NDP KMR Terminal B: Underground Piping Modification Project NDP SHELL
NDP KMR Terminal B: Underground Piping Modification Project NDP SHELL
NDP KMR Terminal B: Underground Piping Modification Project NDP SHELL
23'
2 Footing dist. bar T/B & Both way
1/2" 150mm 2 44 6.25 550 0.302 166.1 kg 6" 6"
5'3"
3 Vertical bar long wall side
1/2" 150mm 2 47 6.58 618.52 0.302 186.793 kg
4'7"
2'
4 5"
Vertical bar long wall inside 1/2" 150mm 2 47 5.42 509.48 0.302 153.863 kg
4'7"
2'
Prepared By:Hafiz
NTS
5
Vertical bar foam tank wall inside 1/2" 150mm 2 12 6.08 145.92 0.302 44.06784 kg
. 4'7"
6 5''
Vertical bar foam tank wall side 1/2" 150mm 2 12 4.92 118.08 0.302 35.66016 kg
. 4'2''
2'
7
Horizontal Bar Long wall Both ways
1/2" 150mm 2 19 20.17 766.46 0.302 231.4709 kg
25'
8
Horizontal Bar Foam Tank wall 1/2" 150mm 2 19 6 228 0.302 68.856 kg 6" 6"
5'
2'
11 Trench Support
Horizontal Bar 1/2" 150mm 4 2 6 48 0.302 14.496 kg 6" 6"
5'
Prepared By:Hafiz
NTS
Total weight kg
1212.065
Prepared By:Hafiz
NTS
Prepared By:Hafiz
NTS
Prepared By:Hafiz
NTS
Prepared By:Hafiz