1. The document is a daily welding visual inspection report from PT. Jurong Engineering Lestari for Samsung C&T.
2. It details 4 welds that were inspected on September 5, 2020 between materials AlMgSi0.5.
3. Photos were taken of the welds as part of the inspection process to check for any defects.
1. The document is a daily welding visual inspection report from PT. Jurong Engineering Lestari for Samsung C&T.
2. It details 4 welds that were inspected on September 5, 2020 between materials AlMgSi0.5.
3. Photos were taken of the welds as part of the inspection process to check for any defects.
1. The document is a daily welding visual inspection report from PT. Jurong Engineering Lestari for Samsung C&T.
2. It details 4 welds that were inspected on September 5, 2020 between materials AlMgSi0.5.
3. Photos were taken of the welds as part of the inspection process to check for any defects.
1. The document is a daily welding visual inspection report from PT. Jurong Engineering Lestari for Samsung C&T.
2. It details 4 welds that were inspected on September 5, 2020 between materials AlMgSi0.5.
3. Photos were taken of the welds as part of the inspection process to check for any defects.
Download as XLS, PDF, TXT or read online from Scribd
Download as xls, pdf, or txt
You are on page 1of 6
Date : 09 Sep 2020
Report No. : J1-SCT-RFI-E11-L0102
Page : 1 of 2 Title : IPB PT. JURONG ENGINEERING LESTARI SAMSUNG C&T
DAILY WELDING VISUAL INSPECTION REPORT
Joint Thicknes Welding Welder Visual Result Pickling No Line-Iso-Drw-Spool Mat'l A Mat'l B Filler Metal Remark No (mm) Date Stamp Date Acc Reject Date 1 J1-EGE-SCT-DRW-E00-0027 15A-L1-575 25 AlMgSi0,5 AlMgSi0,5 5-Sep-20 J0106 S Al 4043 2 J1-EGE-SCT-DRW-E00-0027 15B-L1-576 25 AlMgSi0,5 AlMgSi0,5 5-Sep-20 J0106 S Al 4043 3 J1-EGE-SCT-DRW-E00-0027 15C-L1-575 25 AlMgSi0,5 AlMgSi0,5 5-Sep-20 J0106 S Al 4043 4 J1-EGE-SCT-DRW-E00-0027 15D-L1-576 25 AlMgSi0,5 AlMgSi0,5 5-Sep-20 J0106 S Al 4043
Subcont QC QA/QC Contractor Jawa Satu Power
Nama : Nama : Nama :
Date : Date : Date :
Sign : Sign : Sign :
Date : 09 Sep 2020
Report No. : J1-SCT-RFI-E11-L0102 Page : 2 of 2 Title : IPB PT. JURONG ENGINEERING LESTARI SAMSUNG C&T DAILY WELDING VISUAL INSPECTION PHOTOS
Subcon QC QA/QC Contractor Jawa Satu Power
Nama : Nama : Nama :
Date : Date : Date :
Sign : Sign : Sign :
Date : Report No. : Page : Title : PT. JURONG ENGINEERING LESTARI SAMSUNG C&T
DAILY WELDING VISUAL INSPECTION PHOTOS
Subcon QC QA/QC Contractor Jawa Satu Power
Nama : Nama : Nama :
Date : Date : Date :
Sign : Sign : Sign :
09 Sep 2020 J1-SCT-RFI-E11-L0102 2 of 2 IPB
SUAL INSPECTION PHOTOS
Date : Report No. : Page : Title : PT. JURONG ENGINEERING LESTARI SAMSUNG C&T