Calibration of Angle - Bevel Protector

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 6

CALIBRATION

LABORATORY

ANGLE / BEVEL PROTECTOR


TITLE : PROTECTOR CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
L3- CAL-17 0 1 01-Jan-2019 2 of 6

REVISION RECORD SHEET


NOTES

i) Revisions after Rev. 0 are denoted by a vertical line in the left hand margin
against the revised text, with the revision number displayed next to the revision
line as shown on the left.

ii) Revision numbers are A, B, C, etc. up to the issue for management approval
and implementation, which is Rev. 0. Subsequent revisions shall be 1, 2, 3,
etc.

No. Date Description of Revision Prepared Review Approved

Issued for approval &


0 01-Jan-2019 MS JR JC
implementation

DOC. NO. L3- CAL-17 Rev. 0 dt. 01-Jan-19 Page : 2 of 6


TITLE : PROTECTOR CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
L3- CAL-17 0 1 01-Jan-2019 3 of 6

Table of Contents

S/No. Description Page No.

1.0 Purpose 4

2.0 Scope 4

3.0 Reference 4

4.0 Definitions 4

5.0 Responsibilities 4

6.0 Calibration Conditions 4

7.0 General Guidelines 5

8.0 Calibration Procedure 6

9.0 Records 6

10.0 Attachments 6

DOC. NO. L3- CAL-17 Rev. 0 dt. 01-Jan-19 Page : 3 of 6


TITLE : PROTECTOR CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
L3- CAL-17 0 1 01-Jan-2019 4 of 6

1.0 PURPOSE
1.1 The purpose of this work instruction is to ensure that standard practices /
methods of Calibration are followed to obtain reproducible and comparable
results and this document shall be revised as and when required to meet
specific requirements of the project to become a project specific work
instruction.

2.0 SCOPE
2.1 This work instruction is applicable for Calibration Laboratory to carryout
calibration of Angle Protector at Lab. temperature as per applicable
international standards/methods.

3.0 REFERENCE
3.1 Documents used:
 BS 1685 - Bevel Protractors (Mechanical & optical) - Requirements and
Test Methods
3.2 Angle Gauge
3.3 Protractor Digital
3.4 Surface Plate

4.0 DEFINITIONS
4.1 UUT: Unit Under Test
4.2 BS: British Standard

5.0 RESPONSIBILITIES
5.1 All the Operators/Technicians perfoming the Calibration shall be trained.

6.0 CALIBRATION CONDITIONS


6.1 Lab. Temperature : (21 ± 2) °C
6.2 Relative Humidity : (50 ± 15) % RH

DOC. NO. L3- CAL-17 Rev. 0 dt. 01-Jan-19 Page : 4 of 6


TITLE : PROTECTOR CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
L3- CAL-17 0 1 01-Jan-2019 5 of 6

7.0 GENERAL GUIDELINES


7.1 The calibration should be performed in the controlled environment only. Both
the UUT and Reference Standard equipment should be placed in controlled
environmental condition as mentioned above for at least 30 min warm up.
7.2 UUT should be inspected visually before starting the calibration. Visual
inspection is done for
 Any physical damage.
 Proper Display (in Digital Bevel Protractor)
 Proper functioning of push buttons (in Digital Bevel Protractor)
 Clarity in Magnifying Glass (For Vernier type bevel protractor)
 Rusting in the blades.
 If there is any rusting, it should be removed properly in such a fashion
that flatness of the surface should not be affected.
7.3 If it is not satisfactory, it is to be recorded in the Data Sheet.

Bevel Protractor – Vernier type


Angle Protractor

Digital Bevel Protractor Digital Angle Protractor

DOC. NO. L3- CAL-17 Rev. 0 dt. 01-Jan-19 Page : 5 of 6


TITLE : PROTECTOR CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
L3- CAL-17 0 1 01-Jan-2019 6 of 6

8.0 CALIBRATION PROCEDURE


8.1 Wipe clean the blade properly.
8.2 Wipe clean the surface plate properly.
8.3 For Bevel protractors, place the angle gauge between the measuring face of
the blade and the base of the protractor and note down the reading of the
protractor in datasheet.
8.4 For Digital Angle Protractor place the angle gauge on the surface plate and
put the measuring face of the protractor on the angle gauge to get the
reading.
8.5 For Mechanical type Angle Protractor place the angle gauge between the
measuring faces of the protractor and note the reading.
8.6 Similarly take the reading for other sizes of the angle gauge.
8.7 Take the reading one by one in such a fashion that it covers the whole range
of the UUT.
8.8 Compare the maximum error found with the instrument accuracy as per BS
1685 (for Bevel Protractor) and as per manufacturer’s specification (for angle
protractor) and the accuracy statement is made accordingly in the calibration
certificate.

9.0 RECORDS
9.1 Measurement/reading shall be recorded in the appropriate Check
List/Formats given the Attachment.
9.2 The test report should contain the following information as minimum.
 Client/Customer Name
 Instrument Manufacturer, Make, Model, Range, Serial No & Accuracy
 Test results

10.0 ATTACHMENT

S.No Format No. Description

DOC. NO. L3- CAL-17 Rev. 0 dt. 01-Jan-19 Page : 6 of 6