NITROGEN GAS PURIFIER
ISPEC.No.
332147
SPECIFICATION
MODEL ~ : JIP-100E-S
SERIAL No. : D-2419
aes] 4
seat] 1 JAPAN PIONICS CO.,LTD
Ax TOKYO JAPAN
Heng] 1 | <3> i
ee] [<>] 9 > yl mortification Yrastihe Werte Jn Tit. i
pael2|| Apr. 2, '98 Written C Hiramato Lois S
it | 9 |REV DATE DESCRIPTION BY CHK'D APP'DJIP-1008-$
se1472
Specifications of Gas Purifier
1, Name of purifier: Nitrogen Gas Purifier
2. Type : JIP-400E-S
3. Capacity : 4100 Nm3/h
4.Delivery time: Jun. 51996
5.Delivery place:
Delivery conditions : O EXwarehouse
WW Fos.
O CLF.
6. Acceptance : Acceptance shall be finished at the time of completion of
delivery steps
7. Guarantee
7A
7.2
Performance guarantee
We will guarantee the following items provided that the raw material and
utilities are supplied continuously and constantly under the conditions of specified
in this specification at battery limits (B/L)
a.) Product capacity 100 Nm3/h
b.) Product purity or composition
Product purity stated in item No. 9.1 .
Mechanical guarantee
To any mechanical trouble(s) occurred within 12 months after the date of
completion of delivery, and such trouble(s) are proved evidently caused by our
material selection, faulty design and workmanship, we will remedy such trouble
at our burden with replacement or repairing of such faulty part(s) or equipment(s).
To the trouble(s), however, caused evidently by acts of god or by your
mistake(s) or by reasons beyond our control, we shall be released our responsi-
bility.LIP-1008-S,
se-41472
7.3 Confirmation of performance of the facility
To the performance of facility, we will confirm through various
inspections and tests stated in item No. 10 which will be carried out at our factory.
Customer's Presence 5 O Yes
No
8. Purification principle and features
Purification principle
Impurities (oxygen, carbon monoxide, carbon dioxide, and water
vapor ) in the raw gas are adsorbed in a purifier filled with catalyst and adsorbent.
2 trains of purifier are contained in facility and each train performs
alternately purification and regeneration. During one train is in purification,
another is in regeneration or stand by.
Features of facility
1) Stainless products are utilized to the part to be contacted the gases.
2) The purified gases are strictly protected from contamination by utilizing of the
pipes and fittings cleaned by oil free treatment , washing, bright annealing,
ete.
3) All connections of facility are accepted the materials and workmanship which
possible to prevent any leakage or induction of gases.
4) Optimum purification cycles are selected depend upon the composition of raw
gas and flow rate of gas supply.
5) Inert gases can be removed its containing oxygen without adding hydrogen gas
at ambient temperature, and therefore , no cooling devices is required.
6) Itis electro polished, 0.01 #m filter at pure gas outlet, and the inside of
piping behind it.JIP-100E-S,
sear?
