COURSE : BSR 304 – CONTRACT AND CONSTRUCTION MANAGEMENT

DATE OF SUBMISSION : 18th JAN 2021


LECTURER: DR AN NISHA NUR WELLIANA BINTI ABD RASED
ASSESSMENT : FINAL ASSIGNMENT (COMBINE PART A AND B)
BUILDING SURVEYING DEPARTMENT
FACULTY OF ARCHITECTURE, PLANNING & SURVEYING
UNIVERSITY TECHNOLOGY MARA (UiTM)PERAK
SERI ISKANDAR CAMPUS

This assignment is divided into two parts: tender and project management. The report needs to be
generated based on Monthly Progress Report. Please submit only one main (1) report for each group.

Question 1 - TENDER ADVERTISEMENT (GROUP ASSIGNMENT)

You are required to select one (1) development project that is still under construction progress (based on
monthly progress report) and prepare one (1) tender advertisement based on the project (assume that the
project has not started, and tender advertisement is being made to appoint a suitable contractor).

The advertisement calling for tenders for services related to a government project must be clearly stated.
(not limited to):

i. The name of the department sponsoring the building project


ii. The type of service/contract required (e.g 'construction services', 'architectural services',
'project management services')
iii. The project title, location, project reference number, and a brief description of the nature of
the work
iv. How and where the interested service providers/contractor may collect the relevant
documentation (which may include downloading the documents from a secure website)
v. Contact reference
vi. The tender closing date and time, along with the place for lodgement of submissions
                   (i.e. the location of the tender box if required for regional tenders)

Question 2 - PROJECT MANAGEMENT (GROUP ASSIGNMENT)

Project Management is the management of one particular project or work, to develop and implement an
innovation or change in an existing operation or organization. Project management should encompass
planning and control the project activities subject to resources, budget and time constraints to keep the
project on schedule.

You are required to select one (1) development project that is still under construction progress (based on
monthly progress report) and review thoroughly on these following contents:

i. Table of Contents (possible to compare with others project)


ii. Comment on total progress work on site (current/delay/ahead)
iii. Explain on the Work Programme (numbers of task and duration)
iv. Weather chart (effected activity if any)
v. Plant and machinery (if any)
 The report should not be taken from the lecturer note directly and must contain information that
gathered from other sources. 
 The length of the main report should be MORE than 5 pages for both questions.

SUBMISSION DATE

Please submit online via GC by not later than 18/1/2021

EVALUATION SCHEME

o Introduction / comply with instructions - 10%


o Content and originality
      -    Tender and Project Management
  -     Elaboration - 50%
 Format and organization - 30%
 References -   5%
 Dateline -   5%
                        TOTAL                          100%