CARREER SUMMARY
The mechanical engineer with 20+ years of over-all experience in Oil-Gas,(Offshore/ Onshore/ Subsea),
Thermal power generation sectors ,infrastructure, Airport construction sectors and 18+ years’
experience as QC /NDT-Level-III personnel for materials engineering focused on supporting
mechanical integrity and major Inspection and NDT projects. Providing NDT-Level-III services in
,UT/RT/MT/PT/VT & PAUT/TOFD/IRIS/MFL/ECT for various plant shutdown ,training and certification
for Inspection personnel’s, company staffs .Performing NDT/Inspection contract business-Operations,
Procurement quality-TPI services, Sales and marketing in middle east ,India, Vietnam Bangladesh, and
Nepal regions.
ACADEMIC QUALIFICATION
Bachelor Degree in Mechanical Engineering - 2001 Completed N.I.T- Trichy (Formerly Known as R.E.C-
Trichy) /Bharathidasan University
INDIA
Project : API-579 FFS – AUT/IRIS /MFL/VBT Corrosion Monitoring on Refinery piping & NDT
Supervision.
Plans, supervise, execute and coordinates the Inspection activities on the onshore / offshore process facilities
as per client’s management system. Performing plant maintenance in-service-inspection as per routine
planned maintenance (PM)inspection and ADHOC corrective maintenance. (ADHOC-CM) and NDT-
inspectors/technician Supervision. Interpretation of AUT-C scan Data & RTFI.
Actively contribute to the performance of the IRIS/RFET/MFL/ECT team group in terms of heat exchanger
tubes, Fin fan cooler header tubes e non-destructive examination, fabrication, pipe coating and insulation
activities, Plant Shutdown /Turn-Around activities, manpower recruitment, coordination of
equipment/manpower mobilization /demobilization.
Identifying, Managing the performance of NDT activities and ensuring they are undertaken in accordance
with statutory and/or code requirements Ensuring activities performed meet the stated business objectives and
strategies.
Coordinate /interface with Client’s representatives for relevant quality technical issues. Attending the routine
daily /weekly meeting for sort-out/clarify technical issues, forth coming look-Ahead plan ,Cost-optimized
productivity, and solve problems, goal /objective planning, mile-stones achieved, Delegation of roles etc.,
Monitor the RPO/RSO of radiation safety as per FANR / NORMS -guidelines and procedures.
Reviewing and prioritizing both day to day and future inspection and NDT tasks, and planning, resources and
coordinating all NDT inspection work across the assets including budget estimates.
Performing the regular inspection RT-Crank drive equipment’s as per planned maintenance . Arrange import
& export licenses for Isotope and Projectors Control Projector Leak test of isotope-projectors. Sending the
instrument (Survey meter, EPD and TLD) for calibration and Maintain the records.
Responsible for Health and Safety of work force. Ensure the quality of our services. Recommendations to
management regarding continuous improvement of our NDT services and implement agreed measures.
Review of operating Procedures Dealing direct with the supplier to meet all the requirements for the job &
making the payment request Arrange the prequalification for the Clint and provide all necessary documents.
TANK INSPECTION
Internal visual inspection for the tank bottom surface, all the internal welding joint, all internal bore of
nozzles, annular plate to shell welding joint agitator / mixers and tank settlement as per the given check
list.
PROJECT-1
INSTALLATION OF API-5L- Ø24” CWC /CARBON STEEL SUBSEA PIPELINE /CALM BUOY/PLET/ SC-RISER (SCR) /TIE-
IN /CALM BUOY/PLEM INSTALLATION, FROM HALUL ISLAND TO AL-MORJAN PLATFORM –QATAR WATERS.
PROJECT-2
SUBSEA PIPELINE Ø8” CWC/RISER/GAS & WATER LIFT PIPELINE INSTALLATION, AT DUA SUBSEA- VIETNAM
Pipe line Subsea installation inspection:WELDING (API -1104 /ISO 13847 /SHELL DEP
31.40.00.10) / GMAW-STT
Responsible for preparation of WPS, PQR, WQT, stage inspections like fit up, welding, erection, review
of non-destructive inspection reports of fabrication structures as per approved drawings. Control of
QA/QC personnel, NDT crews to perform the inspection as per the agreed plan. Witnessing of grit
blasting and coating on structures, Dossier preparation and handing over to the client.
Check all documentation to execute the work such as approved welding procedures, Quality Control
procedures, NDT procedures, Codes; standards are available at work site.Check that all applicable equipment
is calibrated and has valid certification.
Welding procedure qualification as per DNV -OS-F101 & ONGC Specification Welder qualification as
per DNV, BS EN 287 & ONGC Specification.
Execute the work as per QAP /ITP & co-ordination with client Maintain the calibration status of
instruments and equipment’s.
