Capability Presentation

October 2017
Table of Content

Corporate Presentation

Capabilities & Assets

Track Record

2
Section 1: Corporate Presentation

3
Introduction

› Sapura Energy was established in the 1990s and is today an integrated oil and gas services and
solutions provider operating across the entire upstream value chain. As a fully-fledged
upstream player, the Group’s spectrum of capabilities cover the exploration, development,
production, rejuvenation, as well as decommissioning and abandonment stages of the value
chain.

› With a highly skilled and technically capable multinational workforce, strategic world-class
assets, and strong project management capabilities, the Group today has a global presence in
over 20 countries.

4
Evolution of Sapura Energy

Renamed to Sapura Energy Berhad


2017 Reflect enhanced capabilities and reach in delivering
integrated solutions for upstream oil & gas industry
Entry into E&P sector
2014 Completion of Newfield acquisition- Malaysian assets
Global leader in tender drilling
2013 Acquisition of Seadrill’s tender rig business

Merger of SapuraCrest & Kencana Petroleum (SKPB)


2012
Enhanced Engineering & Construction execution capability

2011 Development of marginal fields


Awarded 1st marginal field Berantai
2007- Proven deepwater capabilities
Secured Malaysia’s first & second deepwater contract –
2010 Kikeh and Gumusut-Kakap (offshore Sabah)
2003- Strengthen strategic asset base
Sapura 3000 (deep-water construction & pipe-lay vessel)
2006 Remotely-operating-vehicles via acquisition of TMT
2000 Established Lumut Fabrication Yard

1990s Entry into upstream services


Pipelay and Heavy lift structures installation executed using two (2) Derrick Pipelay vessels
5 Maintenance of equipment for offshore platforms
Organised to deliver services for the upstream industry
Services across the upstream oil and gas value chain

Engineering and Construction Drilling Exploration & Production


Project Management and Engineering Services Global market leader in 9 PSC blocks
➢ Centralized Project Management execution with experienced
PMT
tender rigs ➢ 6 operated
➢ In-house multi-disciplined engineering capabilities with offices ➢ ~50% market share ➢ 3 non-operated
in Malaysia, London, Perth and Houston
Offshore construction and subsea services Shallow & Deepwater up Proven drilling capabilities
➢ Installation / decommissioning of structures with maximum ➢ Deep horizontal wells
single lift capacity of 3500 MT
to 2,000m water depth
➢ Installation of pipelines in ultra deep water. ➢ Shallow-water fixed ➢ Sandstone and carbonate
➢ Subsea construction, well-intervention and Brownfield platforms reservoirs
rejuvenation
➢ Deepwater TLP, spar, ➢ HPHT
Combined fabrication yard capacity of 125,000 MT with
capabilities for
compliant towers
➢ Central Processing Platforms
Partnerships with Petronas, Shell &
➢ Wellhead Platforms Mitsubishi
➢ Onshore & Offshore Process Modules
➢ Subsea structures and manifolds
6
Services Across The Life-cycle of Oil and Gas Fields

PSC Exploration Development (EPC, IPF & HUC)

Decommissioning
Exploration Development Production Rejuvenation
& Abandonment

PSC Exploration EPC IPF Drilling HUC PSC + Marginal fields EOR + Brownfield Decommissioning

Drilling Production & Rejuvenation Decommissioning

7
Ownership of Strategic Asset to Ensure Timely Project Delivery
Lumut Yard
Fabrication Labuan Shipyard
273 acres, situated in West
88 acres with easy access
Yard Coast of Malaysia facing
to South China Sea
the Indian Ocean

6 x Heavylift Derrick Lay 1 x Subsea Construction


For deepwater and shallow Vessel
water installation work
Offshore
Construction 6 x Flexible and
Umbilical Lay Vessel
1 x Floatover Launch Barge
Capable of working in
WD upto 3,000m

Marine
Support
6 x Diving 2 x Geotechnical 2 x Anchor 6 x Work Boats 28 x Remote Operated
Support Vessel Vessel Handling Tugs and barges Vehicle

8 x Tender Drilling Rigs 9 x Semi-tender Drilling Rigs*


Self-raise, rig-up onto offshore Similar to Tender but able to
Drilling operate in deeper water depth,
platform. Able to drill multiple
wells from single location harsher environment
*2 under construction
8
Project Management Solutions Across The Upstream Oil
and Gas Value Chain Globally
Our capabilities in upstream value chain
Decommissioning &
Exploration Development Production Rejuvenation
Abandonment
PSC Exploration EPC T&I Drilling HUC Production & Operations Brownfield Rejuvenation Decommissioning

~60 ~25
employees London INDIA 70
employees OPERATION
CENTRE
employees
Houston
Dubai Vung Tau
Brunei MALAYSIA 8,000
MEXICO GLOBAL
OPERATION
40 CENTRE CENTRE employees
employees Jakarta

BRAZIL AUSTRALIA
OPERATION OPERATION
CENTRE 950 CENTRE 150
employees employees

National Oil Companies Majors Independents

9
Ongoing and Recently Completed Key Projects Globally
Turkey
• EPCIC for Trans Anatolian Thailand
Natural Gas Pipeline • Tender drilling for Chevron
• EPCIC B-17, B17-01 for PTT-
Myanmar
Petronas Carigali JV
• EPCIC Zawtika for
PTTEP Brunei
• EPCIC Upgrade &
Pemex – 3,200 MT heavylift Decommission Floating
India Terminal for Shell
Mexico
• Pipelay for KMZ Project for • EPCIC MHSRD EPCIC B-127, Malaysia
Pemex both for ONGC • EPCIC ZAK WHP for Hess
• EPC B15 for Sapura E&P
Brazil
Australia • Decommission D-30, MOPU
• 6 Pipelay Vessels Sepat for Petronas
• Well intervention for Shell
Petrobras
• Well intervention and • EOR for ExxonMobil
• 5,930km flexible pipeline • Semi-tender drilling for TLP
decommissioning for
installed for Petrobras Malikai, Shell
Woodside

Sapura Diamante MHSRD III - Topside B15- CPP Drilling for Shell Malikai
10
Section 2: Capabilities And Assets

