Sub : Non comprehensive Biennial Maintenance contract for EOT Cranes of various capacities in East
Yard , Cradle Assembly Shop, Stores Complex and Module Shop in MDL
ii. Firm should have experience of working on EOT Cranes having minimum Capacity 50 Ton. Firm
should submit documentary evidence for the same.
iii. Bidders Company Profile and Shop & Establishment registration certificate.
iv. List of equipment held by them with model / year / working status along with details of their
facilities and personnel with designation, qualification and experience to determine their
capabilities.
v. Bidders Audited Balance sheets and Profit & Loss A/c of the company for last 3 financial years
ending 31st March 2016, 2017 and 2018. The average minimum turn over for 3 years should be at
least Rs. 4.50 Lakh.
vi. Bidder should have experience of having successfully completed similar works during last 7
years ending 31.07.2018 as stated below:
a) Three similar completed works each costing not less than Rs. 12 Lakh.
OR
b) Two similar completed works each costing not less than Rs. 15.00 Lakh.
OR
c) One similar completed work costing not less than Rs. 24 Lakh.
Note: Similar completed works referred above means each work and not all works put
together.
NOTE:
1) Sr. no. (iii) and (iv) above not required for permanent registered vendors.
2) If any cash transaction included in turnover (statement of profit & loss) the same will not
be considered for turnover value.
3) It is clarified that the work executed by the contractors for their in-house or capital use will not be
considered for the purpose of bidders’ experience of completion of similar works.
4) Bidders need to Upload supporting documentary evidence in support of the Pre-
Qualification Criteria viz. Work Order, Work Completion Certificate issued by the party for
whom the work is done. MDL has a right to verify / cross verification of authenticity of the said
documents whenever felt necessary.
3.1 Bidders shall furnish EMD of Rs. 60000 (Rupees Sixty Thousand only) against this tender.
3.2 The EMD can be remitted directly to MDL Bank Account as per details given in Annexure- “A”
of this tender. Further, the bidder should specifically mention the details of company name as
well as nature of remittance, tender number/order number etc in the text/narration fields of
Bank’s NEFT remittance in order to identify the same
3.3 EMD can also be submitted in the form of Bank Guarantee in the prescribed format drawn in
favour of MAZAGON DOCK SHIPBUILDERS LIMITED payable at Mumbai. The format of
Bank Guarantee for EMD is available on MDL Website. The bid bond / Bank Guarantee should be
valid for 4 more weeks beyond the offer validity period indicated in the tender. Bank Guarantee
should be drawn on reputed Nationalized / Scheduled Banks excluding co-operative banks. In
case of BG, Bidders to advise their bank/banker to send original BG directly to OTS department
in sealed envelope to dispense with additional step of verification of authenticity of signatories.
3.4 Bidders are requested to upload the scanned image of EMD i.e. Annexure- A/Bank Guarantee
online along with the bid. If bidders are submitting the Bank Guarantee, they are requested to
inform us the address, Tel. No., Fax No. of the issuing Bank. and forward the original of the
scanned copy of EMD enclosed in a envelop addressed to HOD (Outsourcing), 6th floor,
Service Block, North Yard, Mazagon Dock Shipbuilders Limited, Mumbai – 400 010,
superscribing Tender No & Tender date by Speed Post / Registered Post / Courier
Service/Hand Delivery to reach the office of HOD (Outsourcing) within seven days from the Tender
closing date.
3.5. Timely submission of the EMD is the responsibility of the bidders and no reasons / excuses in
this regard will be entertained by MDL.
3.6 EMD of unsuccessful bidders will be returned after finalization of the tender and shall be interest
free. If bidders are submitting the Bank Guarantee, they are requested to inform us the
address, Tel. No., Fax No. of the issuing Bank.
3.7 For making on line payment please follow the following steps:
* Go to www.mazdock.com
* Click on Online payment tab available on home page.
* 4 options viz.Carreer,Tender,Security,Scrap/Disposal will be available.
* Click on the respective tab and make the payment online using Debit Cards,Credit Cards,Net
Banking,BHIM/UPI etc.after filling required details.
PS : Till the new online payment system is fully established , the receipt through the conventional
method of NEFT/RTGS etc.may be accepted in case the remitter has any genuine difficulty with
respect to on line payment .
b) Firms registered with Mazagon Dock Shipbuilders Limited (MDL). (Exemption will apply only to
items/services Service Group 1402169, if permanently Registered under Group No.1402169. To
qualify for EMD exemption, firms should necessarily submit VALID copy of the Registration
Certificate issued by MDL, for the items for which the offer being submitted, in Part-I offer/bid. Firms
in the process of obtaining MDL registration will not be considered for EMD exemption.
c) Firms registered with NSIC under its “Single Point Registration Scheme”. (Exemption will apply only
to items/services for which they are registered). To qualify for EMD exemption, firms should
necessarily submit VALID copy of the Registration Certificate along with the list of items/services for
which they are registered, as issued by NSIC, in Part-I offer / bid. Firms in the process of obtaining
NSIC registration will not be considered for EMD exemption.
d) All Micro & Small Enterprises subject to their submitting the Registration Certificate from the
Competent Authority regarding their Micro/Small Industry status.(Exemption will apply only to
items/services for which ) they are registered with MSME.
4. Validity Period: Bids / Offers shall have the validity period of 120 Days from the tender closing
date.
