Nothing Special   »   [go: up one dir, main page]

CV Hendra Kurniawan 17122019 PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

PERSONAL DATA

Name & BOD : Hendra Kurniawan / 06 Oct 1982


Gender : Male
Nationality : Indonesian
Mobile phone : +62 813 1824 0572 ( WhatsApp/mobile Number )
Email : Hendra.rnp@gmail.com
Address : KOMP.CIBINONG VILLAGE BLOK PINUS NO.09
JLN.AL FALAH NO.10 - RT 02/05 KEL.HARAPAN JAYA.
CIBINONG.BOGOR JAWA BARAT POSTCODE: 16914

CAREER OBJECTIVES

To secure a challenging position in a reputable organization to expand my learning, knowledge, and skills and also Secure a
responsible career opportunity to fully utilize my training and skills, while making a significant contribution to the success of
the company.

FORMAL EDUCATION BACKGROUND


Bina Nusantara University - Informatics Engineering (Computer science) ( 2002-2007 )
final GPA : 3,41
Senior High School SMUN 2 - Payakumbuh West Sumatera, Indonesia (1998 – 2000)

WORK EXPERIENCES

04 March 2019 – 30 june 2019, Radio Network Planner– NOKIA Jakarta (2G,3G,4G RF Planning Engineer) ISAT Rollout Newsite
Project, Kalimantan Indonesia

Defining naming convention and golden/tuning parameter for first network implementation
Tough coordination with customer and delivery
U900/U2100/L1800/L2100 coverage and quality improvement assessment
Link budget, dimensioning, MDT, drive test analysis, indoor penetration analysis
Propose site count & justification for new rollout and improvement /Atoll
propagation model tuning / Atoll
Improvement solution with add sectors, low traffic re azimuth, flexi zone/small-cell, high-gain antenna, dual-beam
antenna
Site candidate selection, search ring radius, and design (azimuth and RF height) assessment
SRAN17A implementation and dimensioning
Define SRAN configuration and SCF creation
New site parameter planning
Implementation support and troubleshoot
Conduct partner for Functionality test/Single Site Verification and drive test

01 August 2018 – 28 Feb 2019, Network Quality Management Services – NOKIA THAILAND (2G,3G,4G RF Planning
Engineer) AIS NE Swap Project Korat Thailand

Technical supporting 2G,3G,4G ( BCCH, SC & PCI Planning )


Measurements and KPI statistic reporting ( Main Base KPI, 2G Capacity Monitoring )
Frequency BCCH planning 2G GSM DCS
SC Planning 3G UMTS
PCI RSI Planning 4G LTE
Database maintenance 2G 3G 4G
Gcell for MAPinfo 2G 3G 4G
Retune and Modification Freq PCI, SC, BCCH
2G 3G 4G Atoll Coverage prediction before and after reporting

2017 November – 2018 May, Xair Communication Sdn Bhd – NOKIA MYANMAR ( 2G RF Planning Engineer ) New Site &
Rollout Ooredoo Project ( OML )
Mass PES 2G new site creation :
ASSOC by MML creation
BCF parameters by XML & MML
BTS parameters by XML & MML
HOC parameters by XML & MML
POC parameters by XML & MML
TRX parameters by XML & MML
Neighbor addition ( ADCE, ADJW, ADJL ) by XML & MML
Support for 2G TRX Upgrade
Support for 2G TRX Downgrade
Support for 2G BSC Rehoming
Support for 2G Split LAC BSC
2G newsite Database planner preparation
Creation 2G Gcell for MAPinfo
Retune and Modification Freq BCCH & NCC by command handling CRT and Putty
2G Atoll Coverage prediction before and after reporting 2G Global Retune Freq
for new site using Atoll
KPI monitoring & Analysis , PCR, NCR and Initial Tuning ( 2G GSM optimization supporting )
2017 July – 2017 October, PT. Sarana Maju Lestari / SML (2G RF Planning Engineer) NOKIA XL SWAP Comodo Project
Service Sales Support and Network design for bid
KPI monitoring & Analysis, CR and Initial Tuning
2G Radio network design & 2G SSV Drive-test Reporting
Handled and responsible for good performance new site and neighbor
sites PES 2G new site creation
ASSOC by MML creation
BCF parameters by XML & MML
BTS parameters by XML & MML
HOC parameters by XML & MML
POC parameters by XML & MML
TRX parameters by XML & MML
Neighbor addition (ADCE, ADJW, ADJL) by XML &
MML Weekly customer meeting with radio design XL – Nokia

