3g HW Acceptance Bts 030747-Kapau
3g HW Acceptance Bts 030747-Kapau
3g HW Acceptance Bts 030747-Kapau
BTS3900A
PO Number 2015/NEFPA/PO/21082018-575a
Site ID 030747
Integration Date
Nokia Siemens Networks hereby states that the whole of supplies detailed above have been inspected,
implemented, tested and unless otherwise stated conform to the specified requirements in the contract
or order identified above.
Signature :
Approved by :
Date :
Table of Contents
A. 3G Antennas
Antenna Type
Serial No
Direction
Mechanical Tilt
Electrical Tilt
Antenna Height
A. 3G Feeder System
DC Cable Length m m m m m m
A. Rectifier System
AC Input of
220±10% VAC
Rectifier System
DC Output of
-40.5 VDC – -57 VDC
Rectifier System
B. 3G
AC Input of
220±10% VAC
Rectifier System
DC Output of
-40.5 VDC – -57 VDC
Rectifier System
DC Input of
-40.5 VDC – -57 VDC
System Module
FEEDERLESS
RFM/ RFM/ RFM/ RFM/ RFM/ RFM/
RRH RRH RRH RRH RRH RRH
1 2 3 4 5 6
DC Input of RF
-36 VDC – -57 VDC
Module or RRH
DATE OF LAST
MANUFACTURER MODEL SERIAL NUMBER
CALIBRATION
A. VSWR Measurement
Measure the VSWR value of feederline, including the RF bottom jumper, feederline, and antenna. Maximum
VSWR value allowed is 1.3.
3G
VSWR Value
VSWR Value
VSWR Value
VSWR Value
VSWR Value
VSWR Value
M1 M2 M3 M4
Distance to Fault Criteria:
M1 Connection point between RF/RRH Module to the bottom Distance 0 m, SWR 1.05
jumper
M2 Connection point between bottom jumper to the feeder Distance 3-6 m, SWR 1.05
M3 Connection point between feeder to top jumper Distance as per feeder length,
SWR 1.05
M4 Connection point between top jumper to the antenna Distance 3-6 m, SWR 1.05
M5 Maximum VSWR value on feeder line Distance between M2 & M3,
SWR 1.01
3G Feederlines
M1 M2 M3 M4 M5 Not
Feeder OK N/A Remark
S D S D S D S D S D OK
Sector 1 A
Sector 1 B
Sector 2 A
Sector 2 B
Sector 3 A
Sector 3 B
Sector 4 A
Sector 4 B
Sector 5 A
Sector 5 B
Sector 6 A
Sector 6 B
1 EQUIPMENT PREPARATION
1.1 Delivery checked, shortcomings recorded
1.2 Transport damages recorded
2 SITE PREPARATION
Item Description OK NOK N/A
Item
Item Description Quantity Part Number Serial Number
Code
Cabinet APM30
Cabinet RFC
BBU3900 / HERT
BBU,WD2BBBUC,HERT BBU Box
UMPT / WD22UMPTb1 /BBU3900-
WD22UMPTb1-Universal Main
Processing & Transmission unit
with 4E1 and 2FE/GE interface
WBBPd /
BBU3900,QWL1WBBPD2,WCDMA
Baseband Process Unit D,1*1
UPEU / WD2MUPEUC/HERT BBU
WD2MUPEUC,-48V Power and
Environment interface Unit
UEIU / WD2M1UEIU/Functional
Module,HERT
BBU,WD2M1UEIU,Universal
Environment Interface control Unit
FAN/ WD2E1FANC/Fan Box,HERT
BBU,WD2E1FANC,2U Fan Module
WRFU
2.1.2.1 BoQ Upgrade / Licenses
Existing
No Object Final Quantity
Quantity
2.2 1 Channel Element Co
mm 2 Carrier issi
oni ng
3 HSDPA Code
Record
PDH
Flexihopper
Metrohopper
OTHER
………………..
Cross connect route (with system detail)
……………………………………………………………………………………………………………
2.2.2 Node B and RNC Information
Node Name
PLMN ID
Routing Area Code
Location Area Code
Service Area Code
O&M Link (IP Address)
Transmission Capacity
Error:
Refer
ence
TEST DATE COMMENTS
sourc
e not
found
Abis Test
BTS Restart
d. SMS Test
e. MMS Test
f. Handover Test
3. ATTACHMENTS
1. Screenshoots
a. 3G Modules Configuration
b. 3G CE Availability
c. 3G Transmission Module Configuration
2. Antenna Sweep Test Result
a. 3G Sector 1 VSWR and DTF
b. 3G Sector 2 VSWR and DTF
c. 3G Sector 3 VSWR and DTF
d. 3G Sector 4 VSWR and DTF
e. 3G Sector 5 VSWR and DTF
f. 3G Sector 6 VSWR and DTF
3. Installation Pictures
a. System Module Installation (open and closed front cover)
b. DC power cable termination to MCB in Rectifier System
c. Feeder Installation
d. Antenna Installation
4. Commissioning Files
a. NodeBCfg.xml
b. HSDPA upload/download screenshoots (www.speedtest.net)
5. Redline drawing
IMPLEMENTATION PHOTO
N/A
Page 1 of 10
IMPLEMENTATION PHOTO
N/A
N/A
Page 2 of 10
IMPLEMENTATION PHOTO
N/A
Page 3 of 10
IMPLEMENTATION PHOTO
Page 4 of 10
IMPLEMENTATION PHOTO
N/A
N/A
Page 5 of 10
IMPLEMENTATION PHOTO
Page 6 of 10
IMPLEMENTATION PHOTO
Page 7 of 10
IMPLEMENTATION PHOTO
Page 8 of 10
IMPLEMENTATION PHOTO
N/A
View To Site
N/A
Name Plate
Page 9 of 10
IMPLEMENTATION PHOTO
Recti
Page 10 of 10
4. PUNCH LIST
Site ID : 030747
Integration date:KAPAU
1 Chapter : Name :
Description : Date :
2 Chapter : Name :
Description: Date :
3 Chapter : Name :
Description Date :
4 Chapter : Name :
Description : Date :
5 Chapter : Name :
Description : Date :
Revision number: 00 26
Date of issue: December, 2018 of
References: 34
CAPTURE 3G HUAWEI
SITE ID/ SITE NAME: 030747/KAPAU
Revision number: 00 29
Date of issue: December, 2018 of
References: 36
Revision number: 00 30
Date of issue: December, 2018 of
References: 36
Revision number: 00 31
Date of issue: December, 2018 of
References: 36
Revision number: 00 32
Date of issue: December, 2018 of
References: 36
Revision number: 00 33
Date of issue: December, 2018 of
References: 36
Revision number: 00 34
Date of issue: December, 2018 of
References: 36
Revision number: 00 35
Date of issue: December, 2018 of
References: 36
SPEED TEST-3G
SITE ID/SITE NAME: 030747/KAPAU
Revision number: 00 36
Date of issue: December, 2018 of
References: 36