Remodelling and Restructuring of Koyli Creek Including Vehicle Track in Surat. (Ch. 9500 To 10850)
Remodelling and Restructuring of Koyli Creek Including Vehicle Track in Surat. (Ch. 9500 To 10850)
Remodelling and Restructuring of Koyli Creek Including Vehicle Track in Surat. (Ch. 9500 To 10850)
Remodelling and Restructuring of Koyli creek including vehicle track in Surat. (Ch. 9500 to 10850)
Sr. Rate with 1% Labour
Items Unit Quantity Amount (Rs.)
No. Cess (Rs.)
(A) Survey & investigation items
Clearing the creek land width including removing the shrubs,
bushes, cactus, weeds other vegetation including cutting
1 down trees up to 0.50 cm girth and depositing the removed sqm 27000.00 6.63 178,891.20
materials outside the creek land width with all lead and lifts
as directed etc complete.
Cutting downs trees of different girths (30cms and higher of
periphery) including removing and grubbing roots below
2 ground level within the creek boundary including stacking the No 100.00 2104.06 210,406.23
wood outside the creek boundary as directed etc complete
(B) Dismentalling
Dismantling of existing structures like building, compound
wall and other structure comprising of masonry, cement
concrete, steel work, including tools, plants and scaffolding
4 wherever necessary, sorting the dismantled material, disposal -
of unserviceable material and stacking the serviceable
material with all lifts and leads as directed by engineer in
charge.
a PCC cum 525.00 528.60 277,516.94
-
(C) Excavation and Earthwork
5 Excavation & Desilting of creek/streams as per design profile
in allsorts of soils(including wet and slushy condition of soils)
including yellow,sandy and gravelly soil sand softmurrum
including depositing the excavated stuff in uniformlayers in
creek banks or in spoil banks or as and where directed all
lead and lift including clearing the site, dewatering, dressing
the sectionetc. complete as per MORT&H Specification no.
300 and engineer in charge
Remodelling and Restructuring of Koyli creek including vehicle track in Surat. (Ch. 9500 to 10850)
Sr. Rate with 1% Labour
Items Unit Quantity Amount (Rs.)
No. Cess (Rs.)
6 Providing temporary Earthen embankment for construction of
guide wall in creek in breaking clods, dressing to the design
section with all lead and lift and height of embankment as
under including dewatering, Rolling, Compaction, removing
earth from the creek after construction work is complete to cum 129600.00 156.01 20,219,505.12
attain original section of creek as per MORT&H Specification
no.300 and engineer in charge
M-30 grade (T Beam Girder- 20m width ) cum 6885.00 7033.64 48,426,611.40
Remodelling and Restructuring of Koyli creek including vehicle track in Surat. (Ch. 9500 to 10850)
Sr. Rate with 1% Labour
Items Unit Quantity Amount (Rs.)
No. Cess (Rs.)
Chipping and dressing of the RCC piles upto cut off level
(Mini. 1 x dia.) including cleaning of reinforcement and
16 Rmt 19.20 414.10 7,950.72
removal of dismantled materials etc. for providing pile caps as
directed by Engineer and as per specifications.
Remodelling and Restructuring of Koyli creek including vehicle track in Surat. (Ch. 9500 to 10850)
Sr. Rate with 1% Labour
Items Unit Quantity Amount (Rs.)
No. Cess (Rs.)
b) Routine Pile Load Test on piles on working pile Nos 1.00 38945.60 38,945.60
Remodelling and Restructuring of Koyli creek including vehicle track in Surat. (Ch. 9500 to 10850)
Sr. Rate with 1% Labour
Items Unit Quantity Amount (Rs.)
No. Cess (Rs.)
26 Earthwork in embankment using selected soil, soft and hard
murrrum excavated from approved borrow area/village tanks
etc.including breaking clods, dressing to the design section
including loading and unloading and all lift and Compaction of
Earthwork in embankment in layers 15 to 20Cms at requisite
moisture content to required dry density not less then 85% of 131.30
corresponding proctor maximum dry density including
watering, rolling with suitable type of roller etc. complete.
MORT&H Specification no.305 and Excavated stuff to be
dumped or used from the lead upto 500mts.