11
In-house Multi-disciplined Engineering Capabilities
➢ Peritus International (Australia, USA, UK and Malaysia) (fully owned
subsidiary)
➢ Advanced subsea, deepwater pipeline and riser engineering.
➢ Shallow water/ near shore pipelines.
➢ Floating systems engineering.
➢ Developments in remote, hostile or deepwater environments
➢ SapuraKencana Engineering (Malaysia)
➢ Conceptual / Front End Design, Detailed Engineering Design,
Procurement Support & Commissioning Support.
➢ Design pressure vessels, shell & tube exchangers, air-cooled
exchangers, skidded & modularized process systems.
➢ Design equipment modules for FPSO’s, onshore plants & offshore
platforms.
➢ EPCC of new plants & plant upgrades /modifications.
➢ Ocean Flow International (USA) (fully owned subsidiary)
➢ Subsea & Offshore development projects around the world.
➢ Deep water and subsea development while possess extensive
experience in shallow water development.
➢ T&I Engineering and Constructability
➢ Complete in-house T&I engineering capability for platform facilities,
shallow and deepwater pipeline, marine system, SURF and de-
commissioning engineering
➢ Excellent working relationship with International Engineering
companies to meet demand and client need
12
YARD AERIAL VIEW, LUMUT, PERAK,
Fabrication Asset: Lumut Yard
9 June 2014

9
6 8
10 13
7 12
2 2

5
11
4

3 4

1 2

J3: 30,000MT J1: 20,000MT


J10: 3,000MT

1. Shipbuilding Yard 10. Warehouse, Canteen & Car Park


2. Heavy Structure Erection Area 6. Pipe Workshop Centre
11. Fabrication Workshops: Module Fabrication, Piping
3. Open Area for Assembly Work 7. Heavy Structures Prefab/Auto Production Line c/w 2 units of Fabrication, Structural Fabrication
75T & 2 units of 25T Gantry Crane
4. Module Assembly Line c/w 2 units of 25T Gantry 12. Fabrication Workshops: Blasting & Painting, Piping
Crane 8. CNC Pile Profiling Machine & Minor Fabrication Workshop Fabrication , Structural, Storage Area
5. Administrative Building 9. Open Storage Area (10,000 tons Material Storage Capacity) 13. Open Storage: Auto Blast Workshop, Painting
Workshop
TOTAL YARD SPACE COVERED FABRICATION AREA OPEN SPACE FABRICATION AREA AND OPEN STORAGE AREA YEARLY CAPACITY

273 acres 129,302 m2 967,197m2 Max up to 90,000 mt


TOTAL
13 OFFICE SPACE QUAY WATER DEPTH LOADOUT WHARF LENGTH WHARF LOADOUT CAPACITY
22,350 m2 -6m to -12m 770m Ranging from 5,000MT to 30,000MT
Lumut Yard and Marine Base Facilities

14
Fabrication Yard (2): Labuan Shipyard

Total Yard Covered Fabrication Open Space


Open Storage Area Yearly Capacity Total Office Space
Space Area Fabrication Area
15
60 acres 30,700 m2 174,800m2 14,500 m2 36,000mt 16,600 m2
Offshore Assets: Deepwater (Rigid Pipeline)

SapuraKencana 1200 DP-3 HLV SapuraKencana 3500 DP-3 HLV


1,200MT crane, 520MT tension S-lay 3,500MT crane, 390MT tension S-lay

Sapura 3000 DP-2 HLV SapuraKencana Constructor


2,722MT crane, 240MT tension S-lay, 250MT AHC crane, Sat system
400MT tension J-lay, 360MT A&R and
A-frame capacity
16
Offshore Assets: Deepwater (Flexible Pipeline and Umbilical)

Sapura Diamante Sapura Esmeralda Sapura Topazio


550MT VLS 300MT VLS 550MT VLS

Sapura Jade Sapura Onix Sapura Ruby


550MT VLS 550MT VLS 550MT VLS

17
Offshore Assets: Conventional and Installation Support

LTS 3000 DLB SapuraKencana 2000 DLB SapuraKencana 900 DLB


3,000MT crane, 200MT tension, self 2,000MT crane, 140MT tension 9,00MT crane, 120MT tension
propelled

FLB-1 Floatover launch barge 6 x ACB 4 x DSV


16,000MT

2 x AHTs 28 x Remotely Operated Vehicles 10 x Air dive system


4 x portable sat system
18
1x Hyperbaric Rescue Facility (HRF)
HUC & Modification Capabilities

➢ Hook up Works
➢ WHP, CPP, Compression Module, Riser Platform,
Bridge, LQs, Flaring Platform

➢ Brownfield Modification & Topside Major


Maintenance Works
➢ Launcher & Receiver
➢ Riser Tie-in
➢ Installation of New Equipment
➢ Piping Works, Plant Turnaround, Valve Overhaul,
Structural Repair
➢ Electrical & Instrumentation Works
➢ Repair and maintenance work on existing
facilities

19
Offshore Assets: HUC & Modification

KPV REDANG SARKU SANTUBUNG


200 Pax 123 Pax
Crane Capacity: 25T Crane Capacity: 33T
DP2 DP2

SK DUYONG SK AMAN
DP2 DP2
200Pax 200Pax
Crane Capacity: 50MT Crane Capacity: 50MT

SARKU 300 SARKU 2000


300 Pax 270 Pax
Crane Capacity: 300T Crane Capacity: 96T

20
Subsea Services Capabilities
Inspection, Repair & Maintenance
➢ Major inspection, repair and maintenance of platforms, pipelines,
FPSO, FSO etc.
➢ Installation, repair and inspection of subsea facilities and
infrastructures
➢ Pipeline repair and stabilization
➢ Risk-based integrity management (RBI)

Other Services (non-exhaustive)


➢ Air & Saturation Diving
➢ Provision of Diving Support Vessel
➢ ROV pipeline survey / debris survey
➢ Underwater NDT survey
➢ Subsea Wellhead intervention
➢ Pipeline intervention / sectional replacements
➢ Underwater inspection in lieu of dry docking (UWILD)
➢ Anode retrofits
➢ Underwater inspection & report writing
21
Subsea Services Assets

➢ Three (3) active Dynamic Positioning (DP) II Diving vessels


➢ Six (6) Saturation Diving Systems (Three Classed Systems)
➢ Eight (8) Air Diving Systems (Two Classed Systems)
➢ Twenty Two (22) Remotely Operated Vehicles (ROV) and
Work Class ROV Inspection Class
➢ Four (4) Drilling Support ROV ROV

