Guidelines 5S-KAIZEN-TQM 2013 PDF
Guidelines 5S-KAIZEN-TQM 2013 PDF
Guidelines 5S-KAIZEN-TQM 2013 PDF
3rd Edition
March 2013
ACRONYMS
AAKCP Asia-Africa Knowledge Co-creation Program
CD Capacity development
DH District Hospitals
HR Human Resource
MMAM
Mpango wa Maendeleo ya Afya ya Msingi
i
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
QA Quality Assurance
QC Quality Control
QI Quality Improvement
ii
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
FOREWORD
Health services provided in health facilities in the country leave much to be desired in terms of quality.
Inadequate funding, shortage of human resources and other key health resources, poor infrastructure,
uncoordinated quality improvement program (QIP), and lack of comprehensiveness on the quality
improvement initiatives, have been the stumbling blocks. However, successful quality improvement
in health services depends mostly on the ability to create and sustaining a robust and an integrated
foundation for the existing QIPs and frameworks. This is well stipulated in the Health Policy, Primary
Health Care Development Program and the HSSP 3.
The Japanese Government, through Japan International Cooperation Agency (JICA); recognized the
need in African Countries to have such QIP or framework. Using the experience gathered in Asian
countries, JICA promoted a knowledge creation avenue for quality improvement, to several African
countries including Tanzania. This knowledge sharing is called, “Africa – Asia Knowledge Co-creation
Program (AAKCP)”, and the approach that is advocated is the 5S-CQI (KAIZEN)-TQM, using the 5S
principle (sort, set, shine, standardize and sustain), as entry point. Its implementation started in 2007
at Mbeya Consultant Hospital and the first implementation guidelines were printed in 2009.
The approach has been rolled out to 56 hospitals (as of November 2012) of which 13 hospitals are
implementing KAIZEN process. We commend the efforts done by the JICA HRH Development Project
for supporting seven (07)-5S Training of Trainers (ToTs) and two (02)-KAIZEN ToTs, as well as, one
refresher training that have facilitated implementation of the rollout with a face of Public Private
Partnership (PPP).
The development of the third edition has come two (2) years down the line after launching the second
edition in November 2011. The need for review has been contributed by experince from implementing
hospitals as gathered during supervision visits, as well as, from national facilitators who helped to
reveal some gaps in the second edition. This third edition includes additions illustrated in diagrams
and figures that make it easier for users to understand.
The guideline is organized into seven chapters that take a user from: current situation of QI activities in
Tanzania; to national rollout plan of 5S-KAIZEN-TQM approaches; to basic concepts of 5S-KAIZEN-
TQM; to implementation of 5S-KAIZEN-TQM; to five-S (5S) tools for actual implementation; to
quality control (QC) tools; and lastly, monitoring and evaluation of 5S-KAIZEN-TQM activities. This
logical flow gives the reader a step-by-step follow-through that assists acquisition of the knowldege
and skills necessary to implement and evaluate the approach. It should be noted that some chapters,
especially the quality control tools use tools that required further readings to master their application
better (providing fine details for each of the tools is beyond the scope of these guidelines).
The 5S-KAIZEN-TQM approach is being implemented as a foundation that makes all other quality
improvement approaches at health facility to work efficiently. Success stories and findings of the
approach at hospital level have been shared in various forums including the National Quality
Improvement Forum (NQIF) that was launched in November 2011. We encourage health workers and
other stakeholders to visit the NQIF website: http://www.nqif.or.tz regularly for more information
on quality improvement issues in the country.
As experience from implementation and operational research is gained, the document will be
reviewed. Being a living document, your comments for futher improvement of the 5S-KAIZEN-TQM
guidelines are welcome. The Ministry of Health and Social Welfare will work on all comments and
inputs to ensure quality 5S-KAIZEN-TQM implementation guidelines in the health sector. Futhermore,
iii
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
the implementation of the approach in other sectors in Tanzania (e.g., Education, and Energy-Tanesco),
is expected to give more lessons to the health sector. It should be noted that, achievement in its
implementation in health sector is embedded in the commitment of health facilities leadership, health
workers, and other stakeholders.
iv
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
ACKNOWLEDGEMENT
The development and printing of the 5S-KAIZEN-TQM guidelines series (first edition was printed
in May 2009, the second in November 2011, and third March 2013) is a result of relentless efforts
of facilitators, participants and experts of 5S-KAIZEN-TQM approaches. The Ministry of Health
and Social Welfare (MoHSW) would like to acknowledge the contributions of facilitators from the
following: Kilimanjaro Christian Medical Centre (KCMC) Super Specialist Hospital, Mbeya Super
Specialist Hospital, Muhimbili National Hospital, and from Departments, Sections and Units of the
MoHSW.
The Ministry would like to extend sincere thanks to all participants of the 5S-ToTs and KAIZEN-ToTs,
as well as, those who took part in study tours to Mbeya Super Specialist Hospital, Tosamaganga
Designated District Hospital and Muhimbili National Hospital for their constructive feedbacks on the
guidelines and other training materials.
The Ministry would like to thank the Staff of the Health Services Inspectorate and Quality Assurance
Section (HSIQAS) under the leadership of Assistant Director - Dr. Henock A.M. Ngonyani, for their
tireless efforts to coordinate the review process of the third edition.
Sincere appreciation goes to the Government of Japan through Japan International Cooperation
Agency (JICA), for choosing our country to be one of the supported countries in Africa and for the
financial support to implement the 5S-KAIZEN-TQM approach. These implementation guidelines
will remain as a symbol of the good working relationship between the Ministry of Health and Social
Welfare, and Japan International Cooperation Agency (JICA).
Lastly, the Ministry of Health and Social Welfare would like to acknowledge all health workers who
use the implementation guidelines consistently to improve the services provided in their health
facilities. As put by Johann Wolfgang von Goethe: “knowing is not enough, we must apply; willing is
not enough, we must do”. It is the expectation of the Ministry that all health workers will implement
the 5S-KAIZEN-TQM approach as per the guidelines.
v
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
EXECUTIVE SUMMARY
Background
In Africa, it has often been pointed out that the management of the hospital services provision system has
some challenging aspects. Under the chronic shortage of medical resources, the challenge to be tackled is
a matter of management of this system for delivering obtainable best hospital services. Asian countries
also faced same kinds of challenges in the hospital services provision. To improve the situation, some
Asian countries took action to improve quality of health care using 5S (Sort, Set, Shine, Standardize
and Sustain) principles, which were developed in Japanese manufacturers such as Toyota to improve
quality of their products and client satisfaction, in collaboration with Japan International Cooperation
Agency (JICA).
In 2006, based on the observation of Asian countries movement, JICA planed to conduct a training course
for supporting African developing countries to gain skills and knowledge for TQM for better hospital
services. The course is named as Asia-Africa Knowledge Co-creation Program (AAKCP). AAKCP aims
to provide the forum where Asian and African countries share knowledge and experiences, and thereby
facilitate each participating country to create its own method of development that suits best to each
country’s contexts.