9. Specification of facility
9.1 Conditions of gases
Regeneration gas
Feed gas Purified gas A B
(Nm*fhx h) (Nm'/n xh)
Name of fluid Nitrogen > Purified gas | 2% Hydrogen
its self J Nitrogen
Flow rate : Nm*h 100 / 103.7 100 37x 13 3.7.x 2
Pressure : barG 7A 64 ins
Temp. :'C 5 ~ 35 5 ~ 35 5 ~ 35 5 ~ 35
Impurities item Vol. ppb Vol. ppb Vol. ppb Vol. ppb
Oxygen 5,000 below 5 below S below} 50,000 below
co, 500 below 5 below 5 below
co 1,000 below 5 below 5 below
Hy 3,000 below 5 below 5 below
Water (Dew point) | -60 T below] -93 T below] -93 C below] -40 T below
Particle (0.1 4m) ‘ipes./of below9.2 Safety devices accessories
JIP-1006-S
Se-1472,
No tem Applicable Action and indication
1 [Temp. abnormal Purifier H 310T Buzzer, Lamp
(TICATIA- Heater breaker trip
1A2A3A Purification continues
1B,28,3B) Regeneration stops
2 [Temp. abnormal Purifier H 410C | Buzzer, Lamp
(TICA,TIA-4A,48) Heater breaker trip
Purification continues
Regeneration stops
3 [Temp. abnormal Purifier Ec 190 | Buzzer, Lamp
(TIA-1A,24,38 Purification continues
18,28,38 Regeneration stops
4 |Temp. abnormal Purifier L 290C Buzzer, Lamp
(TIA-48,48) Purification continues
Regeneration stops
5 [Emergency stop Push Purification continues
EMG.stop Regeneration stops
switch Main breaker trip
Heater breaker trip
6 [Control power Circuit Main breaker trip
loverload breaker Purification continues
(C80) Regeneration stops
7 [Power failure Purification continues
Regeneration stops
Restarting to operate after
Tecovery of power
H = Upper limit , L = Lower limit
+) We can not guarantee the purity of purified gas.9.3. Operation
Purification — (
96 hours)
Regeneration ( 24hours )
Electric heating
Heater source
9.4 Utilities
Power
JIP-1008-8
Se-1472
Switching alternately
@ Automatic
Automatic
O Semiauto
AC220V , 50 Hz , Single phase
Consumption 0.7 kW
He=74Nih , N2=3.7Nm/h
Height(mm) — Weight(kg)
Installation 9.0 kW
Regeneration gas 2%HeINe , Mixed gas
Flow rate,
Press. 1.0 ~ 3.0 barG
Instrument air Press. 5.0 ~ 7.0 barG
Dew point. -40 °C below
9.5 Dimension and weight
Width(mm) —Depth(mm)
Purifier 1,700 650
Control panel
9.6 Connection
1,800 1,500
be produced by L'AIR LIQUIDE.
No Name Nominal size Material Remarks
1 | Feed gas Inlet_ | 32A (0.0.42.7) | SUS316L | JIS10K O-Ring Flange
2 | Purified gas Outlet_|32A (0.0.42.7)| SUS316L | JIS10K O-Ring Flange
3 | Regeneration gas | Inlet | 4/2" (0.0.12.7)| SUS316L | Male VCR
4 | Waste gas Outlet | 4/2" (0.0.12.7) | SUS316L | Male VCR
5 | instrument air Inlet 4mm NYLON | Quick-fiting joint
6 | Inst.air for air- Inlet / 4mm NYLON, Quick-fitting joint
operated valve Outlet
( from control
panel to purifier )
89JIP-100E-S.
se-1472
9.7 Painting
Purifier : 12-440 (by Japanese Paint Industry Association )
Control panel :
10. Inspection and test
10.1 Observation =: Dimension and action test
10.2 Pressure test :
Pressurize to 12 barG with He gas and hold it for 30 minutes.
No abnormal is acceptable.
10.3 Leakage test :
Pressurize to 11 barG with He gas and hold it for 12 hours.
No practical pressure drop is acceptable.
10.4 Electrical insulation resistance test
2 Meg-ohm resistance or over in the circuit by 500 Volt D.C.
Megar is acceptable.
10.5 Performance test
Confirm specified flow rate and quality of product gas under the condition
of this specification,
Applicable analyzers :
for water content APIMS
for oxygen @ apims
for COz apims
for CO J RGA
for Ha M RGA
for particle Laser particle counter
10-6 Items test or inspection at presence of customer
Items to be confirmed of test or inspection by customer which will be carried
out at our factory are
Two items of No. 10.1, and 10.5.
For other items confirmation of test results may substitute to them.
osJIP-A00E-S
se-t472
11. Documentation to be presented by us
After order is settled, we will submit following documents
Manufacturing Specification : 4 copies
(include wiring DWGs)
Instruction manual : 2 copies
Results of test and inspection : 2 copies
12. Special mention
1) Pressure vessels , Piping and Instrument parts
Be supplied by JAPAN PIONICS.
2) Electrical parts
Be supplied by L'AIR LIQUIDE.
[Note] Control unit is planning by L'AIR LIQUIDE, and is produced,
You submit fabrication drawing to us before producing, and get our
compliance,