Final Brief On Mulkoh Kosh Kagh Last Schem Chitral 2019
Final Brief On Mulkoh Kosh Kagh Last Schem Chitral 2019
Final Brief On Mulkoh Kosh Kagh Last Schem Chitral 2019
4. As per the terms of reference, the assignment envisages the development of the
proposed KPWRD Project, which includes three subprojects identified in the Technical
Assistance Report prepared by ADB in July 2017 and subsequent discussions with
KPID.
i. Mulkoh irrigation distribution system Irrigation Distribution System (IDS) and its
command area development (CAD) in Chitral district.
ii. Modernization of the Tanda IDS and its CAD in Kohat district.
iii. Modernization of the Pehur Main Canal (PMC) IDS and its CAD in Swabi district.
5. Under the TRTA the Consultants are preparing a loan investment project for
increased farm and non-farm incomes of households engaged in agriculture in the three
subproject areas located in districts Chitral, Kohat, and Swabi respectively in Khyber
Pakhtunkhwa (KP) Province. The indicative outcome of the proposed investment project is
increased agricultural productivity in Khyber Pakhtunkhwa Province. The key indicative
outputs will include: i) increased water supply capacities in subproject areas; ii) farmers’
water-use and farm-management capacities increased in subproject areas; and iii) efficient
and effective project management system is operational.
6. Up till now Revised Mid Term report had been submitted by the consultants in
February 2019, which describes the progress on various studies carried out so far and
outlines the future line of action. The final report would be submitted by 23rd March 2020.
6. Presently, the PC-I of the Scheme, “Construction of Mulkoh, Kosht & Kagh Lasht Irrigation
Scheme District Chitral” was updated by the Department with an estimated cost of Rs.6773.33
Million, cleared during the PDWP meeting dated 22.04.2019, for its onward sub mission to
Ministry of Water Resources Islamabad for further processing and its inclusion in the PSDP 2019-
20.
3 Length of Weir m 50
4 Height of Weir m 4
b) Headrace Conduit
2 Length Km 1.20
c) Tunnel
1 Length Km 5.20
3 Height M 2.45
Executive Engineer,
Irrigation Division,
Chitral.