5. Online Submission of offer in Two Bid System: Offer must be submitted in two parts, Part - I
(Techno-Commercial Bid) & Part – II (Price Bid) on the MDL’s e- Procurement website
https://eprocuremdl.nic.in Offer in any other form will not be considered.
i) Online Acceptance on clauses of Tender Enquiry, General Terms & Conditions (GT&C), Standard
Terms & Conditions (STACs) in the Prescribed Formats stating ‘Accepted OR Deviation’ as applicable
for each of the clause.
ii) Deviation sheet in case of any deviations from Terms, Conditions specified in the Standard Terms and
Conditions, Tender Enquiry & General Terms & Conditions shall be uploaded online.
iii) Any deviation with respect to Technical requirement shall be uploaded online by the bidder.
iv) The scanned image of Annexure-“A” / Bank Guarantee towards Earnest Money Deposit (EMD) / BID
BOND as stipulated in TEF clause no. 3 shall be uploaded.
vi) Price schedule BLANKING the PRICES but clearly indicating ‘QUOTED / UNQUOTED’, also
indicating the % of GST applicable, in the prescribed format available on MDL’s e-Procurement
website https://eprocuremdl.nic.in.
vii) Bidders / Vendors should upload scanned documents as per Para 2 in Part-A of the tender.
viii) Scanned Image of valid Registration or Approval certificates in case of Bidder’s/ firms registered with
MDL/ NSIC/ Micro or Small Enterprises/Industries.
ix) Scanned image of Vendor Declaration in bidder’s letterhead as per the format at Enclosure-4.
xi) Scanned image of Acceptance of MDL’s GST standard Terms & Conditions duly signed and stamped
as per Enclosure -5
Note: i) MDL has a right to verify / cross verification of authenticity of the scanned documents with respect
to original submitted against this tender.
ii) The bidder is requested to ensure that all the documents asked for are submitted and are clear, legible
& duly signed (i.e. self-attested), as it would save considerable time without necessitating the need for
furnishing of the documents again by them. The bidder is also requested not to submit unnecessary
documents not asked for, like signed & stamped copy of this Tender document, etc.
iii) The bidder is required to compulsorily select “ACCEPTED” or “DEVIATION” from the drop-down field
choices available against the relevant Para no. /Clause no. of TEF/STACS/GT&C (as applicable). In case
“DEVIATION” is selected against a particular Para no. /Clause no., it would be mandatory to explain the
deviation proposed by the bidder in the adjoining text field. Any deviation (s) mentioned elsewhere in the
Offer/Bid, other than in the said forms, will not be considered.
iv) Blank Rate Sheet form is required to be filled-up by the bidder online by selecting “QUOTED” or “NOT
QUOTED” from the drop-down field choices available, depending upon whether the bidder has quoted for the
particular Service/Item tendered. Therein, the bidder is also required to specify the Taxes & duties (if any)
quoted & the rate of the Taxes/Duties.
Part-II: In this part bidders are requested to fill the PRICES for each of the listed items strictly in the
prescribed format/ Rate sheet provided in E-Procurement Portal. Offer in any other form shall not be
considered.
b. Following bid rejection criteria may render the bids Liable for Rejection.
i) Bidder’s failure to submit sufficient or complete details for evaluation of the bids within the
given period which may range in between two to three weeks depending on the deficiencies
noticed in the drawings / technical data which shall not however conflict with validity period.
However, over all time allowed in respect of normal procurement shall not exceed 3 weeks and
one week in case of emergency procurement.
ii) Incomplete / misleading / ambiguous bids in the considered opinion of TNC.
iii) Bids with technical requirements and or terms not acceptable to MDL.
iv) Bids received without scanned copies of pre-qualification documents wherever required as per
the tender.
v) Bids not meeting the pre-qualification parameters stipulated in the tender enquiry.
vi) Validity period indicated by bidders is shorter than that specified in the tender enquiry.
vii) Bidders not agreeing to furnish Security Deposit till completion of the supplies / services as
per contract.
viii) Bidders not submitting documents as per clause 5.
In case of e-tenders, the original of the uploaded copy of EMD BG if received after seven days
ix)
of the tender closing date.
Firm should have past experience in the Drives and PLC. Firm should submit documentary
x)
evidence for the same.
Firm should have experience of working on EOT Cranes having minimum capacity 50 Ton.
xi)
Firm should submit documentary evidence for the same.
7. Bid Evaluation Criteria: Technically qualified overall lowest offer (L1 bidder) considering 100%
total rates of services ((Exclusive of GST)) and 25% of total rate of spares ((Exclusive of GST))
will be considered for awarding the contract.
Note: In case of any discrepancies observed in any Rate Sheets, or against each item and / or
in Grand total in the price bid, evaluation would be carried out by arriving on the grand total by
considering the unit rate and quantity indicated in Rate sheets.
8. Contract Period: The Contract will be for a period of Two Years and Biennial contract may be
extended for a further period of three months on mutual consent basis on the same terms and
conditions. However if the performance of contractor is not satisfactory then contract may be
terminated with one month notice period by applying relevant clauses of contract such as Risk
Purchase, forfeiture of Security deposit etc.
Contract will start from 08.12.2018
9. Mobilization: The successful bidders shall mobilize the required Manpower / Tools / Materials
within 10 working days from the placement of LOI/ Order whichever is earlier.
10. Pricing: The bidder shall quote the prices of all items listed in the tender which will be inclusive of
all costs such as labour, transportation, incidental expenses etc. However the applicable taxes /duties
and levies will be indicated separately in the rate sheet. The price quoted shall remain firm and fixed
during the tenure of the order/contract.
MDL shall not be bound by any printed conditions or provisions in the bidder's bid forms or
acknowledgement of Order/Contract, invoices, packing list and other documents which purport to
impose any conditions at variance with or supplemental to Order/Contract.
11. Taxes & Duties: Bidder shall indicate separately the percentage of the applicable taxes and
Govt. levies in blank Price Bid submitted in Part I (Techno Commercial Bid) as well as in
Part-II Price Bid.
11.1 Terms for GST:
Following details to be submitted by the bidders:
GST No.
Type of dealer (composition/ Normal)
SAC/HSN NO.
