Pengadaaan PANEL Ruang Pompa: Satuan Harga Upah Kerja Item

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

NO

ITEM VOLUME SATUAN HARGA UPAH KERJA


1 RG. GENSET

Pengadaan Ekshaus Fan dinding 12 bh Rp 1,620,000.00

Trafo 1000 kva - unit

Pengadaaan PANEL Ruang pompa

- panel Hydran 1 set Rp 2,275,000.00

- panel Pompa air 1 set Rp 899,500.00

- panel Utylity 1 set Rp 588,000.00

Pengadaaan PANEL Power House Rp -

- panel MV (incoming IM 630 A+Outgoing QM) 1 set Rp 15,000,000.00

- panel LVMDP 1 set Rp 15,000,000.00

- panel PKG dan perakitannya 2 set Rp 20,000,000.00

- panel Utility 1 set Rp 1,176,000.00

Instal genset dan instalasi kabel tufur dari genset ke tiap gedung 1 set Rp 20,000,000.00

2 PASAR KERING

Pekerjaan instalasi listrik

Panel Listrik 2 set Rp 4,000,000.00

Instalasi

Instalasi Pencahayaan 285 ttk Rp 28,500,000.00

Instalasi Stopkontak (300VA) 30 ttk Rp 3,000,000.00

Instalasi Exhaust Fan 8 ttk Rp 800,000.00

Armature

RM TL 2x36 w 3 bh Rp 45,000.00

DownLight PLC 18 w 262 bh Rp 3,930,000.00

DownLight PLC 10 w 8 bh Rp 120,000.00

DownLight Slim LED 10 Watt, Bare Batten 1 bh Rp 15,000.00

DownLight LED 12 w 8 bh Rp 120,000.00

TL 1X36 watt 3 bh Rp 45,000.00

Saklar Tunggal 28 bh

Saklar Ganda 9 bh

Great Switch 6 gang 2 bh Rp 70,000.00

Stop Kontak Lantai 6 bh Rp 90,000.00

Stop Kontak Biasa 30 bh Rp 450,000.00

Exhaust fan 8 ttk Rp 280,000.00

Setting Commisioning 1 ls
Pekerjaan Instalasi CCTV

Pengadaan dan pemasangan Perlatan Utama CCTV :

DVR 16 channel HDTVI HDCVI 1 unit Rp 300,300.00

Colour Monitor 32" 1 unit Rp 192,500.00

Key Board Expander 1 bh Rp 115,500.00

Trafo For Kamera 1 bh Rp 19,250.00

Kabel Peralatan Utama CCTV 1 lot Rp 92,400.00

Cabinet Rack CCTV System 1 set Rp 308,000.00

Surge Arester 1 set Rp 7,700.00

Pengadaan dan pemasangan CCTV

Fix dome colour camera 5 bh Rp 616,000.00

Kabel Instalasi CCTV (Coaxial 5c/Rg.6) 5 ttk Rp 231,000.00

Kabel Power Kamera ( Kabel Nymhy 2 x 1,5 mm) 5 ttk Rp 121,275.00

Pengadaan dan Pemasangan Sepasang Eskalator

Pengadaan dan Pemasangan eskalator beserta panel + instalasi

Setting Commisioning

Pengadaan dan Pemasangan AC VRV

Indoor AC Cassete 2 pk

Indoor AC Split 1 1/2 pk

Outdoor VRV

Refnet Join

Pipa Reducer

Panel

Pemasangan Instalasi AC, ex. Supreme

Setting Commisioning

Pekerjaan Hydran dan Instalasi 1 set Rp 3,287,914.47

Pekerjaan Pipa Hydran

Pipa Black Steel Sch 40 (ASTM-120)

- Diameter 150 mm 100 m Rp 25,000,000.00

- Diameter 100 mm 25 m Rp 5,000,000.00

- Diameter 65 mm 10 m Rp 500,000.00
- Diameter 40 mm 10 m Rp 450,000.00

- Diameter 15 mm 10 m Rp 300,000.00

Pekerjaan sprinkler & instalasi

Pemasangan Kelengkapan instalasi pipa di ruang pompa

- Header 3 m Rp 298,219.21

- Pipa Black steel dia.150+ Fitting 20 m Rp 5,000,000.00

- Main Control Valve Dia.150 1 lot Rp 420,000.00

- Pressure Reducing Valve dia.150 1 unit Rp 2,100,000.00

- Gate Valve dia.50 1 lot Rp 210,000.00

- Pressure gauge 1 bh Rp 105,000.00

pemasangan sprinkler dan instalasi dalam gedung

Pipa Black Steel Sch 40 (ASTM-120)