2014 June – 2017 June, NOKIA JAKARTA INDONESIA ( 2G RF Planning Engineer )


Provide KPI performance for L-0 document acceptance
KPI monitoring & Analysis, CR and Initial Tuning
Service Sales Support and Network design for bid
2G Radio network design & 2G SSV Drive-test Reporting
Handled 3G /2G New site Project as PLO/RNO Engineer
Responsible to make change request (CR) to create neighbor, change parameter for new site performance.
Checked alarm and parameters new site after connected and make sure that site can do tested by DT
team. Complain handling for New Site & Surrounding
KPI monitoring, drivetest KPI statistic and OSS KPI statistic.
Handled and responsible for good performance new site and neighbor sites
Site Commissioning Files (SCF) creators ( 2G and 4G ) BTS manager ( RG40,RU50,RL70/FL15/FL16)
BTS XML creator for 2G change request ( RG40,RU50,RL70/FL15/FL16 )
Coverage Plot for New Site/New Colo/Swap 2G 3G 4G using Atoll
Nokia Indonesia Project Involved
Swap Nokia ALITA - XL NTT NTB Nokia Komodo Project
Orange CMO Cameroon Project ( Onsite support / Cameroon, Central Africa )
MS sHCPT Project ( Jakarta )
APAC IDS XL Axiata ( Jakarta )
Belltel 2G 3G project ( Philippine )
XL INDOSAT - RAN SHARE ( Jakarta )
SMARTFREN 2G/3G/LTE – DESIGN Bid ( Jakarta )

2013 November – 2014 May, Lexcorp Indonesia ( 2G/3G RF Planning Huawei Service, XL - LionsGate Project ( West Java Area )
Planning Site Parameter for New Site/New Colo using Atoll (BCCH-BSIC frequency planning ;clutter type ; antenna:
type,height,azimuth,tilt (MDT/EDT),feeder type) using Mapinfo
Coverage Plot for New Site/New Colo 2G (roll out acceptance/QC) using
Atoll Global Frequency Retune ( Sulawesi area, Bogor area )
Provide Coverage Plot Before-After (NPI team) per site/per cell/per cluster

2013 February – November 2013, KMS Telecom ( 3G RF Planning Huawei -TSEL Project South Sumatera (
SUMBAGSEL AREA ))
Update 3G Engineering Parameter for South Sumatera Area periodically
Update 3G Planet Database for South Sumatera Area periodically
Experienced HUAWEI UMTS RNP/RNO
Deliver regional E2E RNP task including the nominal plan, site selection, detailed parameters planning, Pull out for
NODIN issue
Initial optimization for 2G/3G,
Experiences with Atoll and Huawei equipment
Experience with M2000
Proficient knowledge of MapInfo software.
Comprehensive understanding of Proper prediction model selection (Okomura, Hata, COST231, etc.) and their
key parameters calibration for various frequencies.
Good knowledge of system topology and air interface parameters of at least one of the main
technologies (GSM/UMTS)
Good knowledge of at least one of the main equipment vendors
Knowledge of system features and parameters for optimal network performance.
Analyze network performance reports and good understanding of KPIs.
Carry out optimization techniques (proper antenna selection for optimal horizontal/vertical performance,
mechanical/electrical tilting, appropriate transmit power setting, antenna clearance, neighbor list analysis, etc.)
for optimal site/cluster performance.
Good understanding of antenna theory (aperture, gain, beam width, dipole vs. isotropic), antenna
performance (return loss, impedance matching, etc.), and engineering tools (spectrum analyzer, site master,
etc.). Perform design criteria and traffic analysis.
Help to define processes and procedures for RF engineering tasks. - Perform RF engineer's performance reviews
as required.

2012 April – October 2012, Intextelindo ( 2G RF Engineer NOKIA-TSEL E2E Project BALINUSRA )
Consistency parameter
Optimization works for Tsel NSN Network elements in respective expertise area.
Optimization and maintenance performance for 8 main KPI such as, HOSR , SDSR,
TCHD, TCHB,TBFUL,TBFDL,TBFCompletion,TCHtraffic
Changes parameter and HCR, solving a problem and other related 2G network problem.
Daily monitor site performance such as SDSR/CDR/HOSR and others.
Monitoring performance of site
Coordinate with TI Team also DT Engineer and Rigger for site audit.
Performance and Capacity monitoring support.
Performance monitoring collects, analysis, and reports indicating element and network performance.
Periodical evaluation of the network, subscriber growth, and assessment of these trends and, availability of
network capacity.
Familiar with NSN RF feature and parameter for GSM/GPRS
Able to perform drive test analysis and post processing data
Able to perform network trouble shooting for high drop call (sdcch/tch), low success rate (sdcch/tch), low
handover success rate,
Able to perform analysis and read GSM network alarm
information BSS parameter tuning & consistency check
BSS counters & KPI formulas analysis & recommendation
Coverage & quality issue handling
Frequency retune & neighbour optimisation
BSS O&M alarms analysis & hardware issue handling
Drive test measurements & analysis
Nominal cell planning, RF coverage & capacity planning
Traffic & coverage analysis