Drill Support ROV Observation Class


SapuraKencana Achiever SapuraKencana Jane ROV
SapuraKencana Conquest

SM1 DX300, 12-manned SM2 DX300, 12-manned Sat-001, 6-manned Sat-02, 9-manned Sat-03, 9-manned
sat system (Classed) sat system (Classed) sat system sat system sat system (Classed)
LWI and P&A Capabilities

Light Well Intervention / Plug & Abandonment


➢ Well Intervention
➢ Well Suspension and Pre-abandonment Tasks / Full Well Abandonment
➢ Well head severance and recovery (below mud line)

LWI / P&A Assets

WHAF WH
Alignment Frame

Subsea Intervention AXE WH Severance Intervention DSIS Down Hole


Device SID System Compensation Survey &
System (ICS) Inspection Tool Hot Stab Manifold
23
De-commissioning Capabilities

24
Drilling Capabilities

Deepwater drilling capabilities


➢ Semi-submersible tender rigs capable of drilling
in up to 2,000 m of water

➢ Demonstrated capability in development drilling


off deepwater platforms
➢ Tension-leg platforms
➢ Compliant towers
➢ Spars

➢ World-wide experience with deepwater


development drilling
➢ West Seno TLP, Indonesia (1,100 m)
➢ Kikeh Spar, Malaysia (1,300 m)
➢ Tombua-Landana Compliant Tower, Angola
(300 m)
➢ Hess Okume/Ebano TLP and Oveng TLP,
Equatorial Guinea (500 m)
25
Drilling Assets : Tender Assisted Drilling (TAD)

SKD T-9 SKD T-10 SKD T-11

SKD T-12 SKD T-17 SKD T-18

SKD T-19 SKD T-20


26
Drilling Assets : Semi TAD

SKD Pelaut SKD Menang SKD Alliance

SKD Berani SKD Setia SKD Jaya

27 SKD Esperanza SKD Kinabalu (Under Construction) SKD Raiqa (Under Construction)
Section 3: Track Record

28
Track Record: Summary of E&C Track Record
Total Platform Fabricated : 46 no. of Topsides / 54 no. of Jackets
Largest structure fabricated : 14,143 MT Kebabangan Jacket for KPOC (2012)
Total Subsea Structures Fabricated : ~69 no. of structures (PLEM, PLET, manifold)
Fabrication of other structures: ~20 (MOPU, compressor modules, bridges, piles, etc.)
Total Platform Installed : ~400 no. of structures (topside, jacket, module, etc.)
Heaviest structure lift : 3,120 MT Kuil-B Topside for PEMEX Mexico (2015)
Largest Floatover Installation : 15,000 MT DPP Topside for Conoco Phillips, Indonesia (2004)
Heaviest Jacket installation : 13,485 MT MHN Jacket for ONGC, India (2011)
Total Rigid Pipeline Installed : ~5,800 km of rigid pipelines
Total Flexible Pipeline Installed : ~6,000km of flexible pipe
Largest Diameter Lay – Carbon Steel : 46" dia for Pertamina, Indonesia (1994)
Largest Diameter Lay – CRA : 24" dia for Carigali Hess, Malaysia-Thailand JDA (2012)
Longest Pipelay : 200km pipeline for Sabah Shell Petroleum Company, Malaysia (2015)
Deepest installation work – Rigid pipelay : 1,450m WD for Murphy Oil, Malaysia (2008)
Deepest installation work – SURF : 2,500m WD for Petrobras, Brazil (2015)
29
Track Record: Major EPCIC Experience
Project Name Scope Client Year
CELSE GNL Terminal Project, Brazil EPCIC of 18” x 8km pipeline, and T&I of mooring yoke tower CELSE 2017 – 2018 (Ongoing)
EPCIC of 11 segments pipeline (114km), topside
B127 Pipeline RTR Project, India ONGC 2016 – 2018 (Ongoing)
modification, mooring buoys, PLEM and SPM
Zawtika Phase 1C, Myanmar EPCIC of 4 pipelines (53km), T&I of 4 WHPs PTTEP 2016 – 2018 (Ongoing)
TANAP Natural Gas Pipeline, Turkey EPCIC of 2 pipelines (35km) TANAP 2016 – 2018 (Ongoing)
EPCIC of 3 WHPs, 15 pipelines (116km) and modification on
MHSRD Phase III Project, India ONGC 2015 – 2017
existing 18 platforms
CPOC Phase 3 Development Project, JDA EPCIC of 4 WHPs and 4 pipelines (44km with 5.5km CRA) CPOC 2014 – 2017
EPCIC of WHP for NMB, Malaysia EPCIC of 3 remote WHPs Hess 2014 – 2016
EVA Trunkline Project, Malaysia EPCIC of riser platform and pipeline (75km) TTM 2013 – 2016
Pearl Manora Development Project, JDA EPCIC of 1 WPP and 2 pipelines (2km) Mubadala 2012 – 2014
Berantai Project, Malaysia EPCIC of WHP, 30km pipeline and 4km flexible flowlines Petrofac 2011 – 2012
Gumusut-Kakap Project, Malaysia EPCIC of 200km PL & subsea structures WD 1,200m SSPC 2010 – 2014
EPCIC for JDA B-17 Project, JDA EPCIC of pipelines (48km) and T&I of 6 WHPs CPOC 2007 – 2009
Kikeh Development Project, Malaysia EPCIC of 88.5km PL & subsea structures WD 1,450m Murphy 2006 – 2008
EPCIC of MOPU Seabase Phase 1, Malaysia EPCIC of MOPU PCSB 2014 – 2015
B15 Jacket and CPP Topside, Malaysia EPCIC of B15 CPP topside and jacket SKE 2016 – 2017
BNJT-K & TTJT-A WHP, Malaysia EPCIC of 2 WHPs PCSB 2014 – 2017
Layang Development Project, Malaysia EPCIC of 1 WHP JX Nippon 2014 – 2015
EPCIC for Bumi, Bulan & Suriya, JDA EPCIC of 3 WHPs CTOC 2006 – 2007
EPCIC of Serendah and Patricia, Malaysia EPCIC of Serendah topside and Patricia topside MOC 2012 – 2013
Track Record: Major Pipelay Experience
Project and Location Client Year Scope
CELSE GNL Terminal Project, Brazil CELSE 2017 – 2018 EPCIC of 18” x 8km pipelines (onshore and offshore)
Trans Anatolian Natural Gas Pipeline, Turkey Tanap Dogalgaz Iletim 2016 – 2018 EPCIC of 2 x 36” x 17.6km pipelines
Guntong Pipeline Project, Malaysia ExxonMobil 2016 T&I of 12” x 11.58km pipelines
MHS Rd Phase III, India ONGC 2015 – 2017 EPCIC of 15 pipelines (total length: 116km)
KJG Onshore & Offshore Pipeline, Indonesia PT PGas Solution 2014 – 2015 T&I of 14” x 198km pipelines (onshore and offshore)
Pan Malaysia 2014 (ExxonMobil), Malaysia ExxonMobil 2014 T&I (6” – 18”) pipelines (total length: 42km)
Nam Con Son 2 Gas Pipeline, Vietnam PV Gas 2014 – 2015 T&I of 26” x 151km pipelines
CPOC Phase 3 Development, JDA CPOC 2014 – 2016 EPCIC of 4 x 18” pipelines (44km; 5.5km CRA)
MB Platform and Pipeline Project, India BG India 2014 – 2015 T&I of 2 x 14” pipeline + 5” piggyback (30km)
EVA Trunkline Project, JDA TTM 2013 – 2015 EPCIC of 24” x 75km pipelines
Pan Malaysia 2013 (ExxonMobil), Malaysia ExxonMobil 2013 T&I (6” – 18”) pipelines (total length: 37km)
Pan Malaysia 2012 (ExxonMobil), Malaysia ExxonMobil 2012 T&I (10” – 28”) pipelines (total length: 90km)
Bumi-B and Cakerawala-D Project, JDA CHOC 2011 – 2012 24” x 6.4 and 10” x 3.9km CRA pipelines
T&I for Puteri Pipeline Restoration, Malaysia Newfield 2011 T&I of 12” & 8” pipe-in-pipe with 4” piggyback pipelines
Pan Malaysia 2010 (ExxonMobil), Malaysia ExxonMobil 2010 T&I of 12” x 4km CRA pipelines
Gumusut Kakap Development, Malaysia Shell 2010 – 2014 EPCIC of deepwater pipelines (WD 1,200m)
Kikeh Gas Pipeline Project, Malaysia Murphy 2006 – 2008 EPCIC of 12” x 88km deepwater pipelines (WD 1,450m)