Several African countries were informed about the opening of AAKCP training course, and fifteen (15)
African countries (Eritrea, Kenya, Madagascar, Malawi, Nigeria, Senegal, Tanzania, Uganda, Niger,
Mali, Benin, Morocco, DRC, Burkina Faso, and Burundi) participated in total since 2007. The Ministry
of Health and Social Welfare (MoHSW) selected Mbeya Referral Hospital (MRH) as the AAKCP pilot
project hospital.
According to the monitoring and periodical evaluation of 5S activities at MRH, MNH, and the four
district hospitals in southern zone (Masasi, Newala, Nachingwea and Tandahimba), 5S-KAIZEN-
TQM approach was verified as a practical, cost effective and efficient approach for improvement of
working environment that supports the effective implementation of quality improvement approaches.
Therefore, Ministry of Health and Social Welfare decided to adopt 5S-KAIZEN-TQM concepts officially
as a foundation of all quality improvement approaches, and to scale up this approach to other hospitals.
MoHSW revised Tanzania Quality Improvement Framework (TQIF). The second version of TQIF was
developed and launched in November 2011 at the time of 1st National Quality Improvement Forum.
Moreover, MoHSW is also worked for development of QI strategic Plan in 2012.
Create work environment conducive to provide appropriate health services with 5S-KAIZEN-TQM
approaches is well documented in both important documents.
Up to November 2012, 56 hospitals including Consultants, Regional, Districts, and Faith Based
Designated, are implementing 5S activities, and 13 hospitals were trained on KAIZEN approach.
vi
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Usually, improvement of work processes often is sustained only for a while, and workers drift back
to old habits and managers lose the determination and perseverance. 5S in contrast involves all staff
members in establishing new disciplines so that they become the new norms of the organization, i.e.,
internalization of concept, and development of a different culture.
Although the 5S originated in the manufacturing environment, they translate well to other work situations
including hospitals, general offices, telecommunication companies, and etc. 5Ss are abbreviations of the
Japanese words Seiri, Seiton, Seiso, Seiketsu, and Shitsuke. In English, 5Ss are translated as Sort, Set,
Shine, Standardize, and Sustain. In Tanzanian context, Kiswahili words are more effective for people to
understand easily thus, facilitators of 5S-KAIZEN-TQM have translated 5S English words into Kiswahili
words and those are: Sasambua (Sort), Seti (Set), Safisha (Shine), Sanifisha (Standardize) and Shikilia
(Sustain).
5S is the initial step towards establishing Total Quality Management. There will be no conflict in the
implementation of 5S activities even though his or her organization is implementing other quality
improvement approach. 5S will support all quality improvement approaches to move forward.
Way forward
The Ministry plans to:
• Rollout 5S-KAIZEN-TQM concept and M&E method to all Regional Health Management Teams
(RHMT) and Council Health Management Teams (CHMTs)
• Scale-up the 5S-KAIZEN-TQM approaches and 5S implementation to all Public hospitals
• Scale up the concepts to health training institutions for teaching the concepts to trainees and
students
• Sharing good practices of 5S-KAIZEN-TQM activities with Private health sector through Association
of Private Health Facilities in Tanzania (APHTA) and Christian Social Service Commission (CSSC)
and other relevant organizations
• Using 5S-KAIZEN-TQM as a foundation of all other quality improvement approaches
• Institute a regular M & E system reinforcing on the 5S-KAIZEN-TQM logical framework for
Tanzanian context
• Continuous provision of technical support to all hospitals implementing 5S-KAIZEN-TQM, to
ensure that mechanisms for sustaining
• Strengthen South – South Cooperation with other African and Asian countries
vii
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Chapter 1:
1.1 Introduction
Provision of quality health care is one of the top priorities in the National Health Policy (1990;
and revised in 2002; and updated in 2007) introduced in the Health Sector Strategic Plan (HSSP)
– II, 2003-2009; and HSSP-III 2009-2015)
Ministry of Health and Social Welfare (MoHSW) established Health Service Inspectorate Unit
(HSIU) in 1998, under the Office of Chief Medical Officer to take responsibilities on the following
main functions:
• Conduct inspection of health care services,
• Coordination of Supportive Supervision,
• Coordination of Quality Improvement related training,
• Coordination of Medical Audit and,
• Collection and dissemination of all experiences, techniques, data and references in regard
to quality
Under the MoHSW organization structure changes, Department of Health Quality Assurance
is established in 2012 and HSIU is also promoted to be one of the sections of the department so
called, “Health Services Inspectorate and Quality Assurance Section (HSI & QAS)”.
1
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
In 2011, the Ministry in collaboration with Jhpiego, has developed Infection Prevention and
Control Standards that are implemented using the Standard Based Management and Recognition
(SBM-R) Approach in National, Consultant, Regional Referral and District Hospitals in phases.
Application of these standards aim at ensuring safety of health services delivered to clients in
health facilities.
The Directorate of Curative Services is also developing standards for hospitals and a system to
strengthen laboratory services called: Step-Wise Certification Towards Accreditation (SWCTA).
Efforts to strengthen the capacity of RHMTs to supervise the Council Health Management Teams
(CHMTs) and Regional Referral Hospitals started in 2008 (phase one) and is continuing its phase
two since 2011 with support of JICA.
MoHSW started to revise TQIF since 2010. The review process was completed in 2011 and launch
2nd TQIF in November 2011 at 1st National Quality Improvement Forum. It is revised more
in practical way to orient health managers and health workforces in both public and private,
and development partners to practice effective, efficient and sustainable quality improvement
program with the existing resources.
1 Refer on page 12 and 13 of “ Hospital Reform Guideline at Regional and District level” in 2005
2
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Establishment of Quality Improvement Team (QIT) was instructed to all hospitals in public sector
in 2005 with the “Hospital Reform Guideline at Regional and District level”. However, majority
of hospitals could not establish QIT. According to the field report that hospitals that established
“functional” QIT are equals to the hospital implementing 5S approach.
Other QI approach and program are also recognizing the effects of 5S-KAIZEN-TQM approaches.
Infection Prevention and Control (IPC) Program took the 5S concepts into the program. Lecture
about5S approach is given during the IPC training to hospitals. Hospital Reform Program of
MoHSW is also preparing the integration of 5S-KAIZEN-TQM approaches into the Program for
further rollout and makes the approaches sustainable.
Success of 5S-KAIZEN-TQM approaches in Tanzania was shared with other African countries in
many occasions. One should notice that MoHSW has been receiving trainees on 5S-KAIZEN-TQM
approaches from Malawi, Kenya, and Uganda since 2010. These successes were also presented
at Global Health Workforce Forum, which was conducted in January 2011 in Bangkok, Thailand.
JICA Headquarter recognizes that Tanzania is the best performing country of 5S-KAIZEN-TQM
Implementation among 15 African countries. This is evidenced by the fact that Mbeya Referral
Hospital was chosen as the field-training site of the KAIZEN training for 6 African countries,
which was conducted in Japan and Tanzania in October 2011.
