G G G G G G G G: Prgho# #VLI833328333U2VLI93332VLI9333U#
G G G G G G G G: Prgho# #VLI833328333U2VLI93332VLI9333U#
G G G G G G G G: Prgho# #VLI833328333U2VLI93332VLI9333U#
G
G
G
G
G
G
G
G
G
G
䌧䌨䌝䌪䌙䌬䌡䌧䌦䋸䌥䌙䌭䌦䌙䌤䋸
䌡䍆䌻䍍䌺䌹䍌䌽䌼䋸䍋䍀䌹䍃䌽䍊䋸
䌅䌛䍀䌹䍅䌺䌽䍊䋸䍌䍑䍈䌽䋸
Prgho#=#VLI833328333U2VLI93332VLI9333U#
Pdqxdo#Qr1#=#5:354O335#Yhuvlrq#=#314#
䋸
G
G
G
G
G
G
䌡䌼䌽䍆䍌䍁䌾䍁䌻䌹䍌䍁䍇䍆䋸䌤䌹䌺䌽䍄
Figure 1
Please locate the identification label on the right side of the instrument. Fill in the information found on
the identification label in the spaces provided above in Figure 1. Refer to this identification label
information when calling, if your unit fails to operate properly, or if you have questions concerning
spare parts or service contracts. Additionally, use this information at www.jeiotech.com when you
register your Incubated shaker or you fill out the enclosed registration card.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Disclaimer
Jeio Tech Co., Ltd. is committed to a continuing program of product development and improvement,
and reserves the right to change information, such as specifications, appearance, and dimensions,
described in this document without notice.
Copyright
No part of this manual may be reproduced or transmitted in any form or by any means, including
photocopying, recording, or using information storage and retrieval systems, for any purpose other
than the purchaser's own use, without the express written permission of Jeio Tech Co., Ltd.
Any other product names and services identified in this manual are trademarks or registered
trademarks of their respective owners. No such use, or the use of any trade name, is intended to
convey endorsement or other affiliation with Jeio Tech Co., Ltd.
0DQXDO12/9HUVLRQ
6CDNGQHEQPVGPVU
G
G
G
1.0 Safety................................................................................................................................................ 1
1.1 How to use the Manual
1.1.1 Introduction
1.1.2 Chapter summary
1.1.3 Model number nomenclature
1.2 Safety Notice
1.3 Symbols used in this Manual
1.3.1 Signal word panels
1.3.2 Safety symbols
1.4 Where to Locate Safety Labels
1.4.1 Front of SIF5000R/6000R
1.4.2 Back of SIF5000R/6000R
1.4.3 Back of SIF5000/6000
1.4.4 Front of SIF5000/6000
1.5 Precautions for Your Incubated shaker
1.5.1 Warning statements
1.5.2 Caution statements
1.6 Responsibility
1.6.1 General responsibility
1.6.2 Operator responsibility
1.6.3 Maintenance responsibility
1.6.4 Reporting a safety defect
L
0DQXDO12/9HUVLRQ
2.0 Functional Description .................................................................................................................. 15
2.1 Introduction
2.2 Feature
2.2.1 Compliance
2.2.2 Construction
2.2.2.1 General
2.2.2.2 Shaking system
2.2.2.3 Incubator
2.2.3 Communication
2.2.4 Safety
2.2.4.1 CLS- Custom logic safety control system
2.2.4.2 Over Temperature Limit
2.2.4.3 Thermal Protector
2.3 Construction
3.0 Installation ...................................................................................................................................... 27
3.1 Unit Components
3.2 Preparing the Location
3.2.1Space requirements
3.2.2 Environmental setting
3.3 Leveling the unit
3.4 Attaching Electrical Connections
3.5 Attaching Condensate Drain
3.6 Attaching/Detaching External Refrigeration
(SIF5000/SIF6000 only)
3.6.1 Inserting tubing into fitting
3.6.2 Removing from fitting
3.7 Initial Start-up
3.7.1 Pre start-up checks
3.7.2 Starting the incubated shaker
3.7.3 Calibrating temperature probe and controller (BIAS Function)
3.7.4 Auto-tuning the incubated shaker controller
3.3.5 Shutting down the incubated shaker
LL
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
4.0 Operation........................................................................................................................................ 45
4.1 Controller
4.1.1 Feature
4.1.2.1 Temp. controller
4.1.2.2 Shaking (agitation) controller
4.1.2 Keypad overview and description
4.1.2.1 PV (Present Value) Display
4.1.2.2 SV (Set Value) Display
4.1.2.3 RPM display
4.1.2.4 Shaker function and status indicators
4.1.2.5 Temperature function and status indicators
4.1.2.6 Safety function and status indicators
4.1.2.7 Button
4.1.2.8 Shaker on/off switch
4.1.2.9 Lamp switch
4.1.2.10 Power switch
4.2 Temperature controller
4.2.1 Setting the temperature unit of measurement (°C/°F)
4.2.2 Setting temperature
4.2.3.1 Single set point value (SV)—preparation
4.2.3.2 Single set point value (SV)—during operation
4.2.3.3 Memorized set point values—SV1, SV2 and SV3
4.2.3.4 Selecting a memorized set point value to operate—preparation
4.2.3.5 Selecting a memorized set point value to operate—during operation
4.2.4 Wait (Delay) Timer
4.2.4.1 Timer capabilities
4.2.4.2 Setting wait-on (on-delay) timer
4.2.4.3 Setting wait-off (off-delay) timer
4.2.4.4 Setting the combined wait on and wait off (on and off delay) timer
4.2.4.5 Cancelling wait on/off timer
4.2.5 Setting Auto-run function
4.2.6 Setting chamber air circulation fan speed
4.2.7 Set Program
4.2.7.1 Understanding of the term for controller
4.2.7.2 Set program using Controller
4.3 Rotary and Rectilinear motion
LLL
0DQXDO12/9HUVLRQ
LY
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Y
0DQXDO12/9HUVLRQ
8.0 Appendixđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđđ
8.1 Technical Specifications
8.1.1 SIF5000/5000R
8.1.2 SIF6000/6000R
8. 2 Maximum rpm per model
8.2.1 Test condition
8.2.2 Result
8.2.3 Attention
8.3 Circuit Diagrams
8.3.1 Electrical (SIF5000/SIF6000)
8.3.2 Electrical (SIF5000R/6000R)
8.3.3 External refrigeration (SIF5000/SIF6000)
8.3.4 Internal refrigeration (SIF5000R/SIF6000R)
8.4 Replacement Parts List
8.5 Disposing of Incubated Shaker
8.5 Warranty
8.5.1 Terms of Warranty Service
8.5.2 Warranty Exceptions
8.5.3 How to Request Services
8.5.4 Product Return Procedures
8.6 Technical Assistance
YL
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
1.0 Safety
0DQXDO12/9HUVLRQ
This manual covers only light corrective maintenance. No installation, service procedure or other
maintenance should be undertaken without first contacting a service technician, nor should be carried
out by someone other than a service technician with specific experience with laboratory equipment
and electricity.
The Appendix contains technical specifications, warranty and Jeio Tech technical support contact
information.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Be sure that you are completely familiar with the safe operation of this Incubated shaker. This unit may
be connected to other machinery, such as a temperature control unit. Improper use can cause serious
or fatal injury.