% of tax
11.2 Bidders to confirm acceptance of Standard Terms & Conditions for GST enclosed with this tender as
per Enclosure-5
i. Payment will be made on Monthly basis through NEFT/RTGS within 15 to 20 days from the date of
receipt of invoice or date of rendering services whichever is earlier subject to reasonable processing time from
receipt of invoice. Bills in triplicate are to be submitted to Invoice Receipt Section along with work
completion certificate (SAP Service Entry Sheet copy), etc duly signed by Chief Manager or executive of
above level of USER department.
ii. No advance will be paid in any manner against the Contract.
13. Site Visit for Quoting: Prior to submission of your quotation, bidders are requested to
visit the site and if any clarification is required bidders may contact Mr. A.B.Patil , CM
(MTC-EY) on Telephone No 2376 3656 and submit duly filled Vendor declaration as per
format at Enclosure –3 along with the offer.
14. Modifications to the Bids: - Bidder will not be allowed to bid after the closing time is over. Bidder
can change the submitted bid any Time till the closing time through e-portal only and the last
changed bid will be considered for ranking of the bids.
15. Security Deposit (SD): The successful bidder shall submit a Security Deposit @ 5% of the value of
the Order within 25 days from date of Order / Contract. The SD can be remitted directly to
MDL Bank Account as per details given in Annexure-“A” of this tender. Further, the
bidder should specifically mention the details of company name as well as nature of
remittance, tender number/order number etc in the text/narration fields of Bank’s NEFT
remittance in order to identify the same. The duly filled & signed copy of Annexure- “A” is to be
submitted to OTS Department. SD can also be submitted in the form of Bank Guarantee in the
prescribed format drawn in favour of MAZAGON DOCK SHIPBUILDERS LIMITED & the
same should be drawn on reputed Nationalized / Scheduled Banks excluding co-operative
banks. The format of Bank Guarantee for SD is available on MDL Website. Any delay in
submission of SD shall result into charging of interest by MDL on the contract @ prevailing PLR
of SBI + 2% on the security deposit amount for the delayed period. The Security Deposit will be
returned only after the successful execution of the order / contract. Refund of Security
Deposit whenever considered admissible by MDL, shall be without interest only. In case of BG,
Bidders to advise their bank/banker to send the BG directly to OTS department in sealed
envelope to dispense with additional step of verification of authenticity of signatories.
16. Guarantee/Warranty: One Year for Replaced Spares.
17. Performance Bank Guarantee (PBG): The Successful bidder will have to submit PBG @ 10 % of
the value of the Order in the form of Demand Draft / Pay Order / Bank Guarantee in the prescribed format
drawn in favour of MAZAGON DOCK SHIPBUILDERS LIMITED. The crossed DD / Pay Order / Bank
Guarantee should be drawn on reputed Nationalized / Scheduled Banks excluding co-operative banks and
shall be Payable at Mumbai from the date of successful completion of scope of work/commissioning as per
purchase order or offer their consent to MDL for retention of 10 % of order value towards PBG till the
completion of guarantee / warranty period. In case of BG, Bidders to advise their bank/banker to send the BG
directly to OTS department in sealed envelope to dispense with additional step of verification of authenticity
of signatories.
18. Inspection: - Quality and Quantity of work will be checked and Inspected by CM(MTC-EY).
a. The contractor shall rectify all the minor faults within one day. Delay in defect rectification
should not exceed one day unless & until MDL is fully convinced with proper reasons &
justification. Major breakdowns shall be rectified within three days. If the breakdown requires
more that 3 days then the contractor & MDL will mutually decide exact time period required for
rectification. If the delay exceeds this mutually agreed period, then penalty will be levied for the
delay on pro-rata basis on quarterly maintenance charges. For example, if delay is 5 days beyond
mutually agreed period then penalty should be (5 * quarterly maint. charges of crane/90). The
penalty amount will be deducted from the quarterly bills raised by the contractor.
b. If delivery of spares delayed beyond delivery period LD @ 0.5% per week up to maximum of
5 % will be applicable.
Frequency Total no. of Grace period Penalty per day per crane after grace
cranes period.
Quarterly 12 15 days Rs. 500
20. Loading Criteria.: Deviations sought by the bidder in respect of Payment terms and delivery
period shall be loaded on the bidder/s quoted prices during price evaluation by MDL as per MDL
Norms. It is desirable that the bidder accepts the Payment Terms indicated by the company in
the Tender document. Varied payment terms quoted by bidders as compared to the terms stated in
the Tender document shall be normalized by loading the Prime Lending Rate of State Bank of India
plus 2% on the quoted price.
Note: Online ranking visible to bidders after opening part II price bids is without loading parameters.
However the L1 bidder will be evaluated offline by applying all applicable loading parameters
as mentioned in the tender document.
21. FREAK LOW QUOTES: In case after opening of price bid of technically cleared firms, it
is noted that L-1 firm has quoted very low rates than cost estimate/NLPP by more than 40 % and
difference between basic rates of L-1 & L-2 is more than 30 % then such quote is treated as freak
low quote. If L-1 bidder indicates to withdraw from the tender then EMD shall be forfeited and firm
may be given tender holiday including intimation to other PSUs. For awarding contract to such L-1
bidder , L-1 firm will have to give additional BG up to the value equal to difference between L-1 and
L-2 as additional security before release of order. Bank charges for this additional BG shall be borne
by MDL and reimbursed against proof of payment.
22. Hindrance Register : All hindrances with date of occurrences and removal shall be noted in the
Hindrance Register. The Hindrance Register shall be signed by the reps of both MDL as well as
Contractor
23. Risk Purchase: If the article / service or any portion thereof be not delivered / performed by
the scheduled delivery date / period, any stoppage or discontinuation of ordered supply / awarded
contract without written consent by Purchaser or not meeting the required quality standards the
Purchaser shall be at liberty, without prejudice to the right of the Purchaser to recover Liquidated
Damages / penalty as provided for in these conditions or to any other remedy for breach of contract,
to terminate the contract either wholly or to the extent of such default. Amounts advanced or part
thereof corresponding to the undelivered supply shall be recoverable from the Contractor / Bidder at
the prevailing bank rate of interest.
