1.0 DESCRIPTION:-
THE PARVEEN COIL TUBING OVERSHOT MAKES A POSITIVE GRIP OVER THE FISH
AND IS CAPABLE OF WITHSTANDING EXTREMELY HEAVY PULLING FROM THE
COIL UNIT.

FEATURES:-

• SPRING I.D. BIGGER THAN FISH ALLOWING THE FISH TO GO UP IN TOOL


FURTHER.
• GRAPPLE CATCH ARE INTERCHANGEABLE.
PARVEEN
COIL TUBING OVERSHOT
TECHNICAL MANUAL

PARVEEN INDUSTRIES PVT. LTD.


(MUMBAI) INDIA
BILL OF MATERIAL
DATE : 07/12/2009 REV: 0 PAGE 1 OF 1

OVERSHOT - (MAX OD-2.30")


ASSY. PART No: 35-23019-00

ITEM NO. QTY. PART NO. REV DESCRIPTION


1 1 35-23019-01 0 BODY
2 1 35-23019-02 0 TOP SUB (1.0" AMMT BOX)
3 1 35-23019-03 0 GRAPPLE(1.1/4" COIL TUBING)
4 1 35-23019-04 0 SPRING

OVERSHOT - (MAX OD-2.30")


ASSY. PART No: 35-23020-00

ITEM NO. QTY. PART NO. REV DESCRIPTION


2 1 35-23020-02 0 TOP SUB (1.1/2" AMMT BOX)
3 1 35-23020-03 0 GRAPPLE(1.1/2" COIL TUBING)
PARVEEN COIL TUB IN G OV ERS HOT

TECHNICAL MANUAL
PARVEEN
COIL TUBING OVERSHOT
TECHNICAL MANUAL

4.0 DISASSEMBLY PROCEDURES

PRE-DISASSEMBLY

PRIOR TO DISASSEMBLY VERIFY THE APPROPRIATE ASSEMBLY DRAWING IS


USED TO AID IN THE IDENTIFICATION OF COMPONENTS IN THE ASSEMBLY
(REFER TO BILL OF MATERIAL).RECORD THE ASSEMBLY MODEL NUMBER AND
SERIAL NUMBERS OF THE COIL TUBING OVERSHOT.

DISASSEMBLY
1. CLAMP DOWN ON THE BODY (1) (ENSURE NOT TO CLAMP THROUGH
THIN SECTION IF POSSIBLE, AVOID USING EXCESSIVE FORCE IN VICES
ON THIN WALLED SECTIONS OF PARTS) TO PREPARE FOR REMOVAL OF
TOP SUB (2) FROM THE BODY (1).PREVENT THE TOP SUB (2) FROM
RELEASING RAPIDLY WHICH IS UNDER SLIGHT SPRING LOAD.
2. REMOVE THE SPRING (4) FROM THE BODY (1) ALLOWING THE GRAPPLE
(3) TO BE REMOVED.
PARVEEN
COIL TUBING OVERSHOT
TECHNICAL MANUAL

5.0 ASSEMBLY PROCEDURES


PRE-ASSEMBLY PREPARATION CHECK LIST

1. ASSEMBLY AREA SHOULD BE CLEAN.


2. COLLECT THE PROPER TOOLING AND THE TEST FIXTURES.
3. VERIFY THAT THE MOST CURRENT ASSEMBLY PRINT IS USED.
4. ENSURE COMPLETE TRACE-ABILITY EXISTS FOR ALL COMPONENTS
5. CLEAN ALL COMPONENTS WITH A SOLVENT AND BLOW THEM DRY
PRIOR TO ASSEMBLY
6. PRE-INSPECT ALL CRITICAL DIMENSIONS, VERIFY THAT ALL PARTS ARE
IN GOOD CONDITION, BY VISUAL INSPECTION IN GOOD LIGHT AND WITH
MAGNIFICTION WHERE REQUIRED.
7. ENSURE THAT ALL THREADS AND EDGES ARE CLEAN AND FREE OF
BURRS, SURFACE DEFECTS AND MARKS.INSPECT COATINGS FOR
CONTINUITY. INSPECT FOR PHYSICAL DAMAGE OR CORROSION.

DO NOT USE WORN, PITTED OR DAMAGED PARTS.

ASSEMBLY
1. PLACE THE BODY (1) IN A SOFT JAWED VICE.
2. INSTALL THE GRAPPLE (3) IN BODY (1).
3. INSTALL THE SPRING (4) IN BODY (1).
4. ASSEMBLE THIS SUB-ASSEMBLY WITH THE TOP SUB (2) THUS
COMPRESSING THE SPRING (4).