Inspection of carbon steel CWC pipe with respect to release note. Reviewing of material test certificate
Respective codes & Standard. Witness the Chemical & mechanical Testing Fit -up /weld-visual/RTFI of
Radiographic Film
Making dimensional and weld map for Riser and subsea Tie in.
Preparation of the documentation for fit -up ,weld visual, field joint coating ,peel test, foam filling ,NDT,
pipe book and Completion certificate Review of Radiographic Films (RTFI)of welds and of Ultrasonic
Testing of Welds
Check installation processes are carried out in accordance with approved procedures & specification &
Inspection and confirmation of welding consumables as per the specifications.
Witness & inspection of all Welding activity, Review of Inspection Documents & Has the authority to
reject defective work.
Automatic Welding System Familiar :Saipem - Passo, STT Presto, McDermott–AWS, Allseas -
Phoenix, Serimer dasa, Vermaat and SAW for double joints.
PAINTING -COATING
Ensure all documentation to execute the work such as approved Painting / Coating procedures, Quality
Control Codes & standards are available at work site. Verify that all applicable equipment is calibrated and
has valid certification.
Field - joint coating inspection, Peel test for cold wrap Coating as per client requirements In fill Polyurethane
foam inspection Making PU samples and measure the Dry density as per the client requirement.
Check Painting / Coating Application processes are carried out in accordance with approved procedures &
specification. Inspection and confirmation of Painting / Coating, Blasting Materials as per the specifications.
Familiared coatings subsea coating systems are fusion bonded epoxy (FBE), liquid, 3-Layer Poly propylene/
ethelene(3-LPP/LE), heat shrink sleeves (HSS) and high density polyethylene (HDPE) pipe coatings.
Check and Witness of Profile, Salt Test, Wet Film Thk. Dry Film Thk., Adhesive Test, Peel Test & Holiday
Test. Witness & inspection of all Painting / Coating activities, Review of Inspection Documents & Has the
authority to reject defective work.
Monitoring coating material (CANUSA) storage conditions thinning, mixing, induction time and pot life of
paint to be applied coating application parameters during application wet film thickness, Witnessing DFT of
paint by means of Non-destructive instrument holiday test for integrity of coating.
HDPE Liner insertion about 2.5 km by Electro Fusion welding carried out by APS-UAE. Monitoring
Prod. uction Quality Test,Tensile Test, HDPE Flange Welding& String Welding ,insertion. Coating of
Chemflake Glass flake epoxy, PU-Protegol 32-55L , Two pack (Interzinc-52& Interzone Epoxy 954.) ZINC
Rich Epoxy, Foam coating, Servi wrap & Rockguard Servi shield. Witnessing the Automated NDT, RTFI,
MPI& PT
Coordination, monitoring the Procurement quality, site inspection pipeline layout supplier documentation
approval and Mechanical Completion Dossier (MCD) builder and responsible for Material Hand Over at
Submission of field inspection reports ( FIR )/ Stage wise Inspection reports (IRN)/ Pre-Shipment Inspection.
Visit to vendor and manufacture shops for Inspections and pre-equipment run inns’ FAT- FACTORY
ACCEPTANCE TEST before shipment to project site if required Inspection of and witness the Utility Boiler
safety Interlock instrumentation commissioning system. Providing the technical support for the process
engineering deliverables.
Establish and implement project specific procedures, Mechanical completion dossier preparation for final
completion. Witness & review the Hydrostatic testing /NDT /PAUT-TOFD,RTFI, Ultrasonic Testing
(UT),MT,PT) etc.
Familiar and up to date with latest Industry standards and ensure compliance of projects design with latest
codes standards.(ANSI /ASME/BSENISO/API-1104/API-5L/API-RP-2X/API-CAT-III /API-RP-7G,DS-1 )
Maintains close interaction with third-party suppliers(TPI), external laboratories, and customers.Witness
& Review Mechanical Destructive testing & their results.
Receive and analyze the scope and specifications for works and services to be contracted, clarifies work
aspects and verifies technical evaluation criteria.
Working knowledge On materials, welding and painting inspection /- On oil / gas processes and
equipment’s BOP/Cross overs, SC-Risers/Lubricators/Conductor/Casing Heads etc.
Review and aligning the Quality Management Systems-Quality manual as per contract requirements.
Preparing/review the Inspection Procedures, Visual Inspection, NDT Techniques, Corrosion Principles &
Failure Modes etc. Planning, Scheduling and Reporting principles.
ITP, QA Plan, WPS & PQR, Fabrication procedures, Hydro test, Heat treatment, and NDT procedures.
Mechanical testing of base materials, PQR test specimens, PTC specimen and stage inspection of above
mentioned items as per Contractual QA Plan.
