28-Jan

29-Jan

30-Jan

31-Jan
10-Jan

Column I Average (71.11 %)


40%
35%
30%
25%
20%
15%
10%
5%
0%

1-Jan

2-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

8-Jan

9-Jan

11-Jan

12-Jan

13-Jan

14-Jan

15-Jan

16-Jan

17-Jan

18-Jan

19-Jan

20-Jan

21-Jan

22-Jan

23-Jan

24-Jan

25-Jan

26-Jan

27-Jan

28-Jan

29-Jan

30-Jan

31-Jan
10-Jan
Column I Average (71.11 %)

Note: This value is got from Meter readings (471+472+473+474)

Performance Ratio (3 meters)


90%
85% 82.57% 82.39%
79.96% 78.93%
78.49% 77.56% 77.90%
80% 76.77% 76.97% 76.51%
74.32% 74.61% 75.02% 75.10%
73.90% 74.44%
75% 71.03% 72.16% 72.01%
70% 66.33%
68.31% 68.85% 67.82%
66.38% Monthly PR 3 meters (%)
63.57% 63.17%
65%
60.30% 60.47%
59.29%
60% 57.95%
55.94%
55%
50%
45%
40% 71.26%
35%
30%
25%
20%
15% ▲ 27.84%
10% vs. previous month
5%
0%
1-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

9-Jan

10-Jan

11-Jan

12-Jan

13-Jan

14-Jan

15-Jan

17-Jan

18-Jan

19-Jan

21-Jan

22-Jan

23-Jan

24-Jan

25-Jan

26-Jan

27-Jan

28-Jan

29-Jan

30-Jan

31-Jan
2-Jan

8-Jan

16-Jan

20-Jan

Column K Average (71.26 %)


Note: This value is got from Meter readings (471+472+473)
Reason Low PR:
Date Reason
Low irradiation
1-Jan-21
Limited by A0 from 8:14 to 13:30
3-Jan-21 Limited by A0 from 10:40 to 13:30
4-Jan-21 Low irradiation
7-Jan-21 Limited by A0 from 10:30 to 12:45
8-Jan-21 Limited by A0 from 10:58 to 12:38
9-Jan-21 Limited by A0 from 10:57 to 12:45
10-Jan-21 Limited by A0 from 8:50 to 12:53
11-Jan-21 Limited by A0 from 10:30 to 12:45
12-Jan-21 Limited by A0 from 8:50 to 13:45
13-Jan-21 Limited by A0 from 9:33 to 13:45
14-Jan-21 Limited by A0 from 8:15 to 13:53
15-Jan-21 Limited by A0 from 9:35 to 12:30
16-Jan-21 Limited by A0 from 9:50 to 12:47
17-Jan-21 Limited by A0 from 9:24 to 12:51
Limited by A0 from 9:45 to 12:30
18-Jan-21
Tx1 was tripped from 11:01 to 12:46
19-Jan-21 Limited by A0 from 11:02 to 12:54
20-Jan-21 Limited by A0 from 10:24 to 13:02
22-Jan-21 Low irradiation
24-Jan-21 Limited by A0 from 10:40 to 13:39
Energy Investment&Technical Services J.S.C
Dong Xuyen Industrial Zone,Rach Dua Ward,
Vung Tau, VN Monthly Report
Phong Phu Solar Farm

