KAR GROUP REFINERY Project Paint Application Procedure
KAR GROUP REFINERY Project Paint Application Procedure
KAR GROUP REFINERY Project Paint Application Procedure
Date : 06.02.2012
Company Name : SILVER TEKNİK
Project : KAR GROUP REFINERY
1. Oil, grease, dust and mud shall be removed from the surface by using a suitable cleaning chemical or thinner.
Surface Preparation 2. Surfaces shall be blasted in Sa 2 ½ level. Surface profile shall be in 40-70 microns range.
3. Blasted surfaces shall be painted in 8 hours at the latest.
1 19300 KANEPOX NOVA PREMIUM 03623009 0671 / 0675 RAL 7032 125 79 1,45 0,229 30 0,328 12 Hours 21 Days
Internal Surfaces of
Tanks
2 19300 KANEPOX NOVA PREMIUM 03623009 0671 / 0675 RAL 7032 125 79 1,45 0,229 30 0,328 12 Hours 21 Days
250
1. Oil, grease, dust and mud shall be removed from the surface by using a suitable cleaning chemical or thinner.
2. Weld Surfaces shall be blasted in Sa 2 ½ level. Surface profile shall be in 30-50 microns range.
Surface Preparation
3. Surfaces painted with shop primer shall be cleaned with sweep blasting.
4. Prepared surfaces shall be painted in 8 hours at the latest.
Dry Film Theoretical Loss Practical Application Time of New
Paint Product Code / Name Volume Solid Density
Application Zone Hardener Thinner Colour Thickness Consumption Rate Consumption Coat
Coat (%) (kg/lt)
(microns) (kg/m²) (%) (kg/m²) Min. Max.
1 15510 KANEPOX TOL 03093002 0675 / 0675 7133-GREY 140 82 1,40 0,239 30 0,341 6 Hours 30 Days
External Surfaces of
Tanks
2 37370 KANPOLY ACR ENAMEL 01043003 0650 / 0651 RAL 7001 60 55 1,30 0,142 30 0,203 4 Hours 7 Days
200