MDL shall also be at liberty to purchase, manufacture or supply from stock or utilize the services as
it deems fit, other articles of the same or similar description to make good such default and/or in the
event of the contract being terminated, the balance of the articles of the remaining to be delivered
there under. Any excess over the purchase price, cost of manufacture or value of any articles
supplied from the stock, as the case may be, over the contract price shall be recoverable from the
Bidder / Contractor.
24. Public Grievance Cell: - A Public Grievance Cell headed by Shri S. D. Kajawe, General
Manager GM (F-CA), 3rd floor, Mazadock House has been set up in the Company. Members of
public having complaints or grievances are advised to contact him on Wednesday between 10.00
hours and 12.30 hours in his office on 3rd floor, Mazadock House or send their
complaints/grievances to him in writing for redressal. His Telephone No. is 23762184 or
23759793.
25. Working on MDL Holidays: Request for permission for working on Saturday / Sunday /
holidays if required, should be submitted 3 working days prior to the date of holiday, to Personnel
department and Security through concerned Dept.
26.5 Besides the training being organized, Online User Manual is available on the website for the
guidance of users & for participating in the e-Procurement/ e-Tendering, the bidder must ensure
having the requisite (IT) infrastructure at their office premises.
26.6 Assistance for Online Bidding only: In case of any difficulty during online submission of
offer, bidders are requested to contact Mr.Sagar Shende ,M(C-MP), Ph. No. 022 2376 3249 / 3246 or
Mr. Akshay Vichare, 022-2376 3251, Mb No: 9022422364 before the closing date of the tender.
Bidders can also contact toll-free customer help line no 0120-4200462, 0120-4001002 of e-
procurement portal http://eprocuremdl.nic.in
In case of any further problems / issues are being faced during online bidding on e-procurement
portal ,maintained by NIC, you may contact to Mr. Sagar U Shende, Manager, Ph No 022 23763249
for facilitating the addressal of you problem / issues.
Also, a Training program is arranged in MDL Premises on every working Fridays in one session
(1400 – 1600 hrs) for prospective/willing Bidders and those bidder should sent request email to
sushende@mazdock.com.
25.7 Bidders in their own interest are requested to upload their bids well in advance of tender
closing date to avoid the last minute difficulties in uploading the bids. Request for extension, if at all
to be made, shall be forwarded at least 3 working days in advance to the tender closing date / time
with proper reasoning. MDL reserves all rights in this regard & decision of MDL shall be binding to
the applicant. Problems in hardware/software, internet connectivity, system configurations, Browser
setting etc, for whatsoever reason shall not be considered for extension of tender closing date and
time.
26.8 MDL will not be responsible for an error in downloading of tender documents from web by
the bidders. The version appearing on MDL website will be considered final and authentic.
26.9 All bidders are requested to get their technical queries, if any, clarified in advance (3 days in
advance to tender closing date) before bidding to avoid last minute delay. For any technical
clarification, bidders are requested to contact Mr. M.S.Khandale CM. (OTS), Tel. no. 23763299.
26.10 Entry Pass for Contractors and their workmen: Bidders shall comply with the “MDL Security
Procedures laid down in MDL for entry passes in respect of Contractors and their workmen” which
is available in the home page of OUTSOURCING DEPT. of MDL Website www.mazdock.com
→Tender Shipbuilding → Outsourcing→ SB-OTS Notifications. A copy of same (11 pages) is
attached herewith at Enclosure -6
26.11 Bidders can participate in online bidding
• By registering with https://eprocuremdl.nic.in for User ID and password.
• By obtaining class IIB or above DSC (Digital Signature Certificate) with encryption &
signing authority (for secured bidding.
26.12 Bids received against online participation shall only be accepted. Bids submitted in any other
mode will not be considered.
26.13 MDL bidder’s earlier quoted for MDL tender on website https://mdl.eprocure.in have to
register again (free of cost) on website https://eprocuremdl.nic.in
26.14 MDL reserves the right to consider placement of Order / Contract in part or in full against the
tendered quantity or reject any or all tenders without assigning any reason.
We look forward to receive your most competitive and reasonable offer against this tender.
Yours faithfully,
ANNEXURE “A”
Signature of Vendor/Representative
Sr. No.2 and 3 above will be filled in by the Vendor and MDL commercial Executive respectively and the
form forwarded to Treasury Section for posting of SAP Document to the respective Bank Account.
The bidder should specifically mention the details of company name as well as nature of remittance,
tender number/order number etc. in the text/narration fields of Bank’s NEFT remittance.
Enclosure-I
SCOPE OF WORK :
I. AIM: MDL intends to have Non comprehensive maintenance contract of EOT cranes
installed in various workshops in East Yard & South yard. The Cranes are equipped with SIEMENS
make VVVF Drives and S7-200, S7-300 PLC. The Main aim of Maintenance Contract is to ensure
smooth functioning of the Cranes all the time and availability of the spare parts immediately to attend
the breakdown, enhancing the performance of the Cranes and reduction of production loss due to
machine downtime.
Location and Capacity of EOT Cranes Under Non Comprehensive Maintenance contract.
III. Preventive Maintenance: Firm has to carry out the Preventive Maintenance of each Cranes as per
schedule and Checklist attached at ANNEXURE I.
