Facade Front-Elevation: at Axis A
Facade Front-Elevation: at Axis A
Facade Front-Elevation: at Axis A
0 1 5 SECTION PLAN
UE
FACADE FRONT-ELEVATION
TR
AT AXIS A PLANT
PLATFORM NOTES:
FOR CHILLER
SMOKE SMOKE SMOKE SMOKE 1: MV AND MAIN LV POWER CABLES ARE MOUNTED ON CABLE LADDERS. ALL OTHERS ON CABLE TRAYS.
ESCAPE ESCAPE ESCAPE ESCAPE 2: WALL DUCT SIZES FOR SMALL AUXILIARY SERVICE PIPES TO BE CONFIRMED BEFORE PLACING.
3: FINAL LOCATIONS AND DIMENSIONS OF RECESSES AND OPENINGS TO BE CONFIRMED BY
CORRESPONDING SUPPLIERS (E.G. ELECTRICAL, HVAC, AUXILIARY UTILITIES).
4: AUTOMATIC SPRINKLER SYSTEM IS COMPLYING WITH NFPA 13.
TANKING:
EXHAUST
AIR
EXHAUST
AIR
EMERGENCY
EXIT
EXHAUST
AIR
EMERGENCY
EXIT
EXHAUST
AIR
EMERGENCY
EXIT
EXHAUST
AIR
EXHAUST
AIR
EARTHING:
1. WELDED STEEL WIRE FABRIC (FLAT GRID GALVANIZED) TO BE LAID INSIDE THE SCREED AND INTERCONNECTED
WITH THE FOUNDATION GROUNDING. FOR DETAIL LOCATION REFER TO SCHEDULE OF FINISHES.
2. EARTHING DETAILS OF SPECIFICATION "11-YE90-D-603, PUMP STATION EARTHING SYSTEM, EARTHING DETAIL
CABLE DUCT TO CABLE DUCT TO CABLE DUCT TO CATALOGUE ", HAVE TO BE CONSIDERED.
VSD BUILDING MAIN PUMP HOUSE MAIN PUMP HOUSE
LEGEND:
STRUCTURE:
REINFORCED CONCRETE PRECAST CONCRETE SANDWICH PANEL
GRAVEL
SERVICE PIPES:
21 20 19 18 17 16 15a 15 14 13 12 11 10 9 8 7a 7 6 5 4 3 2 1 0 HVAC:
E-SYMBOLS COMMUNICATION
EMERGENCY EMERGENCY
EXIT EXIT
EMERGENCY
SUPPLY AIR SPRINKLER RELEASE SUPPLY AIR SUPPLY AIR SPRINKLER RELEASE
FAN 3 STATION
ACCU UNIT 1B ACCU UNIT 1A FAN 2
EXIT
FAN 1 STATION
TRANSFORMER 2 TRANSFORMER 1
REFERENCE DRAWING:
DRAWING No. TITLE
SMOKE SMOKE
ESCAPE ESCAPE
KINGDOM OF SAUDI ARABIA
Project No.
20407 SHUQAIQ WATER TRANSMISSION SYSTEMS - PHASE 3
ENGINEER
ROAD ROAD
CONTRACTOR
C 2 2 - Z G 2 0 - S - 7 0 1 8 6/8 A
SUB-
CONTRACTOR FINAL ENGINEERING: IBG Ltd.