Installation and repair procedures require specialized skills with laboratory equipment and electricity.
Any person that installs or repairs this unit must have these specialized skills to ensure that this unit is
safe to operate. Contact Jeio Tech or their local authorized distributor for repairs or any questions you
may have about the safe installation and operation of this unit.
The precaution statements are general guidelines for the safe use and operation of this instrument. It
is not practical to list all unsafe conditions. Therefore, if you use a procedure that is not recommended
in this manual you must determine if it is safe for the operator and all personnel in the proximity to the
Temperature and Humidity chamber. If there is any question of the safety of a procedure please
contact Jeio Tech before starting or stopping the Temperature and Humidity chamber.
This equipment contains high voltages. Electrical shock can cause serious or fatal injury. Only qualified
personnel should attempt the startup procedure or troubleshoot this unit.
Documentation must be available to anyone that operates this equipment at all times.
Keep non-qualified personnel at a safe distance from this unit.
Only qualified personnel familiar with the safe installation, operation and maintenance of this unit
should attempt start-up or operating procedures.
Always stop the Incubated shaker before making or removing any connections.
0DQXDO12/9HUVLRQ
The following signal word panels, safety symbols and non safety symbols are used to alert you to
potential personal injury hazards or information of importance. Obey all safety messages that follow
these symbols to avoid possible personal injury or death.
Signal word panels are a method for calling attention to a safety messages or property damage
messages and designate a degree or level of hazard seriousness. It consists of three elements: a
safety alert symbol, a signal word and a contrasting rectangular background. The following signal word
panels are in accordance with ANSI Z535.4-2007 and ISO 3864 standards.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Safety symbols are graphic representations—of a hazard, a hazardous situation, a precaution to avoid
a hazard, a result of not avoiding a hazard, or any combination of these messages—intended to
convey a message without the use of words. The following safety symbols are used in this manual.
Mandatory Prohibition
No direct
Read manual
sunlight
No high
Wear a face
frequency
mask
noise
No corrosive
Wear gloves fluid or
cleaners
WARNING
Safety Alert
Symbol. Hand crush or
General pinch
caution.
Electrical
Foot crush
shock
Flammable or
fire could be Lifting hazard
caused.
Sharp points
0DQXDO12/9HUVLRQ
/KUEGNNCPGQWUPQPGUCHGV[U[ODQNUWUGFKPOCPWCN
The following graphic representations are intended to convey a message without words or to bring
your attention to important information about the use of the Incubated shaker or a feature.
European
Union
electrical Earth ground
directive
compliance
Relative
Note
humidity
Altitude
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
The following illustrations show where the safety labels should be attached to the Incubated shaker
until service of the product is discontinued. If the safety labels are damaged, please contact your local
Jeio Tech office or distributor to request new labels.
0DQXDO12/9HUVLRQ
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
0DQXDO12/9HUVLRQ
Our Incubated shaker is designed to provide safe and reliable operation when installed and operated
within design specifications. Make sure you read and understand all instructions and safety
precautions listed in this manual before installing or operating your unit. If you have any questions
concerning the operation of your unit or the information in this manual, contact our Sales Department.
To avoid possible personal injury or equipment damage when installing, operating, or maintaining this
Incubated shaker, use good judgment and follow these safe practices:
Check the voltage, phase and capacity of the power supply and connect properly.
DO NOT insert multiple plugs into the outlet at the same time.
DO NOT handle or touch electrical cord and electrical parts with wet hands.
DO NOT move the Incubated shaker while it is plugged into the power source.
DO NOT install the Incubated shaker near environments where flammable gas may leak.
DO NOT use the machine near environments where explosion can occur due to organic
evaporating gases.
DO NOT put explosive and flammable chemicals (Alcohol, Benzene, and etc) into the
chamber.
DO NOT let moisture, organic solvents, dust, and corrosive gas enter the control panel.
DO NOT use the Incubated shaker in places where moisture is high and flooding can occur.
DO NOT install the Incubated shaker near machinery generating high frequency noise
DO NOT use Incubated shaker in environments that contain industrial oil smoke and metallic
dust.
DO NOT operate the Incubated shaker when there is strange sound, smell and smoke coming
from the unit.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
DO NOT disassemble, fix or change the Incubated shaker other than for those items
described in this operating manual
1.5.2 Caution statements
DO NOT pour water or put liquid on the Incubated shaker when cleaning the unit.
DO NOT operate Incubated shaker and immediately disconnect the main power supply and request
service when water may be in the unit.
DO NOT clean the Incubated shaker with a strong cleanser (e.g., solvent type) and use a soft cloth.
In addition to the safety warnings listed above, safety messages are posted throughout the manual.
These safety messages are designated by the use of a signal word panel followed by text and a
safety symbol where applicable. Read and follow these important instructions. Failure to observe
these instructions can result in permanent damage to the unit, significant property damage, personal
injury or death.
0DQXDO12/9HUVLRQ
1.6 Responsibility
Our Incubated shaker is constructed for maximum operator safety when used under standard
operating conditions and when recommended instructions are followed in the maintenance and
operation of the machine.
All personnel engaged in the use of the Incubated shaker should become familiar with its operation as
described in this manual.
Proper operation of the unit promotes safety for the operator and all workers in its vicinity.
Each individual must take responsibility for observing the prescribed safety rules as outlined. All
caution, warning and danger labels must be observed and obeyed. All actual or potential danger areas
must be reported to your immediate supervisor.
Organize a safety committee or group, and hold regular meetings. Promote this group from the
management level. Through this group, the safety program can be continually reviewed, maintained,
and improved. Keep minutes or a record of the meetings.
Hold daily equipment inspections in addition to regular maintenance checks. You will keep your
equipment safe for production and exhibit your commitment to safety.
Please read and use this manual as a guide to equipment safety. This manual contains safety
warnings throughout, specific to each function and point of operation.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Plant and personnel safety is sometimes forgotten in the desire to meet incentive rates, or through a
casual attitude toward laboratory equipment formed over a period of months or years. Your employer
probably has established a set of safety rules in your workplace. Those rules, this manual, or any other
safety information will not keep you from being injured while operating your equipment.
Learn and always use safe operation. Cooperate with co-workers to promote safe practices.
Immediately report any potentially dangerous situation to your supervisor or appropriate person.
REMEMBER
l NEVER place your hands or any part of your body in any dangerous location.
l NEVER operate, service, or adjust the equipment without appropriate training and first reading
and understanding this manual.
l Before you start the portable drying/conveying system check the following:
ü Remove all tools from the Incubated shaker.
ü Be sure no objects, samples or chemicals are lying on the Incubated shaker.
l If your Incubated shaker has been inoperative or unattended, check all settings before starting
the unit.
l At the beginning of your shift and after breaks, verify that the Incubated shaker is functioning
properly.
l DO NOT wears loose clothing or jewelry, which can be caught while working on the equipment.
In addition, cover or tie back long hair.
l Clean the equipment and surrounding area DAILY, and inspect the machine for loose, missing
or broken parts.
l Shut off power to the Incubated shaker when it is not in use. Turn the power switch to the OFF
position, or unplug it from the power source.
0DQXDO12/9HUVLRQ
Proper maintenance is essential to safety. If you are a maintenance worker, you must make safety a
priority to effectively repair and maintain equipment.
