Yellow Building Drawings
Yellow Building Drawings
Yellow Building Drawings
Westway
Westway
e
Lin
ty
Ci
d
an
ith
sm
er
m
m
Ha
West
C
ross R
oute
e
enu
k Av
nd Par
Holla
k
Par
and t
Holl dabou
roun
Sheperd’s Bush Common
0 100 200m
50 150
Location Plan
40m
30
N
lace
hP eig
20
eL n
d
Sto
Roa
eigh
ns L
. An
10
0
y
Wa w
illo
W
ad
Ro
nn’s
St. A
eet
Str af
Ol
oad
nR
sto
Fre
treet
am S
Evesh
ad
las Ro
Nicho
ad
n Ro
sto
Fre
oute
C ross R
West
d
Roa
Bard
ne
Li
ty
Ci
d
an
ith
sm
er
m
m
Ha
ad
r Ro
Sillve
Site Plan
North Contextual Elevation
0 10 20 30 40m
ad
Ro
12 3
d
Bar
2
14 11 1
10 4 15 Building 10
Nicholas Road
Building 4 Building 9
Building 11
Evensham Street
Olaf Street
d
n Roa
Fresto
n Road
Fresto
0 5 10 15 20m
KEY
1 Lift lobby
13 5
2 WC area
3 3 3 Open plan office space
4 Atrium bridge
5 Private office
12 6 Meeting room
2 2 7 Tea point
7 7
8 Storage
9 Technical area
10 Board area
1 4 1 4 11 Show room
12 Design desks
13 Loggia
14 Roof plant
2 2
12
3 3 11
9 5 6
3 14
8
2 7
1 4
2
14
3
10
West Elevation
0 5 10 15 20m
South Elevation
0 5 10 15 20m
2 5
4 7
8
9
11
10
9
11
KEY
1. Roof Single ply membrane,
Insulation and VB, Steel profiled
9
decking Acoustic Liner
2. Lattice roof truss
3
3. Entrance door
4. Services distribution and
lighting support frame
5. Fabricated steel support
frames
6. In-situ RC frame
7. Full height glass smoke
containment to atrium
8. Perimeter heating
10 9. Air supply ducts
10. Services and air distribution
through raised floor
11. In-situ RC slab
0 1 2m
4
KEY 3
2
1 In-situ exposed reinforced
concrete frame.
2 Steel roof support frame –
box sections formed from welded
plate.
3 Roof lights – high performance
double glazed unit on insulated
preformed aluminium kerb and
moulded GRP liners.
4 Main return air ducts and grills. 6 5
5 Tubular steel lighting support rails.
6 Full height toughened and laminated
structural glass screen as atrium
smoke reservoir.
7 Steel framed bridges and stairs to
atrium – rubber covered aluminium
steps and decking and perforated
aluminium soffit panels. 1