ReviewTBA’sTQ’s,MR’s P.O’sValves,Pumps,Data sheets and Drawings,Company Technical specification
and provide ITP/QAP coments for VENDOR’s ITP
Review of TPI’s report,coordination with TPI Agencies and monitoring
Review of TPI, FIR’s,IRN’s and issuance of IRN
Review of MRB’s and submission to company
PEDESTAL CRANES
The 38” OD onshore pipe line scope extends from the Khursaniyah landfall (onshore/offshore interface
point) up to the scrapper facility at Khursaniyah gas plant; it is an integral part of the 38”OD pipe line
from TP-1 platform at ALmorjan to Halul Offshore field.
Project-35KM for cross country onshore and 80 KM for offshore) for sour services (trunk line).
Material – API 5L Gr B,X42,X46,X52 & X60-DIA 38”, 30mm thick-24M Length double joint - long seam
and girth welded pipe with FBE coated both internally and externally.
Review and qualifying the contractor Pipe line Welding procedures WPS & PQR as per the API 1104, ANSI
B31.8 & B31.4. (Welding process SMAW,GMAW-STT & SAW and combination of welding process with the
pipe material API 5L Gr X60, electrode and filler wire Atom Arc E-7018,ER70S-6(STT) &E71T-1M ,No
PWHT with Impact test at -20°C, With Hardness for Sour Services).
Procedure qualification requirement of – Sour services.
ER 70S-6 used for sour services the chemistry of wire limited with NACE-SP0472.
Review the contractor piping procedures qualification as per the ASME Section IX.
Review and qualifying WQT as per the API 1104, ANSI B31.8 & B31.4.
Review and approval of NDT procedure and qualifying NDT personal as per the company specification.
Incoming pipe material inspection including verifying heat number, pipe number etc.
Verifying welding equipment calibration for each station.
Verifying welder(s) have been issued job clearance card and that range of qualification shown matches
the application of WPS being used.
Witnessing fit up, pre heat temperature and inter-pass temperature.
Consumables inspection for each process (GTAW, SMAW, GMAW and FCAW). Including storing condition
and backing for low hydrogen electrode.
Monitoring in process welding activities and auditing for welding parameters (travel speed, voltage,
current, inter pass temperature, heat input and comparing with used WPS.
PRESSURE VESSEL:
Initial visual inspection in open condition through man way or access through confined face entry to record
condition of vessel and internal apartness.
Detailed internal visual inspection after cleaning of the shell surface, bottom and top dish, all the internal
welding joint, internal bore of all nozzle ( after removal of product deposit or chocking), vortex breaker,
impingement plate, baffle plate , demister pad & mesh, Agitators/mixers and vessel apartness.
Offering appropriate NDT method for internal welding joint were susceptible to crack and all internal nozzle
welding joint either MPT or PT test & UTG.
Evaluating noticed pitting, corrosion, crack and damages part and making recommendation for repair.
Reporting all visible of deterioration or questionable condition.
Calculating metal loss, corrosion rate, remaining life and next inspection interval were having thinning.
HEAT EXCHANGER:
Initial visual inspection in open condition after removal of channel head and tube bundle (patrician plate,
internal nozzle welding and internal surface, gasket sheeting face for nozzles, both channel and shell side for
gasket seating face for any pitting, corrosion and damages, tube sheet to tube seal welding joint , tubes, tie
road &spacer , baffle plate ,bearing plate etc. )
After the cleaning detailed visual inspection in both channel internal surface, nozzle surface and welding joint
and patrician plate and in shell side internal visual inspection for the shell surface, nozzles, all internal
welding joint and the U tube bundle after the cleaning of water jetting visual inspection of U tubes, baffle
plate, tie rod & spacer, bearing plate, tube seat to tube seal welding joint for any erosion / corrosion, fatigue
and damages.
Exchanger’s inspection by leak test, snoop test, ultra probe sensitivity test and internal tube failures by
boroscopic test including photography and videotape.
Column
Initial visual inspection in open condition through each man way or access through confined face entry to
record condition of vessel and internal apartness.
Detailed visual inspection after cleaning for the distributor pipe, all internal welding joint, nozzles all internal
welding joint and internal bore of all nozzles , cladding , mesh demister , each filter tray top to bottom,
blowing down comer , plate seal pan etc.
Offering appropriate NDT method for internal welding joint were susceptible to crack and all internal nozzle
welding joint either MPT or PT test & UTG.
Evaluating noticed pitting, corrosion, crack and damages part and making recommendation for repair.
Reporting all visible of deterioration or questionable condition.
Calculating metal loss, corrosion rate, remaining life and next inspection interval were having thinning.
CLEAVELAND BRIDGE ENGINEER – JEBAL ALI UAE One of the leading EPC Contractor in the field of
Power Plant Design, Procurement and Erection & Commissioning of AIRPORT Structural projects in and Around UAE.CV
approved by Dubai Civil Aviation Authority,DUBAL,& ZADAF Port
Fabrication, examination, testing & erection of Penstock pipes (Material SA 517 GR. F)
Organising routine inspection of: Pipe spools fabrication, witness of NDT & erection activities at site.