Total Length of Rigid Pipeline Laid : ~5,800km


31
Track Record Snapshot: EPCIC Mumbai High South Phase III
Client: ONGC
Field: Mumbai High South
Scope: EPCIC of 3nos Wellhead Platforms, 18 nos. platforms
modification and 177km of pipelay and Subsea
repair works
Period: May 2015 – April 2017
Tonnage: 17,386 MT
Manhours: 6,951,732
Track Record Snapshot: EPCIC CPOC Phase 3 Development

Client: Carigali-PTTEP Operating Company


Field: MTJDA
Scope: EPCIC of 4 WHPs, 4 x 18” pipeline (total
length 44km with 5.5km CRA) and
Brownfield modifications

Period : June 2014 – Feb 2018


Tonnage: 5,576MT

33
Track Record Snapshot: EPCIC HESS CDK Development

Client: HESS
Field : North Malay Basin
Scope: FEED + EPCIC (FEPCIC) of 3 nos Remote
Wellhead Platforms (RWHP)
Period: May 2014 – Sept 2016
Tonnage: 7,039 MT

34
Track Record Snapshot: EPCIC TANAP Natural Gas Pipeline

Client: Tanap Doğalgaz İletim A.Ş


Field: Dardanelles Straight, Turkey
Scope: EPCIC of 2 x 36” x 17.6km pipelines
EPCIC of 4 x Fibre optic cable
Include shore approach installation
Period : July 2016 – Ongoing (expected completion in
July 2018)

35
Track Record Snapshot: EPCIC ONGC B127 Pipeline Project

Client: Oil and Natural Gas Corporation


Field: Bassein & Mumbai High South Field
Scope: EPCIC of 11 segments pipelines (total
length 114km)
Topside modification and riser installation
Period : Sept 2016 – March 2018

36
Track Record Snapshot: EPCIC Tukau and Baronia Development

Client: Petronas Carigali Sdn Bhd


Field: Tukau & Baronia Field
Scope: EPCIC of 2 nos Wellhead Platforms
Period: April 2014 – July 2015
Tonnage: 10,075 MT
Track Record Snapshot: EPCIC Layang Development Project
Client: JX Nippon

Field: Layang Field

Scope: EPCIC of 1 nos Wellhead Platform

Period: April 2014 – July 2015

Tonnage: 3,644 MT

38
Track Record Snapshot: EPCIC Kikeh Deepwater Project

Client: Murphy Oil Corporation 1st Deepwater project in Malaysia


Field: Kikeh Field
Scope: 12” export x 138km pipeline, PLEM, tie-in jumper
spool and in-line future tap tie-in installation

Period : 2006 – 2007


Water depth : 1,450m

The Kikeh field was discovered in Aug 2003 and was the
first offshore deepwater development in Malaysia. The
field is located in 1,450 meters water depth offshore
Sabah, making the Kikeh gas pipeline the deepest rigid
pipeline installed in Asia Pacific region to date. The
project was successfully completed in 2008 with
minimum installation downtime
39
Track Record Snapshot: EPCIC Gumusut-Kakap Project

Client: Sabah Shell Petroleum Company 2nd Deepwater project in Malaysia


Field: Gumusut Kakap Deepwater Offshore
(Block J & K)
Scope: 18” x 200km export pipeline including
shore approach, 8” & 12” flowlines
with SCRs, 5 no. Subsea Manifolds,
9 no. PLETS & 7 nos. sleds

Period : 2008 – 2009


Water depth : 1,200m

40
Track Record Snapshot: EPC of Kebabangan Jacket

Client: Kebabangan Petroleum Oil


Company (KPOC)
Field: Kebabangan Northern Hub
Development Project
Scope: EPC for 8-legged floatover
jacket
Period: April 2011 – Sept. 2012
Tonnage: 14,143 MT

41
Track Record Snapshot: EPC Chevron Wheatstone LNG Module

Client: Bechtel (West Australia) Pty Ltd

Scope: Fabrication of LNG ISBL Module for


Chevron Wheatstone Project

Period : 2012 – 2015

Tonnage : 65,909+ MT.