The firm shall carry out the maintenance activities to prevent failures and also execute improvement
activities / repair activities to prolong the crane life, reduce maintenance hours and to ensure
maximum availability of the system
a. Firm has to attend all the breakdowns during the Maintenance Contract.
b. Firm has to depute their Engineers / Electricians during breakdowns. However if the
breakdown is mechanical in nature. Firm will be provided assistance of Millwright mechanics
by MDL.
c. Breakdown of the Crane will be intimated to the firm by Email / Fax or telephone. Firm has to
respond / attend the call within 8 Hrs during working hours and next day if breakdown occurs
in night / after office hours.
V PANALTY:
a. The contractor shall rectify all the minor faults within one day. Delay in defect rectification
should not exceed one day unless & until MDL is fully convinced with proper reasons & justification.
Major breakdowns shall be rectified within three days. If the breakdown requires more that 3 days
then the contractor & MDL will mutually decide exact time period required for rectification. If the
delay exceeds this mutually agreed period, then penalty will be levied for the delay on pro-rata basis
on quarterly maintenance charges. For example, if delay is 5 days beyond mutually agreed period
then penalty should be (5 * quarterly maint. charges of crane/90). The penalty amount will be
deducted from the quarterly bills raised by the contractor.
b. If delivery of spares delayed beyond delivery period LD @ 0.5% per week up to maximum of 5
% will be applicable.
Frequency Total no. of Grace period Penalty per day per crane after grace
cranes period.
Quarterly 12 15 days Rs. 500
VI. SPARES
b. Firm has to quote separately for spares. The rates for quoted spares will be fixed for two years.
Warrantee for supplied spares will be for one year after fitment.
c. If any item or component was found defective during overhauling, servicing or testing, the
same has to be replaced by the contractor at actual. If the item is available with MDL, the same
will be given free of cost for fitment of it.
d. If any defective item is required to be taken out to the service centre by the contractor for
further repairing, the firm shall submit Bank Guarantee for amount of Rs. 15,000/- (Rupees.
Fifteen thousand only) . Taking out defective drive from MDL and bringing back repaired item
to MDL shall be in the contractor’s scope. The contractor has to bear all transportation charges
and also transit insurance for taking out/bringing back the item
e. Proper record of services and service reports should be maintained by the firm including
breakdown call, spares used / consumed.
f. Necessary permanent entry passes to enter EY, NY, ALY and SY must be made by the
contractor through MDL security dept and to be renewed as and when necessary.
g. Water, electricity and compressed air will be provided by MDL on free of cost as and when
needed.
VII. GENERAL:
a. Firm has to maintain all the records of preventive Maintenance and breakdown repairs, spares
replaced.
b. Firm should submit all the records of preventive Maintenance, Breakdown Maintenance and
replaced spares to EY –MTC / SB-MTC quarterly for work completion Certificate for payment
purpose.
c. Firm should depute their manpower (Engineers /Electricians) as standby during load testing and
heavy load shifting. Firm will be intimated one-day advance regarding this work.
a. Contractor should engage only those workers who are qualified and experienced for the work to
be done and for which contract has been awarded.
c. It is the responsibility of the contractor to ensure safe working of his workers while carrying out
the work and should follow all Statutory Safety provisions and rules. Contractor should provide
and ensure use of full harness Safety Belts, good quality leather Safety Shoes, Safety Helmets as
per IS – 2925, Face Shield, Nose & Mouse Masks, good quality safety Goggles, Ear plugs,
Welding Shields, Hand Gloves, etc. by workers for safe working. The contractor shall take all
safety precautions and follow safety rules prevailing at MDL.
d. Special precautions should be taken while working at height or handling of heavy jobs. Contractor
should ensure that none of his worker works at a height without using safety belts. The contractor
should supervise the work while working at height or handling of Heavy Plants & Equipment
and should intimate in writing to concerned MDL Supervisor / Engineer before commencement
of work.
e. Contractor should ensure that none of his employees work without safety shoes. No work should
be allowed to work inside the MDL premises wearing slippers / chappals.
f. Contractor workers should in no case operate MDL’s E.O.T / Mobile Cranes / Jumbo / Fork Lift
trucks/ and any of the Machine Tools & Equipments without permission from MDL officer.
h. In case of any Accident causing injury of casualty to any of Contractor’s worker while carrying
out the work, the complete responsibility lies with the Contractor. Contractor should ensure to
provide immediate Medical help to his injured worker / workers and should provide
Compensation as per Workmen Compensation Act 1923 in case of injury or casualty causing out
of accident while on work to his workers.
i. All the employees of the contractor must follow the safety and security procedures of MDL.
a. Firm should have past experience in the Drives and PLC. Firm should submit documentary
evidence for the same.
b. Firm should have experience of working on EOT Cranes having minimum Capacity 50 Ton. .
ANNEXURE ‘I’
: Checklist for Preventive Maintenance:
1. Quarterly:
a. Switch off the Power supply of Control panel of Main Hoist, Auxiliary Hoist, Cross Travel
and Long Travel.
b. Clean all the Control panels and junction boxes internally and externally with dry air.
e. Check all ACB’S, MCCB’s, MCBs, Switches, Contactors, Relays, Indicating lamps, Push
buttons, joysticks etc. Replace the same if found defective.
f. Check the cooling fans of the control panels. Replace the same if found defective.
h. Check the oil level in the Electro Hydraulic thrusters of MH, AH, CT & LT and fill the oil
in the thrusters if needed.
i. Check the motor terminals and tighten the connections of the motors if needed.
b. Cleaning of Cards, rectifiers, inverter IGBT's shall be checked for its healthiness.
c. All power & control connections shall be checked for its tightness.
e. Reassemble the drive. Inspect all power & Control connections of Drives. Check the
system earthling.
f. Cleaning of installed PLCs.
b. Check the Rotary and gravity (Counter weight) limit switches of Main Hoist and Auxiliary
hoist and adjust (reset) the limit switches if needed.
