Variant Configuration Material Variants Creationusage in Sales Order For Replacing Configurable Material Part 1
Variant Configuration Material Variants Creationusage in Sales Order For Replacing Configurable Material Part 1
Variant Configuration Material Variants Creationusage in Sales Order For Replacing Configurable Material Part 1
Technical Articles
Ritesh Dube
September 14, 2012 6 minute read
Material Variants
Do you want to wait for customer order to plan and start production for the fastest selling
and in demand con guration of your product ?
In many industries when we deal with Con gurable material, many of times we come across a con guration which is
asked every now and then by many customer.
Also business don’t want to wait for customer to enter order and then start its production , instead there is a need to have
something similar to Make to Stock for this con guration to bring lead time down and maintain some stock of this fast
moving con guration.
To address all of these and many other requirements, there is a standard option available in SAP to create “Material
Variant”.
This document will be useful for beginners in VC area to understand the concept of Material Variant and how it can be
setup using standard SAP. Also we will discuss how when you con gure a material in sales order (VA01) or Con guration
Simulation CU50, you can check whether a material variant already exists that has the same characteristic values and it
will manually or automatically replace the con gurable material in sales order. You can display existing material
variants on the characteristic value assignment screen. However, the con gurable material is not automatically
replaced by the variant.
A material variant is a material that can be kept in stock and that arises from an individual con guration of a
con gurable product.
The material master record of a material variant is linked to the con gurable material and con gured using the
characteristics of the con gurable material. This variant of the con gurable material can then be manufactured and
kept in stock.
A. You have a Con gurable Product “BIKE” which has 3 attribute on which it can be con gured, which become
Characteristics of this con gurable material.
· COLOUR
o Red
o Blue
o Black
o Green
o Golden
o Silver
o Orange
o Purple
o Yellow
o Dark Red
· ENGINE TYPE
o 200 CC
o 400 CC
o 600 CC
o 800 CC
o 1000 CC
o 1200 CC
o 1400 CC
o 1500 CC
o 1600 CC
o 1800 CC
· EXHAUST
o S- EXHAUST 1
o S- EXHAUST 2
o S- EXHAUST 3
o S- EXHAUST 4
o S- EXHAUST 5
o S- EXHAUST 6
o S- EXHAUST 7
o S- EXHAUST 8
o S- EXHAUST 9
o S- EXHAUST 10
You created con gurable material with all Basic settings required for “Variant Con guration”
(3)
Below are the steps to create a Material Variant”, Create a new material, BIKE – BLACK – 1000
Transaction: MM01
(3)
Select views
(3)
Complete the material creation process by lling out necessary details and mandatory elds.
To manufacture the material variant in-house, you must maintain the variant at plant level, so that BOMs, routings, and
so on can be determined. Cross-plant variants can be used in Purchasing, but are not supported in Sales.
To set up the material variant speci c to a plant, in MRP 3 View, in eld “Con gurable Material ( MARC-STDPD) “ in put
the con gurable material number.
Press enter; you will get a message to “Con gure the material.
(3)
Come out of the screen using,complete the process of creation of material following all required view and mandatory
elds.
In the basic data, you can link the material variant to a con gurable material. This con guration applies to all plants.
Now the Material Variant is created, and need to be linked with BOM and Routing of Con gurable Material.
Transaction: CS40
(3)
Press enter
(3)
(3)
(3)
Use the material assignment option, Enter Group counter, Material and plant
(3)
If the strategy group associated is relevant for “Make to stock: production, you can plan the independent requirement,
have MRP run, generate plan order, convert it to production order and con rm to generate stock of this material
variants.
Variants can be planned on the finished product level using any make-to-stock strategy, such as Planning with Final Assembly
(40) or Net Requirements Planning (10)
Variants can be planned on the finished product level using any make-to-order strategy, such as Planning w/o Final Assembly (50)
or Planning with a Planning Material (60)
You can define the settings for variant matching in the configuration profile of a configurable material and on the characteristic value
assignment screen.
I. In the configuration profile, choose Settings, and on the characteristic value assignment screen choose View —
Settings.
(3)
Prerequisites (1)
You define the settings for variant matching in Customizing for Sales and Distribution, where you maintain item categories.
§ Configuration of Sales and Distribution -> Sales -> Sales Document -> Sales Document Item -> Define Item Categories.
(3)
Activate variant matching for an item category, by put a tick as shown above
Define Material variant action to decide how the system reacts if it finds a material variant:
The system automatically replaces the configurable material with the material variant.
You see a message telling you that a material variant with the same configuration exists.
Receive an automatic message with a list of the material variant stock situation. You can then decide whether to replace the
material variant.
Decide that you do not want to replace the variant.
Transaction VA01:
(3)
(3)
Material Variant matching the values will listed on lower part of screen.
(3)
(3)
(3)
Once you have configured the material, leave the configuration editor.