42
Track Record Snapshot: Chevron Gorgon LNG Project
Pre-assembled Pipe Rack (PAR)

Client: Saipem SA

Scope : Fabrication of Pre- Assembled Pipe


Rack (PAR)

Period: April 2011- Nov 2013

Tonnage: 15,406 MT

43
Track Record Snapshot: PEMEX Platform Installation & Pipelay

Heaviest Lift with SK3500 for Kuil B


Topsides 3,200MT
Client: PEMEX

Field: Bay of Campeche, Mexico

Scope: Installation of fixed marine platforms, pipelaying


and lifting of major power generation
equipment, utilizing DP3 vessel SapuraKencana
3500

Period: April – Oct 2015

Cumulative Track Record by SK3500 in region:


• Total tonnage Installed till date: 10,987 MT
• Total pipelay: 40 km (up to 36”)
Track Record Snapshot: ONGC MHN Project

Client: ONGC
Field: Mumbai High North ,
India
Scope: Transport and
Installation of Platforms
(MNP, MLQ, MNF 1 &
MNF 2)
Period: Dec 2010 – May 2011

Heaviest Jacket Launched and


Installed (13,380MT)

45
Track Record Snapshot: VSP Nam Con Son 2 Project

Client: Vietsovpetro (VSP)

Field : Nam Con Son Basin, Offshore Vietnam

Scope: 26” x 151km Offshore Pipeline


Construction for Nam Con Son 2 Gas
Pipeline

Period: Jul 2014 till Nov 2015

46
Track Record Snapshot: Thai Binh – Ham Rong Project

Client: PTSC Offshore Services


Field : Thai Binh Field, Offshore Vietnam
Scope: T&I of 12” x 5.28 km - nearshore scope, 12” x 13.1km – offshore and beachpull (3.1km), tripod jacket at 541MT,
3 x 54” OD pile, 2 x 26” OD conductor, Boat landing 73.75MT, Riser guard 33.77MT and a Topside 787MT.
Period: Nov 2014 – Oct 2015
Track Record Snapshot: BG India MB Project

Client: BG India
Field: Panna-Mukta Field, India
Scope:
Transportation & Installation of:
➢ One WHP (≈1500MT)
➢ Pipeline 14” + 5” piggyback x 25km
➢ Pipeline 14” + 5” piggyback x 5km

Period : 2014 – 2015


48
Track Record Snapshot: Deepwater Pipelay for Petrobras (1)

Sapura Diamante Sapura Esmeralda

Sapura Topazio Sapura Jade

Sapura Onix Sapura Rubi


Field : Brazil Pre-salt Basin

Scope : Deepwater Flexible Pipelay

Pipeline Laid: ~5,930km of 4” – 9” flexible pipeline

Water depth: up to 2500mtr

99.5% uptime
Track Record Snapshot: Deepwater Pipelay For Petrobras (2)

Sapura Sapura
Sapura Topazio
Diamante Esmeralda

➢ Installation of ➢ Installation of ➢ Installation of


➢ 1,226km of flexible pipeline ➢ 482km of flexible pipeline at ➢ 265km of flexible pipeline at
at Lula Field, Brazil (Max WD Lapa Field (Max WD 2,149m) Lula Field (Max WD 2,252m)
2,252m) ➢ 621km of flexible pipeline at ➢ 129km of flexible pipeline at
➢ 57km of flexible pipeline at Lula Field (Max WD 2,130m) Cernambi Field (Max WD
Entorno de Iara Field (Max ➢ 21km of flexible pipeline at 2,246m)
WD 2,250m) Sapinhoa Field(Max WD ➢ 5.6km of flexible pipeline at
➢ 100km of flexible pipeline and 2,154m) Iracerma Norte Field(Max WD
600m flexible jumper at ➢ 8km of flexible pipeline at 2,240m)
Iracema Sul Field(Max WD Marlim Sul field (Max WD ➢ 365km of flexible pipeline at
2,228m) 1,188m) Sapinhoa field (Max WD
➢ 290km of flexible pipeline at 2,221m)
Sapinhoa field (Max WD
2,130m)
50
Track Record Snapshot: Deepwater Pipelay For Petrobras (3)

Sapura Jade Sapura Onix Sapura Ruby

➢ Installation of ➢ Installation of ➢ Installation of


➢ 343km of flexible pipeline at ➢ 1.8km of flexible pipeline at ➢ 93km of flexible pipeline at
Lula Field, Brazil (Max WD Espadarte Sul Field (Max WD Lula Field (Max WD 2,248m)
2,248m) 2,500m)
➢ 427km of flexible pipeline at
➢ 73km of flexible pipeline at ➢ 594km of flexible pipeline at Sapinhoa Field (Max WD
Iracerma Norte Field (Max Lula Field (Max WD 2,260m) 2,165m)
WD 2,240m) ➢ 24km of flexible pipeline at ➢ 10km of flexible pipeline at
➢ 119km of flexible pipeline and Sapinhoa Field (Max WD Sepia Field(Max WD 2,135m)
600m flexible jumper at 2,179m)
➢ 10km of flexible pipeline at
Iracema Sul Field(Max WD ➢ 1.4km of flexible pipeline at Itapu field (Max WD 2,009m)
1,323m) Jubarte field (Max WD
1,371m)

51
Track Record Snapshot: Bayu Undan Project (Floatover)

52
Track Record Snapshot: Woodside Angel Topside Floatover

53
Track Record Snapshot: EPC of Subsea Systems (1)

Title Title
Woodside GWF Project Shell Prelude Project

Client / Owner Client / Owner


FMC Technologies (Singapore) Pte Ltd / Woodside FMC Technologies (Singapore) Pte Ltd /
Limited (Australia) Sarawak Shell Limited

Work Scope Work Scope


Engineering, Procurement and Construction of 2 Engineering, Procurement and Construction of 2
manifolds and 2 skids Production Manifolds with mudmats, 1 Riser Base
Manifold with mudmat
Period
October 2012 – March 2014 Period
February 2013 – October 2015
Tonnage
480 MT Tonnage
54 833 MT
Track Record Snapshot: EPC of Subsea Systems (2)

Title Title Title


Ichthys Project Upper Pyrenees Moondyne Dev Proj Julimar Development Project

Client / Owner Client / Owner Client / Owner


GE Vetco Gray Scandinavia AS Cameron Limited GE Oil & Gas , Vetco Gray Scandinavia AS