Before removing, adjusting, or replacing parts on this Incubated shaker, remember to turn off all
electric supplies and all accessory equipment at the machine, and disconnect and lockout electrical
power. Attach warning tags where possible.
Be sure that the Incubated shaker is correctly connected to earth grounded electrical outlet that
complies with current codes.
When you have completed the repair or maintenance procedure, check your work and remove your
tools.
DO NOT restore power to the Incubated shaker until all persons are clear of the area. BEFORE you
turn the Incubated shaker over to the operator for production, verify the unit is functioning properly.
The principle factors that can result in injury are failure to follow proper operating procedures
(i.e. lockout/tag out), or failure to maintain a clean and safe working environment.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
0DQXDO12/9HUVLRQ
2.1 Introduction
SIF5000/5000R, SIF6000/6000R, 2-step stacking incubated shakers are space-efficiency and SI-
300/300R, SI-600/600R can be loaded on SIF Series.
Orbital and reciprocal shaking is possible. Shaking system is designed to use a wide variety of
laboratory glassware. 6,000 ml Flask clamp can be mounted on SIF6000/6000R. Orbital and reciprocal
shaking, both can be selected by a user.
The 3-speed, forced convention heating and cooling system provides uniform temperature regulation
with no overshoot—eliminating potential sample damage. External refrigeration capabilities are
available in SIF5000R/SIF6000R and integrated cooling is available in SIF5000R/SIF6000R models.
A wide variety of platforms can be used with the incubated shaker. Dedicated platforms are available
for a variety of flask sizes. A universal platform and flask and separatory funnel clamps, micro plate
holders, test tube racks and stick pads are available along with spring wire racks, rubber mat and
universal attachment platforms.
Additionally, incubated shakers have an R-232 communications port for data logging and remote
control with our free Lab Tracer software.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
2.2 Feature
2.2.1 Compliance
CE is an abbreviation for CONFORMITE EUROPEAN and it means that the
products are qualified for European Standard related to safety, health, environment
and protection of consumers. CE Mark doesn’t mean that it guarantees the
products quality but complied with basic safety requirements.
The products which do not acquire CE mark or do not follow the standards can not be sold or
distributed in European market, and products test must be done by a manufacturer itself or a specified
institute.
If you want to distribute the products in Europe manufactured by outside of Europe must attach CE
mark. EU supply 76 ea guidelines and have 3 types (EN:EUROPEAN NORM, HD:HARMONIZED
DOCUMENTS, ENV:EUROPEAN PRE-STANDARD) which including approx.3000 kinds of standards.
Jeiotech has supplied products met CE standards based on our strict quality policy.
0DQXDO12/9HUVLRQ
2.2.2 Construction
2.2.2.1 General
Waterproof Structure
Even there is spillage by users accidentally the liquid doesn’t go into the equipment
Observation lamp
If the unit is in a dark place, a user can check the sample.
Door Lock
There is a hole on the latch. It can keep security and temperature.
Chemical Resistance
The basic surface finishes with a powder coating.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Brushless DC motor
Jeio tech succeeds in controlling the motor accurately and it is the best motor for laboratory.
Accessory
Various accessories could be equipped flexibly.
0DQXDO12/9HUVLRQ
2.2.2.3 Incubator
2.2.3 Communication
RS-232 Interface available
Lab Tracer is easy-to-use software supplied with the SIF series Incubated Shaker. It enables operators
of all levels to use their PC to
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
2.2.4 Safety
2.2.4.1 CLS- Custom logic safety control system
CLS-Control system
Jeio Tech has separated these two important elements and now has an independent safety system
running alongside the performance controller.
When any risk factors are sensed (ex: voltage peaks, short circuit, over temperature etc.) the machine
will go into a recoverable safety mode as follows.
The power supply to individual components is isolated by a magnetic switch, leaving only the earth in
circuit.
Audible and visual alarms alert the user and remain on until attended.
Independent IC logic detects and intercepts electronic interference before the main control board to
give added safety to both user and product.
The built-in over temperature protector warns (audible alarm and LED lighted) and shuts off the heater
in the event of overheating problems. Over temperature safety feature with independent thermostat
provides additional backup by controlling heat if main temperature controller fails.
The power line of the heater is by thermal protector. It automatically cut off the power when the space’s
temperature where the heater is equipped is above 90Ȕ. And if below 90Ȕ, it connect the power
again. Therefore, it protects overheating in advance.
0DQXDO12/9HUVLRQ
2.3 Construction
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
(1) Shelf
If you use low-height flasks, there are shelves(Standard 2ea). Shelves can be put on the shelf level
adjuster.
ü Evaporator
Fin-type evaporator cools the chamber air down to Amb-20Ȕ
(When ambient temperature is more than 20Ȕ)
ü Heater
Two (2) 550W, Incoloy fin-type heaters heat the chamber air to a
maximum of 80Ȕ
ü Circulation Fan
Three-speed fan circulates air in the chamber and through the
evaporator and heater.
(6) ID Label
Model name, Serial number, Voltage, Frequency, Power
Consumption For Incubated Shaker (Two machine stackable)
0DQXDO12/9HUVLRQ
ü RS-232 Port
This equipment can monitoring and change setting to COM1 or COM2 port with state of appliances
through PC and connection and a RS-232C program.
Also, can save control state of appliances, and output is possible through a printer, too.
ü Lamp Switch
Turn On/Off Observation Lamp.
ü Main Switch
Main Switch On/Off. When Main Switch On, it lights.
ü Fuse
The fuses protect the equipment from instantaneous electric currents.
Please check with correct electricity when fuse change.
(10) Body
The body is painted by a powder coating for chemical resistance
(11) Controller
ü Shaking controller
It can control for Left turn, right turn and stationary state by timer function
ü Temperature controller
This equipment loaded the Micro processor (CPU) which had the verified S/W that Digital PID Auto
tuning this is possible and is having a temperature revision function for a temperature sensor and a
heating control function.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
(13) Door
The door provides full and easy access to the incubator shaker chamber. An observation window is
provided for viewing of samples during experiments.
0DQXDO12/9HUVLRQ
(23) Chamber
Corrosion-resistant stainless steel was used. Agitation table, heater,
evaporator, and temperature sensor are built in.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
3.0 Installation
0DQXDO12/9HUVLRQ
After unpacking, please check the contents to ensure you have received all of the following incubated
shaker components. Also, check the identification plate on the side of the incubated shaker to make
sure you received the model number your ordered.
If you didn’t receive one or more of the components or if the model is incorrect, contact your local Jeio
Tech office, or the distributor from which the incubated shaker was purchased.
Unit 1
1
Operating instruction
LabTracer
1
communication
software CD
Cable for 1
communication
Wire Shelves 2
Spacer 4
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
It is essential that the incubated shaker be situated in an area where there is sufficient space for the
shaker and service lines. The minimum space requirements needed to properly operate and maintain
the incubated shaker.
j k l
n
Dimension
A B C D E F G
Model
mm(inch)
0DQXDO12/9HUVLRQ
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
The Jeio Tech SIF series incubated shakers operate properly under the following environmental
conditions.
0DQXDO12/9HUVLRQ
When you set up the unit, balancing is very important. If the balance of the unit is not in a good
condition, it causes vibration and noise and the user could be in danger.
Make it balanced well as following.