3
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Chapter 2:
4
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
After the TOT, all trained personnel from hospitals or local health authorities are recognized as
“National” or “Regional” or “District” trainers and they were expected to implement 5S-KAIZEN-
TQM activities at their organization or hospital as a team. Then, after organization or hospital
successfully adopts the concept and practicing the approach continuously, they are encouraged
to train or provide technical inputs to lower facilities.
In 2011, all RHMTs were trained on 5S-KAIZEN-TQM approaches. Based on the Consultation
visit’s results, it is found that some region like Singida, utilizing Regional Facilitators to train
CHMTs and district hospitals within their region by using their own resources.
TOT on basic 5S approach covers basic knowledge on Quality and its improvement, mindset
changes, QI implementation structure for health facilities, 5S-KAIZEN-TQM concept, 5S
implementation method, and M&E of 5S activities.
TOT on KAIZEN Approach is very much different from basic 5S TOT. KAIZEN TOT only focuses
on how to practice Quality Control Story (QC story). Criteria to participate KAIZEN TOT are
that the hospital practicing 5S and achieved S4 (Standardize) and S5 (Sustain) level activities to
organize working environment well.
Since strong leadership is a key for successful implementation of 5S-KAIZEN activities, MoHSW
usually invite leaders and managers to both TOTs. Medical officer in-charge, Matron/Patron,
and Hospital secretary are usually invited from hospital level.
The approaches were well disseminated to Regional Health Management Team (RHMT), and it
is on the process of disseminating to Council Health Management Teams (CHMTs). Knowledge
and skills on 5S will be used effectively whenever RHMT and CHMTs conduct supportive
supervision, which will always include a component of improvement of working environment.
When training is conducted for Regional Health Management Teams and Council Health
Management Teams, Regional Medical Officer (RMO)/ District Medical Officer (DMO), Regional
Nursing Officer (RNO)/ District Nursing Officer (DNO), and Regional Health Secretary (RHS) /
District Health Secretary (DHS) are usually invited to basic 5S TOT.
From the experiences of 5S-KAIZEN-TQM Rollout, many hospitals do not have enough budgets
or not allocate budget for “in-house training”. Therefore, the following issues should be taken
care by Hospital Management Team (HMT) and Quality Improvement Team (QIT) in order to
ensure training of all health workers in the facility;
5
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
• Proper “in-house training plan” and budget allocation by HMT and QIT
• Using gathering opportunities such as morning report, continuous education session, to
train staff part by part,
• Visiting areas and provide on the job training
• Coaching during monitoring of 5S-KAIZEN activities
MoHSW trained all Regional Health Management Teams (RHMTs) and on the process training
Council Health Management Teams (CHMTs). Therefore, hospitals in public sector should discuss
budget allocation issues with RHMT or CHMT, and if budget is not enough, trained RHMT and
CHMT can be technical back up.
Diagram 2: Cascade training model and technical back up by local health authority
Additionally, all functional 21 RHMTs and CHMTs where district hospitals are practicing 5S were
also trained on 5S to enhance 5S-KAIZEN-TQM activities at regional and district level. Moreover,
MoHSW is planning to conduct more TOT to train newly upgraded hospitals to consultant and
regional referral level.
6
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Table 2: List of hospital got 5S training and implementing 5S activities (August 2011)
No. Hospital Level Location
1 Mbeya Referral Hospital Consultant Mbeya
2 Kilimanjaro Christian Medical Centre Consultant Moshi/Kilimanjaro
3 Bugando Medical Centre Consultant Mwanza
4 Muhimbili National Hospital Consultant Dar es Salaam
5 Muhimbili Orthopedic Institute Specialized Dar es Salaam
6 Ocean Road Cancer Institute Specialized Dar es Salaam
7 Mirembe Psychiatric Hospital Specialized Dodoma
8 Kibong’oto Hospital Specialized Kilimanjaro
9 Songea Regional Referral Hospital Regional Referral Songea/Ruvu,a
10 Morogoro Regional Referral Hospital Regional Referral Morogoro
11 Tumbi Special Hospital Regional Referral Kibaha/Pwani
12 Iringa Regional Referral Hospital Regional Referral Iringa
13 Sumbawanga Regional Referral Hospital Regional Referral Sumbawanga / Rukuwa
14 Kitete Regional Referral Hospital Regional Referral Tabora
15 Singida Regional Referral Hospital Regional Referral Singida
16 Mbeya Regional Referral Hospital Regional Referral Mbeya
17 Bombo Regional Referral Hospital Regional Referral Tanga
18 Mawenzi Regional Referral Hospital Regional Referral Moshi/Kilimanjaro
19 Mount-Meru Regional Referral Hospital Regional Referral Arusha
20 Sekou-Toure Regional Referral Hospital Regional Referral Mwanza
21 Musoma Regional Referral Hospital Regional Referral Musoma/Mara
22 Babati Regional Referral Hospital Regional Referral Babati/Manyara
23 Shinyanga Regional Referral Hospital Regional Referral Shinyanga
24 Kagera Regional Referral Hospital Regional Referral Bukoba/kagera
25 Maweni Regional Referral Hospital Regional Referral Kigoma
26 Dodoma Regional Referral Hospital Regional Referral Dodoma
27 Sokoine Regional Referral Hospital Regional Referral Lindi
28 Ligula Regional Referral Hospital Regional Referral Mtwara
29 CCBRT Degignated Regional Hospital Designated Regional Referral Dar es Salaam
30 Tosamaganga Designated District Designated District Iringa
31 Mugana Designated District Hospital Designated District Bukoba/Kagera
32 Tandahimba District Hospital Designated District Tandahimba
33 Newala District Hospital District Newala
34 Masasi District Hospital District Masasi
35 Nachingwea District Hospital District Nachingwea
36 Amana Municipal Hospital District Dar es Salaam
37 Temeke Municipal Hospital District Dar es Salaam
38 Mwananyamala Municipal Hospital District Dar es Salaam
39 Siha District Hospital District Kilimanjaro
40 Kibosho Designated District Hospital Designated District Moshi / Kilimanjaro
41 Kilema Designated District Hospital Designated District Moshi / Kilimanjaro
42 Usangi District Hospital District Kilimanjaro
43 Mbulu District Hospital District Manyara
44 Kiteto District Hospital District Manyara
45 St. Joseph Hospital FBO Moshi / Kilimanjaro
46 Haydom Lutheran Hospital FBO Mbulu / Manyara
47 Hai District Hospital FBO Hai District/ Kilimanjaro
7
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Table 3: List of hospital got KAIZEN training and implementing KAIZEN activities (Novemebr 2012)
8
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Chapter 3:
Expectations that are not met include non-health expectations such as dignity, basic human
needs, human rights, prompt attention in care and treatment2, confidentiality, communication,
autonomy, etc. Other unmet expectations are health expectations. Hospitals that fail to deliver
these expectations express such failure as hospital accidents. These failures can be active failures
when rules and procedures are violated at the site of treatment or action, or they can be latent
failures created as a result of design failure, building failure and regulatory or policy failures.