Work Scope Work Scope Work Scope


Fabrication of 5 units Manifold with Fabrication and Supply of 4-Slot Production Engineering & Construction of 1 Production
Foundations and 1 unit SDH with Foundation Manifold Manifold & Foundation, 1 Cross Over Manifold
for Ichthys project & Foundation, 3 pig launchers, 14 Jumper kit
Construction Period and 3 PLETs
Construction Period Dec 2012 – July 2013
July 2013 – Dec 2015 Construction Period
Tonnage April 2013 – October 2015
Tonnage 118 MT
2,058 MT Tonnage
2,160 MT
55
Track Record Snapshot: EPC of Subsea Systems (3)

Title Title Title


BHP Pyrenees Project Reliance KG-D6 Gumusut-Kakap Project

Client / Owner Client / Owner Client / Owner


Cameron Limited / BHP Billiton Aker Kvaerner (M) Sdn Bhd / Reliance FMC Wellhead Equipment Sdn Bhd
(AUSTRALIA) Industries Limited. Ltd. (INDIA) (MALAYSIA)

Work Scope Work Scope Work Scope


EPC of subsea manifolds and foundation 9 units: 3 manifolds, 6 suction anchors for 5 Subsea Manifolds Gumusut-Kakap
mud mats. manifolds, 1 DWPLEM with suction anchor,
1 UDH with suction anchor, 3 SDA with Period
Period suction anchors. 2008 – 2009
2007 – 2009
Period Tonnage
Tonnage 2006 – 2007 600 MT
810 MT
Tonnage
2,337 MT
56
Track Record Snapshot: EPC of FDSO / FDPSO Modules

M20, Bumi Armada Prosafe Azurite Development Module Construction

Client / Owner Client / Owner


Bumi Armada Prosafe Production Services Pte Ltd

Work Scope Work Scope


Engineering, Procurement & Construction Detail engineering for Electrical Module and work drawings for all other
Module, Procurement, Fabrication, Assemble, Erection T&C
Period
2008 – 2009 Period
2007 – 2008

57
Major Track Record: Brownfield
Project Title Client Man Hours Duration
1 Tapis Enhanced Oil Recovery (EOR) – Rejuvenation & Retrofit Project EMEPMI 2,400,000 Feb 2014 – 2018
(On Going)
2 Provision of Hook-Up, Commissioning and Topside Major Maintenance Services EMEPMI 3,400,000 May 2013 – 2018
for 2013 to 2018 (On Going)
3 Provision of Construction Services For Brownfield Projects. DU3744A2 EMEPMI 2,227,469 July 2009 – Apr 2013
4 Provision Of Hook-up And Commissioning For Platform Upgrading, Modification For ONGC 1,650,000 Oct 2015 – Apr 2017
MHSRD III Project Phase 2 ( Phase 1 ) (On Going)
1,200,000
( Phase 2 )

5 Provision Of Phase 2 Early Gas Brownfield Construction For Cakerawala Gas Field Carigali-HESS 2,953,590 May 2006 – May
Development 2008
6 Provision Of Hook Up & Commissioning for Restoration Of Bekok-C Petronas 2,229,882 Jun 2012 – Feb 2014
Carigali /
Petrofac
7 Provision of Hook-Up and Commissioning for Platform Upgrading, Revisit and IO Petronas 1,500,000 Aug 2012 – Dec 2014
Modification for Samarang Redevelopment Project (Phase 2) including LQ upgrade Carigali
8 Brownfield Works on MDPP, MDB and JKB Platforms for JDA Block B-17 and B-17- Carigali- 242,545 Jan 2015 – Nov 2015
01 field phase 3 development project. PTTEP
9 Provision Of Topside Major Maintenance, Hookup ,Commissioning and Sarawak Shell 7,2000,000 Sept 2008 – Dec 2013
Construction Services / Sabah Shell
Total Mhrs 25,003,186
58
Track Record Snapshot: HUC and Brownfield (1)

Title Title Title


Tapis EOR Brownfield Modification and Hook-Up, Commissioning and Topside Construction Services For Brownfield
Retrofits Project (long term) Major Maintenance Services for 2013 to Projects. DU3744A2 (long term)
2018
Client / Owner (long term) Client / Owner
ExxonMobil Exploration & Production ExxonMobil Exploration & Production
Malaysia Inc. Client / Owner Malaysia Inc.
ExxonMobil Exploration & Production
Period Malaysia Inc. Period
February 2014 – 2018 (Ongoing) July 2009 – April 2013
Period
Man-Hours May 2013 – 2018 (Ongoing) Man-Hours
2.3 million (HSE LTI–0) 2.2 million (HSE LTI: 0)
Man-Hours
4 million (HSE LTI: 0)
Track Record Snapshot: HUC and Brownfield (2)

Title Title Title


Hook Up Commissioning for Platform Brownfield Works On MDPP, MDB, and
Upgrading, Revisit and IO Modification JKB Platforms For Phase 3 Development Hook-Up and Commissioning for
for Samarang Redevelopment Project Project Restoration of BEKOK-C
(Phase 2) including LQ Upgrade
Client Client
Carigali-PTTEP Operating Company Sdn Petronas Carigali / Petrofac Engineering
Client / Owner Bhd (CPOC)
PETRONAS Carigali Sdn Bhd and Construction
Period:
January 2015 – November 2015 Period
Period: June 2012 – February 2014
August 2012 – December 2014
Man-Hours
Man-hours
Man-hours 250,000 (HSE LTI : 0) 2.2 Million (HSE LTI–0)
1.5 Million (HSE LTI – 0)
Track Record Snapshot: HUC and Brownfield (3)

Title Title Title


GREENFIELD - EPCIC of JDA Gas GREENFIELD - EPCC of KAMELIA-A GREENFIELD - Provision of Hook-Up
Balancing Evacuation Project (EVA Wellhead Platform (WHP) for Early and Commissioning Services for
Project for Trans Thai-Malaysia Production Scheme (EPS), North Kebabangan Northern Hub
(Malaysia) Sdn Bhd Malay Basin Field Development Project

Client / Owner Client Client / Owner


Trans-Thai Malaysia Sdn Bhd Hess Exploration and Production Kebabangan Petroleum Operating
Malaysia B. Company Sdn Bhd (KPOC)
Period:
July 2013 – April 2015 Period Period
December 2011 – March 2013 June 2012 –December 2014
Man-hours: 245,000
Man-hours: 700,000
Man-Hours: 330,000
Track Record Snapshot: HUC and Brownfield (4)