January-2021

4.Inveter Production

Inverter Daily Production


20

18

16

14

12

10

0
3-Jan

6-Jan

10-Jan

13-Jan

16-Jan

19-Jan

22-Jan

23-Jan

25-Jan

26-Jan

28-Jan

29-Jan

31-Jan
1-Jan

2-Jan

4-Jan

5-Jan

7-Jan

8-Jan

9-Jan

11-Jan

12-Jan

14-Jan

15-Jan

17-Jan

18-Jan

20-Jan

21-Jan

24-Jan

27-Jan

30-Jan
INV 1.1 INV 2.1 INV 2.2 INV 3.1 INV 3.2 INV 4.1 INV 4.2

Inverter Daily Production


20

18

16

14

12

10

0
2-Jan

11-Jan

13-Jan

15-Jan

18-Jan

19-Jan

20-Jan

22-Jan

24-Jan

26-Jan

28-Jan

31-Jan
1-Jan

3-Jan

4-Jan

5-Jan

6-Jan

7-Jan

8-Jan

9-Jan

10-Jan

12-Jan

14-Jan

16-Jan

17-Jan

21-Jan

23-Jan

25-Jan

27-Jan

29-Jan

30-Jan

INV 5.1 INV 5.2 INV 6.1 INV 6.2 INV 7.1 INV 7.2 INV 8.1 INV 8.2

500
Monthly Inverter Production

450 458.14 457.66 457.34 457.76


454.63 449.31 451.51 448.42
444.56 443.70 440.86
427.35
400 410.31 402.82

350 371.77

300

250

200

150

100

50

0
INV 8.2
INV 8.1
INV 7.2
INV 7.1
INV 6.2 Production (MWh) Average (MWh)
INV 6.1
INV 5.2
INV 5.1
INV 4.2
INV 4.1
INV 3.2
INV 3.1
INV 2.2
INV 2.1
INV 1.1
Reason Low Production:
INV Reason
INV 6.1
INV 7.1
Fewer strings than the other INVs.
INV 8.1
INV 8.2

5.Overview

Month

Total BEV-Energyday Total Production Revenue (Billion


(kWh/m2)-January (kWh)-January VND)-January

197.344 6,569,967 14.140

▲ 49.25% ▲ 33.85% ▲ 34.04%


vs. previous month vs. previous month vs. previous month
Year

Production-2020 Production-2021

BEV-Energyday-2020 BEV-Energyday-2021
7 230

6 194

5 158

4 122

3 86

2 50

Oct
Mar

Apr

Nov

Dec
Jan

Feb

Jun

Aug

Sep
May

Jul

Total BEV-Energyday Total Production


PR 3 meters-January PR 4 meters-January
(kWh/m2)-January (kWh)-January

197.344 6,569,967 2021 2021


2020 2020
▼ -9.07% ▲ 45.31%
vs. last year vs. last year Jan Jan

43.41% 44.24%
71.26% 71.11%

▲ 27.84% ▲ 26.87%
vs. last year vs. last year
Energy Investment&Technical Services
J.S.C
Dong Xuyen Industrial Zone,Rach Dua Monthly Report
Ward, Vung Tau, VN Phong Phu Solar Farm

January-2021

1.Risk and Issue History

Time
Device name/
Location Description of Issue Error Code Solution Recovery
Serial No. Start End
_MV TRF tripped. This issue related to 18-Jan-21 11:01 18-Jan-21 12:46 Tripped because of oil level. Released gases from DMCR by vacuum
Transformer 1
transformer oil. 29-Jan-21 13:12 29-Jan-21 14:02 pump.
MVPS 1
#7708:Faulty switching status of
INV 1.1 INV was down 22-Jan-21 6:17 21-Jan-21 6:22 Set the parameter ErrClr to Ackn
Remote GFDI
INV 3.1 #7708:Faulty switching status of 23-Jan-21 6:18 23-Jan-21 6:23 Set the parameter ErrClr to Ackn
MVPS 3 INV was down
INV 3.2 Remote GFDI 21-Jan-21 6:22 21-Jan-21 6:27 Set the parameter ErrClr to Ackn

2.Completed Work

Location Equipment Description Error Code Checking Date Fixed Date Solution Recovery

Wrong value voltage between L-Ground, N-Ground, L-N


MVPS 3,4 UPS 3,4 21-Nov-20 9-Jan-21 Replaced PE board
when turned off UPS.

Replaced 16 SCB monitors:


_ 8-Jan-21: A1.1-J10, A2.2-J09
_ 9-Jan-21: A3.1-J06, A3.1-J10, A3.1-J11
_ 12-Jan-21: A7.2-J07, A7.2-J05, A7.2-J11
SCB Monitors Communication of SCBs was not stable 19-Jan-21
_13-Jan-21: A3.2-J02, A4.1-J03
_16-Jan-21: A5.2-J10, A6.1-J13, A6.2-J02, A6.2-
J13
_19-Jan-21: A5.1-J14, A6.1-J09

SCB6.2-J05 Current Transformer Wrong current value. 15-Jan-21 15-Jan-21 Replaced Current transformer

3.Pending Work

Location Equipment Description Temporary Solution Checking Date Fixed Date Solution Recovery

_ The communication between SCADA and PPC is lost


(The pink cells appear in PPC monitor)
Substation SCADA 26-Nov-19 Open Check with Trina Solar
_ The status signals on SCADA
_ Symbol of schematic on SCADA

Replaced 4 new cables from DMCR Protection Relay to


23-Apr-20 Open Waiting for SMA to replace 4 new cables
STSD cabinet temporarily.

