D85ess P2u
D85ess P2u
D85ess P2u
Undercarriage
Inspection Report Pt. United Tractors Tbk
D85ESS-2
Inspection By : Applic. Soil condition Work condition
Nominal
Measurement % worn LH RH
Meas.
Components Replacement Replacement
Rebuild Plan on Plan on
Left Right Left Right
Limit
813.8
833.8
125.0
115.0
73.0
64.5
65.0
25.0
185.0
163.0
185.0
163.0
185.0
163.0
20.0
30.0
6.0
0.0
210.0
174.0
Page 3 of 3 460232590.xlsx