27
Providing and laying 25mm to 100mm thick compacted
BITUMINOUS CONCRETE using aggregates as per gradation
and percentage of asphalt for mixing shall be as arrived from
mix design, provided in no case asphalt percentage shall
beless than 5.5 % by Wt. of total mix as binder by drum mix
type hot mix plant and laying by sensor paver finisher
MT 3800 2577.52 9,794,576.00
including consolidation by vibrator roller including providing
and operating plant, sensor paver and machinery, cost of fuel,
oil, lubricant and labour charges including cost of asphalt,
aggregate and filler ( if found required as per mix
design)etc.complete (But excluding cost of providing &
applying tack coat.)
28
Providing and applying Prime Coat with bitumen emulsion
(Medium Grade )on prepared surface of granular Base
sqm 20250 20.57 416,617.43
including clearing of road surface and spraying primer at the
rate of 0.60 kg/sqm using mechanical means and conforming
to MORT&H Specification clause 502
29
Providing and applying Tack coat with bitumen emulsion
(Medium Grade ) using emulsion pressure distributor at the
sqm 20250 7.89 159,734.03
rate of 0.20 kg per sqm on the prepared bituminous/granular
surface cleaned with mechanical broom and conforming to
MORT&H Specification clause 503
30
Providing and laying of cement concrete of R.C.C. M35 grade
as per the specifications for RCC retaining wall stem as per
drawing and MORT&H Specification no.1500,1700,2300 as
directed by the Engineer. Rate shall include cost of form work
but exclude cost of reinforcement
M-35 grade for Crash Barrier cum 1215.00 5016.67 6,095,254.05
31 Providing and placing in position FE 500 TMT CRS Bar
Reinforcement as per I.S. Standard for R.C.C Raft, Piers,
Abutments, Retainingwall, Top Slab, Kerb, Approach Slab,
Qtl
Cutoff, Foot path including cutting bending hooking and tying
complete as per detailed drawing and MORT&H Specification
no. 1600
TMT Qtl 1093.5 5002.53 5,470,266.56
32 Road marking with Hot applied Thermo Plastic compound
with Reflectorising glass bend on Bituminous
Surface.Providing and laying of hot applied thermo plastic
sqm 1012.50 298.96 302,697.00
compound 2.5mm thick including refelectorising glass beads
@250gms per sqmt .The finished surface to be level ,uniform
and free from streaks and holes.
SURAT MUNICIPAL CORPORATION
Remodelling and Restructuring of Koyli creek including vehicle track in Surat. (Ch. 9500 to 10850)
Sr. Rate with 1% Labour
Items Unit Quantity Amount (Rs.)
No. Cess (Rs.)
33
Supplying of Molded Shank Raised Pavement Markers made
of polycarbonate and ABS molded body and reflective panels
with micro prismatic lens capable of providing total internal
reflection of the light entering the lens face and shall support
a load of 16000 kg tested in accordance to ASTM D 4280 Type
H and complying to Specifications of Category A of MORTH
Circular No RW/NH/33023/10-97 – DO III Dt 11.06. 1997.
The height, width and length shall not exceed 50 mm, 100
mm and 100 mm and with minimum reflective area of 13
No 900.00 177.26 159,534.00
Sqcm on each side and the slope to the base shall be 35 +/- 5
degree. The strength of detachment of the integrated
cylindrical shanks, (of diameter not less than 19 +/- 2 mm
and height not less than 30+/- 2 mm) from the body is to be a
minimum value of 500 Kgf. Fixing will be by drilling holes on
the road for the shanks to go inside, without nails and using
epoxy resin based adhesive as per manufacturer’s
recommendation and complete as directed by the engineer.
(3M or Equivalent Brand)
34
The work includes SETC & defect liability (guarantee) period
of 12 months of entire streetlight system having all
components GI streetlight pole, GI bracket, foundation of
pole, cable, termination of cable, excavation & laying in DWC
pipe of appropriate size, cable guard pipe, fitting wire, led
streetlight outdoor luminaire, CCMS, pole number for
identification etc.
The important design aspects are as under: -
I. Average illumination level = 15 lx
II. Overall maintenance factor= 0.7 no 46 51510.00 2,369,460.00
III. Uniformity Factor= 0.4, Transverse uniformity ratio= 0.33
IV. Span (min.) = 30 m
V. Impact Resistance= IK 08 (min.)
VI. CCT= 4,000⁰ K
VII. CCMS system having remote control, monitoring,
supervision, operation facility from remote location. It should
have electrical data collection/ retrieving facility through
GPRS/ GSM mobile.
