Nothing Special   »   [go: up one dir, main page]

Sepco Arabia: King Salman International Complex For Maritime Industries & Services Project

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

SEPCO ARABIA

King Salman International Complex for Maritime Industries & Services Project
Heavy Equipments Maintenance Checklist/ Log
SEPCO Equipment # Equipment Type: Equipment Running Hours:

Mechanical Maintenance Electrical Maintenance


Inspection Item NEW Used Remarks Inspection Item Yes No Remarks
Oil Oil
(LTR) (LTR)
Head Lights Working
Change of Engine Oil
Back Alarm Working
Inspection Items Yes No Remarks Indicator Working
Transmission Oil Condition Battery Condition
Gear Oil Condition Safety Lights Working
Axel Oil Condition Alternative Working
Oil Filter Condition Comments:
Fuel Filter Condition
Hydraulic Filter Change
Air Filter Condition AC Condition Yes No Remarks
Hydraulic Cylinder AC Working Properly
Condition
Engine Running Condition Gas Problem
Any Leakage Other Problem
Bucket Condition Any Other Defect / Problem
Tire /Breaks Pads Condition 1.
Fan Belt Condition
2.
3.
Radiator Condition
4.
Lubricant Condition

Driver Signature Mechanic Signatures

Used oil Receiver Signature


In CO Work shop:

NOTE: All equipments Maintenance Running Hours are 300 – 400 hrs

You might also like