Reviewing fabrication, hydro test, heat treatment and Non-destructive examination procedures.
Inspect, test, or measure materials, products, installations, or work for conformance to specifications.
Discard or reject products, materials, or equipment not meeting specifications.
Analyze and interpret blueprints, data, manuals, and other materials to determine specifications, inspection
and testing procedures, adjustment and certification methods, formulas, and measuring instruments required.
Shutdown & Maintenance Inspection of Vessels, Piping, Valves etc, Inspection of fabricated items, such as
Heat Exchangers, Columns, Spheres, Storage Tanks etc.
Leading the NDT team for shutdown project, participation in weekly or daily basis meeting at site.
Interact with the client regarding for job, Resolve the client problem or doubts with discussion of senior
person.
RLA (Residual Life Assessment) of boiler in HPCL, BPCL, and some in sugar factory.
Cross-country pipeline welding, Ultrasonic & Interpretation of Radiographic inspection.
Radiography film interpretation of different types of welding & casting jobs.
Hardness testing , Ferrite content measurement of different types materials.
Carry out inspection of pressure vessels weld visual dimensional inspection, maintenance of Plant.
Observe and monitor production operations and equipment to ensure conformance to specifications and make
or order necessary process or assembly adjustments.
Measure dimensions of products to verify conformance to specifications, using measuring instruments such as
rulers, calipers, gauges, or micrometers.
Interacting with third party inspection agencies like NPCIL, LLOYDS, EIL/CEIL, BVIS, DNV etc. and
offered the stage wise inspection as per QAP/ITP.
International and National codes such as ASME SEC III, SEC VIII division 1 & 2, ASME B31.3, BS/PD 5500, API,
Experienced in evaluating, characterization and mechanical testing of ferrous and non- ferrous materials as
per ASTM, ASME, BS, ISO, EN, DIN, BIS & other standards.
Adept in codes such as ASME Sec. II, III, V, VIII Div.1 & 2, IX, ANSI B 31.3, 31.4, 31.8, BS 5500, TEMA, API,
Basic knowledge of design, welding technology, metallurgy and heat treatment procedures.
PLANT SHUT DOWNS WORKED… ON CALL OUT BASIS….. AS ADHOC –PLANT INSPECTOR
Plant maintenance Turn-Around Activities: Involved in supervision & witness of welding/NDT on Tie-In, Hot-
Tapping and corrosion mapping during shutdown of various Oil & Gas, refineries and plants
MRPL- Heat Exchanger Tube Inspection, FL & IRIS, RFET ,ET GRTA’07
Lead Auditor Quality Specialist for Retail Petrol Bunk Outlets ,BPCL,INDIA-Audit 2006
B.P.C.L- Refinery CDU & VDU-Modification Project,Mahul Mumbai, INDIA March -April Shut Down’2002
Well internal and external inspection experience in various type of Piping classes in EQUATE petrochemical
company units like EU/ EG/ UTL/ PP / PE.
Conducted all NDT tests like UT, RT, MPT, PT & VT for their different units likes EU/EG/PP/UTL/PE.
Carry out all NDT testing including ultrasonic testing for RBI jobs (Risk based inspection).
External visual inspection by given frequency like painting damages on non insulated process piping, process
leak, external environmental corrosion as per the given external check list.
External visual inspection for insulated piping likes damaged insulating, missing insulation, process leak as
per the given external checklist.
Corrosion monitoring by given frequency and piping classes by various NDT like UTG, UT and profile
radiography.
Calculating minimum required thickness, corrosion rate both long terms and short terms, remaining corrosion
allowance and remaining life
Find outing In-services crack in piping existing weld likes stress corrosion crack, hydrogen induced crack,
pitting in weld by ultrasonic angle beam shear wave methods by given frequency and continuous monitoring
PRESSURE TEST:
Witnessed out hydrostatic pressure test of complete system of boiler No #1, boiler No # 2 and boiler No # 3
for given frequency every year in EQUATE PETROCHEMICAL COMPANY.
Witnessed hydrostatic pressure test for various piping classes after the repair work.
Witnessed pneumatic pressure test for various piping classes after the repair work.
Witnessed pneumatic pressure test for various pressure vessels, exchangers, pump for given frequency.
Witnessed for hydrostatic and pneumatic test for newly fabricated various piping system and classes.
Witnessed snoop leak test for heat exchangers.
Witnessed services leak test for various piping line system if not possible to do hydrostatic test pressure.
Witnessed hydrostatic test for flexible hoses – like chemical, steam, utility and N2 Hoses.
PERSONAL DETAILS
Nationality : Indian