3.1.2 Safety
There was shocking report came out from Institute of Medicine3 in US in 1999, it is reported that
errors cause between 44,000 and 98,000 deaths every year in American hospitals and over one
million injuries. The biggest killers include:
• Hospital associated infections
• Drugs errors
• Patients accidents
• Communication problems
• Disorganized work environment
In Tanzania, the data on the burden of Hospital Associated Infections (HAI) is limited, as there
is no systematic mechanism to study and collect the information. Therefore, we cannot say how
many cases are occurring, and it can be imagined that there are so many medical errors and
accidents happening in Tanzania. A recent article in the World Health Organization Bulletin
(2011) puts the prevalence of HAI in Tanzania at 14.8%.4 Therefore, necessity of research on this
aspect to detect the extent of this situation is important.
The hospital industry is a hazardous industry. However, while the hospital industry has many
employees of different job categories, involved in risky procedures to save patients and with
many conflicts, other hazardous industries tend to have fewer employees of fewer categories
involved in risky procedures to make a product or provide a service and usually with less conflict.
2 TASAF and Public Affairs Foundation, Bangalore, India. (2011). Citizen Report Card on District Hospitals in Tanzania.
3 The Institute of Medicine (IOM) released a report in 1999 entitled “To error is HUMAN: BUILDING A SAFE HEALTH
SYSTEM”
4 Nejad, S.B., Allegranzi, B., Syed, S.B., Ellis, B. & Pittet,D. (2011). Health-care-associated infection in Africa: a systematic
review. Bull World Health Organ; 89:757-765.
9
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Hospitals appear to be far behind from other high-risk industries in ensuring basic safety.
Hospitals should be Highly Reliable Organizations (HROs) as they handle human life under
risky procedures.
HROs are organizations in which errors can have catastrophic consequences but which
consistently avoid such errors. To accomplish this they conduct relatively error free operations
over a long period of time and make constantly good decisions resulting into high quality and
reliability. Examples of such organizations include aviation and airlines, air traffic control, and
nuclear power plants. Could hospitals become the same? The answer is “YES”, and it can be
achieved through proper organization of the work environment in hospitals.
To achieve high quality, systems used in implementation have to constantly be improved, for
quality fails when systems fail. It is therefore important to take two steps in problem solving:
1) First step for problem solving is to remove the immediate obstacle for patient care.
However, only removing obstacle is not enough. If root cause of the problem is not thought
and tackled with, there is a chance of recurrence.
2) Second step for problem solving refers to system re-organization to prevent problem
recurring.
There are some tools that are useful for monitoring of trend of problems such as control charts.
Those tools will be explained in chapter 6 as “QC tools”.
10
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Empowering people to fight against poverty could ameliorate the chronic problems of funding
health services. But while the problems are persistent with us, we, health workers, cannot stop
providing services to the people, nor can we leave the problems unattended. The answer to this
lies with how we manage the available resources and work environment.
Managing our work will lead to our enjoyment of life. One of the strategic entry points is the
working environment improvement, which can easily be achieved by the implementation of the
5-S concept. The other strategic entry point is the implementation of the planning activities. These
planning activities include strategic analysis, strategic choice, and strategic control. While there
are various models of implementing the planning activities the most important and vital point is
the need to always improve on what already exist leading to Continuous Quality Improvement.
11
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
……………………………………………………………………………………
(a) Sort: (Removal/ organization) = S1
Remove unused items for current work process from your workplace; and reduce clutter
(b) Set: (orderliness) = S2
Organize everything needed in proper order for easy work
(c) Shine: (Cleanness) = S3
Maintain high standard of cleanness of workplace, tools and equipment
5 Prof. HANDA Yujiro, Moses SINKKALA. 2005. “Strategic Management and Continuous Quality Improvement (CQI
(KAIZEN)) using 5S Principles”
6 Hirano and Talbot, 1995
12
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Five steps of Sort – Set – Shine – Standardize - Sustain is a sequence of activities to improve
work environment in order to make it as convenient and comfortable as possible and thereby
also improve healthcare and administrative service contents with regard to preparedness,
standardization and timeliness.
How five steps of 5S activities will work is illustrated in the 5S conceptual framework, shown in
Diagram 3. S1 to S3 are practiced first. Then see the progress, implement S4 activities to prevent
fallback and equalization. Finally, implement S5 activity for long-term implementation.
i. Sasambua (Sort)
Ondoa vifaa vyote visivyotumika ofisini kwako.
ii. Seti (Set)
Weka katika utaratibu mzuri vifaa vyako ili kurahisisha upatikanaji wakati wa kutoa huduma.
iii. Safisha (Shine)
Dumisha usafi wa hali ya juu, pamoja na vifaa vya kazi katika sehemu zote za kutolea huduma.
iv. Sanifisha (Standardize)
Kusasambua, kuseti, na kusafisha kwa kiwango kinachokubalika iwe ni utaratibu wa kila sehemu ya
kutolea huduma.
v. Shikilia (Sustain)
Fundisha na dumisha tabia njema ya watoa huduma ya utekelezaji wa kusasambua,
kuseti, kusafisha na kusanifishailiiweendelevu.
13
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Two different grades are identified in the standard of 5S activities in service sector particularly
in health services. One refers to practice 5S for physical environment, and other refers to practice
5S for software matters such as: Job sequence and contents, Time management, Communication
(meetings and briefings), and Standardization of patients care procedures.
If health facility management is strategically carried out, it will be able to reach the standard on
5S practices in software matters, and possible to tackle with technical aspects of the health care
for the betterment.
14
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
The above table is an example of the target setting for clusters (implementation units) at a health
facility. To have a tangible outcome, each division is required to fulfill the task in the obtainable
best working condition avoiding excessive workload to the staff in-charge.
The workload should be moderate under the stimulating working condition to allow the staff to
be innovative in developing various ideas or proposals for the betterment of the jobs, procedures
and the outcomes. It is, however, not easy to realize the above situation in reality. In the real setting,
health managers and workers have to attend many patients, lots of paper works, complexity in
reporting system are often seen in workplaces.
These areas are all targets of 5S activities. By the continuous actions of Sort-Set-Shine-Standardize-
Sustain, it is possible to reduce workload; make maximal use of given working hours to provide
services to both external and internal clients; and in addition, you will be able to have an extra
cup of tea in the tea time, because the system becomes lean and maximally efficient.
First step is to sort necessary and unnecessary items in your workplace, and unnecessary items
need to be discarded or relocated where needed. Then, arrange the essential items according
to workflow. Then make workplace and tools shining by daily cleaning and also standardize
the process of Sort-Set-Shine successfully. In the process of the standardization, health workers
acquire good attitude to be in driver’s seat of 5S and KAIZEN activities to sustain and improve
Quality of health services in health facility or hospital.
