SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.

Rev. 2018.03.00 31-Mar-18


SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Verification - RT Techniques & Procedure
SAIC-RT-2007 14-May-18 NDE-
Implementation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements ... Additional Requirements Shall be as agreed upon in SAIC-RT-2010. See Note 1.

Radiographic procedure approved by Inspection department is SAEP-1143,


A1
available to verify the RT requirements and Techniques applied. Para 5.2

Personnel performing radiography are certified to a minimum of Level


SAEP-1143
A2 II per the certifying organization's written practice/ requirements of
Para. 5.3
ANSI/ASNT CP-189. (Ref. SAIC-RT-2002)

Radiographic personnel have passed the Radiation Safety


examination administered by the Saudi Aramco Loss Prevention SAEP-1143
A3
Department and are in possession of a current Saudi Aramco Para. 4.3
Radiographer Permit issued by the Inspection Department.

Protective measures are taken by radiographic personnel to insure


SAEP-1143
A4 that no individual is exposed to radiation in excess of the prescribed
Para. 4.2
limits as mandated in SAEP-1141 and GI-0150.003.

Weld ripples or weld surface irregularities on both the inside (where


accessible) & outside are removed to such a degree that any such SAEP-1143
A5
irregularities appearing on the radiographic image will not mask nor Para. 5.3.1
be confused for any discontinuity.

Weld has been visually examined and accepted prior to release for SAEP-1143
A6
radiography. Para. 5.3.2

Lead letter "B" is attached to the back of each film holder during each
exposure to determine if backscatter radiation is exposing the film.
SAEP-1143
A7 Note: Para. 5.4
The dimensions of letter "B" shall be 13mm (0.5 inch) of height and
1.5mm (0.0625 inch) thickness.

Final radiography for acceptance of the weld / material shall be


performed after final post weld heat treatment. SAEP-1143
A8
Note: When the time of the RT examination is not stated in the Para. 5.5
referenced code or project specification.

B Location Markers and Film Identification

Saudi Aramco: Company General Use


Weld Joint number and location of weld to be radiographed were
positively verified to conform with the RT request. The following
identification on the RT Request corresponds to the completed weld
to be radiographed as minimum:
a) Weld Number
b) Spool Number
c) Drawing number SAEP-1143
B1
d) Line number Para. 8.4.1
e) Wall thickness
f) Welder/s symbol

g) BI Number

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Verification - RT Techniques & Procedure
SAIC-RT-2007 14-May-18 NDE-
Implementation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Location markers are identified on the surface of the specimen being


radiographed.
SAEP-1143
B2 Note: Regardless of the technique used, the area of interest of the
Para. 8.3.1
radiograph shall be accurately traceable to its location on the part
until acceptance.

Location markers are placed on the part being examined and not on
SAEP-1143
B3 the exposure holder/cassette. Location markers shall not intrude into
Para. 8.3.1
the area of interest.

The starting point and the direction of numbering shall be identified SAEP-1143
B4
adjacent to the weld. Para. 8.3.1.1

If the weld is ground flush, markers, such as arrows or V's, pointing


toward the centerline of the weld are placed on both sides of the weld
SAEP-1143
B5 approximately 6 mm (.25 inch) away from the toe of the weld. At
Para. 5.3.3
least two sets of arrows or V's shall appear on the film; one set near
each end of the interpreted area of the film.

Location markers (Number belt) is in "inch" units unless specifically


noted in the report and is spaced around the circumference of the
piping per the requirements listed in the table below (Table 6).
Table 6 – Number Belt Spacing
NUMBER SPACING Nominal Pipe Size Spacing
Over 3½ inches through 8 inches 1 inch (2.5 cm) apart SAEP-1143
B6
Over 8 inch through 20 inches 4 inches (10 cm) apart Para. 8.3.1.2
Over 20 inches Up to the discretion of of the
Film Interpreter or Field
Supervisor
Note: The number belt shall consist of lead numbers of size 6 mm
(0.25 inch) to 12 mm (0.5 inch) in height.

For DWE/DWV Radiography technique (employed on pipe or tube


welds 3.5 inch NPS or less in diameter):
SAEP-1143
B7 1. First exposure shall be identified with a lead letter "A" .
Para. 8.3.2
2. The second exposure shall be identified with a lead letter "B"
3. Third exposure, (superimposed) by letter "C"

Each radiograph shall be permanently identified using lead numbers


and/or letters. The radiographic identification shall include the
following information:
• Job number or BI number
SAEP-1143
B8 • Component, vessel, or piping identification
Para. 8.4.1
• Seam or weld identification
• R1 for Repair, if necessary; R2, etc., if more than one repair.
Cutouts shall be identified as a new weld, e.g., NW1, etc.
• Date of radiography

C Exposure Techniques

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Verification - RT Techniques & Procedure
SAIC-RT-2007 14-May-18 NDE-
Implementation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Single wall exposure technique described below is used for


radiography whenever practical.
SAEP-1143
C1 Single Wall Exposure - Single Wall Viewing (SWE/SWV) Technique -
Para. 7.1
the radiation passes through only one wall of the weld (material),
which is viewed on the radiograph for acceptance.