Title Title Title


GREENFIELD – EPC of Serendah (SN- GREENFIELD - EPCIC of Patricia GREENFIELD - PCSB HUC for Kanowit
PA) & Serendah Accommodation Satellite, PT-SA & West Patricia, WP- CPP KAKG-A Platform (Kumang
(SN-AA) Substructure for Murphy's PA Topsides Facilities for SK309/311 Cluster Development Project- Phase
Sarawak SK309/311 SPSA Sarawak Murphy’s Sarawak Development 1)
Development Project Project
Client / Owner
Client Client Petronas Carigali Sdn Bhd
Murphy Sarawak Oil Murphy Sarawak Oil
Period
2010 – 2011
Period Period
June 2012 – October 2014 February 2013 - August 2013 Man-hours: 700,000

Man-hours: 300,000 Man-Hours: 90,000


Track Record Snapshot: HUC and Brownfield (5)

GREENFIELD - Offshore HUC Works for Kinabalu NAG GREENFIELD - Supply, Delivery, Installation &
Processing Platform B (KNPG-B) Commissioning Of Refurbished Wellhead Platform,
Pipeline & Host Tie-In For D21 Project
Client / Owner
Malaysian Marine Heavy Engineering Sdn Bhd/ PCSB Client / Owner
IEV Group Sdn Bhd/Petronas Carigali Sdn Bhd
▪ 1st Gas introduction achieved on 31 Dec 2012
▪ Platform Living Quarters habitation completed ▪ 1st oil introduction achieved on 31 December 2012
within 11 days on 7th August 2012. ▪ Installation of A2 Flow Line Well completed

Period Period
Aug 2012 – Mar 2013 Feb 2012 – July 2013

Man-Hours: 1.5 Million Man-Hours: 86,600


Decommissioning Track Record: Dana & D30

Project Details
Project Name EPRD of Dana & D30 Decommissioning
Location Offshore Sarawak, Malaysia
Client PCPP Operating Company Sdn. Bhd.
Contractor Sapura Offshore Sdn Bhd
Year 2017
Water Depth 80 meters
Vessel Utilised SK 3500

Engineering, preparation, removal and


decommissioning of:
Scope of Work
• Dana and D30 light weight structure
• Pipeline end capping and burial

Dana LWS:
• Jacket: 461MT
• Topside: 77MT
Detail of structure
D30 LWS:
• Jacket: 410MT
• Topside: 535MT

64
Decommissioning Track Record: Woodside Balnaves

Project Details
Project Name Balnaves Phase 2 and 3A
Location NWS Western Australia
Client Woodside Energy Limited
Contractor Sapura Energy Australia
Year 2016
Water Depth 500m
Vessel Utilised SK Constructor
(i) Disconnection of risers and flowline
from FPSO Armada Claire DTM
(ii) Recovery of buoyancy modules,
Scope of Work mooring chains, riser, flowlines,
manifold, jumpers, spools and riser
tether base
(iii) Towing of DTM to 500m zone

65
Decommissioning Track Record: Shell LWI and WH Severance

Project Details

Project Name Provision of LWI Services for Shell

Location Australia

Client Shell Australia

Contractor Sapura Energy Australia

Year 2016 – 2017

Water Depth 170m

Vessel Utilised SK Constructor

(i) Light well intervention services for


Prelude Commissioning
Scope of Work
(ii) Subsea Wellhead severance and
retrieval in Crux & Block F

66
Decommissioning Track Record: Buffalo Project

Project Details
Project Name Buffalo De-Commissioning Project
Location Buffalo Field, Australia
Client Modec Inc
Contractor Sapura Energy Australia
Year Between 2004 – 2005
Water Depth Between 30 – 300 meters
Vessel Utilised SK 900
(i) Plugging and abandonment of all production
wells and flowlines
(ii) Disconnection of the flexible flowlines and
umbilical from the FPSO (Buffalo Venture)
Scope of Work (iii) Recovery of the flexible flowlines, rigid
flowlines and umbilical in water depths up to
300m
(iv) Removal of the wellhead platform including
topside, jacket and well conductors
(i) Rigid flowlines (10”x2.8km & 4”x2.8km)
Detail of de-commissioned (ii) Flexible flowlines (~600m)
structure (iii) Umbilical (~2.8km)
(iv) Topside (Weight = 330MT)

67
Decommissioning Track Record: Baram-8 Structure Removal
Project Details
Project Name Baram-8 Structure Removal
Location Offshore Sarawak, Malaysia
Client Sarawak Shell Berhad (SSB)

Contractor Sapura Offshore Sdn Bhd

Year Between 2004 – 2005


Water Depth Approx. 56 meters
Vessel Utilised DLB 332
(i) To remove the abandoned Ba-8
Tripod structure
Scope of Work (ii) Relocate the de-commissioned
jacket to Siwa Coral area as an
artificial reef

Detail of structure Tripod Jacket (Weight = 500MT)

▪ Baram-8 was damaged in a storm and collapsed to the seabed in


1975
▪ Baram-8 decommissioning project was a salvage operation
▪ The recovered jacket was made into the first artificial reef in
Malaysia
68
Decommissioning Track Record: Demobilization of FSO Abu

Project Details

Project Name Provision for Demobilization of FSO Abu

Location South Angsi Field, Offshore Terengganu

Client MISC Offshore Floating Terminals Ltd.


Contractor Sapura Offshore Sdn Bhd
Year 2016
Water Depth Approx. 70 meters

Vessel Utilised SK 1200, SK Achiever

(i) Disconnection of FSO incl. 2 flexible


risers, floating hose and 6 mooring
Scope of Work legs
(ii) Towing of FSO to yard in Johor
Bahru

69
Decommissioning Track Record: Iwaki Platform Project

Project Details
Project Name Iwaki Platform Decommissioning Project
Location Iwaki Gas Field, Japan
Client Offshore Iwaki Petroleum Co. Ltd.
Contractor SapuraAcergy (50% owned by SEB)
Year 2009 - 2010
Water Depth 154 meters
Vessel Utilised Sapura 3000
➢ Topside removal is made in 16 modular topside
(i) Removal of topside facilities and module lifts ranging from 10MT to 1100MT
support frame
Scope of Work
(ii) Cutting jacket members at EL-92 meters ➢ Jacket de-commissioning is made with 188 subsea
(iii) Lifting of upper section of jacket, cuts, at depth of 92m
lowering onto seabed and toppling
(iv) Cutting and stabilising export pipeline ➢ Upper section of jacket (1500MT) was lifted and
lowered to the seabed
Detail of (i) 8-legged platform weighing 20,735MT
➢ Iwaki platform was the biggest platform in the
structures (ii) 12” gas export pipeline
Asia Pacific region to be decommissioned