MV TRF tripped and the situation of being unable to switch on


MVPS 6 MVSG
MVSG
Disconected one cable No. 1.16 at Q1 relay (STSD
24-May-20 Open Waiting for SMA to replace Relay (STSD cabinet)
cabinet)

Could not switch on MVSG after swapping 2 terminal blocks and 2 Disconected one cable No. 1.16 at Q2 relay (STSD
MVPS 7 MVSG 8-May-20 Open Waiting for SMA to replace Terminal block and Relay (STSD
Relays from MVPS 6. cabinet)

_ 9-Oct: Replaced 2 batteries, disconnected the fan, Fault led was


supplier to find root cause.
MVPS 5 UPS UPS have damaged Bypassed UPS 13-Jun-20 Open _ 9-Dec: PE Board has been damaged.
_5-Jan-21: Replaced PE Board. Error still occurred. Waiting for sup
cause.
Reboot PPC, reconnect RJ45 terminals from ION meter to _ 19-Nov: Check cable from ION Schneider meter to PPC, Cable
Substation PPC Lost connection to PPC, power was not following PPC Setpoint. 15-Nov-20 Open
PPC Contact SMA if any error occurs.

4.Record PM

Refer to "PM file".


Solution Recovery Image

Tripped because of oil level. Released gases from DMCR by vacuum


pump.

Set the parameter ErrClr to Ackn

Set the parameter ErrClr to Ackn


Set the parameter ErrClr to Ackn

Image

Solution Recovery

Check with Trina Solar

Waiting for SMA to replace 4 new cables

Waiting for SMA to replace Relay (STSD cabinet)

Waiting for SMA to replace Terminal block and Relay (STSD cabinet)

_ 9-Oct: Replaced 2 batteries, disconnected the fan, Fault led was on. Waiting for
supplier to find root cause.
_ 9-Dec: PE Board has been damaged.
_5-Jan-21: Replaced PE Board. Error still occurred. Waiting for supplier to find root
cause.
_ 19-Nov: Check cable from ION Schneider meter to PPC, Cables are good.
Contact SMA if any error occurs.
Energy Investment&Technical
Services J.S.C
Dong Xuyen Industrial
Zone,Rach Dua Ward, Vung Tau,
Monthly Report
VN Phong Phu Solar Farm
January-2021

1.Spare Part

Quantity at Quantity used Remaining Received spare


Received Date Category Component
warehouse in January quantity part

MC4 97 97
PV modules
PV Panel 9 9
Cable
15A -String fuse 410 410

7-Jan-21 Monitor 20 17 3

SCB Current Transformer 26 1 25

SPD (Surge Drotection Device) 8 8

MCCB 4 4
SCB cabinet 7 7
IGBT 4 4
315 A- INV Fuse 24 24
AC Switch SOR/SCR 1 1
AC Switch 1 1
DC Switch 1 1
DC Switch SOR/SCR 1 1
Interior Fan 2 2
Power Unit Heat Sink Fan 1 1
ISO Monitor 1 1
SC30CONT.GR4 1 1
MVPS
SC30ACC.GR5 1 1
SC30COM.GR3 1 1
SC30RIO.GR2 1 1
SC30DCC.GR2 1 1
SC30DST.BG4 1 1
SC30DCM.GR4 board 2 2
Buffer Module incl. 24V Power Supply 1 1
GFDI 1500VDC 1 1
Remotely switch unit for S800 1 1
Air outlets 1 1
Temperature Sensor 1 1
Relative Humidity Sensor 1 1
Weather station
Wind Sensor 1 1
LP02 Pyranometer Sensor 2 2
9-Sep-20 CCTV POE 2 2
5-Jan-21 UPS Board Circuit 3 3 0
5-Jan-21 SCADA Control box 1 1
3M冷缩电缆终端3 *185 cold shrink cable terminal 3*185 2 2
12/20KV 三芯可触摸T型前接头 12/20KV 3 core tangible front connector
2 2
3*70 3*70
12/20KV 三芯可触摸T型前接头 12/20KV 3 core tangible front connector
2 2
3*185 3*185
TS4 连接器 TS4 connector 130 130
直流断路器 DC breaker 8 8
直流防雷器 DC arrester 10 10
直流熔断器底座 DC fuse base 20A 30 30
熔断器 DC fuse 15A 12 12
机器人控制器 Robot controller 2 2
ION6800电表 ION6800 energy meter 2 2