Double wall techniques described below shall be used when it is not


practical to use a single wall technique.
1. Double Wall Exposure - Single Wall Viewing (DWE/SWV)
technique. Radiation passes through two walls and only the
weld (material) on the film side wall is viewed for acceptance
on the radiograph. For full weld coverage of circumferential
welds at least 3 exposures taken 120º apart shall be taken.
2. Double Wall Exposure - Double Wall Viewing (DWE/DWV)
Technique radiation passes through two walls and both walls
are viewed for acceptance on the radiograph. These
techniques shall only be used for materials and welds in piping
3.5 inch NPS or less.

Table 4 provides the Technique and Exposure Requirements based


on pipe sizes.

SAEP-1143
C2
Para. 7.1

For the elliptical DWE/DWV technique the radiation beam shall be


offset at the weld at an angle sufficient to separate the images of the
SAEP-1143
C3 source side and film side portions of the weld.
Para. 7.4.2
Note: The elliptical technique requires at least 2 exposures 90º to
each other to achieve complete coverage of the weld.

In the superimposed DWE/DWV technique, the source shall be at


right angles to the weld and the image of both walls are
superimposed. SAEP-1143
C4
Note: The superimposed technique, as a minimum, requires three Para. 7.4.3
exposures taken either 60° or 120º to each other to achieve complete
coverage of the weld.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Verification - RT Techniques & Procedure
SAIC-RT-2007 14-May-18 NDE-
Implementation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

D Equipments and Materials

Radiation Sources used are one of the following:


1.X-ray generators (up to 6 MeV)
2.Iridium 192 (Ir-192) (up to 200 Ci)
SAEP-1143
D1 3.Cobalt 60 (Co-60) (up to 100 Ci)
Para. 6.1
4.Selenium 75 (Se-75) (up to 50 Ci)
Note: Use of Co-60 is only permitted when the thickness of the
material exceeds the practical limits of Ir-192 or Se-75.

The voltage for examinations with x-ray tubes shall be selected to SAEP-1143
D2
insure that the required IQI wire is visible on the radiograph. Para. 8.1.1

Gamma Radiation i.e Ir-192, Se-75 and Co-60 (together with the
SAEP-1143
D3 radiographic technique used) shall be selected to produce the
Para. 8.1.2
required radiographic sensitivity.

Radiographic film used shall be either Type I or Type II.


Type I film shall be used for radiography of pipe diameters of 8 inch
SAEP-1143
D4 nominal pipe size (NPS) or less.
Para. 6.2.1
Note: Film shall be selected to produce radiographs possessing
acceptable sensitivity, density, and contrast.

Lead intensifying screens are used and the minimum thickness of the
front lead screen is.
1. 0.13 mm (0.005 inch) for Ir-192 and Se-75. SAEP-1143
D5
2. 0.25 mm (0.010 inch) for Co-60 or the linear accelerator. Para. 6.3
Note: Lead screens which are an integral part of "ready pack"
(i.e., Pb contact pack) film are acceptable.

E Image Quality Indicators (IQI)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Verification - RT Techniques & Procedure
SAIC-RT-2007 14-May-18 NDE-
Implementation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Image Quality Indicators of one of the following types are used.
A) DIN type penetrameters described in DIN 54 109.
B) ISO type penetrameters described in ISO 1027.
C) ASTM type penetrameters described in ASTM SE-747/90.
Tables 1, 2 and 3 below show the standard identification numbers
found on the penetrameter packs and the wire sizes found in the DIN
type, ISO type and ASTM type typical packs.

SAEP-1143
E1
Para. 6.4

IQIs shall be from either the same alloy material group or grade or
from an alloy material group or grade with less radiation absorption SAEP-1143
E2
than the material being radiographed. Para. 6.4.3

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Verification - RT Techniques & Procedure
SAIC-RT-2007 14-May-18 NDE-
Implementation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Penetrameters (IQI) shall be selected to insure the designated wire
required by Table 7 shall be included in the penetrameter pack used.

Note:When possible, penetrameter


shall be selected to ensure that there exists wires both above &
below the designated wire.

SAEP-1143
E3
Para. 8.5.1

SAEP-1143
E4 IQIs are not damaged, e.g., bent wires.
Para. 6.4.2

Selection of the penetrameter shall be based on the nominal


thickness of the base material plus the estimated weld reinforcement
(not to exceed the maximum permitted by the referencing code
section). In general, the following applies:
A) SWE/SWV or DWE/SWV techniques - the required wire size is
based on singl wall thickness plus single reinforcement where
SAEP-1143
Para. 8.5.2
E5 See E6
such reinforcement is not ground off.
Below
B) DWE/DWV elliptical technique - the required wire size is based on
single wall thickness plus single reinforcement where such
reinforcement is not ground off.
C) DWE/DWV superimposed technique - the required wire size is
based on single wall thickness plus single reinforcements were
such reinforcement is not ground off.