Note : If any of the spares is outdated or discontinued by OEM, firm may quote successor product.The
relevant documents regarding the discontinuation and successor product received from OEM is to be
submitted by the firm.
Enclosure-2
PRICE BID(PART-II)
Schedule-I
Sub : Non Comprehensive Biennial Maintenance contract for EOT Cranes of various capacities in East
Yard , Cradle Assembly Shop, Stores Complex and Module Shop in MDL as per scope of work attached.
Sr Description of Crane No of Total SAC/ GST Unit Rate Total GST Total
No Cranes No of HSN % Quarterly cost in Rs. cost in
. Services Code activities Rs. Rs.with
(in Rs.) W/O GST
GST
1 20T/5T EOT Crane 2 16
TOTAL Rs.
Schedule-II
RATE SHEET FOR SUPPLY OF SPARES FOR NON-COMPREHENSIVE BIENNIAL
MAINTENANCE CONTRACT.
NOTE :
(1) The above quoted rates for services and supply of spares shall remain firmed & fixed during the tenure of
the contract
(2) The above rates will be inclusive of all services charges required in preventive and breakdown
maintenance including labour, handling servicing, replacement of spares etc. The spares will be replaced as
and when required basis and cost of the spares will be paid separately.
(3) The Spares should receive through Good Receiving Section (GRS), MDL.
Enclosure –3
2. PAN No.
3. VENDOR ADDRESS
4. VENDOR'S TELEPHONE
5. E-MAIL ADDRESS
6. BANK NAME
7. BANK ADDRESS
8. ACCOUNT NO.
9. ACCOUNT TYPE
12. MICR NO
17. GST ID .
We hereby declare that the particulars given above are correct and complete. If the transaction is
delayed for reason of incomplete or incorrect information, we would not hold MDL responsible.
Certified that the particular as per Serial No. 1 & 6 to 12 are correct as per our records.
VENDOR DECLARATION
Sub:. Non Comprehensive Biennial Maintenance contract for EOT Cranes of various capacities in East
Yard , Cradle Assembly Shop, Stores Complex and Module Shop in MDL as per scope of work attached.
-----------------------------------------------------------------------------------------------------------------------------------
We have visited your site and understood the Scope of Work and requirement given in the tender. We also
confirm herewith that our quoted price/rates are in line with the above scope of work.
M/s..............................................................
SIGNATURE.........................................
NAME................................................
DESIGNATION
STAMP
DATE:
Enclosure -5
I. GST as per GST Law shall be payable extra as quoted and agreed.
IV. If the vendor is registered under GST, vendor shall mention the
HSN code for goods &/or services in their tax invoice, etc. These
codes must be in accordance with GST Laws and responsibility of
specifying correct HSN codes for goods &/or services is that of
the vendor. MDL shall not be responsible for any error in HSN
code for goods &/or services specified by supplier/ contractor.
Supplier/contractor shall pay penalty and/or interest imposed
on MDL or any loss due to delay in availing ITC by MDL or aby loss
of ITC to MDL due to errors by vendors at any stage. MDL reserves
right to recover any such interest, penalty or loss from any
amount due to supplier/contractor or otherwise.
VI. If the vendor is registered under GST, the GST registration number
(15digit GSTIN) issued by GOI shall be mandatorily provided by the
vendor. Vendor having multiple business verticals within state/ at
multiple states with separate GST registration numbers shall
forward GSTIN of only that vertical which is involved in supply of
goods and/or services. MDL GSTIN is 27AAACM8029J1ZA and
vendor shall mention the same while invoicing and avoid any data
entry error on GST portal.
VII. If the Vendor is registered under GST, Vendor shall ensure timely
submission of invoice as per the provisions/requirement/timeline
promulgated by GOI in relation to GST Law with required
supporting documents to enable MDL to avail input tax credit
promptly. The vendors invoice inter alia should contain GSTIN of
Vendor, GSTIN of MDL (i.e. 27AAACM8029J1ZA), GST tax rate
separately, HSN code wise goods or services, place of supply,
signature of vendor, etc. original invoice needs to be submitted to
bill Receipt entre at MDL gate, and a copy of the invoice should be
given to the goods receiving section (GRS).
VIII. If the vendor is registered under GST, vendor shall file all
applicable returns under GST Laws in the stipulated time & any
losses of tax credit to MDL arising due to delay in filing will be
recovered from their invoice wherever MDL is eligible to avail tax
credit. Any default towards payment of tax and / or uploading of
monthly returns by supplier/contractor, MDL retains right to
withhold payments towards tax portion until the same is corrected
& complied by the supplier/contractor with the requirement of
GST along with satisfactory evidence.
IX. The rate sheet enclosed with the tender will indicate the rates to
be entered under each head wherever applicable. Bidders must
clearly mention the applicable Taxes & duties. The item-wise rates
(i.e. Baisc+P&F+F&I) quoted in the rate sheet should exclude taxes
& duties. Bidder should indicate gst rates as applicable separately
under each of the head in the same Rate Sheet, which will be paid
extra based on tax invoice to the extent applicable. The gst will be
applicable on total basic rat of each item(i.e. basic +P&F + F&I).
Accepted
Stamp
Procedure for Issue of Entry Passes to Casual Indian Visitors, Foreign Visitors and
Subcontractors for entering the premises of MDL.
Important Note:
Procedure / guidelines promulgated herewith are subject to changes as and when required on
instructions of Government or when necessitated.