- Diameter 150 mm 100 m Rp 25,000,000.00

- Diameter 100 mm 50 m Rp 10,000,000.00

- Diameter 65 mm 128 m Rp 6,400,000.00

- Diameter 25 mm 186 m Rp 6,510,000.00

fitting 1 lot

Instalasi Pipa Drain

- Pipa Dia.25 50 m Rp 1,750,000.00

- butterfly Valve dia.25 2 bh Rp 168,000.00

- sigh glass dia.25 1 bh Rp 175,000.00

- Pressure gauge Dia.25 1 bh Rp 105,000.00

Valve lengkap+support

- Branch Control Valve dia.100 1 unit Rp 490,000.00

- Sprinkler head tye Pendant 59 bh Rp 332,465.00

Setting Commisioning 1 ls Rp 525,000.00

Lantai 02

Pekerjaan instalasi listrik

Panel Listrik 2 set Rp 4,000,000.00

Instalasi

Instalasi Pencahayaan 296 ttk Rp 29,600,000.00

Instalasi Stopkontak (300VA) 30 ttk Rp 3,000,000.00

Instalasi Exhaust Fan 8 ttk Rp 800,000.00

Armature
RM TL 2x36 w 2 bh Rp 30,000.00

DownLight PLC 18 w 279 bh Rp 4,185,000.00

DownLight PLC 10 w 9 bh Rp 135,000.00

DownLight Slim LED 10 Watt, Bare Batten 1 bh Rp 15,000.00

bh

Lampu Gantung Hias Besar 1 bh Rp 1,000,000.00

Lampu Gantung Hias kecil 4 bh Rp 2,000,000.00

Saklar Tunggal 34 bh

Saklar Ganda 13 bh

Great Switch 6 gang 2 bh Rp 70,000.00

Stop Kontak Lantai 2 bh Rp 30,000.00

Stop Kontak Biasa 38 bh Rp 570,000.00

Exhaust fan 8 ttk Rp 280,000.00

Pekerjaan Instalasi CCTV

Pengadaan dan pemasangan CCTV

Fix dome colour camera 6 bh Rp 739,200.00

Kabel Instalasi CCTV (Coaxial 5c/Rg.6) 6 ttk Rp 277,200.00

Kabel Power Kamera ( Kabel Nymhy 2 x 1,5 mm) 6 ttk Rp 145,530.00

Pengadaan dan Pemasangan AC

Indoor AC Cassete 2 pk

Indoor AC Split 1 1/2 pk

Outdoor VRV

Refnet Join

Ybranch

Outdoor Pipe Connection

Pipa refrigrant

Panel

Pemasangan Instalasi AC, ex. Supreme

Pekerjaan Hydran dan Instalasi 1 set Rp 3,287,914.47

Pekerjaan Pipa Hydran


Pipa Black Steel Sch 40 (ASTM-120)

- Diameter 150 mm 55 m Rp 13,750,000.00

- Diameter 100 mm m Rp -

- Diameter 65 mm 10 m Rp 500,000.00

- Diameter 40 mm 10 m Rp 450,000.00

- Diameter 15 mm 10 m Rp 300,000.00

Pekerjaan sprinkler & instalasi

pemasangan sprinkler dan instalasi dalam gedung

Pipa Black Steel Sch 40 (ASTM-120)

- Diameter 150 mm - m

- Diameter 100 mm 30 m Rp 6,000,000.00

- Diameter 65 mm 135 m Rp 6,750,000.00

- Diameter 25 mm 200 m Rp 7,000,000.00

Fitting 1 lot

Instalasi Pipa Drain

- Pipa Dia.25 50 m Rp 572,699.54

- butterfly Valve dia.25 2 bh Rp 70,000.00

- sigh glass dia.25 1 bh Rp 35,000.00

- Pressure gauge Dia.25 1 bh Rp 35,000.00

Valve lengkap+support

- Branch Control Valve dia.100 1 unit Rp 200,000.00

- Sprinkler head tye Pendant 67 bh Rp 377,545.00

Top floor

Pekerjaan instalasi listrik

Panel Listrik 1 set Rp 2,000,000.00

Instalasi

Instalasi Pencahayaan 11 ttk Rp 1,100,000.00

Armature

Spot light 8 bh Rp 120,000.00

DownLight Slim LED 10 Watt, Bare Batten 3 bh Rp 45,000.00

3 PENGADAAN POMPA

Pengadaan Pompa Hydran 1 unit Rp 4,725,000.00


Pengadaan Pompa Diesel 1 unit Rp 2,625,000.00

Pengadaan Pompa Jockey 1 unit Rp 2,450,000.00

Pengadaan Pompa Distribusi Air bersih dari groundtank ke unit gedung4 unit Rp 2,772,000.00

4 HYDRAN KIOS

A KIOS 1 BARU + EKSISTING

Pekerjaan Hydran dan Instalasi 1 SET Rp 3,287,914.47

Pipa Black Steel Sch 40 (ASTM-120)

- Diameter 150 mm 200 m Rp 50,000,000.00

- Diameter 100 mm 70 m Rp 14,000,000.00

- Diameter 65 mm 20 m Rp 1,000,000.00

- Diameter 40 mm 20 m Rp 900,000.00

- Diameter 15 mm 20 m Rp 600,000.00

B KIOS 2 BARU + EKSISTING

Pekerjaan Hydran dan Instalasi 1 SET Rp 3,287,914.47

Pipa Black Steel Sch 40 (ASTM-120)

- Diameter 150 mm 36 M Rp 9,000,000.00

- Diameter 65 mm 20 M Rp 1,000,000.00

- Diameter 40 mm 20 M Rp 900,000.00

- Diameter 15 mm 20 M Rp 600,000.00

TOTAL ITEM PEKERJAAN MEP Rp 400,771,941.62