Rankirimada Temple
Rankirimada Temple
Rankirimada Temple
Prepared by Checked by
Recommend by Approved by
PROJECT NAME :- ESTIMATE FOR TOILET BLOCK RANKIRIMADA TEMPLE AT DOLUWA
T D S DISCRIPTION T D S DISCRIPTION
1.0 Excavetion foundation 24.92 CL
2. R.R.M work 1.00 25.92
3.1:3:6 concrete screed and
floor
ddt
1.00 24.92
4. cement blocks work 57.62 1.0
5. slab concrete 1.63 24.92
6.r/f tor steel
7.form work 1.63 m3
8.internal plaster
9.external plaster 4. cement blocks work
10.sofit plaster 25.59 CL
11.wall tiling 6.00 153.54 25.92
12. floor tiling ddt T joint
13.squating pan 0.3
14.110 mm pvc pipe 25.59
15.panal door with frame ddt for opanings
16.Concrete fan light 5.5
17. bib tap 2.50 13.75 12.85 m2
18.20mm p.v.c pipe
19.septik tank 1.0
20.plinth plaster 1.5 1.5
21.internal painting
22.External 15.3
painting 138.3
12.85
5. slab concrete
CL 9.83
5.83 0.41 m3
16.96 0.25 14.33
12.96 0.41
29.92
6.r/f tor steel
24.59 1.0 Excavetion foundation 24 7.66 183.84 10 mm
1.33 CL 56.04878 34.75 Kg
1.75 57.23 25.92 34.75
1.62 ddt
1.33 9.83 7.form work
24.59 5.83 57.31
2.00 1.00
1.50 3.00 17. bib tap
18.00 1.00 1.0 Nos
135.54
12.60 18.20mm p.v.c pipe
10.sofit plaster 4.0 4.0 m
9.83
5.83 57.31 19.septik tank
ddt 1.0
25.59 4.35 m2 1.0 Nos
0.41 10.49
46.82 20.plinth plaster
4.35 28.59
1.00 28.59
11.wall tiling 2.66 2.66 m2
25.59
3.00 76.77 21.internal painting
6.21 m2 s.a.b
2.5 6.16 m2
4.0 10 ddt
66.77 22.External painting
6.21 s.a.b
12. floor tiling 12.60 m2
2.00 3.75
3.75 28.13
ddt
2.00 1.50 2.20 m2
1.50 4.50
23.63
2.20
14.squating pan
2.0 2.0 Nos
Prepared by Checked by
DIVISIONAL SECRETARIYAT -IBBAGAMUWA - PROGRESS CLAIM
PROJECT NAME - TOILET BLOCK SARANANKARA DAHAM SHCOOL AT RANKIRIMADA TEMPLE , DOLUWA
CONTRACTOR - Rankirimada rajamaha viharastha dayaka sabawa
G.N. DIVISION -Doluwa CLAIM NO - 01
QUANTITY
ITEM CORRECTED
DESCRPTION OF WORK BOQ UNIT WORK RATE AMOUNT REMARKS
NO BOQ QTY PAID AMOUNT
NO. DONE
Excavation in trenches for walls/ column pits in
ordinary soil from 0 - 1500 mm deep and
1.0 depositing excavated material to a distance not
exceding 30 m (Earth work support to be paid
seperately where necessary).
