Nothing Special   »   [go: up one dir, main page]

Material Ledgers Blog

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 25

Material Ledgers/ Actual Costing

FollowRSS feedLike
28 Likes 31,242 Views 17 Comments

Material Ledger/ Actual Costing is one of the complex tool provided by SAP to manage its inflows
and outflows of core manufacturing related materials in multiple currency and valuations. In this blog,
I have tried to explain this functionality in detail with example (mainly Actual Costing).

Basically Material Ledger/Actual Costing are the two separate functionalities which are inter-
dependent and are incorporated in the SAP Controlling module which are discussed below.

Actual Costing
Actual Costing is functionality provided by SAP to calculate actual prices i-e; PUP (periodic unit
price) of inventories/ valuated material including Raw Material (ROH), Semi- Finished Good (HALB)
and Finished Good (FERT). It includes all the actual prices for material in particular period.

Actual Costing Run (CKMLCP) is the month end activity, which is used to valuated the inventory in
balance sheet at actual price (PUP- Periodic Unit Price) by calculating and posting Production
variance during the month on the Material which was previously maintained at Standard Price
(calculated from CK11N) in balance sheet.

Standard costing and actual costing can run completely separate from each other without any
conflicts. The only decision to be made is, what price you use for material valuation. You can mark
and release your cost estimations from CK40N as standard price to be used during the period. After
the period is over and you run your CKMLCP you can decide in the closing entries if you want to
revalue the inventory (of last month) by the periodic unit price.

The figure below shows the process and entries for Production Variance without Material Ledger/
Actual Costing,
The figure below shows the process and entries for Production Variance with Material Ledger/ Actual
Costing,

If ML / Actual Costing is active the following Price determination setting can be done in Material
Master of material.
ML active ML not active

Moving Average Standard price (S) Standard price (S)


price (V)
Recommended for
SFG FG

Price Price determination Price Moving Average(V)


determination determination
3 Single/Multilevel Recommended for
2 Transaction- 2 Transaction- RM
based (PUP is used for based
Valuation in the
(MVA is used for closed period) (Std price is used for
valuation) Valuation.
Recommended for
FG SFG and also RM MVA is used for Info
purpose )
If ML is active with
price determination 3 If with ML active you
and you have already use price
performed determination 2 then
transactions to the you can have both
material during the standard and
current period the moving average
costing release price (S or V) but
(CK40N or CK24) of cannot do inventory
Standard price to valuation at actual
material is not costing (PUP).
allowed.
So, if you decide to
use 2 and V then the
purpose of ML would
only be for parallel
valuation (not for
actual costing).

S4 HANA Simplifications for Actual Costing:

In S4/HANA, there are no changes in the Actual Costing process it is remain optional to client
whether to use this functionality or not as in SAP ECC.

Material Ledger
Material Ledger is a tool used to manage your inventory in multiple currencies and/ or perform
multiple inventory valuation. It allows the client to manage its inventory in three currencies which is
previously (when Material Ledger is not activated) being manged in only one currency with legal
valuation.

Material ledger with Or without Multiple valuations

In order to used Multiple Valuations ML must be implemented.

ML with multiple valuations ML w/o multiple valuations

If multiple valuations are  used ML valuates If multiple valuations are not used ML just
the materials in up to 3 valuation views with 2 store the material prices/stock values in
currencies up to 3 currencies

Example 1: 3 val : 2 curr Example 1:

Legal valuation/ Comp code currency Comp code currency

Group valuation/ Group currency Group currency

Profit center valuation/ Group currency Hard currency

                        OR Example 2:

Legal valuation/ Comp code currency Comp code currency

Group valuation/ Group currency Group currency

Profit center valuation/ Comp code currency Index based currency

Example 2: 3 val : 1 curr  

Legal valuation/ Comp code currency

Group valuation/ Comp code currency

Profit center valuation/ Comp code currency

Used with Multiple Valuation: Used without Multiple Valuation:

Used for parallel valuations. Material Used if we want to store/display material


price/stock is valuated(costed through price/stock/transactions in multiple
CK11N) separately and stored in the currencies.
specified currency.
It is a mere translation of price/ stock into
different currencies at historical exchange
rate .