In a health institution, for example, CQI can monitor the performance of each section of the
hospital ranging from hospital director’s office to patient wards. The major TOOL for the initiation
of CQI process is 5S, which is elaborated in Chapter 4 (implementation of 5S-KAIZEN-TQM)
7 Prof. HANDA Yujiro, Moses SINKKALA. 2005. “Strategic Management and Continuous Quality Improvement (CQI
(KAIZEN) using 5S Principles
15
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
3) Environment often defines the behavior of the people. Your workforce is not an exception.
If the physical structure and other in-house facilities are comfortable to them, their physical
and psychological stresses are much reduced. They fulfill their work easily and efficiently.
4) On the contrary, under unfavorable and inconvenient work environment, where they
have to use extra energy to overcome the inconvenience, people’s willingness to the work
naturally deteriorates.
The production line is perfectly in order since they have to assemble the 2500 parts precisely on
time having their outcome target of finalizing 5,000 vehicles per day. Each assembly process and
maneuver of workers should be in the achievable best level. The issue is to reduce the number
of products, which are rejected at end products final evaluation. If there are many rejected items,
the company loses money. It also negatively affects the quality of vehicles and finally loses in the
competition in the market.
Quality of the end product, which is handled by various groups of people (production units),
cannot be maintained, if there is no mechanism, by which all production units seek higher quality
of work throughout the on-going production process. It is this concept, which KAIZEN seeks to
achieve in the provision of health services in the hospitals and other health facilities.
16
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Health service is also handled by various groups of people. Therefore, you, as managers of
health service, are the persons who have to strengthen internal mechanism of your organization
to involve all staff in the movement to promote Continuous Quality Improvement. This is
“KAIZEN”.
Specific targets for KAIZEN have to be given by top- and /or middle-level management staff to
all divisions or implementation units at health facility.
We need a situation, where every division always look into the potentiality of making the job
easier, more effective and more efficient within the given circumstances by mobilizing their
capacities to create new ideas. Small ideas sometimes initiate efficiency and effectiveness. Ideas
from the workforce have to be considered by the top management (bottom to top uptake of
ideas).
17
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Those wastes are called “MUDA” in Japanese. There are two more things need to be
eliminated by 5S-KAIZEN-TQM activities for improvement of hospital management and
quality of health care. Those are; “MURA” (Waste of unevenness) and “MURI” (Waste of
overburden)
8 http://www.makigami.info/forum/index.php?topic=2.0
18
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Note that “MURI”, “MURA” and “MUDA” are usually observed together. When a work
process is imbalanced (means “MUDA”), it causes overburden on equipment and staff
(means “MURA”), which will cause all kinds of activities that do not add value.
19
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Chapter 4:
Implementation of 5S-KAIZEN-TQM
It is necessary to create good working environment for making for both internal and external
clients satisfy. However, one-way communication from top to bottom only will not be able to
improve working environment as the mind set of health workers is not going to change easily.
Therefore, big attitude change and mutual effort by both management and other health workers
are necessary to improve working environment. This can be achieved through utilization of a
mixture of top to bottom and bottom to top approaches shown in diagram 5 “ 5S implementation
structure”.
20
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Note that what we need in implementing 5S principles is: little knowledge, little hard work, little
dedication and a very big positive attitude!
The phases of 5S implementation should be considered carefully at the time of developing action
plan. Inserting many activities in the first two phases (Preparatory and Introductory) will delay
the implementation process. Starting from selecting few target areas and prioritize activities for
each targeted area according to the phase of 5S implementation leads to successful and sustainable
implementation of 5S activities.
21
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
There are 10 steps for implementing 5S activities. From Step 1 to Step 5 are under Preparatory
phase. From Step 6 to Step 8 are Introductory phase, Step 9 is under Implementation phase, and
Step 10 is under Maintenance phase.
In each step, there are many activities to complete for next step. The 5S-KAIZEN-TQM activities
flow chart is illustrated in Diagram 8.
The Maintenance phase is an on-going phase hence the phase has no time limit. However, it
is expected that within three (3) years of entering this phase, all necessary structures for
implementation of QI program and accountability systems should be in place. All health workers
(staff) will be shaped to follow workplace rules and habits. S1-S4 will be the culture of all staff
and the facility management.
Preparatory Phase
The aims of this phase are to make managers understand and adopt 5S-KAIZEN-TQM concepts
and establish structure of 5S implementation. It is important to know “where and how you are”
by conducting situation analysis. Time required for this phase is approximately three (3) months.
22
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
cleanup. 5S is a philosophy and a way of organizing and managing the workplace and work flow
with the intent to improve efficiency, safety and productivity by eliminating waste, improving
workflow and reducing process unreasonableness.
The following points should be emphasized to convey the actual meaning of 5S activities during
the sensitization session:
• 5S activities is the foundation of all quality improvement programs
• 5S activities will improve working environment by elimination different kinds of wastes
• 5S activities will help managers and health workers to manage workplace, which leads the
improvement of productivity and safety
• 5S is not in conflict with any other quality improvement approaches that are already
introduced in the Tanzania Health Sector
• 5S is not a one-time event. It should be practiced day by day and make 5S as a culture of
the health facility. Periodical training is necessary for both management and department/
section level for sustainability
Step 2: Training for Management level staff
Based on the different studies and experiences from organizations introduced 5S activities,
it is found that “Strong leadership and commitment” is a key for successful and sustainable
implementation of 5S-KAIZEN-TQM approaches.
During training of managers, the concepts of 5S-KAIZEN-TQM must be well understood and
adopted by the participants. The steps of 5S-KAIZEN-TQM activities implementation must
logically be lectured.
The following contents need to be focused during the management level training;
• Basic concept of 5S-KAIZEN-TQM approaches
• How to conduct “Situation analysis”
• How to establish Quality Improvement Team (QIT) and its roles and responsibilities
• Action plan development and integration of the action plan into hospital operation plan
• How to establish Workplace Improvement Team (WIT) and its relationship with QIT
• Self -monitoring and evaluation of 5S activities
• How to organize in-house training (education of staff)
Note that it is better to develop implementation plan for 5S activities at the end of the manager
training.
23
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Moreover, problems existing in the health facility are also identified through Situation analysis.
After establishment of QIT, this is the first activity that QIT conducts. When QIT conducts the
analysis, QIT must be equipped with digital camera, and take pictures of working environment
in all departments, sections, and units within the health facility, including back yard services
such as kitchen, laundry, store etc. Pictures of hospital environment such as entrance, parking,
waste dumping point, garden, patient waiting area, should also be taken.
Those photos must be recorded as baseline (before 5S). These are useful for comparison and to
measure the progress (before-after comparison) of 5S activities. While taking pictures of working
environment, the following points of the picture need to be captured;
• Equipment and furniture arrangement,
• Tools and supplies storage in the store area, inside cabinet, drawers etc.
• Sluice room and storage of cleaning tools,
• Working bench
• Trolleys
• Waste bins
Note that positions of photographing must be recorded for the next visit to monitor progress of
5S activities.
