Mobile Crane Set Up Ckeck List: PROJECT TITLE: OG119-Design & Construction of KIZAD Gas Network Date

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

MOBILE CRANE SET UP CKECK LIST

PROJECT TITLE: OG119-Design & Construction of KIZAD Gas Network Date:

Crane Company: Crane Capacity:


Licence / Permit Type of crane:
Crane Operator Name: Crane I.D.
Crane Rigger/B/M Name:
1.Pre set up check list-Daily
No. Requirements Yes No Comments
1 PPE worn by rigging crew
2 Trained banks man/ rigger present
3 Valid test certificates available
4 Correct crane load chart available
5 Safe load indicator fitted / working
6 Crane operator licensed and competent
2.Crane set up check list (Every crane shift) Riggers check
SL # 1ST Setup 2ND Setup 3rd Setup 4th Setup
(Timing) (Timing) (Timing) (Timing)
1 Ground suitable for the crane set up
2 Location of crane setup
3 Crane in level
4 Crane Wheels off the ground
5 Outrigger blocks in use
6 All outriggers extended fully
7 Crane slew area barrier in place
8 Weight of the load known
9 Tag lines in use
10 Loose lifting gears certified
11 Slinging / rigging of load correct
Crane operator Time: Date: Contact#
Signature___________________
Crane banks man/rigger Time: Date: Contact#
signature____________
3.Spot check by:
Name(s) Signature(s) Time: Company
Work Supervisor:
Engineer in charge:
HSE officer/Engineer:
Mobile Crane Set Up Diagram:
Mobile Crane Set Up Calculation

A=________________
B=________________
C= ________________
D= ________________

Total Weight (C+D) = ________

Maximum Weight Capacity


_____________________

Current % Weight Capacity


A _____________________