For each valuation view we maintain separate Version in controlling through t-code: OKEV.
Example,

Versio Version Plan Actual Valuation WIP/RA Variance


n Description View

0 Legal valuation    . Legal valuation  

909 Group valuation Group  


Valuation
910 Profit Ctr
Valuation Profit Ctr
Valuation

With Legal Valuation, you are able to valuate your business processes similar to how you would do
that in the Company Code, using Company Code Currency. Hence your financial reporting will be
similar in Profit Center Accounting and FI.

In the Group View, you apply transfer pricing among Profit Centers at cost. Therefore, there are no
intra-company transfer profits. The only profits that arise will be with respect to non-group
companies.

With the Profit Center View, you apply transfer prices amount Profit Centers with Internal Revenue
and Internal Costs. Therefore, rather than transfer the goods at Cost, the sender PC will “sell” the
goods to the receiver PC. This differs from the Legal view, where the group valuation is more like a
intra-group transfer.

S4 HANA Simplifications for Actual Costing:

Previously in SAP ECC,

Now in SAP S4/HANA,


Material Ledger Simplifications in S4/ HANA,

Material Leger/ Actual Costing Process


Flow.
Procure to Pay Cycle for RM (Raw Material):
Figure below shows the Purchase to Order cycle to procure RM1 and RM2 material at respective
prices.
Accounting entry generated in FI module during transaction MIGO,

In report CKM3 for RM1, we see that the price difference between standard price maintained in RM1
material and actual price at Good receipts is separately posted and shown under Price difference.

Prerequisites for Production Cycle:


Now check or Run cost estimate for FG and SFG to calculate and update Standard Prices in
Material Master. Also create BOM and Routing master data for FG1 (FERT).
Production Cycle for FG (Finished Good):
Now we create Production Order using CS01, as we are using Collective order processing which is a
set of production orders for FG and all its SFGs.

To Create a collective order, one of the SFG must have a special procurement key 81 in its MRP/
Costing view of master data.

As, we are using External activity “PCKG” at operation 0020. So when create Production order of
any quantity the Purchase requisition for this activity type based on required quantity and standard
price got created. Then on the basis of the Purchase requisition purchase order is created and
Invoice verification MIRO is done against it.

Now the confirmation for SFG1 operation 0010 is performed. During confirmation the plan yield
based on production quantity plus BOM and activity from routing is suggested which is change
by manually entering the actual quantity and activity cost. It also suggests scrap of 2% maintained in
MRP1 view of material master.
Figure below analyzes RM1 goods issue and SFG1 Production issue for Production order in Material
price report CKM3N for RM1 and SFG1.

Now the confirmation for SFG2 operation 0010 is performed. The pertaining accounting entries and
moment types are shown in figure below,

Below is the figure to analyze RM2 goods issue and SFG2 Production issue for Production order in
Material price report CKM3N for RM2 and SFG2.
Now, we do the final confirmation for FG1 for operations “0010” and “0020” as shown in figure
below,

Material Price Analyses report CKM3 for FG1 is analyzed, as shown in the below figure,

Following are the additional reports to further analyze the FG1 Material activity, purchase price and
production variances.

Month-End Process for Production:


Now, we calculate actual activity Prices through KSII or entered it manually through KBK6. Then we
TECO the all three production order and run the settlement to calculate Production Variances for FG
(FERT) and SFGs (HALB).
Below the figure showing CKM3 report analysis for FG1, SFG1 and SFG2,
Order to Cash Cycle for FG:
Now we make the sales 100 quantity of FG1. First we maintain the sales price for condition type 
PR00 in VK11 and then we execute the sales order cycle for the entry of sales order to billing where
the accounting invoice is generated in Finance.

After doing post good issue/ delivery where the accounting entry is generated for Cost of sales. In
Material Price analysis report CKM3 for FG, we are now able to see the impact of this sales as
shown in below figure,

Note: If costing based CO-PA is activated, we can see the document generated for delivery and
billing in Profitability Analysis by using t-code KE24 only after billing.
Actual Costing Run (CKMLCP):
Pre-requisites:
The sequence in ML/Actual Costing should always be the following:

1) Create and mark cost estimate in period 1 for period 2  (T-Code: CK11N)

2) Do the period shift from period 1 to 2  (T-Code: MMPV)

3) Release the Standard cost estimate (T-Code: CK40N or CK24)

4) Do ML period end closing of period 1 (T-Code: CKMLCP)

With ML active, you may use CKMLCP to calculate the actual price and mark it as the further price
(but only for two periods later. Let’s say, if you do post closing for period 06 and get a periodic unit
price, this price can only be marked as future price in period 08 or later). This marked future price
can be released via ck40n, ck24, CKME.

If the company decides to go for periodic unit price every period. It is recommended to
execute CKMLCP and further processes till release of periodic unit price from period 6 to 7 with
material price determination maintain as 3 and S.

Company may decide whether or not to use the PUP (actual price) as future price. If it does not want
so, use the normal Product Cost Planning process from CK11N/ CK40N.
Case 1 (Price determination 3 & S):

If ML is active with price determination 3 and you have already performed transactions to the
material during the current period, the costing release (CK40N or CK24) of Standard price to
material is not possible.

Case 2 (Price determination 2 & V): 

If with ML active you use price determination 2 then you can have both standard and moving
average price (S or V) but cannot do inventory valuation at actual costing (PUP). So, if you decide to
use 2 and V then the purpose of ML would only be for parallel valuation (not for actual costing).

CKMLCP Execution:
CKMLCP is executed to calculate Period Unit Price (PUP), which basically represent average actual
cost for material or semi finished goods. Execution of CKMLCP includes the below steps:

Step 1: Selection

Execution of Selection steps identified, the list of materials for which the Periodic Unit Price
calculation need to be executed during CKMLCP. The selection step work on the below concept:

After executing the Selection step, the system will identifies all the materials for which Periodic Unit
Price should be calculated during the CKMLCP as in our case materials MAK2 RM1, MAK2 RM2
MAK2 SFG1, MAK2 SFG2 & MAK2 FG1 are selected.. The materials selected during this run are
based on following criteria,

1- Materials from those plants specified at creation of CKMLCP costing run.

2- It includes all the materials for which any goods movement happened during the current period or
any of the previous periods after the go-live off Material ledger in Plant

3- List of materials for which ML indicator is set to active in Material master.

4- Material with status other than not defined or new.

Step 2: Determine Sequence


In this step the system describes the sequence in which the Periodic Unit Price for all the selected
materials needs to be calculated.

It determine the group of materials, the cost of which don`t depend on the cost of any other
materials. Generally these are externally procured materials from external vendor (not from internal
organization transfer, or purchase from some other plant of same company). Like in our case raw
materials MAK2RM1 and MAK2RM2 gets selected. These materials are considered for actual PUP
calculation at single level price determination.

All the other materials, manufacture in-house, sub-contracting, purchase from some other affiliates in
the same company are considered for multilevel price determination.

Step 3: Single level price determination

Single-level material price determination is the step in which the Periodic Unit Price (also called
PUP, Actual Price) is determined.
This step calculates actual material prices based on Costs of Procurement.
The term single-level always refers to an individual material and its procurement process (external
procurement and internal procurement like production or company transfer).

When using Actual costing, all materials are valuated with a preliminary price (standard price) that
must remain constant during a period.
Variances (price differences and exchange rate differences) arise during the period for this
preliminary valuation price.
At the end of the period, you can use the single-level price determination to assign the variances
recorded in the period for each material.

In our case the Price difference for RM1 & RM2 are calculated and production variance for SFG1,
SFG2 & FG1 are calculated.

The below figure shows the impact of single level price difference on the ending inventory of FG1.

Step 4: Multilevel price determination

In this step system do the PUP price calculations by considering the below prices:

1- Variance between the Standard price of raw materials with the Single level PUP calculated at
-single level price determination

2- Variance between Plan activity rate with Actual activity rate

3- Variance allocation performed through the actual flow of goods on actual quantity

4- Variance between inter-plant (under same company, may or may not be under the same co.
codes)  transfer are also consider if any goods movement happened between these plants,
otherwise not

5- All other variances having an impact on lower level materials actual cost are consider for
calculating actual PUP for higher level materials.
The screenshots below depicts the the impact of Multi-Level Price determination on the RM1 to
SFG1 highlighted in blue circle.