Not only taking pictures but also observation and interview from staff are also important
methodology for situation analysis. After compiling the findings from situation analysis,
the findings must be shared with sections /units in-charge and staff. This will help them to
understand “how your working environments are”. Moreover, situation analysis results should
be reflected to the action plan.
24
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
When select the target area(s), DO NOT select sections or units that are facing lots of problems as
it will take long time to solve the problems and difficult to make them as a “showcase”.
Number of target area(s) can be decided according to the capacity of QIT and resource availability.
Many hospitals in Tanzania select 3 to 5 areas as showcase in the beginning of “Introductory
phase”.
Once 5S is successfully introduced to the targeted area(s) and mechanism to sustain the activities
is in place, expansion of target area(s) can be executed.
Introductory Phase
The aims of this phase are to make staff understand and adopt 5S-KAIZEN-TQM concepts and
implement 5S activities. It is important to know “How to practice 5S activities” and responsible
team establishment at section or unit level. Time required for this phase is approximately six (6)
months.
25
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Formation of WITs essentially necessitates pursuing several steps that are: forming, storming,
performing and closing. The norms of the team generally consist of:
• Close relationships developed and the team demonstrating cohesiveness
• Team group rules and boundaries agreed
• Cooperation
• Team identify and member enjoy camaraderie (fellowship/peer consciousness) with one
another and
• Commitment to work out differences and giving constructive feedback
The team meeting should be conducted regularly as per schedule and minutes of the meeting
including the attendance record of the participants should also be kept properly and appraised
regularly (see Diagram 9 on how WIT operates).
Throughout WIT regular meetings, the tips are usually underlined. Some of the tips for of effective
team meeting to take into account include: meeting agenda prepared in time and distributed
to the members, time management and maintaining focused discussion, and encouraging and
supporting participation of all members.
Amongst the areas which WITs seek to effect qualitative improvement includes; services to the
customer /public, workflow, efficient use of resources, work environment and safety.
Benefits of working as a team comprise of: sharing of the knowledge, skills and experiences of
different members which builds confidence among the members and collective decision making;
sharing responsibility; tackling issues in synergistic manner; and there is also mutual support
and cooperation between team member, thus in the end accomplish quality improvement.
Teamwork is vital in achieving continuous quality improvement. Usually the teams take a
problem as an opportunity and the team members support each other. It should be remember,
“One big tree does not make a forest!”
Step 8. Practice of Sort, Set and Shine
Practice of Sort (Seiri) is starting from identification of unwanted items in the work place. It
has to be initiated by disposing all that are no longer needed after identification of unwanted
items through red tagging (see Chapter 5.0: 5S tools). Simple way of Sorting is to categorize all
equipment, machines and furniture into three (3) categories by using colors. These categories are;
Unnecessary (not need it), May/May not be necessary (May not need), and Necessary (Need it)
as depicted in Diagram 10.
26
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Unnecessary items should be discarded, if the item is not repairable. If the item is repairable,
repair it and store, as it may be needed by other department/sections or other hospitals.
May/May Not Necessary items mean that the items are not used often (probably only once a
month) or it is functioning but not used in current workflow. This kind of items should be stored
in sub-store of department/sections so that it can be taken out quickly when it is needed.
Necessary items should be organized properly according to current workflow. This will be
explained in “setting” activities
Remaining items have to be arranged and stored according to frequency of use. All areas including
floors, cupboards and tabletops have to be organized. The changes made have to result in more
efficient work than before.
When unwanted items are collected from various departments/sections, the following things
must be recorded and filed for smooth discarding procedures:
1) Name of items
2) Inventory number,
3) Where it was,
4) Where it will be stored
“Unwanted items store” should be established and all unwanted items properly stored in until
you complete discarding process. If sizes of unwanted items are large and not repairable, space
for unwanted items should be created within hospital compound with safe storing measures.
Rules for regular disposal have to be established.
After practice of “Sorting exercise”, only necessary items remains in workplace. Then, next step
is practicing “Setting exercise” Practice of Set (Seiton) emphasizes on proper orderliness of things
in the work place. When organize the necessary items, workflow must be considered well to
27
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
make your work easier and reduce unnecessary movement (“Transportation” is one of the seven
waste to eliminate). All necessary items should be arranged by using “Can see – Can takeout –
Can return” Philosophy.
Signboards are set at the entrance for easy access of various services locations in the health facility.
All locations are named or numbered. Every item has to be labeled with an inventory number
(discretely) and assigned a location. Visual controls including color-coding are practiced. Files
and cupboards are indexed. X-axis-Y-axis alignment is practiced in the positioning of items.
Note that above-mentioned activities in “Setting practice”, 5S tools are very helpful to organize
necessary items with proper workflow. Application of different 5S tools will be explained in
Chapter 5.
Next step is “Shining exercise”. Practice of Shine (Seiso) is the cleaning of workplace and
maintenance of tools and equipment. Floors, walls, windows of all areas in workplace and all
equipment, tools furniture etc. need to be cleaned. Appropriate cleaning tools must be used and
well stored. Waste bins for different purposes should be available.
Cleaning maps and schedules with responsible person should be developed for continuous
practice of cleaning waste bins. Color-coding for segregation of wastes must follow the national
standard color-coding in the healthcare waste management (HCWM) guidelines; as well as the
National Infection Prevention and Control guidelines of the MoHSW.
Implementation Phase
The aims of this phase are to practice S1 to S3 properly and generate maintenance system for
S1to S3 (standardization: S4) in many areas of health facility. Time allocation for this phase is
approximately two (2) years.
Increase number of implementation areas in health facility might reduce frequency to visit
5S-implementing areas for mentoring and coaching of staff. This might cause fallback of 5S
practices. Therefore, it is important to standardize and prevent fallback of 5S activities in the
facility.
28
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
“Checklists” should be developed for each activity/service area and utilize it for the
standardization.
For example, OPD clinic of a hospital is very busy in the morning hours and workloads of health
staff heavy in the morning hours. However, there are few patients in the afternoon and some
staffs are not attending patients. This variability of services is not productive and does not meet
external clients needs as waiting time get long, and consultation time gets short etc.
Variability is the cause of creating needless work in the workflow. Therefore, the following issues
need to be considered for equalization;
• Individual capacity,
• Quality, Productivity and Safety,
• Information
• Staff’s mindset towards KAIZEN activities.
These aspects can be equalized using various tools as mentioned below:
Individual capacity:
Information sharing and development of Standard Operating Procedures,
Quality, Productivity and Safety:
Use of Standard Operating Procedures
Staff’s mindset towards to KAIZEN activities:
Fair performance evaluation and awards to good practice, equal opportunity of training to all
staff,
Information:
Sharing among staff of policy and strategy for quality improvement and current situation of
KAIZEN activities
29
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Maintenance Phase
The aims of this phase are to maintain staff to follow good work habits and keep workplace rules
and regulations. To make 5S activities as a part of organization culture, it takes long time and
need to be repeated. There is no specific time allocation of this phase as it is on going process.