PV cable 4mm2 (H1Z2Z2-K-4- 1.5 KV DC) 750 m 750 m

RS485 communication cable, 2x2x1.5


( 325m)
500 m 500 m
Cable, 2x2x1.5, Alantek 16AWG, 2-Pair
(301-CI9502-0500)

RS485 communication cable (Alantek


PA /Audio/Control shield twisted pair cable 305 m 305 m
16 AWG- 1 pair)
3-Mar-20 Cable
Optic Fiber Cable single mode 4C- DAC4 575 m 575 m

Optic Fiber Cable single mode 12C,


225 m 225 m
amoured cable
PV 4mm2 cables 636 m 636 m
LV Power cable, Cu, 3x2.5mm2 50 m 50 m
3-Mar-20 Cable

LV Power cable Cu, 3x6mm2 200 m 200 m


LV Power cable, Cu, 1x2.5mm2 200 m 200 m
Control cable, copper 2x1.5mm2 200 m 200 m
Received spare
Note Proposal
part

Replaced 16 monitors
1 new monitor has
damaged port

Replaced at SCB6.2-J05
Date BEV-Energy day (kWh/m2)

1-Jan 3.9219
2-Jan 4.9687
3-Jan 6.2031
4-Jan 2.6406
5-Jan 6.5000
6-Jan 4.8750
7-Jan 7.1094
8-Jan 7.0938
9-Jan 7.2188
10-Jan 7.0000
11-Jan 7.2344
12-Jan 7.2969
13-Jan 7.2188
14-Jan 7.1094
15-Jan 7.0938
16-Jan 6.1094
17-Jan 6.7344
18-Jan 6.8438
19-Jan 5.5313
20-Jan 7.1563
21-Jan 5.1094
22-Jan 3.5625
23-Jan 7.1094
24-Jan 7.0938
25-Jan 6.7969
26-Jan 7.3438
27-Jan 6.9531
28-Jan 6.8907
29-Jan 6.7032
30-Jan 6.9062
31-Jan 7.0157
Sum 197.3438
Average 6.3659
Total Production
Average (6.3659 kWh/m2) 4 meters
(kWh)
6.3659 138,415
6.3659 187,998
6.3659 209,430
6.3659 98,059
6.3659 241,453
6.3659 190,912
6.3659 251,539
6.3659 258,319
6.3659 256,761
6.3659 193,430
6.3659 247,912
6.3659 209,400
6.3659 218,003
6.3659 203,833
6.3659 204,599
6.3659 199,676
6.3659 184,556
6.3659 240,979
6.3659 201,885
6.3659 225,020
6.3659 184,701
6.3659 138,429
6.3659 260,353
6.3659 230,074
6.3659 239,883
6.3659 240,240
6.3659 256,331
6.3659 235,085
6.3659 212,283
6.3659 222,788
6.3659 187,621
6,569,967
211,934.42
Total Production
Average (211934.42 kWh) 3 meters
(kWh)
211,934.42 103,473
211,934.42 141,044
211,934.42 156,422
211,934.42 73,578
211,934.42 182,141
211,934.42 142,900
211,934.42 188,299
211,934.42 193,326
211,934.42 192,258
211,934.42 144,019
211,934.42 185,323
211,934.42 156,215
211,934.42 162,909
211,934.42 152,634
211,934.42 149,311
211,934.42 137,018
211,934.42 179,549
211,934.42 179,549
211,934.42 151,143
211,934.42 168,508
211,934.42 138,788
211,934.42 104,205
211,934.42 195,761
211,934.42 172,020
211,934.42 179,629
211,934.42 179,505
211,934.42 192,289
211,934.42 176,154
211,934.42 157,968
211,934.42 166,288
211,934.42 139,332
4,941,558
159,405.10
PR 4 meters
Average (159405.1 kWh) Average (71.11 %)
(%)