1.0 m3 1.62 2.21 2.21 989.00 2185.69
Cement concrete 1:3:6(40 mm) in floors and
2.0
foundation 2.0 m3 0.23 0.32 0.32 12685.00 4059.20
Random rubble masonry in cement mortar 1:5 in
3.0
deeper levels 0- 1500 mm 3.0 m3 1.63 2.53 2.53 10273.00 25990.69
100 mm thick solid block masonry in cement and
4.0
sand mortar 1:5 4.0 m2 12.85 15.38 15.38 1693.00 26038.34
Cement concrete 1:2:4(20 mm) in floor slabs in
5.0 ground floor 5.0 m3 0.41 1.04 1.04 22275.00 23166.00
Tor steel reinforcement to lintels, slabs, beams
6.0 and columns bent to shape laid in position and
tied with G.I. Wire as directed. 6.0 Kg 34.75 77.55 77.55 240.00 18612.00
12 mm thick plywood formwork in slabs
7.0
including dismantelling 7.0 m2 6.04 10.32 10.32 1398.00 14427.36
16 mm thick plastering to wall in lime cement
8.0 and sand 1:1:5 finished smooth with lime putty
floating. 8.0 m2 6.16 15.12 15.12 848.00 12821.76
16 mm thick plastering to wall in lime cement
9.0 and sand 1:1:5 finished semi-rough with wooden
float. 9.0 m2 12.60 14.82 14.82 678.00 10047.96
10 mm thick plastering to soffit slab in cement
10.0
and sand 1:3 including floating with lime putty 10.0 m2 4.35 4.72 4.72 1085.00 5121.20
Glazed tiles fixed to walls including bedding in
cement mortar 1:2 and pointing with coloured
11.0 polymer grout ( Approved Sri Lankan, Chinese or
Malasian made - Prime Cost of a 200x300 tile is
Rs. 100.00 without VAT)
11.0 m2 6.21 7.87 7.87 4114.00 32377.18
300 x 300 mm Homogeneous floor tiles bedded
in 12 mm cement mortar 1:2 and pointing with
12.0 coloured polymer grout (Approved Srilankan,
Malaysian or Chinese made - Prime Cost of a
300x300 mm tile Rs. 190.00 without VAT)
12.0 m2 2.20 4.30 4.30 3977.00 17101.10
Supplying and fixing orrisapan (footrest squatting
pan) with trap including all complete to working
13.0 order. approved quality Chinese or Malasian
made (Prime cost of the squatting pan is Rs.
2,000.00 without VAT)
13.0 nr 2.00 2.00 2.00 6849.00 13698.00
110 mm PVC drainage pipe laid on 100 mm thick
14.0 1:3:6(40 mm) concrete including excavation and
cement concrete haunching. 14.0 m 4.00 4.88 4.88 1369.00 6680.72
Door plywood with 32 mm thick ( Ginthota or
equivalent ) best quality plywood sash 95x70 mm
frame including Union or equivalent branded
mortice lock, brass fittings and (Mee,Kohomba,
Hedawaka, Ketakala ) brass hinges 3 Nos
15.0 125x125 mm, best quality Union mortice lock,
two coats of wood presevative, aluminium primer
under coat and two coats of enamel paint. (Prime
cost of motice lock is Rs. 3,100.00 without VAT)
15.0 m2 0.77 0.00 0.00 14594.00 0.00
Supplying and fixing 12 mm dia plastic, approved
16.0 type bib tap water tec or equivalent
16.0 nr 1.00 2.00 2.00 498.00 996.00
20 mm (1/2") dia. PVC pipes (PNT 14) fixed to
17.0
walls or buried under ground with specials 17.0 m 4.00 7.93 7.93 257.00 2038.01
Supply and placing 600 mm dia. 2440 mm long
precast reinforced concrete septic tank
comfirming SLS 452. Rate shall include
18.0 excavation of the pit and hire charges of
boomtruck for placing and subject to specific
approval by the Divisional Engineer.
18.0 nr 1.00 1.00 1.00 36853.00 36853.00
12 mm thick rendering in cement and sand 1:3
19.0
finished smooth with neat cement floating 19.0 m2 2.66 2.68 2.68 648.00 1736.64
Prepare the surfaces and apply two coats of
20.0
emulsion paint 20.0 m2 6.16 16.32 16.32 296.00 4830.72
Prepare the surfaces and apply two coats of
21.0 weathershield emulsion paint
21.0 m2 12.60 13.20 13.20 335.00 4422.00
Supplying and fixing bronzed anodized aluminum
framed 100 mm single door with 4mm thk
aluminium composite panel (aluminium cladding)
and bronze anodized stainless steel fittings and
other accessories to manufacturer's details and to
the engineer's approval
Ex 1 m 2.71 2.71 16896.00 45788.16
Total 308991.73
I certify -(a) that the above account is correct and was incurred on the above sanctioned estimate/authority and that the price charged is/are according to
regulation /contract fair and resonable: (b) that the works have been properly done. ©that the meterials (marked x)have been taken on charge in the books of
this department.