VIII. GI octagonal streetlight pole (min. coating of 85 micron)
Remodelling and Restructuring of Koyli creek including vehicle track in Surat. (Ch. 9500 to 10850)
Sr. Rate with 1% Labour
Items Unit Quantity Amount (Rs.)
No. Cess (Rs.)
40 Supplying and filling fine sand (Pana) in 25/75 mm (Avg.)
compacted thickness over the base including necessary
compaction, watering etc. complete. Item includes levelling by cum 182.25 451.47 82,280.41
using vibratary plates compacted machine and as directed by
Engineer-in-charge.
41
Providing interlocking type Rubber moulded cement concrete
paver block of approved shape, design & colour having 60mm
thickness (M-35) purchased from SMC's approved paverblock
manufacturer only & fixing of fine sand bedding. Item sqm 2430 419.15 1,018,534.50
includes levelling by using vibratory plates compacted
machine. Item also includes all materials, labour,
equipments, tools, plants, watering, cleaning etc. complete.
42
providing and fixing post and pipe railing as per detailed
Rmt 1400.00 1174.63 1,644,482.00
drawing including 3 coats of painiting to steel works complete
(F) STORM WATER DRAINAGE
providing and fixing in position (different diameter) IS NP3
class reinforced pipe with caulking the joints with cement
mortar 1:1 proportion using jute string soaked in cement
slurry, finishing joints, and laying pipes to the designed grade
and levels, curing etc complete for all lead and lifts
43
300mm dia M 500 1190.00 595,000.00
450mm dia M 500 2140.00 1,070,000.00
600mm dia M 500 3060.00 1,530,000.00
900mm dia M 2700 5660.00 15,282,000.00
1200mm dia M 500 9270.00 4,635,000.00
1400mm dia M 500 11920.00 5,960,000.00
providing and constructing sewer manholes, scraper
manholes and unit house connection chamber, as per the
type design in brick masonary in c.m.1:5and inside and
outside 15 mm thick plastering inc.m.1:3necessary 100 mm
44 coping with reinforce ment in RCCM-200 fixing C.I. step sand Nos. 90 18160.00 1,634,400.00
fixing manhole frame and covers (excluding supply of Manhole
Frame)over manholes (includingExcavation) manhole type
Acircular type having inside diameter of 1200mm for depth up
to 4m.
Removing, cleaning and refixing of R.C.C. pipes of canal
structure and U.G.P.L. including fixing collars for pipe joints
in cement and sand including filling and chaulking joints with
45
cement mortar of 1:1 proportion curing etc complete for all
lead and lift
400mm to 450mm dia pipes m 10500.00 380.08 3,990,840.00
Providing and filling rubbles including hand packing and
46 filling interstices with quarry spalls behind abutments and cum 2430.00 907.99 2,206,415.70
between returns as directed
Box cutting the road surface to proper slope and camber as
per drawing and MORT&H clause no 301 , including setting
out, construction of shoring and bracing, removal of stumps
47 cum 1080.00 66.16 71,447.40
and other deleterious matter, dressing of sides and bottom,
backfilling the excavation earth to the extent required and
utilising the remaning earth locally for road work.
Providing and laying of dry lean cement concrete (DLC) of M15
grade and compacting the same with 8 to 10 Tone vibratory
48 roller as per the Technical specifications and as per drawing cum 240.00 4013.34 963,200.64
and as directed by the Engineer. Rate shall include cost of
formwork if any.
SURAT MUNICIPAL CORPORATION
Remodelling and Restructuring of Koyli creek including vehicle track in Surat. (Ch. 9500 to 10850)
Sr. Rate with 1% Labour
Items Unit Quantity Amount (Rs.)
No. Cess (Rs.)
Concrete Pavement M-30 - 250 mm thk - construction of
unreinforced, dowel jointed, 250 mm thick M30 grade
Reinforced cement concrete pavement as per MORT&H
clause no 602,1500,1600,1700,2700 and in conformity with
the lines, grades and cross sections shown on the drawings.
The work shall include furnishing of all plant and equipment,
materials and labour and performing all operations in
49 cum 300.00 4700.34 1,410,101.40
connection with the work, as approved by the Engineer.The
unit rate also includes full costs of Kerb constuction,
contraction, expansion , construction and longitudinal joints.
Itshall also includes joint filler,keys, caulking rod, debonding
strip, sealent primer,joint sealent, dowel bar and tie rod. For
construction of road TRIMIX vacume dewatering system shall
be used.