The KAIZEN framework is illustrated in Diagram 12. KAIZEN teaches solving problems, skills
for working effectively in small groups, documenting and improving processes, collecting and
analyzing data and self-managing within a peer group. KAIZEN activity must deal not only
with improving results, but also more importantly with improving capabilities to produce better
results in the future.
30
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
How can we create well-organized working place? Work environment is not an entity only with
physical environment, such as building, equipment, and instruments. It includes functional
aspects of your working venues, such as personnel team, meetings, recording/reporting system,
time arrangement for work and communication system among staff and external counterparts.
Environment often defines the behavior of the people. Your workforce is not an exception. If
the physical structure and other in-house facilities are comfortable to them, their muscular and
mental stresses are much reduced.
They fulfill their work easily and efficiently. On the contrary, under unfavorable and inconvenient
work environment, where they have to use extra energy to overcome the inconvenience, people’s
willingness to do the work properly, naturally deteriorates.
Do you think that your work venues are good enough to promote motivation to work? Are you
satisfied with the present condition? Are you sensitive enough to detect inconvenience to yourself
and your staff?
There are so many questions, which have to be answered by you. The responsibility of a manager
includes the arrangement of the obtainable best work environment for the teammates and staff.
Now we have to discuss a feasible approach for us to uplift the work environment. One approach
that we can employ is called KAIZEN in Japanese language or Continuous Quality Improvement
(CQI). The instrument for the initiation of this approach is 5S principles.
31
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Another way of saying that is well implementation of 5S activities make us easy to find problems
existing in our workplace.
Facility practicing 5S well developed a culture of eliminating different kinds of wastes, and when
problems occurs, it is easy to identify them in the health facility.
Thus, health managers and workers will be able to understand better what is really happening
and needs to be tackled within their workplace.
Receptiveness: Creating receptive environment for ideas is one of the important keys for successful
KAIZEN. Every health worker in a facility is encouraged to come up with idea for making things
better, accepting changes, suggestions and so on.
Implementation/practice: Taking immediate actions for improvement is one of the important keys
for successful KAIZEN. The health workforces are encouraged to implement their ideas as small
changes can be done by the worker him or herself with very little investment of time.
Recognition: Quick and easy Kaizen helps to eliminate or reduces waste, promotes personal
growth of employees and the organization, provides guidance for employees, and serves as a
barometer of leadership.
Cumulative Impact: Each Kaizen may be small, but the cumulative effect is tremendous. Therefore,
continuation of Kaizen activities is one of the important keys for successful KAIZEN.
32
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Permanent method changes: Change the method. Once the change is made, you cannot go back to
the old way of doing things.
Continuous flow of small ideas: The smaller ideas are the better. Innovation takes time and is costly
to implement, but kaizen is just day-to-day small improvements that when added together
represent both enormous savings for the facility and enormous self-esteem for the worker.
Immediate local implementation: Be realistic. KAIZEN is done within realist or practical constraints.
When any mistake occurs in a working process, probably supervisor will ask the person who
made the mistake and say; “Why did you make the mistake”. Then, the worker might answer;
“Oh, I was busy”, or “Oh, we do not have enough staff” or “I was in a hurry”.
If there is no KAIZEN mind in your supervisor, and organization, counter measures of the mistake
will be an opposite of the cause, and he or she might say, “ Do not make a mistake” or “ Do not be
in a hurry”. Opposite of the cause will not solve the problem or reduce same kinds of mistakes.
“Individual blaming policy” will make “problem” to remain dormant, as workers are scared
of reporting their mistakes or errors, and stand in awe of losing job. It means that no report on
medical error, accident, or mistakes will appear to surface, and it is impossible to tackle with
problems for improvement of the situation. In such a situation, “No individual blaming policy”
needs to be applied and blame the system or way of doing things. If the organization has KAIZEN
mind as their culture, supervisor think as “Is there any problem on the way of doing things in our
system?” and need to focus on “Why this is happening”, then you will find a clue for KAIZEN.
It is important to try to find the root cause of the problem or mistake and then tackle the root
cause(s).
33
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
It is better not to think of changing things all at once, but rather to think of changing whatever
you can. It means that put feasible “KAIZEN” measure into practice. As it goes, little things make
a big difference. Continuation of small KAIZEN activities will be able to make a big change.
However, the people, who are stuck with the idea that KAIZEN is a difficult and hard thing to do,
it is difficult to convince them. Therefore, use pictures, numbers and other evidences to explain
about KAIZEN.
Here is the good example of small KAIZEN. The picture bellow was taken at one of the base
hospitals in Sri Lanka.
The hospital gardener came up this small “KAIZEN” idea, and the management of hospital
adopted it to maximize productivity of the staff and minimize water usage. The gardener used
to pull a long water pipe and took a lot of time for watering plants all over the hospital. However,
the gardener came up with an idea to utilize used empty IV drips container and line without
needle to drop water to watering the plants. After introducing this KAIZEN idea, workload of
the gardener was reduced and possible to do other works, and water usage was reduced. By
such a small idea, the hospital accomplished the reduction of workload of staff, costs, and could
improve productivity.
34
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Simply record the current situation or problem the section is facing, and add what kind of input
and solution applied with picture or drawing. Finally, benefits and outputs obtained from the
small KAIZEN need to be recorded on the right side of the format with pictorial records (after
small KAIZEN).
!!!!!!!!!!!!!!!!!!"#$%&'()*&+,-()%.,#%/
0.-1,.,#%,*/*(%,/2//////&///////////&/////////////3,(*/45/'062!!!!!!!!!!!!!!
!"#$%"&'()%$*"("+,&-./'0123& /4"%&5()%$*"("+,&-./'0123
63 7%$89"(:& 63 !"+"@,AB?,)?,:&
&
;3 .<5="+&)$5+,:&
&
>3 '+)?,&
75C,?%":&(7,)&./'012
Pictures before KAIZEN 75C,?%":&(7,)&./'012
!"#$%&'()*+,)
*-.(/-/01/2)2'1/)3))4/&/-5/#)6778
!"#$%"&'()%$*"("+,&-./'0123& /4"%&5()%$*"("+,&-./'0123
9: ;#<5(/-=) 9: A/0/B1)
• 6,789&*5:5,$%:&$4"+&;$+#<:"=&,>"& • C$+#<:5$+&$#&:>$"&;$*"%&:,7,<:&5:&
:,7,<:&$#&:>$"&;$*"%& %"=<;"=&
• ?>"%"&@"%"&5+7))%$)%57,"&)%7;A;"&$#&
'+#";A$+&B%"*"+A$+&7+=&C$+,%$D& • '+#";A$+&)%"*"+A$+&7+=&;$+,%$D&7%"&
& 5()%$*"=&
6:)>'%?/0).<%01)
• 1:,7ED5:>&E$F":&#$%&:>$"&;$*"%&#$%&
G:7#"H;D"7+I&7+=&G=5%,JI&7,&"+,%7+;"&
$#&'CK&
&
@:)*0."1)
?@$&"(),J&E$F":&7+=&:,7A$+"%5":&
To solve those bigger problems or improve such situation, it is necessary to take some actions that
need to learn some skills for using Quality Control (QC) tools and statistical analysis methods.