Related to Item E5, the following is also a requirement:


A) Welds without Reinforcement (Ground Flush) -
Nominal single wall thickness for SWE/SWV & nominal single wall
thickness for DWE/DWV technique shall be basis for penetrameter SAEP-1143
E6
selection. Para. 8.5.2
B) Internal protrusion of single bevel welds, backing rings or strips
shall not be considered as part of thickness in penetrameter
selection. (Refer to item for definitions of S,D,W,E,V used above)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Verification - RT Techniques & Procedure
SAIC-RT-2007 14-May-18 NDE-
Implementation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Penetrameters used are on:


SAEP-1143
A) The Source side
E7 Para. 8.6.1
B) Film side if the placement of the penetrameter(s) on the source
side of the object is not possible.

Penetrameters placed on the Film side are installed as follows:


A) The penetrameters is in contact with the part being examined. SAEP-1143
E7 B) A lead letter "F", as least as high as the penetrameter
identification numbers, is placed adjacent to or on each Para 8.6.2
penetrameter.

When configuration or size prevents placing the penetrameter(s) on


the part or weld, the penetrameter(s) may be placed on a separate SAEP-1143
E8
block of radiographically similar material. The block shall be placed Para. 8.6.3
as close as possible to the item being examined.

The penetrameters are placed perpendicular across the weld. ID


SAEP-1143
E9 numbers and, when used, the lead letter "F", is not be in the area of
Para. 8.6.4
interest.

Required number of penetrameters on the item to be RT'd::


A) 2 (Two) penetrameters - DWE/SWV or SWE/SWV techniques
requiring multiple exposures using film lenghts greater than 127 mm
(5 inches). One shall be within 25.4 mm (1 inch) of the end of the film
length to be interpreted and the other shall be at the center of the film
length to be interpreted.
B) 4 (Four) penetrameters are used & placed perpendicular to the
weld & spaced equally around circumference (panoramic RT)
C) 1 (One) penetrameter on each radiograph when an array of SAEP-1143
E10
objects in a circle is radiographed. Para 8.7
D) On T-junctions where portions of longitudinal welds adjoin the
circumferential weld are being examined simultaneously with the
circumferential weld, additional penetrameters are placed on the
longitudinal weld at the ends of the welds being radiographed.
Note:If more than two penetrameters are used because of density
requirements, one shall be placed in the lightest area of interest &
the other in the darkest area of interest. Intervening densities of the
radiograph shall be considered as having acceptable density.

Only a source side penetrameter are used for the double wall viewing SAEP-1143
E11
technique (DWV technique). Para.7.4.1

If more than two penetrameters are used because of density


requirements, one is placed in the lightest area of interest and the SAEP-1143
E12
other in the darkest area of interest. Para. 8.7.2
(NOTE: This is applicable for Re-shoots.)

Four (4) penetrameters equally spaced around the circumference are


used for panoramic radiography techenique (When a complete SAEP-1143
E13
circumferential weld is radiographed in a single exposure using a Para. 8.7.3
source inside)

One penetrameter shall show on each radiograph when an array of SAEP-1143


E14
objects is radiographed in a circle. Para. 8.7.4

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Verification - RT Techniques & Procedure
SAIC-RT-2007 14-May-18 NDE-
Implementation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Additional penetrameters shall be placed on the longitudinal weld at


the ends of the welds being radiographed when portions of
SAEP-1143
E15 longitudinal welds adjoining the circumferential weld are being
Para. 8.7.5
examined simultaneously with the circumferential weld.

F Geometric Unsharpness

Calculated Geometric unsharpness, Ug, of the radiograph shall not


exceed the values listed in Table below. The minimum source to
object distance, D, shall be great enough to insure that Ug does not
exceed the limit.
Geometrical Unsharpness (Per Table 5, SAEP-1143)
Material Ug
Thickness, mm (Inches) Maximum,mm(Inch)
Under 50.8 (2 in.) 0.500 (0.020 in.)
50.8 - 76.2 (2 in. through 3 in.) 0.760 (0.030 in.)
Over 76.2 - 101.6 (> 3 in. through 4 in.) 1.010 (0.040 in.)
Greater than 101.6 mm (> 4 in.) 1.780 (0.070 in.)

Note: The minimum source to object distance, D, (necessary to SAEP-1143


F1
insure that the Ug does not exceed the values listed in Table) can be Para. 8.2.2
determined by.
D = (Ft/Ug) + t
Where:
D=Source to weld distance, F=Source size, Ug=Geomatric
unsharpness t=Distance from source side of the Object to the film.

NOTES:
1. Items indicated as "Best Practice" shall be agreed upon by Contractor, SAPMT and Inspection. These will then be
incorporated in the project requirement and in the Project Quality Plan and will be mandatory for implementation.

REMARKS:

NOTES: 1. This checklist shall be utilized per SAIC-RT-2010, RT Process Control Procedure relative to Selection of NDE & Repairs
REFERENCE DOCUMENTS:
1. SAEP-1143, Radiographic Examination, (2 Oct, 2014)
2. SAEP-1141, Radiation Protection For Environmental, 12 July 2016

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED