Estimate Bungalow
Estimate Bungalow
Estimate Bungalow
BILL OF MATERIALS
CLEARING AND GRABBING
LENGTH WITDTH AREA((SQ.M.) M/COST L.COST(40%)
7.83 12 93.96 TOTAL: 6,577.20 2,630.88
EXCAVATION:
STRUCTURE DIMENSION PIECES VOLUME U-COST M/COST L.COST(40%)
Length Width Height cu.m pesos pesos
Site Excavation Footings 81.4 0.5 0.6 1 24.42 400.00 9,768.00
1.2 1.2 1.7 16 39.17 400.00 15,667.20
TOTAL: 25,435.20 10,174.08
CONCRETE WORKS
STRUCTURE DIMENSION PIECES VOLUME
Length Width Height pcs. cu.m
Footing 1.20 1.20 0.30 16 6.91
Columns 0.30 0.30 3.90 16 5.62
Beams 60.50 0.20 0.30 1 3.63
Wall Footing 81.40 0.50 0.20 1 8.14
Flooring 12.00 7.83 0.15 1 14.09
TOTAL = 42.23
MASONRY
STRUCTURE DIMENSION OPENINGS AREA VOLUME
Walls Length Height Width sq.m sq.m. cu.m
Exterior 38 3.1 0.15 14.89 102.91 15.44
Exterior 9.5 0.6 0.15 0 5.7 0.86
Interior 22.3 2.5 0.1 9.24 46.51 4.65
TOTAL: 155.12 20.94
STRUCTURE DIMENSION OPENINGSAREA QUANTITY U-COST M/COST L.COST(40%)
House Walls Length Height sq.m sq.m. pcs. pesos pesos
Exterior 6"CHB 38.00 3.90 14.89 133.31 3554.93 15.00 53,324.00
Exterior 6"CHB 9.50 0.60 0.00 5.70 152.00 15.00 2,280.00
Interior 4"CHB 22.30 3.10 9.24 59.89 1597.07 12.00 19,164.80
TOTAL: 74,768.80 29,907.52
LOCATION dia.bar bar(L) no. bar bar T.wt (kg) no. M/COST L.COST(40%)
CHB BAR 12mm 6 73.24 0.888 390.22 1 19,511.14 7,804.45
DESCRIPTION RATIO PIECES U-COST M/COST L.COST(40%)
Cement 1 352.89 bags 300.00 105,868.13
Sand 2 19.76 cu.m 350.00 6,916.72
Masonry Volume = 19.2488 TOTAL: 112,784.84 45,113.94
CARPENTRYWORKS
DESCRIPTION DIMENSION AREAPROD.AREA PIECES U-COST M/COST L.COST(40%)
Length Width sq.m sq.m pcs. pesos pesos
Ceiling Gypsum board
7.00 12.00 84.00 2.88 29.17 500.00 14,583.33
1.2m x 2.4m x 12mm thk
2.00 5.00 10.00 2.88 3.47 500.00 1,736.11
PLUMBING FIXTURES
DESCRIPTION QUANTITUNIT U-COST M/COST M/TOTAL L.COST(40%)
pesos pesos
Water Closets 2 set 5000 10000
Kitchen sink 1 set 3000 3000
Lavatory Faucet 2 set 500 1000
Lavatory 1 set 2500 2500
Shower heads 2 set 2500 5000
Faucet 4 pcs. 250 1000
Floor drain 3 pcs. 250 750 TOTAL: 23,250.00 9,300.00
PLUMBING FIXTURES
DESCRIPTION QUANTITUNIT U-COST M/COST M/TOTAL L.COST(40%)
pesos pesos
Convenience Outlet (Duplex Universal) 9 set 70 630
Aircon Outlet (Single) 2 set 90 180
Lighting (2 gang switch with LED) 2 set 80 160
Lighting (1 gang switch with LED) 4 set 50 200
Ceiling Receptacle 8 set 15 120
Electrical Flexible Hose (100 meters) 1 set 850 850
Wire and Cables 1 lot 3000 3000
Electrical Panel Board (Delta brand) 1 set 370 370
Safety Breaker 3 set 370 1110 TOTAL: 6,620.00 2,648.00
T/TOTAL
35,609.28
T/TOTAL
165,656.11
T/TOTAL
153,106.46
T/TOTAL
104,676.32
T/TOTAL
85,896.36
T/TOTAL
65,780.56
T/TOTAL
188,498.24
T/TOTAL
66,500.00
T/TOTAL
4,256.00
67,606.00
T/TOTAL
27,315.59
T/TOTAL
157,898.78
T/TOTAL
22,400.00
14,000.00
26,880.00
T/TOTAL
65,800.00
T/TOTAL
32,550.00
35,000.00
T/TOTAL
9,268.00
42,000.00
T/TOTAL
129,356.44
1,509,262.22