I. Procedure incorporated below deals with various aspects of Entry process in MDL.
Note:-
i) The authority for issuing Entry Passes to all type of Visitors including Sub-contract labour rests
with CSO, MDL.
ii) It is mandatory for all Visitors display the Visitors Identification Badge while in MDL premises.
iii) It is also mandatory for all Visitors to return the Visitors Identification Badge along with the
Visitors Pass to Reception Centre after obtaining the signature and stamp on the Visitors Pass of the
officer visited, before leaving the Yard.
a) Letter of recommendation from concerned Project Superintendent / HOD along with prescribed
format enclosed at Annexure - 2 and copy of clearance from MOD / NHQ, is required to be
submitted to CSO, MDL.
b) Foreigners are to submit passport & visa for verification along with 2 xerox copies of the same and
2 passport size photograph with white background.
c) On completion of above formalities, Photo Pass will be issued to the foreigners by OIC, Pass Issue
Cell on the basis of visa validity or as per the recommendations by the Project Superintendent / HOD.
The following procedure to be followed for issue of Photo Entry Passes to the employees of various
Government & Semi-government organizations and Vendors / Regular Suppliers.
a) Application forms for issue of Photo Passes to be submitted to OIC, Pass Issue Cell with
recommendation from HOD along with 2 passport size photographs with white back ground and h
copy of LOI / Work Order.
b) Applicant is also required to submit an Undertakig on their Compnay's letter-head as per the
Format enclosed at Annexure-3 to be endorsed by the concerned HOD.
c) Ater due verification of application forms and documents, the Photo Entry Passes will be issued
for a period of 3 months by OIC, Pass Issue Cell.
5. Sub-Contract Labourers:
(a) Pre-requisites:
The contractor has to fulfill statutory obligations towards Provident Fund (PF), ESIC (ESI),
Labour Licence and all Labour Laws as applicable and amended from time to time. In addition,
contractor has to get all his employees verified by Police Authorities as mentioned at Sl.5 (e).
(b) ESI.
All employees of the contractor must have their own ESIC Registration Code Number and
individual ESIC A/C. No. of the labourers. In case of newly joined employees, contractor has to fill-
up a RDF Form, sample attached at Annexure-4 and ESIC Declaration Form, sample attached at
Annexure -5 and submit it to ESIC's local office and obtain their acknowledgement on the copy of
RDF Form before deploying the labourers. The above mentioned blank forms are also available
with our Labour Consultant's office, situated in South Yard near Scindia Bldg.EPABX Tel.
No.3441. In case contractors do not have their own ESI Code No., as a special case they may be
allowed to use MDL ESI Code No. against a written request, for recovery of contributions. However,
this facility may be allowed only for a period of 30 days, by which time the contractor must obtain
his own ESI Code No. In such cases, contractor may collect the Forms from our Consultant's office,
fill it up and then get them signed by the concerned officer of MDL Corporate Personnel Dept.
situaqted on the second floor of Mazdock House, having EPABX Tel No.3121. Then the contractor
has to submit these forms to ESIC's local office and obtain acknowledgement which needs to be
attached with Labour Challan, sample attached at Annexure - 6. The timings of Labour Consultant's
office and the concerned Officer of Corporate Personnel Dept. are as below:
Note:- In case contractor's employees are out of ESI Coverage, they are required to be covered under
a Group Insurance Policy linked with Workmen's Compensation.
The contractor has to make an application on Contractor's letter-head to the concerned office for
Police Verification Report (PVR), attaching personal particulars of each employee, in the prescribed
form, to be obtained from respectrive zonal offices given above. A copy of sample format is
enclosed at Annexure-7. The sub-contractor has to fulfill the requirement of documents mentioned
on the personal particular form. It normally takes one month time to get the Police Verification done
from the Police Department. However, an acknowledgement slip of submitting the application,
issued by the Poloice Department will be useful for getting Entry Passes for the first month from
MDL.
i) The contractor has to fill up Labour Challan and it should be attached with LOI or Work Order
issued by MDL. Efforts are in hand to put up these forms on MDL Website which can be
downloaded by the contractor. Blank forms are also available with MDL Labour Consultant's office.
ii) Contractor has to get these forms endorsed by the relevant Commercial Department confirming
that the contract is in force.
iii) Contractor has to submit these forms to Labour Consultant's office for scrutiny and
encorsement.
iv) The forms subsequently are to be submitted to CM (CR-P&IR), MDL, during the timings
mentioned above, whose endorsement will be obtained immediately. In case of any difficulty,
AGM (CR-P&IR) is to be contacted.
vi) The contractor has to then approach OIC, Pass Issue Cell, situated in the ground floor of
Scindia House, South Yard between 0930 hrs. to 1030 hours and 1400 to 1500 hours. Contractor has
to submit the Labour Challan along with two passport size photographs (with white
background) of each employee & police verification report of all his employees or the
Acknowledgement slip issued by the Police Dept.
viii) On satisfying the above prescribed conditions by the contractor, the contractor has to fill up a
Register maintained by Pass Issue Cell and collect blank passes, on written request, duly
recommended by respective Commercial Dept. The contractor has to fill up the blank passes and get
it signed by OIC, Pass Issue Cell.
ix) In case Police Verification Report is not there, OIC, Pass Issue Cell will carry out interviews
between 0930 to 1030 hours on all working days and verify one of the following documents for the
authenticity of individual contract labour.
a) Ration Card.
b) School Leaving Certificate.
c) Election Card or
d) Driving Licence or
e) Photo Identity Card issued by State / Central / Education Institution etc.
f) PAN Card.
x) Before appearing for interview, contractor has to give an undertaking in the Undertaking
Format, copy enclosed at Annexure - 3, for the employees who do not have PVR. This Declaration
Form is to be endorsed by the concerned Commercial Department and also to be supported by an
cknowledgement Slip of application made for PVR. After interview, if an employee is found to be
suitable, he will be cleared for issue of Entry Pass.
xi) Contractors are advised to simultaneously take action on PVR, ESI & PF to save time. It is
intended that the formalities with Labour Consultant's Office and Corporate Personnel Department
will be completed in a day and formalities at Pass Issue Cell of Security Dept. will be completed in a
day.
xii) A day's Visitor Pass will be issued for new Sub-contract Labourers by CSO on the
recommendation of Commercial Department for carrying out the formalities at the offices of
Labour Consultant's office and CR - P&IR.
xiii) Sub-contractor Labours who are having PVR, need not be present in person while rep. of
contractor goes to Pass Issue Cell. Sub-contract labours who are not having PVR have to remain
present as they have to be interviewed.