Step 3: Place a level on the top of the door and check for
level side-to-side and front-to-back.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Compare voltage on unit’s identification plate, wall outlet connection on electrical cord (see Figure 3.5
below) and the wall outlet to ensure proper connection before making any electrical connections. If you
have the wrong electrical cord, please contact your local Jeio Tech office, or the distributor from which
the incubated shaker was purchased to get the correct electrical cord.
If the supplied electrical cord is not long enough, it is recommended to use an IEC 60320 male to
female extension cord with the proper amperage rating for the unit.
0DQXDO12/9HUVLRQ
Step 1: Find the power connection socket on the back of the unit.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
As the chamber heats and cools condensate will build up. The condensate drain is designed to
eliminate any water build up. To connect the condensate drain to a floor drain or any other waste
outlet push Ø6mm ID soft-walled tubing, such as: vinyl, FKM, urethane, neoprene or silicone, over the
drain barb until is seated against the collar, as shown below.
0DQXDO12/9HUVLRQ
Many laboratories are built with central chilling systems. With this in mind Jeio Tech has developed the
IS-971 incubated shaker so that it can be connected to external refrigeration systems. To connect the
unit to external refrigeration source use Ø8mm OD hard-walled tubing, such as nylon or polyethylene.
Note: The IS-971 controller does not have the ability to communicate with the external
refrigeration source.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 1: Grab the tubing tightly and push towards the incubated shaker as you firmly push the collect
release button with two fingers.
Step 2: Continue to push the collect release button, and pull the tubing out of the fitting.
0DQXDO12/9HUVLRQ
l Make sure condense drain hose is tightly on hose barb and hose is run to a drain.
l Make sure caster feet are lowered and have locked the incubated shaker in place.
l Make sure there are no flammable or explosive liquids in the incubation chamber.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
l After 3 seconds, a beep will emit and the following will appear.
Main Display
0DQXDO12/9HUVLRQ
The BIAS function lets you calibrate the temperature probe and controller. While the temperature
probes and microprocessor are calibrated at the factory during production, it is good practice to ensure
the incubator chamber temperature and microprocessor are in sync for your operating environment.
Use the following procedure to correct temperature variations:
Step 1: Press the power switch to turn the unit on, if it is not already on. Allow the controller to
stabilize and the main display to appear, as shown in Figure 3.7.2.
Step 2: Place a scientific digital thermometer into the chamber, close the door and allow the
thermometer to stabilize. Make sure the thermometer display is readable through the incubated
shaker’s observation window if it does not have a remote display.
Step 4: If there is a difference, press the TEMP key six (6) times. The PV display will show the
revised value and the SV display will read BIAS (as shown below).
Step 5: Press the UP key or DOWN key to reflect the difference between the present value and
the thermometer reading the BIAS value display.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
The fuzzy-logic, auto-tune function lets you automatically fine-tune the PID control parameters of your
IS-971, IS-971R and IS-971RF incubated shaker system based on its dynamic characteristics and
your process requirements then stores them for future use. Auto-tuning is of importance for minimizing
commissioning times for temperature regulation loops since they often have high system time
constants, such as lag times and dead times.
During auto-tuning the controller heats to 75% of the set point temperature, where it oscillates above
and below the set point as many as three (3) times before loading the new tuning parameters. After the
tuning parameters are loaded it heats to the set point temperature. See Figure 3.13 above.
Auto-tuning is dependent on the operating conditions and can take up to 45 minutes. It is best done
before any experiment is run.
0DQXDO12/9HUVLRQ
Step 1: Press the Temp key one (1) time. The setting in the SV display will flash.
Step 2: Press the UP key or DOWN key to set the desired temperature.
Step 4: Press and hold down the A/T key for one (1)
second or until the A/T LED illuminates and the PV and SV displays
change to the following.
Multi-Segment Programs
The auto-tune function is locked out once program has been
started.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 2: Press the Power switch to turn the unit off. Make sure the switch is not illuminated afterwards.
0DQXDO12/9HUVLRQ
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
4.0 Operation
0DQXDO12/9HUVLRQ
4.1 Controller
4.1.1 Feature
4.1.2.1 Temp. controller
PID Control
PID control is to control with calculation of the result with proportional, integral and differential
values. Basically it comes the result out based on P(present), I(past) and D(future) info that can
approach the practical required temperature quickly.
Calibration
Auto-Tuning
The fuzzy-logic, auto-tune function lets you automatically fine-tune the PID control parameters of
your incubated shaker system based on its dynamic characteristics and your process
requirements then stores them for future use.
Defrosting
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
When stopping the shaking system, the function operates on stopping at the exact position. This
function contains the Brake Function for the automatic system in Shaker.
Timer function
Speed Compensation
Motor recognizes set RPM frequently and should be adjusted to set value with memorized speed value
of that time in case of external influences
0DQXDO12/9HUVLRQ
Displays
Lamp switch
Power switch
The following describes what each section includes and their function
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Or
Or
Or
0DQXDO12/9HUVLRQ
AND
✺ⱞ㏎
⳿⺪▫㗆
Or
Acceleration and rotation direction
⳿㭶ⳮ ⫗㭶ⳮ
⟆ᆮℓ㪏 ℂ⟆ᆮℓ㪏
✺ⱞ㏎
⳿⺪▫㗆
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Shake LED
Illuminates when shaking timer(s) is(are) set.
Flashes during the timer mode.
F/Ward LED
Illuminates when the clockwise timer is set.
Flashes during the timer mode or counterclockwise deceleration.
B/Ward LED
Illuminates when the counterclockwise timer is set.
Flashes during the timer mode or clockwise deceleration.
Pause LED
Illuminates when the pause timer is set.
Flashes during the timer mode or pause mode
Temp. LED
Illuminates upon starting the temperature program.
Turns off when the temperature program expires.
Heater LED
Indicates the heater is on.
LED is on when heater is at 100% ouput.
LED flashes when PID cycles the heater.
Auto-tune LED
Flashes during Auto-tune function
0DQXDO12/9HUVLRQ
Door LED
Illuminates when the door is open.
Notes:
When opening the door the shaking table, heater,
and circulation fan stop operating.
After 5 minutes, the microprocessor stops all
programs, the Door LED flashes, and a beep is
emitted.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
4.1.2.7 Button
TEMP Button
Incubation Temperature setting button
Push TEMP
PV Display function
Button key
1 time Setting general temperature
5 times Choose F or C
6 times Calibration
TIMER Button
Sets the program, timer, circulation fan, speed and
auto-run function.
Push timer
PV Display function
key
1 time Wait on (delay on) timer
UP Key
Increases the set value
DOWN Key
Decreases the set value
ENTER Key
Stores the selected set value.
0DQXDO12/9HUVLRQ
Auto-Tune Key
Press the A/T button for one (1) second to begin
autotuning the temperature.
SHAKE/SET Key
Rpm setting & shaking timer mode
Push
PV Display SHAKE/SET function
Key
stop : rpm setting
1 time
operation: setting rpm
6 times pause
Operation incubation/shaker at
7 times
the same time
START/STOP Key
Start / Stop
Synchronized: Starts and stops the incubator and
shaker.
Not Synchronized: Starts and stops the incubator only.
Press to clear flashing LED and beeping when the
incubated shaker stops operating.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Lamp Switch
Power Switch
0DQXDO12/9HUVLRQ
The incubated shaker’s temperature can be measured in degrees Celsius or Fahrenheit. Unit of
measurement is factory set to degrees Celsius (°C). Use the following procedure to change the
temperature unit of measurement
Step 1: Press the TEMP key five (5) times. The PV and SV displays will change to the following.
Step 2: Press the UP key or DOWN key to change the unit of measurement.
Step 3: Press the ENTER key to finish setting the unit of measurement
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 1: Press the TEMP key one (1) time. The setting in the SV display will flash.
Step 2: Press the UP key or DOWN key to set the desired temperature
.
0DQXDO12/9HUVLRQ
Step 1: Press the TEMP key one (1) time. The setting in the SV display will flash.
Step 2: Press the UP key or DOWN key to set the desired temperature
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 1: Press the TEMP key two (2) times. The setting in the PV display will show SV1, and the SV
display will flash.
Step 2: Press the UP key or DOWN key to set the desired temperature
Step 3: Press the ENTER key to finish setting the SV1 temperature value
Step 4: Press the TEMP key one (1) time. The setting in the PV display will show SV2, and the SV
display will flash..
Step 5: Press the UP key or DOWN key to set the desired temperature.
Step 6: Press the ENTER key to finish setting the SV2 temperature value
Step 7: Press the TEMP key one (1) time. The setting in the PV display will show SV3, and the SV
display will flash.
Step 8: Press the UP key or DOWN key to set the desired temperature.
Step 9: Press the ENTER key to finish setting the SV3 temperature value
Step 10: Press the ENTER key to return to the main display
0DQXDO12/9HUVLRQ
Use the following procedure to select SV1, SV2 or SV3 as operating temperature once they have been
set and memorized.
PV Display Shows
Times Previously
Unselected
pushed Selected
2
Step 2: Check the temperature setting in the SV display to ensure it is the one you want to select.
.
Step 3: Press the ENTER key to finish selecting the rememorized temperature setting.
Step 4: Press the START/STOP key two (2) times operator the controller
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Use the following procedure to select SV1, SV2 or SV3 as operating temperature once they have been
set and memorized.
PV Display Shows
Times Previously
Unselected
pushed Selected
2
Step 2: Check the temperature setting in the SV display to ensure it is the one you want to select.
Step 3: Press the ENTER key to finish selecting the rememorized temperature setting. Upon pressing
the ENTER key the controller will continue operating with the new set value.
0DQXDO12/9HUVLRQ
The wait (delay) timer is a productivity tool and a safety device, which allows you to preset the start up
and running times for unattended operation.
The wait-on (on-delay) timer delays the start of incubator temperature profile for a selected time. The
wait-off (off-delay) timer shuts off the incubated shaker after the program runs for a chosen time.
When incubator and shaker are synchronized the wait off (off
delay) timer shuts down all temperature and shaking programs.
The wait-on and wait-off timers can be combined to give you a complete unattended start up and shut
down.
'ZCORNGG
It is currently 5:00 PM and a completed culture is needed by 9:00 AM the
O
next morning. It takes 4 hours for the culture to incubate at 35 C. The
O
current chamber temperature is 25 C, and from a previous experiment you
know the IS-971 will take approximately 15 minutes to raise the temperature
O
to 35 C.
Place the culture in the incubator and set the Wait-On timer to 11 hours 45
minutes. Set the Wait-Off timer to 4 hours. Press the start key and return
later to collect the culture.
The timers count down and can be set from one (1) minute to ninety nine (99) hours and fifty nine (59)
minutes (99:59) in one (1) minute increments. The factory timer setting is one (1) hour. Each occasion
the timer is set the last setting will be displayed.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
When the wait-on (on-delay) and wait-off (off-delay) timer starts, the following will occur:
$NKPMU
When the wait-on (on-delay) timer expires the following will occur.
&WTKPIYCKVQP6KOGT
&WTKPIYCKVQP6KOGT
#HVGTYCKVQP6KOGT'ZRKTGU
When the wait-off (off-delay) timer expires the following will occur:
The word ‘stop’ will remain in the PV display (as shown above) until
the START/STOP key is pressed.
0DQXDO12/9HUVLRQ
Step 1: Press the TIMER key one (1) time to display the Wait-On (On-Delay) Timer. The PV and SV
screens will change to the following on the main display.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 2: Press the UP key or DOWN key to change the timer to your desired setting.
Step 3: Press the ENTER key to finish setting the timer. The W/ON LED will illuminate
(as shown In Figure) and a beep will be emitted.
Step 4: Press the ENTER key to return to the main display. Press the START/STOP
key to activate the timer and any other temperature and/or shaking parameters.
0DQXDO12/9HUVLRQ
Use the following procedure to set and start the wait-off timer.
Step 1: Press the TIMER key two (2) times to display the Wait-Off (Off-Delay) Timer. The PV and SV
screens will change to the following on the main display.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 2: Press the UP key or DOWN key to change the timer to your
desired setting.
Step 3: Press the ENTER key to finish setting the timer. The W/OFF LED will illuminate (as shown in
Figure) and a beep will be emitted.
0DQXDO12/9HUVLRQ
4.2.4.4 Setting the combined wait on and wait off (on and off delay) timer
Use the following procedure to set and start the combined timer
Step 1: Press the TIMER key one (1) time to display the Wait-On (On-Delay) Timer. The PV and SV
screens will change to the following on the main display.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 2: Press the UP key or DOWN key to change the timer to your desired setting.
Step 3: Press the ENTER key to finish setting the timer. The W/ON LED will illuminate (as shown in
Figure on page 28) and a beep will be emitted.
Step 4: Press the TIMER key one (1) time display the Wait-Off (Off-Delay) Timer. The PV and SV
screens will change to the following on the main display.
Step 5: Press the UP key or DOWN key to change the timer to your desired setting.
Step 6: Press the ENTER key to finish setting the timer. The W/OFF LED will illuminate (as shown in
Figure ) and a beep will be emitted.
0DQXDO12/9HUVLRQ
Use the following procedure to cancel the Wait-On Timer, Wait-Off Timer or both
Step 1: Press the TIMER key one (1) time to display the Wait-On (On-Delay) Timer.
Or
Press the TIMER key two (2) times to display the Wait-Off (Off-Delay) Timer.
Step 2: Press the UP key or DOWN key to until the timer reads 0:00 as shown below.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
The incubated shaker’s Auto-Run function is a productive and safety tool, which lets you:
l To automatically restart programs where they stopped when the power interruption occurred
once power has been restored, or
l For safety purposes, require the operator to manually restart the programming once power
interruption has been corrected.
Step 1: Press the TIMER key three (3) times. The PV and SV displays will change to the following.
Selecting YES enables the unit to automatically restart operation upon restoration of power. Selecting
NO makes the operator manually restart incubated shaker after restoration of power.
Step 3: Press the ENTER key to finish setting the auto-run function
0DQXDO12/9HUVLRQ
Use the following procedure to change the air circulation fan speed.
Step 1: Press the TIMER key four (4) times. The PV and SV displays will change to the following.
.
Step 2: Press the UP key or DOWN key to change the air circulation fan speed
If not selecting the fan speed for ten (10) seconds, the
controller will return to the main display and last set fan
speed value.
Step 3: Press the ENTER key to finish setting the air circulation fan speed
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Program pattern
0DQXDO12/9HUVLRQ
The controller of this unit uses terms as below for setting programs.
Program
A Collection of each segment setting temperature and time.
Segment, Prg.1~Prg.9
Program consists of each segment. Each segment can be set time and temperature, and they are
displayed on the controller from Prg.1~Prg.9 in order.
When you set time at each segment, should consider time to reach the set temperature.
It moves to next segment after finishing setting time even it doesn’t’ reach the setting temperature.
Therefore, please consider extra time to reach the set temperature.
Phase (SEg.L)
If you input repeat numbers, it will operate from the specified segment after running all segments once.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Example
One user wants to input 7 temperatures at each time and repeat it 10 times. For the first time, it will
operate all from 1 segment to 7 segments, and then it will run from 3rd segment in seven segments
during remaining 9 times.
First of all, input 7 temperatures and times at each segment and then input 00:00 at 8th segment.
0DQXDO12/9HUVLRQ
Step 3: Press Enter button to save. If you input 1 or more, PV and SV are displayed as below.
Step 4: Press Up/Down button to set SEg.L(phase) for assigning start segment for the second
operating.
Step 6: Press Up/Down button to set time for the first segment.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 8: Press Up/Down button to set temperature for the first segment.
Temperature range is
amb+5Ȕ~80Ȕ(SIF5000/SIF6000),
amb-20Ȕ~80Ȕ(SIF5000R/SIF6000R),
each time you press the button, once the temp will
increase or decrease by 0.1Ȕ
When you keep pressing Up/Down button, setting time
will be changed very rapidly.
After pressing Enter button, SV, PV are displayed as below and then you can input time for second
segment.
Repeat Step 6 and Step 7 to set the time for second segment.
Repeat Step 8 and Step 9 to set the temperature for the second segment.
Repeat Step 6 to Step 9 to set temperatures and times for all segments.
Max.9 segments can be set.
0DQXDO12/9HUVLRQ
If you finish all steps as above, press “Enter” button. Then, PV and SV display 8th segment as below.
If time is entered 00:00, it will run until the previous segment. Even though you set time after 00:00, it
will not be operated. As above example, it will run to 7th segment, and will not run 9th segment even if
time is set.
Step 12: Press Enter button and then it returns to main screen
Or
Press Start/Stop button, it operates program mode.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
This unit is designed to use both of rotary and rectilinear motion. It is fixed as Rotary motion from our
factory, and you can exchange the mode easily as following process.
Necessary Tool
Step 2: Open the door to see the inside of chamber and remove all accessories including universal
platform. And then you can see the shaking table.
Step 5: Remove 4 ea spacer (for rotary) motion rotating counterclockwise by 13mm wrench.
Step 6: Fix the supplied spacer for rectilinear motion to lower side of the frame.
Step 7: Assemble the bolts and washer which were removed at step 3 to the outer hole of the shaking
table.
Step 8: Changing the motion is done. Please power on and operate the unit.
0DQXDO12/9HUVLRQ
㎄㢨䇭G䊀㢨⽈G㥐ᶤ
7DNH7KH6KDNLQJ7DEOH
䟀㤸G㟨┍㟝GẠ⮁
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
The above drawing shows the times it will take to reach set RPM and to stop when you press
Start/Stop button. This graph is only the result of testing 1 unit with 20kg loading, if you load more, if
you stack up one unit more, the upper unit would be less 30~50rpm due to vibration.
However, this graph could have a difference depends on your environment like condition of floor,
distribution of load so on.
This drawing is used as an important material when you set whole time using a shaking timer.
Because you can set timer by reaching rpm, when you set time, the time as above should be
considered to use timer function correctly.
0DQXDO12/9HUVLRQ
You can set rpm not only when the unit stopped but also when it is working.
Step 1: Press Shake/set button to check RPM once. PV and SV show as below.
Step 4: Press Enter button to go back to main display. Press Start/Stop button, then, incubator and
shaker start working at the same time. .
Or
When you press Shaker On/Off switch, only shaker start working.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 1: Press Shake/set button to check RPM once. PV and SV show as below
0DQXDO12/9HUVLRQ
You can set timer for “Delay Off” function as following steps – “TIME” step of whole time.
Step 1: Press Shake/Set button twice to set timer for “Delay off”
– (set “Hour” of whole time) PV and SV display as below.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
You can set timer for “Delay Off” function as following steps. – “Minute”, “Second” step of full time.
Step 1: Press Shake/Set button 3 times to set timer for “Delay off” – (“minute”, “second” of whole time)
PV and SV display as below.
Step 2: Press Up/Down button to set “minute” and “second” of whole time you want
The whole time of timer for “Delay off” is combined inputting hour step and
minute/second step. If you input just one of steps, the SHAKE LED light on as above
figure.
0DQXDO12/9HUVLRQ
The time of forward rotation during working of delay-off timer can be controlled by setting as following
steps.
Step 1: Press Shake/set button 4 times to set time for forward rotation. PV and SV display as below.
Step 3: Press Enter button to save the time. And then, F/WARD LED light on as right figure with beep.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
The time of backward rotation during working of delay-off timer can be controlled by setting as
following steps.
Step 1: Press Shake/set button 5 times to set time for backward rotation. PV and SV display as below
Step 3: Press Enter button to save the time. And then, B/WARD LED light on as right figure with beep.
0DQXDO12/9HUVLRQ
You can control the pause time during working delay-off timer by setting as following steps.
Step 1: Press Shake/set button 6 times to set pause time. PV and SV display as below
Step 3: Press Enter button to save the time. And then, PAUSE LED light on as right figure with beep.
PAUSE does not work if you only set time and pause during delay-off timer. F/WARD or
B/WARD set is necessary.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
l General Operation
l Delay off timer including F/WARD or B/WARD.
l Delay off timer including F/WARD and B/WARD.
l Delay off timer including F/WARD or B/WARD and PAUSE.
l Delay off timer including F/WARD, B/WARD and PAUSE.
0DQXDO12/9HUVLRQ
It runs only forward rotation regardless the time. Start/Stop button or Shaker On/Off switch is used.
SHAKER LED does not light on during general operation (regardless the time)
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
In this configuration, you can operate one of rotation forward or backward in a certain time. If you set
whole time and forward(or backward) rotation time and press Start/Stop button or Shaker On/Off
switch, the unit runs setting time and stop automatically even in your absence.
Step 2: Set ‘Hour” or “Min/sec” of Shaker Delay off and press Enter button.
Step 3: Set F/WARD (or B/WARD) time and press Enter button.
0DQXDO12/9HUVLRQ
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
In this configuration, F/ward and B/ward rotation are operated step by step in a certain time. If you
input whole time, F/ward, B/ward rotation time and press Start/Stop button or Shaker On/Off switch,
the unit runs exactly what you saved and stop even in your absence.
The unit starts F/ward rotation first. The set time for F/ward rotation is finished then shaking table
speed is decreased to stop. After stop, it starts accelerate for B/ward rotation. The set time for B/ward
rotation is finished, then it decelerate and start F/ward rotation again. It will continue until the whole set
time is finished.
You can set F/ward and B/Ward rotation program as following steps.
Step 2: Set “hour” or “min/sec” of Shaker delay off timer and then press Enter button.
Step 3: Set time for F/ward rotation and press Enter button.