The picture below shows the the effects of Multi level Price determination on SFG2 from RM2
consumption.
Finally the the variances in consumption of SFG1 & SFG2 for FG1 would be transfer to FG1 Receipt
from lower level Variances as shown in the figure below.
Step 5: Revaluation of consumption

In this step system do the revaluations of all the consumption based on the actual PUP calculated at
single level or multilevel price determination. The main purpose of this step is to bring the cost of
consumption for Good Finished to actual cost, so that the profit margins are not over or under stated.
The below image illustrates the impact of Consumption Revaluation on FG1 as the cost from non-
allocated is assigned to Revaluation of Consumption.

Step 6: WIP revaluation

In this step system do the revaluations of all the Work in progress based on the actual PUP
calculated at multilevel price determination.

As in our scenario WIP is not calculated for Production Order so we skip this step.

Step 7: Post closing


At post closing step, system do the posting of all the variances calculated during single level or
multilevel price determination and do the revaluation of consumption and closing inventory, and
passed the necessary entries.

After this the material master price control in the previous period will be changed permanent to V,
from S. But in the new period, it will still be S.

Below are Accounting entries for the analysis resulted as a result of Post Closing execution.
In above entries you see that here the activity Price variance is charge to cost center and FG
Inventory directly rather than to Cost center and Production Order. Here we don’t have to run t-code
CON2 for Revaluation of activity at actual Price.

Step 8: Mark material price


Material ledger provides the functionality of converting the current Periodic unit Price (PUP) as
standard cost of next month. This can be done via executing the Mark material price step.

When you mark price with CKMLCP, the future price in accounting view 1 is changed together with
the “valid from” date.

After executing this step, the PUP of current months gets updated as marked cost estimate for
coming month. For converting, the PUP of current month as standard cost of next month
autoatically, we need to activate Dynamic price release.

This Blog is aimed to give the concept and use of Material Ledger/ Actual Costing and what benefits
an organization gains from this functionality. Below are some references which are knowledge full to
readers if they want more insight of Actual Costing. Hope that this article is able to deliver what it is
destined too. It is requested from readers to please share their feedback. Your time and efforts
would be highly appreciated.

Real Time Problems And Business Scenarios of ML-


Actual Costing.
Following are the solutions/ blogs and queries pertaining to real time issues face by organization for
Material Ledger- Actual Costing.

Problem:
How To Analyze Not Distributed Price Differences with Value Flow Monitor
(CKMVFM)

Link: https://blogs.sap.com/2013/02/15/how-to-analyze-not-distributed-price-differences-with-value-
flow-monitor-ckmvfm/

Problem:
How to open the MM previous periods, after the ML- Actual Costing activation, for
the creation(Plants) and entries (of Materials) on the new Plants on which ML-
Actual Costing is not active.

Link: https://answers.sap.com/questions/12900355/how-to-open-the-mm-closed-period-when-
material-led.html

Problem:
ML is Revaluing the consumption as the difference of 24,231.49/= is allocated for
% Qty which is consumed in Production. It’s not revaluing the Stock transfer
made to other Plant of Qty 505.
Link: https://answers.sap.com/questions/12547238/not-allocated-variances-in-ml-closing—
ckm3n.html

Problem:
ML Document reversal on MIRO cancellation/reversal. On reverse of MIRO,
system should also reverse ML Document and all price difference posted against
invoice. However, in CKMVFM (Value monitor flow), system is showing reversal
documents and posting differences on material which should not be done.

Link: https://answers.sap.com/questions/12900755/ml-document-reversal-on-miro-reversal.html

References: 
Special thanks to Srinavasa Kasireddy
https://blogs.sap.com/2019/03/07/material-valuation-with-material-ledger/comment-page
1/#comment-453516 – By Srinavasa Kasireddy

https://blogs.sap.com/2014/05/12/automation-of-actual-costing-run-ckmlcp-in-material-ledger/

https://archive.sap.com/discussions/thread/1772674

https://archive.sap.com/discussions/thread/3346981

https://answers.sap.com/questions/12547238/not-allocated-variances-in-ml-closing—ckm3n.html

 
 

You might also like