Note:-
Sub-contract labours who do not have PVR, will initially issued Entry Passes for a maximum period
of one month to facilitate them to complete PVR formalities on production of receipt from police
authorities for having submitted the documents for police verification. In case of adverse remarks
from the Police Department, Entry Passes issued will be withdrawn immediately. In case of any
difficulty in issue of Entry Passes from Pass Issue Cell, Chief Security Officer (EPABX Phone
3850) is to be contacted. Contractors are issued Entry Passes of 'Green' colour for all Yards other
than East Yard. 'Yellow' colour Entry Passes are issued for East Yard. A person holding Entry
Pass of East Yard is permitted to work in all other Yards of MDL but not vice-versa.
xiv) Issue of Entry Passes to the employees of contractor for a short period of 10 days or less:
Any contractor(s) having MDL Contract work of '10 days or less' are required to comly with
ESIC / PF formalities and for such contractor employees, no Police Verification Report (PVR) is
required. However, Undertaking on Letterhead is necessary. The Entry Passes of such
subcontractors employees are stamped as "Non-Police Verified". For such non-police verified
contractor employees, Site Engineer / Supervisor of the contractor is required to escort their
employees to the work site and escort them at the end of the day. At the end of the day, the Site
Engineer / Supervisor of the contractor has to collect the Passes from their employees and deposit
the same with the duty security staff in the PassIssue Cell. If the contractor labour are not covered
under ESIC Act, then they are required to produce Group Insurance Policy linked with Workmen's
Compensation.
North Yard:
Wicket Gate No.NY/4 : Visitors, Vendors, Casual Visitors, Foreigners, Proprietors, OEM rep. /
Consultant etc. Wicket Gate No.NY/13 : Sub-contract labourers.
South Yard:
Wicket Gate No.SY/2 : For MDL Officers, Staff, Visitors, Vendors, Casual Visitors, Foreigners,
Proprietors, OEM Rep/Consultant etc. Wicket Gate No.SY/9 : Sub-contract labourers.
East Yard:
Wicket Gate No.EY/1 : For MDL Officers, Staff, Operatives, Visitors, Vendors, Casual Visitors,
Foreigners, Proprietors,OEM Rep/Consultant etc. Wicket Gate No.EY/2 : Sub-contract labourers.
Alcock Yard:
Wicket Gate No.AY/7 : For MDL officers, staff, Visitors, Vendors, Casual Visitors, Foreigners,
Proprietors,OEM Rep/Consultant etc.
i) Normal working timings for contractors workers is from 0700 to 1830 hours. Any contractor
desire to deploy their workmen beyond their working hours, due to emergency, the requirement
is to be endorsed for such working by HODs of User Department in the prescribed enclosure at
Annexure - 8.
ii) If the contractor is required to employ their workmen on Saturdays, Sundays & General
Holidays, they have to make an application in the prescribed format as enclosed at Annexure-9
with recommendation from concerned HOD and in case of Sundays/Holidays, request has to be
sent to Corporate Personnel Department two days in advance.
iii) For all such extended working hours, the concerned contractor has to obtain permission from
Sr.Commandant, CISF / Chief Security Officer, MDL, respectively.
8. Material Movement:
The contractors who are required to bring in their vehicles for delivery / collection of stores, due to
emergency of work beyond 1830 hours, are required to obtain the recommendation from HODs of
the User Department and subsequently permission will be granted by Commandant, CISF /
CSO, MDL for their respective Yards..
9. Renewal of Passes:
The following procedure is to be adhered to by the contractors for renewal of passes of their
employees:
i) The Entry Passes of contractor employees, working on regular basis, having Police Verification
Reports, are renewed on completion of ESIC/PF formalities up to a period of one month.
ii) The contractor employees who are not police verified and required to work up to 10 days, the
Passes of such employees are not renewed any further.
iii) The passes of reps. of various organizations are renewed on need basis on the recommendation of
respective HODs. However, such Entry Passes are renewed up to a maximum Period of
three months.
iv) The Entry Passes issued to foreign nationals are renewed subject to verification of documents
and recommendations of respective HODs.
i) As soon as contractor employee losses the Entry Pass, he is required to report the loss to the
nearest Police Station under whose jurisdiction the Pass is reported to have been lost and obtain a
copy of Police Certificate.
ii) The loss of Pass will then be reported to Chief Security Officer, MDL, along with a letter
from the contractor duly recommended by OIC, User Department and original copy of police
certificate.
iii) The Entry Pass will be issued to the contractor employee after due verification of the Labour
Challan for the particular month.
ii) It is mandatory for the contractors to obtain NOC from Chief Security Officer, MDL, for
having returned all the Entry Passes issued to them for final settlement of the contract.
iii) Security Deposit of the contractor will not be released unless & until the NOC is produced.
Note: - Transfer / Misuse of MDL Photo Entry Pass is strictly prohibited & shall attract action as per
the provisions of Indian Official Secrets Act 1923.
ii) Application form for mobile phone permit is to be obtained from Chief Security Officer,
MDL, through an application recommended by concerned Commercial Department. These
Permit application forms are to be endorsed by concerned HODs (in case of subcontractors, the
relevant Commercial Department) and submitted to OIC, Pass Issue Cell, for obtaining Mobile
Permit along with mobile phone for inspection..
iii) Unauthorised use of Mobile Phone by any sub-contractors employee shall invite strict action to
the extent of confiscation of mobile phone in addition to the cancellation of Entry Pass. DGM /