Step 4: Set time for B/ward rotation and press Enter button.
0DQXDO12/9HUVLRQ
After set the timer and press Start/Stop button, the LED lights on as shown. The SHAKE
LED will be blinking until the timer working is finished and applicable working LED is
blinking during timer working.
The opposite side LED is blinking while the shaking table speed is decelerated
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
In this configuration, F/Ward rotation (or B/Ward rotation) and Pause can be operated step by step in a
certain time. Set whole time, F/ward time (or B/ward time) and pause time and press Start/Stop button
or Shaker On/Off switch, then, the unit will be operated what you saved and stop even in your absence.
The unit starts F/Ward (or B/Ward) rotation first. After finishing F/ward(or B/Ward) rotation time then,
shaking table starts deceleration and pause after it stop. After finishing pause time, it starts operating
F/ward rotation again. It continues until terminate whole time.
You can set program of whole time, F/ward rotation or B/ward rotation, pause time as following steps.
Step 2: Set “hour” or “min/sec” of Shaker delay off timer and then press Enter button.
Step 3: Set F/ward time (or B/ward time) and press Enter button.
0DQXDO12/9HUVLRQ
After set the timer and press Start/Stop button, the LED lights on as shown. The SHAKE LED will be
blinking until the timer working is finished and applicable working LED is blinking during timer working.
The opposite side LED is blinking while the shaking table speed is decelerated
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
This configuration provides the operator with timed oscillation between forward (clockwise) and
backward (counterclockwise) agitation with pauses between agitation direction. Upon setting the whole,
forward, and backward and pause timers and pressing the START/STOP key, the shaking timer
controls the forward and backward agitation and stopping of the agitation for unattended operation.
Agitation begins in the forward (clockwise) direction. Upon timer expiration, the shaking table will
decelerate. The pause timer begins when the shaking table stops. After the pause timer expires, the
backward timer will begin and the shaking table will accelerate to the set speed. After the backward
timer expires and the shaking table comes to a stop another pause cycle will begin. The agitation and
pause cycling will continue until the whole (run) timer expires.
.
Step 2: Set Whole timer (Hours and/or Minutes:Seconds). Press the ENTER key.
0DQXDO12/9HUVLRQ
Step 6: Press the START/STOP key to begin agitation. Agitation continues until the whole timer
expires.
Upon setting the timers and pressing the START/STOP key the following indicator
LEDs will illuminate. During the timed agitation the SHAKE LED will flash during the
total whole (run) time, and F/WARD (B/WARD) and PAUSE LEDs will flash during
timing cycle.
As the shaking table decelerates the opposite rotation LED will flash.
When using the Timer function, set each set value, then must press Enter button to illuminate Display
LED.
Even if illuminate SHAKE LED, the shaker doesn’t operate when not illuminating the FORWARD LED
or BACKWARD LED.
The shaker doesn’t operate even if illuminating SHAKE LED and PAUSE LED.
If not setting the time, the shaker operates, the shaker repeats operation until pressing the
START/STOP button.
Without insetting the set value by turns, illuminates the SHAKER LED. Press the button, the timer
starts operating only the set value.
When pressing the button during the timer operation, able to re-input in the TIMER set time. Press
Enter button, the shaker stops operating slowly and restarts following with the latest value.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Step 1: Press the SHAKE/SET key seven (7) times. The following PV and SV displays will appear.
Step 2: Press the UP key or DOWN key to change the incubator/shaker synchronization.
Step 3: Press the ENTER key to finish setting your synchronization choice.
Or
Press the START/STOP key to activate any other shaking and/or temperature parameters.
Step 1: Press the SHAKE/SET key seven (7) times. The following PV and SV displays will appear.
Step 2: Press the UP key or DOWN key to change the incubator/shaker synchronization.
Step 3: Press the ENTER key to finish setting your synchronization choice.
0DQXDO12/9HUVLRQ
Step 4: Shaker would be stopped if Shaker On/Off switch is pushed again but Incubator is still
working.
䌝䍐䌹䍅䍈䍄䌽䋸 䌉䌒䋸 䌡䌾䋸 䌹䍆䋸 䍍䍋䌽䍊䋸 䍏䌹䍆䍌䍋䋸 䍌䍇䋸 䌻䍀䌽䌻䍃䋸 䍌䍀䌽䋸 䍋䍌䌹䍌䍍䍋䋸 䍇䌾䋸 䍈䍊䍇䌻䌽䍋䍋䋸 䍇䌾䋸
䌻䍇䍆䍌䍁䍆䍍䌽䋸䍌䍀䌽䋸䌻䍍䍄䍌䍁䍎䌹䍌䍁䍇䍆䋸䍈䍊䍇䌻䌽䍋䍋䌆䋸
䌝䍐䌹䍅䍈䍄䌽䋸 䌊䌒䋸 䌡䌾䋸 䍑䍇䍍䋸 䌼䍇䍆’䍌䋸 䍏䌹䍆䍌䋸 䍌䍇䋸 䍍䍋䌽䋸 䌡䍆䌻䍍䌺䌹䍌䍇䍊䌄䋸 䍌䍍䍊䍆䍁䍆䌿䋸 䍌䍀䌽䋸 䍇䍆䍄䍑䋸
䌫䍀䌹䍃䌽䍊䋸䍇䍆䌇䍇䌾䌾䋸䍋䍏䍁䍌䌻䍀䋸䌻䌹䍆䋸䌺䌽䋸䌹䍎䌹䍁䍄䌹䌺䍄䌽䋸
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
0DQXDO12/9HUVLRQ
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
BIAS function ●
Thermocouple ●
Check temperature
settings
Current operating ●
Memorized
(SV1, SV2, SV3) ●
Programs ●
Check
incubator/shaker
●
synchronization
settings
Check wait timer
settings and controller ●
function
Shaker
Check accessory (ies)
attachment screws to
●
universal platform are
tight.
Check shaking table to
platform screws are ●
tight
Check agitation RPM
setting ●
Check shaking
forward, backward,
total timer setting ●
and controller function
0DQXDO12/9HUVLRQ
Step 1: Put anti-chemical gloves on and wipe out the inside of machine with a neutral detergent on
soft patch.
Step 2: Wipe out the inside of machine with a neutral detergent on soft patch.
If the inside of machine is exposed and polluted by a toxic chemical and dangerous gas, wipe out
carefully with following next steps
Step 2: Wipe out the inside of machine slowly with dried patch.
Step 3: Please clean up the controller panel with a dry patch like brushing away dust.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
%QPFGPUGT
%QXGT%TGY
䂌⒨㉐G䀘ⶸ
⸰䏬O[ᵐP
%QPFGPUGT%QXGT
䂌⒨㉐G䀘ⶸ #KT(KNVGT
㜄㛨G䙸䉤
Step 1: Press the POWER switch to turn the incubated shaker off.
Step 5: Clean the air filter with a vacuum cleaner, compressed air or rinse with water.
Step 6: Check condenser and clean with a vacuum cleaner or compressed air as needed.
0DQXDO12/9HUVLRQ
NOISE
CURRENT FUSE
MODEL VOLTAGE FUSE(A) FILTER
DRAW (A) PART NUMBER
(A)
9.6~
100V~120V 12 15 00CDE0005542
11.1
SIF5000
210V~250V 5.0 ~ 5.7 8 10 00CDE0005544
11.4~
100V~120V 15 15 00CDE0005541
12.9
SIF5000R
210V~250V 6.8 ~ 7.5 10 10 00CDE0005543
9.7~
100V~110V 12 15 00CDE0005542
10.8
SIF6000 120V 11.2 15 15 00CDE0005541
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Fuses are located at the right side of the incubated shaker near back of the switch. Use the following
instructions to replace fuses.
)XVH+ROGHU
䘜㪼G䝴⒈
Step 1: Press the POWER switch to turn the incubated shaker off.
Step 2: Insert straight blade screwdriver into the fuse holder. Turn fuse holder 50 degree
counterclockwise and pull the fuse holder out its socket.
Step 3: Replace blown fuse with new one. Compare fuse markings with the required fuse amp rating
in the table 5.3 on page 113 before inserting new fuse in fuse holder.
Step 4: Complete steps 1 through 2 in reverse order. Make sure the unit is level when put back in its
place.
0DQXDO12/9HUVLRQ
Review the following checklist upon completing the tasks in Sections 5.2, 5.3 and 5.4 to ensure the
unit runs properly.
ü Make sure all unit and wall outlet electrical connections are tight.
ü Make sure condense drain hose is tightly on hose barb and hose is run to a drain.
ü Make sure external refrigeration hoses are tightly secured. (SIF5000, SIF6000 only and only if
using external refrigeration feature.)
ü Make sure caster feet are lowered and have locked the incubated shaker in place.
ü Make sure there are no flammable or explosive liquids in the incubation chamber.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
0DQXDO12/9HUVLRQ
6.0 Troubleshooting
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
0DQXDO12/9HUVLRQ
6.2 Electrical
Power failure or circuit Find out the causes of power failure and
breaker shuts down recovery.
Main plug not seated Check the electrical cord connection at the
The unit does not properly. unit to ensure it is fully seated.
turn on
Socket / plug / main power If the socket / plug / main power line are
line might be cut cut, request service.
Main plug does not insert Make sure electrical cord connections at
correctly the outlet and the unit are firmly in place.
With the POWER
sw
itch ON, the switch Blown fuse(s) Check the fuses and replace, if necessary.
does not illuminate.
Faulty connection at the
POWER switch
Request service.
POWER switch malfunction
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
Humidity might inflow into the If there is humidity on the inserting part, clear it
main power inserting part and reconnect.
The temperature Confirm whether Temp LED is If Temp LED is not illuminated, press
doesn’t decrease. illuminated. START/STOP key.
0DQXDO12/9HUVLRQ
6.3 Refrigeration
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
6.4 Shaker
0DQXDO12/9HUVLRQ
7.0 Accessories
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
100ml 28 44
125ml 28 44
250/300ml 13 24
500ml 10 16
1,000ml 5 8
2,000ml 4 5
2,800ml 2 4
4,000ml 2
6,000ml 2
Mode
SIF5000/5000
SIF6000/6000R
R
Funnel Clamp
250ml 4 6
500ml 2 3
1,000ml - 2
2,000ml - -
Model
SIF5000/5000R SIF6000/6000R
Type
Single 8 15
Tower 6 10
Flat A(large) - 2
Flat B(small) 2 3
0DQXDO12/9HUVLRQ
Platform
SIF5000/5000R SIF6000/6000R
Rack Angle
0˚~60˚ 2 4
Test tube
Test tube diameter
quantity
8mm/10mm/11mm 86
12mm/14mm 58
15mm/16mm/17mm/18mm/19mm 32
20mm/22mm/25mm/28mm 19
30mm/35mm 10
50mm 4
Platform
SIF5000/5000R SIF6000/6000R
Flask
50ml 16 25
100/125ml 9 16
250/300ml 4 9
500ml 4 5
1,000ml 2 4
2,000ml 1 2
2,800ml 1 2
ȉ About the right position for mounting maximum quantity of Accessories, please visit Jeio
Tech website or contact our office and distributor.
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
0DQXDO12/9HUVLRQ
8.0 Appendix
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
0DQXDO12/9HUVLRQ
8.1.2 SIF6000/6000R
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
The floor that the shaker is tested on for below results is a typical factory flooring materials (liquid
hardener, powder hardener, epoxy paint, epoxy lining, etc.)
Weight condition is the sum of accessories (flask clamps, etc ...), flasks and the weight of the sample
in a flask
8.2.2 Result
8.2.3 Attention
It may cause damage to floor paper when loading more than 21.5kg on the floor with normal floor
paper.
When two units are loaded, the above one will have the result which approximately 30~50rpm less
than above results.
0DQXDO12/9HUVLRQ
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
0DQXDO12/9HUVLRQ
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
When ordering replacement parts or requesting service information, Please provide the Model Number
and Serial Number of the unit.
65TL, 8A 1 EA 00CDE0005544
0DQXDO12/9HUVLRQ
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG
8.5 Warranty
8.5.1 Terms of Warranty Service
Customer can get free warranty service for 2 years limited warranty from the date of purchase when
the machine is broken while operating.
1. Purchase date
2. Customer name / Address / Telephone NO. / E-mail Address
3. Serial Number (Serial number on Identification plate)
4. Defect and trouble
1. Purchase date
2. Customer name / Address / Telephone NO. / E-mail Address
3. Serial Number (Serial number on Identification plate.)
4. Forwarder’s information
5. Return Authorization Number
6. Reason of Return
0DQXDO12/9HUVLRQ
Ø +PVGTPCVKQPCN5CNGU*GCF1HHKEG
-QTGC
%\XFNVDQ'LJLWDO9DOOH\&KD*DVDQ'RQJ*HXPFKHRQ*X6HRXO.RUHD
6GN 'OCKNRYHUVHDV#MHLRWHFKFRP
(#:
Ø 6JG#OGTKECU
75#$TCPEJ
$*LOO6W:REXUQ0$86$
6GN 'OCKNLQIR#MHLRWHFKFRP
(#:
Ø 'WTQRG
7-$TCPEJ
8QLW7RZHU,QGXVWULDO3DUN&KDOJURYH2[IRUGVKLUH2;;=8QLWHG.LQJGRP
6GN 'OCKNODEFRPSDQLRQ#PHGOLQHVFLHQWLILFFRP
(#:
Ø %JKPC
5JCPIJCK$TCPEJ
$2ULHQWDO,QWHUQDWLRQDO3OD]D/RX6KDQ*XDQ5G&KDQJQLQJ'LVWULFW6KDQJKDL&KLQD
6GN 'OCKNORQJMXQFDR#MHLRWHFKFRP
(#:
Ø 5QWVJ'CUV#UKC
/CNC[UKC$TCPEJ
No 57-59, Jalan Adenium 2G/6Pusat Perniagaan Adenium48300 Bandar Bukit Beruntung
Selangor Darul Ehsan , 0DOD\VLD
6GN 'OCKNODEFRPS#VWUHDP\[FRP
(#:
² 7KHFRQWHQWVRIWKLVPDQXDOFDQEHFKDQJHGRUXSJUDGHGZLWKRXWSULRUQRWLFH
² 7KHFRS\ULJKWRIWKLVPDQXDOLVUHVHUYHGE\-HLR7HFK
$OO5LJKWV5HVHUYHG-HLR7HFK&R/WG