(Project Name) : Inspection Checklist - Tiling (Floor & Wall)
(Project Name) : Inspection Checklist - Tiling (Floor & Wall)
(Project Name) : Inspection Checklist - Tiling (Floor & Wall)
#: _____________
[PROJECT NAME]
Inspection Checklist - Tiling (Floor & Wall)
Inspection criteria (2) Pre & Post Screeding Post-Installation of Floor & Wall Tiles
Consistency of Colour
RS Re-Verification (3)
Gradient at Wet Area)
Positioning of Fixings
RS Accepted Works
Water Ponding Test
Free from Damage,
CWP Pressure test
MC Rectification (3)
MC Rectification (3)
RS Verification (3)
RS Verification (3)
Floor Level Pegs
RS Approval to
Wall Alignment
Water proofing
proceed works
Remarks
Location (1)
9 Bedroom 2 N/A NA NA
10 Bathroom 2
11 Bedroom 3 N/A NA NA
12 Bathroom 3
13
Checked/Verified by: MC RS MC RS MC RS MC RS
Signature
&
Date
Tiling Quality KPI = Nos. of location accepted by RS after Re-Verification @ Post-Inst. / Total locations x 100% =
Notes:
(1) Change the location in this checklist according to the product layout. For high-rise project, to attach a copy of the layout.
(2) See below for acceptance tolerance. MC to mark 'a' in respective location only if workmanship is acceptable (NA if not applicable), then inform RS to verify.
Inspection stage Inspection criteria Acceptance tolerance Tools used
Pre-Screeding Floor level pegs 1 along the wall, intermediate at < 1600mm interval Measuring
Wall alignment (base plaster) 3mm / 1.2m for verticality, horizontality & squareness tape
Cross line
Water ponding testing completed 24hrs Water ponding test passed before proceed with floor screeding. laser
Visual
Post Screeding Floor flatness (2% gradient at wet area) 3mm / 1.2m for flatness Spirit level