2011 October – 2012 April, Universal Celullar Engineer ( Radio Network Planning (RNP) 2G/3G Huawei )
Planning Site parameter for New Site/New Colo using Atoll (BCCH-BSIC frequency planning, clutter type antenna:
type,height,azimuth,tilt ,feeder type) using Mapinfo and GENEX
Create NODIN for integration (defining LAC,Cell ID, BSC)
Cove Plot for New Site/New Colo 2G (roll out acceptance/QC) using Atoll
Provide Coverage Plot Before-After (NPI team) per site/per cell/per cluster

2011 February – 2011 October, Lintas Media Telekomunikasi ( 2G / 3G RF ( Technical Support Engineer - HUAWEI
TELKOMSEL PROJECT / JAKARTA– EAST JAVA & XL PROJECT – BALI area )
Optimization and maintenance performance
Audit Network & Consistency parameter
Optimization works for Telkomsel & XL Huawei Network elements
Changes parameter, solving a problem and other related 2G/3G network problem.
Daily monitor site performance and others.
Monitoring performance of site&Coordinate with DT Engineer and Rigger for site audit -Performance monitoring
collects, analysis, and reports network performance.
Periodical evaluation of the network, subscriber growth, and assessment of these trends and, availability of
network capacity.
Experience with 2G /3G in Huawei Network & Coverage & quality issue
handling Familiar with Huawei RF feature and parameter for WCDMA/
GSM/GPRS Familiar and experience with Huawei tool such as M2000 , LMT
Able to perform analysis and read GSM/WCDMA network alarm information- Frequency retune &
neighbour optimisation
BSS O&M alarms analysis & hardware issue handling

2010 March - January 2011, PANADYNAMIC ( 2G RF OPTIM ENGINEER ( ERICSSON - TELKOMSEL PROJECT /
MIDLE SUMATERA area )
Optimization works for T-sel Ericsson Network elements in respective expertise area.
Optimization and maintenance performance for 3 main KPI such as HOSR TCHD and SDSR.
Changes parameter, solving a problem such as SD DROPS, TCH DROP, HO FAIL and other related 2G network problem.
Daily monitor site performance such as SDSR/CDR/HOSR and others.
Monitoring performance of site
Coordinate with DT Engineer and Rigger for site audit.
Performance and Capacity monitoring support. - Optimize working flowchart.

2008 March – 2009 May, Universal Cellular Engineering ( UCE Int.Indonesia ) ( TELECOMMUNICATION DB
PLANER ENGINEER ( NSN - HCPT Project )
Handle for XML Script New site Request - West Java & Jabodetabek
PCR Request script- West Java & Jabodetabek
Parameter 2G and 3G Script - West Java & Jabodetabek
Cut Over site Script
VIP Request Complain Script
Modify BTS Object Script Jabodetabek
Database Maintenances
Support Data creation/modification for TRX Downgrade/Upgrade activities

2008 January – March 2008 , PT.Centfor Technology ( Telecommunication Technical Support Engineer ( ZTE –
TELKOMSEL Project )
Make Daily KPI for Region North Sulawesi ( Gorontalo & Manado )
Make Weekly KPI for Region North Sulawesi ( Gorontalo & Manado )
KPI daily Monitoring North Sulawesi Region ( Gorontalo & Manado )
Parameters Modifying and maintenances base on Netnumen ISMG & MINOS - Alarm monitoring base on
Netnumen ISMG & MINOS
Site investigation, BTS problem, Customers complaint handling.

2007 Sept – Nov 2007 , PT.Sarana Sapta Sejahtera ( Citibank ) Creditcard Telesales Citibank
Selling and offering Citibank product by Phone, such as :
Silver card – Premier miles, Gold Card , and Platinum Card
Citibank Telkomsel Card
Garuda Indonesia Card
Easypay Loan Card
Followup customer ( canvasing ), and Directly meet the customer by request
Customer database updating using Cardpack ( Citibank customer database )
Offering to upgrade limit and other benefit base on paytracker customer
Meets daily and monthly selling target for Citibank

COMPUTERS SKILL
MS Office - Word, Excel, Visio
Tools - MINOS, Caddie Database Planner BR.9, Nokia Netact Plan Edit, ISMG, BO Ericsson, Mcom 4.2,
Actix, Tems 9.1, Mapinfo, Winfiol, iM2000, Atoll Planner, LMT BSC 6000, 6900, GENEX, GoogleEarth, CRT, Putty Command
Operating Systems - Windows 2000, Windows 98, Windows XP Home Edition, Windows Professional, Windows Longhorn,
Windows Vista, Linux

LANGUANGE ABILITY
Bahasa Indonesia (Mother language)
US English
Read : Good
Write : Very Good
Speak : Good
Willing to travel : Yes
Support on Site : Yes
Contract Position : Yes
Permanent Position : Very Considered

You might also like