159,405.10 74.60% 71.11%


159,405.10 79.97% 71.11%
159,405.10 71.36% 71.11%
159,405.10 78.49% 71.11%
159,405.10 78.51% 71.11%
159,405.10 82.77% 71.11%
159,405.10 74.78% 71.11%
159,405.10 76.97% 71.11%
159,405.10 75.18% 71.11%
159,405.10 58.41% 71.11%
159,405.10 72.43% 71.11%
159,405.10 60.66% 71.11%
159,405.10 63.83% 71.11%
159,405.10 60.60% 71.11%
159,405.10 60.96% 71.11%
159,405.10 69.08% 71.11%
159,405.10 57.92% 71.11%
159,405.10 74.42% 71.11%
159,405.10 77.15% 71.11%
159,405.10 66.46% 71.11%
159,405.10 76.41% 71.11%
159,405.10 82.13% 71.11%
159,405.10 77.40% 71.11%
159,405.10 68.55% 71.11%
159,405.10 74.60% 71.11%
159,405.10 69.14% 71.11%
159,405.10 77.92% 71.11%
159,405.10 72.11% 71.11%
159,405.10 66.94% 71.11%
159,405.10 68.18% 71.11%
159,405.10 56.53% 71.11%

71.11%
PR 3 meters Estimated Loss due to A0
Average (71.26 %)
(%) Curtailment (MWh)

74.32% 71.26% 10.96


79.96% 71.26% 1.24
71.03% 71.26% 26.82
78.49% 71.26% 2.51
78.93% 71.26% 4.57
82.57% 71.26% 0.00
74.61% 71.26% 17.55
76.77% 71.26% 10.18
75.02% 71.26% 16.47
57.95% 71.26% 71.52
72.16% 71.26% 25.91
60.30% 71.26% 66.78
63.57% 71.26% 55.23
60.47% 71.26% 65.26
59.29% 71.26% 63.90
63.17% 71.26% 33.01
75.10% 71.26% 70.34
73.90% 71.26% 18.05
76.97% 71.26% 8.78
66.33% 71.26% 45.84
76.51% 71.26% 9.89
82.39% 71.26% 0.00
77.56% 71.26% 8.74
68.31% 71.26% 38.42
74.44% 71.26% 17.38
68.85% 71.26% 37.72
77.90% 71.26% 6.84
72.01% 71.26% 25.72
66.38% 71.26% 41.43
67.82% 71.26% 38.61
55.94% 71.26% 77.92
917.57
71.26%
Estimated Production Loss due to Estimated Production Loss due to
IGBT (MWh) IGBT (MWh)
42 MWh 47.3121 MWh
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.00 0.00
INV 1.1 INV 2.1 INV 2.2 INV 3.1 INV 3.2

9.73 9.59 9.53 9.38 9.57


13.02 13.10 13.17 12.75 13.16
14.57 14.14 14.46 14.14 14.55
7.54 7.48 7.52 7.30 7.60
17.46 17.16 17.24 16.50 16.79
13.19 13.09 13.17 12.80 13.30
17.61 17.45 17.51 17.04 17.55
18.07 17.94 17.99 17.51 18.06
17.85 17.84 17.92 17.42 17.91
13.33 13.26 13.30 13.02 13.32
17.52 17.11 17.17 16.74 17.23
14.50 14.39 14.50 14.12 14.46
15.23 15.04 15.12 14.67 15.07
14.08 13.06 14.03 13.70 13.99
14.27 14.08 14.17 13.76 14.09
14.04 13.81 13.81 13.47 13.82
12.58 12.45 12.50 12.24 12.59
14.16 16.90 16.95 16.46 16.96
14.70 14.35 14.31 13.82 14.11
15.86 15.60 15.65 15.20 15.66
13.05 12.85 13.00 12.45 12.91
9.87 9.68 9.75 9.37 9.67
18.55 18.22 18.37 17.62 18.28
16.14 15.91 15.97 15.52 15.96
16.89 16.64 16.69 16.21 16.68
16.76 16.54 16.65 16.19 16.73
17.89 17.86 17.94 17.37 17.97
17.92 16.08 16.18 15.70 16.23
13.10 14.74 14.79 14.42 14.82
15.73 15.47 15.47 15.08 15.46
12.93 12.80 12.83 12.59 12.84
458.14 454.63 457.66 444.56 457.34
438.4093 438.4093 438.4093 438.4093 438.4093
INV 4.1 INV 4.2 INV 5.1 INV 5.2 INV 6.1

9.37 9.56 9.28 9.27 8.91


12.93 13.12 12.69 12.62 12.18
14.24 14.54 14.14 14.05 13.60
7.40 7.61 7.38 7.30 7.04
16.77 16.93 16.05 16.04 15.48
12.98 13.36 12.98 12.79 12.45
17.18 17.51 16.97 16.88 16.32
17.65 18.00 17.50 17.37 16.77
17.60 17.90 17.36 17.26 16.70
13.13 13.30 13.01 12.93 12.63
16.88 17.20 16.74 16.62 16.10
14.28 14.45 14.09 13.99 13.63
14.85 15.10 14.69 14.57 14.18
13.83 14.01 13.68 13.61 13.32
13.94 14.13 13.75 13.67 13.36
13.55 13.87 13.39 13.35 12.92
12.37 12.67 12.51 12.33 12.23
16.62 16.97 16.48 16.37 15.83
13.91 14.11 13.40 13.41 12.84
15.34 15.67 15.05 14.98 14.61
12.77 13.01 12.46 12.37 11.96
9.55 9.75 9.29 9.23 8.87
17.94 18.30 17.57 17.48 16.84
15.68 16.00 15.50 15.42 14.97
16.38 16.71 16.15 16.06 15.55
16.37 16.71 16.27 16.15 15.58
17.53 18.01 17.37 17.29 16.62
15.90 16.25 15.79 15.67 15.20
14.56 14.81 14.46 14.34 13.94
15.13 15.33 15.07 14.89 14.41
12.68 12.87 12.63 12.55 12.31
449.31 457.76 443.70 440.86 427.35
438.4093 438.4093 438.4093 438.4093 438.4093
INV 6.2 INV 7.1 INV 7.2 INV 8.1 INV 8.2

9.42 8.65 9.29 8.41 7.81


12.92 11.60 12.86 11.25 10.29
14.34 13.03 14.27 12.79 11.92
7.54 6.67 7.49 6.51 5.94
16.55 14.81 16.42 14.20 12.99
13.29 11.82 13.29 11.58 10.61
17.30 15.55 17.21 15.25 14.11
17.78 15.97 17.71 15.68 14.48
17.68 15.87 17.62 15.55 14.36
13.17 12.17 13.15 12.02 11.37
17.00 15.37 16.94 15.13 14.08
14.27 13.10 14.27 12.91 12.13
14.92 13.60 14.91 13.35 12.41
13.85 12.88 13.84 12.67 11.92
13.93 12.88 13.95 12.64 11.89
13.67 12.48 13.58 12.18 11.35
12.70 11.84 12.78 11.67 11.02
16.73 15.18 16.66 14.82 13.73
13.72 12.43 13.66 11.92 10.95
15.44 14.00 15.36 13.71 12.74
12.74 11.38 12.79 11.02 10.12
9.56 8.49 9.45 8.19 7.47
17.99 15.88 17.94 15.46 14.15
15.78 14.34 15.72 14.06 13.10
16.46 14.88 16.41 14.55 13.45
16.41 14.95 16.53 14.68 13.63
17.77 16.62 15.77 17.63 14.06
16.07 14.51 16.03 14.23 13.21
14.64 13.42 14.61 13.19 12.32
15.11 13.95 15.18 13.73 12.86
12.76 11.99 12.73 11.84 11.30
451.51 410.31 448.42 402.82 371.77
438.4093 438.4093 438.4093 438.4093 438.4093
71.11%
#REF!

28.89%
71.26%
#REF!

28.74%
Energy Investment&Technical
Services J.S.C
Dong Xuyen Industrial
Zone,Rach Dua Ward, Vung Tau, Monthly Report
VN Phong Phu Solar Farm

January-2021

1.Conclusion

_Observing the all devices to notify SMA promptly if any problem occurs.
_SLC continues performing and checking pest control measures at all MVPSs by putting the chaphor balls.
_P.M work should be coordinated between SLC and Trina: 5 SCBs / day will be checked.
_SLC need to update the "P.M file" on Google Drive daily after performing P.M work (Preventative maintenance
work).
_Vegetation control should be carried out for the whole plant to avoid risks from snake and loss production due to
effect of shadows and.
_Noticed the rusty bolt and washer at almost all earthing terminals of string. Need to use penetrating oil for rusted
bolt or replace.
_February is sunny month, dusty panel should be cleaned.
_SLC and O&M team coordinate to solve pending P.M work (Preventative maintenance work).

2.Feedback about site condition

1.General
1.1. Raining days
a. Inspect and rectify erosion areas especially after heavy rain fall.
b. Require to have vegetation control, need to cut grass around SCBs
c. Inspect whether devices are affected by lightning strike.
2. WHS (Workplace Health & Safety)
2.1. No smoking
2.2. Waste management
a. Waste left from construction phase should be removed and disposed of properly to avoid risks and causing
pollution at site.
b. Increase people’s environmental awareness through workshop or meeting. The plant should keep clean,
free of waste,…
2.3. Field technicians should apply basic PPE requirement
3.1. A shared information channel (Google Drive/ Dropbox) is necessary, so that everyone can get documents
easier.

1
Energy Investment&Technical
Services J.S.C
Dong Xuyen Industrial Zone,Rach Monthly Report
Dua Ward, Vung Tau, VN Phong Phu Solar Farm

January-2021

3.Next Month Plan

1 Manpower for O&M in next month.

Feb-21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Working days


Lam 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17
Hieu 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 31

2 Monitoring at SCADA system to find out some faults come from PV and Inverter.
Visual inspection of string and the combiner boxes, PV module, cable DC, module mounting structure, earthing system based on
3
“P.M file” and report. (Refer to sheet "P.M schedule February").
Report the disconnection and interruption, scheduled and unscheduled maintenance activities, damages and defects, spare parts
4
replacement.
5 Observe fixed fault and noted.
6 Prepare the monthly report with the production, PR and detail of any defect or damage.
7 Restart Robot every 2 weeks.
8 UPS 5: Waiting for spareparts from supplier.
2
Preventive Maintenance Sch
Check
Location Component/Device Equipment ID Status
1 2 3 4 5 6 7 8 9
SCB 1.1-J01 1
SCB 1.1-J02 1
SCB 1.1-J03 1
SCB 1.1-J04 1
SCB 1.1-J05 1
SCB 1.1-J06 1
SCB 1.1-J07 1
String Combiner Box
SCB 1.1-J08 1
Area 1
SCB 1.1-J09 1
SCB 1.1-J10 1
SCB 1.1-J11 1
SCB 1.1-J12 1
SCB 1.1-J13 1
SCB 1.1-J14 1
Inverter INV 1.1 x x x x x x x x x
MV Transformer TX 1 x x x x x x x x x
SCB 2.1-J01 1
SCB 2.1-J02 1
SCB 2.1-J03 1
SCB 2.1-J04 1
SCB 2.1-J05 1
SCB 2.1-J06 1
SCB 2.1-J07 1
SCB 2.1-J08 1
SCB 2.1-J09 1
SCB 2.1-J10 1
SCB 2.1-J11 1
SCB 2.1-J12 1
SCB 2.1-J13 1
SCB 2.1-J14 1
String Combiner Box
SCB 2.2-J01 1
Area 2 SCB 2.2-J02 1
SCB 2.2-J03 1
SCB 2.2-J04 1
SCB 2.2-J05 1
SCB 2.2-J06 1
SCB 2.2-J07 1
SCB 2.2-J08 1
SCB 2.2-J09 1
SCB 2.2-J10 1
SCB 2.2-J11 1
SCB 2.2-J12 1
SCB 2.2-J13 1
SCB 2.2-J14 1
INV 2.1 x x x x x x x x x
Inverter
Inverter
INV 2.2 x x x x x x x x x
MV Transformer TX 2 x x x x x x x x x
SCB 3.1-J01 1
SCB 3.1-J02 1
SCB 3.1-J03 1
SCB 3.1-J04 1
SCB 3.1-J05 1
SCB 3.1-J06 1
SCB 3.1-J07 1
SCB 3.1-J08 1
SCB 3.1-J09 1
SCB 3.1-J10 1
SCB 3.1-J11 1
SCB 3.1-J12 1
SCB 3.1-J13 1
SCB 3.1-J14 1
String Combiner Box
SCB 3.2-J01 1
Area 3 SCB 3.2-J02 1
SCB 3.2-J03 1
SCB 3.2-J04 1
SCB 3.2-J05 1
SCB 3.2-J06 1
SCB 3.2-J07 1
SCB 3.2-J08 1
SCB 3.2-J09 1
SCB 3.2-J10 1
SCB 3.2-J11 1
SCB 3.2-J12 1
SCB 3.2-J13 1
SCB 3.2-J14 1
INV 3.1 x x x x x x x x x
Inverter
INV 3.2 x x x x x x x x x
MV Transformer TX 3 x x x x x x x x x
SCB 4.1-J01 1
SCB 4.1-J02 1
SCB 4.1-J03 1
SCB 4.1-J04 1
SCB 4.1-J05 1
SCB 4.1-J06 1
SCB 4.1-J07 1
SCB 4.1-J08 1
SCB 4.1-J09 1
SCB 4.1-J10 1
SCB 4.1-J11 1
SCB 4.1-J12 1
SCB 4.1-J13 1
SCB 4.1-J14 0
String Combiner Box
SCB 4.2-J01 0
Area 4 SCB 4.2-J02 0
SCB 4.2-J03 0
String Combiner Box
Area 4

