Draft of Rev.

08

1. No.1 Steel Penstock


A. [SPECIFICATION No.1] (Inside of No.1 Penstock for horizontal position and steel lining)

Spreading Rate Minimum


Coating
including Loss Dry Film
Process Product Name Paint Name Color Coating Method Interval Thinner
Factor of 35% Thickness
(L/m2) (at 23°C)
(microns)
Work Shop
Surface
Blast Cleaning to ISO 8501-1 Sa 2 ½ or Sa 2 ½ of SIS 055900 or SSPC-SP10. 2 hrs.
Preparation
Thinner
Primer ( at field shop) Hempel’s Galvosil 15780 Inorganic Zinc Grey Airless Spray 0.19 90 Min 4 hrs.
08700
Erection Site Secondary
All oil, paraffin, grease and dirt will be removed from the surfaces to be painted, by wiping the surfaces with a clean
Surface
cloth dipped in mineral solvent.
Preparation
Thinner
1stCoat Hempadur 15130 Coal Tar Epoxy Black Airless spray 0.35 160 Min 7 hrs.
08450
Thinner
2ndCoat Hempadur 15130 Coal Tar Epoxy Black Airless spray 0.33 150 Min 7 hrs.
08450
Total Dry Film Thickness min. 400
- Airless spray repair coat will be applied for field paint.
Repair Coats - This painting method shall be applied for repair coat of grout holes, spider lugs and field welding joint. After 24 hrs.