2.0 Cement concrete 1:3:6(40 mm) in floors and foundation 2.0 m3 0.23 0.32 0.09 12685.00 2,917.55 4,059.20 1,141.65 -
Random rubble masonry in cement mortar 1:5 in deeper
3.0
levels 0- 1500 mm 3.0 m3 1.63 2.53 0.90 10273.00 16,744.99 25,990.69 9,245.70 -
100 mm thick solid block masonry in cement and sand
4.0 mortar 1:5 4.0 m2 12.85 15.38 2.53 1693.00 21,755.05 26,038.34 4,283.29 -
Cement concrete 1:2:4(20 mm) in floor slabs in ground
5.0 floor 5.0 m3 0.41 1.04 0.63 22275.00 9,132.75 23,166.00 14,033.25 -
Tor steel reinforcement to lintels, slabs, beams and
6.0 columns bent to shape laid in position and tied with G.I. 6.0 Kg 34.75 77.55 42.80 240.00 8,340.00 18,612.00 10,272.00 -
Wire as directed.
12 mm thick plywood formwork in slabs including
7.0 dismantelling 7.0 m2 6.04 10.32 4.28 1398.00 8,443.92 14,427.36 5,983.44 -
16 mm thick plastering to wall in lime cement and sand
8.0 1:1:5 finished smooth with lime putty floating. 8.0 m2 6.16 15.12 8.96 848.00 5,223.68 12,821.76 7,598.08 -
16 mm thick plastering to wall in lime cement and sand
9.0 1:1:5 finished semi-rough with wooden float. 9.0 m2 12.60 14.82 2.22 678.00 8,542.80 10,047.96 1,505.16 -
10 mm thick plastering to soffit slab in cement and sand
10.0 1:3 including floating with lime putty 10.0 m2 4.35 4.72 0.37 1085.00 4,719.75 5,121.20 401.45 -
Glazed tiles fixed to walls including bedding in cement
mortar 1:2 and pointing with coloured polymer grout
11.0 ( Approved Sri Lankan, Chinese or Malasian made - Prime 11.0 m2 6.21 7.87 1.66 4114.00 25,547.94 32,377.18 6,829.24 -
Cost of a 200x300 tile is Rs. 100.00 without VAT)
Item Boq item BOQ Actual Excess Saving Actual Excess Saving
Description Unit Rate BOQ Amount
No no Qty Qty Qty Qty Amount Amount Amount
300 x 300 mm Homogeneous floor tiles bedded in 12 mm
cement mortar 1:2 and pointing with coloured polymer
12.0 grout (Approved Srilankan, Malaysian or Chinese made - 12.0 m2 2.20 4.30 2.10 3977.00 8,749.40 17,101.10 8,351.70 -
Prime Cost of a 300x300 mm tile Rs. 190.00 without VAT)
(110,713.30) (110,713.30)
50.75
4.72 m2
11.00 wall tiling 29.50 3.41 100.60
84.70
B.O.Q
Item DISCRIPTION No Length Breadth Depth Quantity Total
. No
No
7.87 m2
12.00 floor tiling 2.00 3.50 4.00 28.00
7.00 3.25 22.75
ddt for opanings 2.00 1.50 1.50 4.50
46.25
4.30 m2
13.00 squating pan 2.00 2.00
2.00 Nos
14.00 110 mm pvc pipe 2.00 8.00 16.00
4.88 m
15.00 panal door with frame
0.00
16.00 bib tap 2.00 2.00 Nos
17.00 20mm p.v.c pipe 26.00 26.00
7.93 m
18.00 septik tank 1.00 1.00
1.00 Nos
19.00 plinth plaster 28.83 1.00 28.83
28.83
2.68 m2
20.00 internal painting 50.83 3.83 194.68
Prepared by Checked by