SCB 4.2-J04 0
SCB 4.2-J05 0
SCB 4.2-J06 0
SCB 4.2-J07 0
SCB 4.2-J08 0
SCB 4.2-J09 0
SCB 4.2-J10 0
SCB 4.2-J11 0
SCB 4.2-J12 0
SCB 4.2-J13 0
SCB 4.2-J14 0
INV 4.1 x x x x x x x x x
Inverter
INV 4.2 x x x x x x x x x
MV Transformer TX 4 x x x x x x x x x
SCB 5.1-J01 0
SCB 5.1-J02 0
SCB 5.1-J03 0
SCB 5.1-J04 0
SCB 5.1-J05 0
SCB 5.1-J06 0
SCB 5.1-J07 0
SCB 5.1-J08 0
SCB 5.1-J09 0
SCB 5.1-J10 0
SCB 5.1-J11 0
SCB 5.1-J12 0
SCB 5.1-J13 0
SCB 5.1-J14 0
String Combiner Box
SCB 5.2-J01 0
Area 5 SCB 5.2-J02 0
SCB 5.2-J03 0
SCB 5.2-J04 0
SCB 5.2-J05 0
SCB 5.2-J06 0
SCB 5.2-J07 0
SCB 5.2-J08 0
SCB 5.2-J09 0
SCB 5.2-J10 0
SCB 5.2-J11 0
SCB 5.2-J12 0
SCB 5.2-J13 0
SCB 5.2-J14 0
INV 5.1 x x x x x x x x x
Inverter
INV 5.2 x x x x x x x x x
MV Transformer TX 5 x x x x x x x x x
SCB 6.1-J01 1 x
SCB 6.1-J02 1 x
SCB 6.1-J03 1 x
SCB 6.1-J04 1 x
SCB 6.1-J05 1 x
SCB 6.1-J06 1 x
SCB 6.1-J07 1 x
SCB 6.1-J08 1 x
SCB 6.1-J09 1 x
SCB 6.1-J10 1 x
SCB 6.1-J11 1 x
SCB 6.1-J12 1 x
SCB 6.1-J13 1 x
String Combiner Box SCB 6.2-J01 1 x
SCB 6.2-J02 1 x
Area 6
SCB 6.2-J03 1 x
SCB 6.2-J04 1 x
SCB 6.2-J05 1 x
SCB 6.2-J06 1 x
SCB 6.2-J07 1 x
SCB 6.2-J08 1 x
SCB 6.2-J09 1 x
SCB 6.2-J10 1 x
SCB 6.2-J11 1 x
SCB 6.2-J12 1 x
SCB 6.2-J13 1 x
SCB 6.2-J14 1 x
INV 6.1 x x x x x x x x x
Inverter
INV 6.2 x x x x x x x x x
MV Transformer TX 6 x x x x x x x x x
SCB 7.1-J01 1 x
SCB 7.1-J02 1 x
SCB 7.1-J03 1 x
SCB 7.1-J04 1 x
SCB 7.1-J05 1 x
SCB 7.1-J06 1 x
SCB 7.1-J07 1 x
SCB 7.1-J08 1 x
SCB 7.1-J09 1 x
SCB 7.1-J10 1 x
SCB 7.1-J11 1 x
SCB 7.1-J12 1 x
SCB 7.1-J13 1 x
String Combiner Box SCB 7.2-J01 1 x
SCB 7.2-J02 1 x
Area 7
SCB 7.2-J03 1 x
SCB 7.2-J04 1 x
SCB 7.2-J05 1
SCB 7.2-J06 1
SCB 7.2-J07 1
SCB 7.2-J08 1
SCB 7.2-J09 1
SCB 7.2-J10 1
SCB 7.2-J11 1
SCB 7.2-J12 1
SCB 7.2-J13 1
SCB 7.2-J14 1
INV 7.1 x x x x x x x x x
Inverter
INV 7.2 x x x x x x x x x
MV Transformer TX 7 x x x x x x x x x
enance Schedule
Check Date (February-2021)
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x

x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x

x
x
x
x
x
x
x
x
x
x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x

You might also like