Depending on the settings in Customizing, either the material is replaced by the material variant immediately, or you see a
message telling you that a suitable material variant has been found.
Individual or collective requirements can be generated for the material variant. Pricing also applies to the material variant,
unless you define the configurable material as the pricing material for the material variant.
Alert Moderator
References:
Assigned tags
(2) Link mention is a document by Philip Cluster on SAP SDN
distribution | sap(z) |
sd courtesy : https://www.motorcyclelegalfoundation.com/types-of-motorcycles/
View more...
Related Blog Posts
Related Questions
JSSJMDJSSS
variant matching
By Former Member , Nov 09, 2016
Multi-level Con gurable Materials - Planned order not created after MRP run S4 HANA 1709
By K P , Jul 24, 2018
57 Comments
Navaneetha Krishnan
Hi Ritesh,
I especially liked the way you have mentioned your references and the system you have used!
Thanks for such a nice document. I will try it some day this month (little held up for sometime)
If you can move this to SD area, you will have more consultants reading your document, more will get bene tted. Dont
know what should be done for that though.
Like(0)
Navaneetha Krishnan,
Regards
Ritesh
Like(1)
Like(1)
Former Member
Regards,
Senthil
Like(0)
SIVA KUMAR
Basant
Like(0)
Monst Yang
hi,Ritesh:
Is variant also work in MD81?I test it in MD81 but variant doesn’t replace VC material..
Like(1)
Former Member
HI,
4) In the basic data, i linked the material variant to a con gurable material.
5) Now i can’t create a link to a con gurable materiel with the transaction CS40. Should i create a BOW First? and the BOW it’s necessary
to complete the process of con gurable materiel?
Thanks
Like(0)
Former Member
Good document.
Thanks
PV
Like(0)
venu gopal
Like(1)
venu gopal,
Ritesh
Like(1)
Thierry Mathieu
Regards,
Like(1)
Ritesh
Like(1)
Former Member
Like(0)
Amber Naseer,
I can see you help a lot to community memmbers & share your knowledge & expertise.
Regards
Ritesh
Like(1)
Former Member
June 6, 2014 at 1:41 am
Very Useful and it solved my problem about the “Super Routing”.
Thanks a lot!!!
Like(1)
Thanks for comment , appriciate if you rate this documnet too , by clicking on * and like option too.
Thanks
Ritesh
Like(1)
Navaneetha Krishnan
Hi Ritesh,
Read this document once again today just to clarify some doubts.
1. Why do you use CS40 and CA02. Is it mandatory even in a non PP scenario. I have been working purely on SD
perspective and have not used CS40 till date. Is that an acceptable approach. Actually I am of the belief that the MRP3
view or the basic view links the variant with the con gurable material and hence CS40 is redundant. Please clarify if I am
incorrect.
2. Also Why do we need routing for variant material which anyway should be a MTS material. Again to my primitive
understanding about routing, we can have routing only for MTO materials from SD perspective. During TOR, we send
requirements to PP and then the production/assembly order will have the routing for the material. Hence in a stock
scenario, this should not be applicable.
If you can help me understanding these two concepts, it will help me.
Like(1)
Navaneetha Krishnan
With MRP 3 entery you connect the con gurable material with material variant ,
using CS40 you connect material variant with BOM and through CA02 you made link between material variant & routing
operation of con gurable.
Thanks
Ritesh.
Like(1)
Navaneetha Krishnan
Hi Ritesh,
This makes my understanding very clear. Thanks a bunch for your response.
Like(1)
Former Member
Hi Ritesh,
Nice document ! By the way for deleting/removing a material variant shall I go about in the reverse of the order in which
we created it?
If so, Will removing MV from mat.assignment in routing or
Link to con gurable material a ect the routing in any way like deleting the comp.allocations?
Like(1)
Krishnan Sekar,
Thanks for comment , I dont think removing of MV from routing material assignment or changes to component
allocations will a ect anything.
Also, when you say reverse , I hope you do not want to remove con gurable material from basic data 2 or MRP 3 view
from con gurable material eld. Its Not possible
Like(1)
Former Member
October 27, 2014 at 11:39 am
Hi Ritesh,
I have particular question – if there are more then one suitable material variants in my case system propose only one of
them (with least mat.num.). Is it expected behaviour or some customisation is missed?
Like(0)
Caetano Almeida
Hi Ritesh
Very nice document. I wrote the following document about an error that may happen with variant materials that may be
useful:
Con gurable planned order for material variants: Exception “53: No BOM explosion due to missing con guration”
BR
Caetano
Like(1)
Thanks for comment Caetano Almeida, I follow you in PP forum and already gone thorugh yoru document.
Like(1)
Former Member
Hi Ritesh,
Really a very useful document to understand the material variant concept. Your explanation with screenshots would
leave no doubts in mind of the reader.
Regards
SD
Like(0)