70
De-commissioning Track Record: Well P&A (1)

INSTALLATION COUNTRY OPERATOR FIELD WELL


T7 Thailand Chevron Thailand Satun 1
T10 Malaysia Petronas Carigali ANGSI Angsi-B Slot #6
T3 Thailand PTTEP Arthit - WP9 AT-9-C
T4 Thailand Chevron Thailand Erawan C-07
SKD Pelaut Brunei Brunei Shell Petroleum Champion CP 05
SKD Pelaut Brunei Brunei Shell Petroleum Champion West CW38
T11 Thailand Chevron Thailand Erawan ERWG-11
T11 Thailand Chevron Thailand Erawan ERWL 22
T11 Thailand Amerada Hess Ltd. 1074R ERWL 23
T11 Thailand Chevron Thailand Erawan ERWL 25
T11 Thailand Chevron Thailand Erawan ERWL 34
T11 Thailand Chevron Thailand Funan FUWM 03
T11 Thailand Chevron Thailand Funan FUWM 07
T11 Thailand Chevron Thailand Funan FUWM 08
T11 Thailand Chevron Thailand Funan FUWM 25
T11 Thailand Chevron Thailand Funan FUWM 27
T11 Thailand Chevron Thailand Funan FUWM-02
T11 Thailand Chevron Thailand Funan FUWM-04
T11 Thailand Chevron Thailand Funan FUWM-06
T11 Thailand Chevron Thailand Funan FUWM-09
T11 Thailand Chevron Thailand Funan FUWM-10
71
De-commissioning Track Record: Well P&A (2)

INSTALLATION COUNTRY OPERATOR FIELD WELL


T11 Thailand Chevron Thailand Funan FUWM-11
T11 Thailand Chevron Thailand Funan FUWM-12
T11 Thailand Chevron Thailand Funan FUWM-13
T11 Thailand Chevron Thailand Funan FUWM-15
T11 Thailand Chevron Thailand Funan FUWM-17
T11 Thailand Chevron Thailand Funan FUWM-18
T11 Thailand Chevron Thailand Funan FUWM-20
T11 Thailand Chevron Thailand Funan FUWM-21
T11 Thailand Chevron Thailand Funan FUWM-24
T11 Thailand Chevron Thailand Funan FUWM-26
T11 Thailand Chevron Thailand Erawan P&A ERWG-17
T11 Thailand Chevron Thailand Erawan P&A ERWG-20
T11 Thailand Chevron Thailand Erawan P&A ERWG-21
T11 Thailand Chevron Thailand Erawan P&A ERWG-22
T11 Thailand Chevron Thailand Erawan P&A ERWG-24
T11 Thailand Chevron Thailand Erawan P&A ERWG-26
SKD Menang Malaysia Murphy Kikeh PS21
SKD Menang Malaysia Murphy Kikeh PS21P A
T18 Thailand Chevron Thailand Pakarang Rig Move to SPWB
T18 Thailand Chevron Thailand Pakarang SPWB Slot-B
T18 Thailand Chevron Thailand Pakarang SPWB Slot-C
72
De-commissioning Track Record: Well P&A (3)

INSTALLATION COUNTRY OPERATOR FIELD WELL


T18 Thailand Chevron Thailand Pakarang SPWB Slot-E
T18 Thailand Chevron Thailand Pakarang SPWB Slot-F
T18 Thailand Chevron Thailand Pakarang SPWB Slot-G
T18 Thailand Chevron Thailand Pakarang SPWB Slot-I
T18 Thailand Chevron Thailand Pakarang SPWB Slot-J
T18 Thailand Chevron Thailand Pakarang SPWB Slot-L
T18 Thailand Chevron Thailand Pakarang SPWB Slot-T
T18 Thailand Chevron Thailand Pakarang SPWB Slot-W
SKD Pelaut Brunei Brunei Shell Petroleum AMPA SWA 129 Abandonment
SKD Pelaut Brunei Brunei Shell Petroleum AMPA SWA 134
SKD Pelaut Brunei Brunei Shell Petroleum SWA SWA 137
SKD Pelaut Brunei Brunei Shell Petroleum AMPA SWA 304st1 abandonment
T7 Thailand Chevron Thailand Baanpot T-7 BAWC P&A programme
T4 Thailand Chevron Thailand Erawan WS 03

73
Drilling Track Record Last 5 Years
Unit Work Description Client Location Year
Semi-TAD
Development Drilling SSB / SSPC Malikai Field 2013 – 2018
SKD Esperanza
Development Drilling Hess Okume Field, Equatorial Guinea 2013 – 2015
SKD Jaya Development Drilling BP Chaugauramas Bay, Trinidad & Tobago 2011 – 2016
Development Drilling JX Nippon Helang & Layang Field, Malaysia 2015 – 2016
SKD Berani Development Drilling Total E&P N’Kossa, Congo 2014 – 2015
Development Drilling COPI Block B Natuna Field 2012 – 2014
SKD Setia Development Drilling Chevron Tombua-Landana, Angola 2009 – 2016
Development Drilling Foxtrot Ivory Coast 2015 – 2016
SKD Alliance
Development Drilling SSB Jintan Field, Malaysia 2005 – 2015
SKD Menang Development Drilling Murphy Kikeh SPAR, Malaysia 2011 – 2015
SKD Pelaut Development Drilling BSP Various Brunei Fields, Brunei 2009 – 2017
Barge-TAD
SKD T-20 Development Drilling CNR International Espoir Field, Ivory Coast 2014 – 2016
SKD T-19 Development Drilling PCSB Various Field, Malaysia 2010 – 2015
SKD T-18 Development Drilling Chevron Erawan Field, Thailand 2014 – 2019
SKD T-17 Development Drilling PTTEP Arthit Field, Thailand 2014 – 2019
SKD T-12 Development Drilling Chevron Lanta & Kaphong Field, Thailand 2011 – 2016
Development Drilling PCSB Terengganu, Malaysia 2014 – 2019
SKD T-10
Development Drilling Chevron Gulf of Thailand, Thailand 2012 – 2014
SKD T-9 Development Drilling PCSB Offshore Terangganu, Malaysia 2014 – 2019
THANK YOU