Basically, it is necessary to think or analyze such problems, and come up with solution by using
Plan-Do-Check-Act (PDCA) concept, which is the backbone of managing “KAIZEN” problem
solving approach.
Plan is to establish objectives and process or countermeasures with expected outcome based on
the past performances or future forecasting of work.
Act is to analyze the differences to identify the causes of “Gap”, and take necessary action to
improve changes.
During the planning, 5W1H need to be clarified against the theme or topic as shown below:
36
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Then, implement the plan and see the effectiveness and efficiency of those activities that are taken.
Then, activities that show good result should be standardized and adopted in routine practice.
The activities that do not reduce the problems should be discontinued and it is necessary to plan
better activities for improvement of the situation.
This matches exactly with the KAIZEN Process that will be explained in the next section. However,
PDCA cycle consists of four steps only and the cycle may be stopped at Act often. Kaizen aims
to raise the standard of our workplace, productivity, quality and safety in a continuous upward
spiral through rotating PDCA cycle, reflecting on achievement of KAIZEN and taking action to
improve the way for next KAIZEN.
Plan, preparing how to implement KAIZEN - Clarify the objectives and decide on the control
characteristics (control items) - Set measurable target - Decide on the methods to be used to
achieve the target.
Do, Implementing KAIZEN activities - Study and train in the method to be used - Utilize the
method - Collect the measurable data set up on the plan for decision-making.
Check, Reviewing the result of KAIZEN activities and achievements - Check whether the results
of implementation has been performed according to the plan or standard - Check whether the
various measured values and test results meet the plan or standard - Check whether the results
of implementation match the target values.
Act, taking countermeasures based on the review in “Check” - If the results of implementation
deviate from the plan or standard, take action to correct this - If an abnormal result has been
obtained, investigate the reason for it and take action to prevent it recurring - Improve working
system and methods. The diagram below explains which KAIZEN process match with PDCA
cycle.
It is often misunderstood that KAIZEN is the Japanese name of PDCA cycle. This must be
clarified that PDCA cycle is used, as the backbone of KAIZEN process, and it is not exactly
same as original concept of PDCA. It can say that KAIZEN process is the improved concept and
practical approach derived from PDCA cycle.
37
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Original PDCA cycle is often illustrated as “closed cycle”. However, “PDCA” used in KAIZEN
is not “closed cycle”. It is “open quality spiral”. Since PDCA cycle consists of four steps only,
the cycle maybe stopped at “ACT ” often. KAIZEN aims to raise the standard of our workplace,
productivity, quality and safety in a continuous upward spiral through rotating PDCA cycle,
reflecting on achievement of KAIZEN and taking action to improve the way for next KAIZEN.
38
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
“Problem” can be defined as “the gap between ideal situation and current situation”.
Then, it is necessary to take some action for making things better and close to the ideal condition
or situation. To do so, it must take some steps to solve “problem” or minimize “gap”. Generally,
these steps are called “QC story”, and it consists of 7 steps. The 7 steps of QC story are like when
a mountain climber is climbing High Mountain. We need to make sure the correct route and
taking process step by step.
39
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Step 1 is “Selection of KAIZEN theme” - the issue needs to be tackled, and then followed by
analysis of the current situation of selected KAIZEN theme together with target setting; that is
Step 2. In Step 3, try to find root causes for the issues / problems. In Step 4, think of counter-
measures to tackle the issues / problems, and then implement the identified counter measures in
Step 5. In Step 6, it is necessary to check the effectiveness of the counter measures. In Step 7, if the
countermeasures are effective in reducing the problem or improve the situation, standardize the
counter measures for easy implementation by anyone who may face same problem in the future.
Even though, a problem is solved, it may have other problems affecting the set theme. Therefore,
finally, it is necessary to sort unsolved problems and plan for next KAIZEN activities.
Note that the situation created by KAIZEN process may not be the best. If you think that is the
end of KAIZEN, things will not improve further. Client’s need and expectations changes easily.
Therefore, always consider client’s needs and expectations, and continue KAIZEN activities.
To complete KAIZEN process for solving problems scientifically, it is necessary to take the 7 steps
mentioned above. Each step needs to use some tools and information that is collected routinely.
The process needs to be understood properly. It is necessary to learn each step more in detail.
In actual settings in health facility, individual action is not recommended. Therefore, a team
should be established with section or unit and practice KAIZEN activities as a team. Usually,
the team practicing KAIZEN at section level called Work Improvement Team (WIT) with the
members of 5 - 6 staff working in the section.
40
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
During the brainstorming meeting, possible KAIZEN themes (It is called KAIZEN suggestion)
will be suggested by staff working at the department, section or unit based on:
• Claim from clients/patients
• Mistakes often happening
• Working process that takes time and are hard to do it
• Medicines and equipment that are disturbing the smooth practice of routine work
Several KAIZEN themes might be suggested during the brainstorming meeting. From those
suggested KAIZEN themes, it is necessary to evaluate feasibility on each suggested theme.
On the other hand, another staff raised a problem of small working space, and others raised
many sampling mistake, high wastage volume of medicine and so on. Based on the matrix in the
above, highest mark obtained is “Giving wrong medicine is reduced” as it will have immediate
effects, does not require many resources, and is possible to realize.
41
effects, does not require many resources, and is possible to realize.
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
42
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Collection of right information and data is the key for accurate situation analysis. To do so, it is
necessary to check the availability of information and data related with the selected KAIZEN
Theme. If the data and information were kept well and available, WIT needs to collect them and
study the trend or movement. However, if data and information is not available, it is necessary to
identify necessarycomments
Additional data and information, and then start collecting them for certain period.
Collected data and information should be analyzed properly. There are some tools that are useful
for Comment 1
accurate and statistical situation analysis used in KAIZEN process called QC tools. One of the
tools is called “Pareto Chart”.
AddStep
In the this2,table inChart
Pareto page is43, above
useful forthe sentence ofof“target(s)
prioritization Makingfortheproblem
above table is when
solving,
various contribution
the first factors
step to draw exist. Visualize
Pareto Chart. On frequency of incidents
the process contributing
for making to the problem is
Pareto Chart,
also helpful for decision making on prioritization of target for problem solving.
place the high frequency one from the left of the graph like below so as to
Pareto Chart is able to identify “the contributing factors that need to be focused for better
visualize “the
improvement”. It problem that need to
means, identifying thebecontributing
focused on”. Set frequency
factors of occurrence
that has high frequency and
affecting work process most. To make a Pareto Chart correctly, it is necessary to count
on the left vertical axis of the chart and, set cumulative ratio of the total number frequency
of incidents that are causing or contributing to the problem (selected as KAIZEN theme) and
of occurrences on the right vertical axis of the chart like example shown below.
calculate accumulation ratio of the incidents like in the table below.
Table 7: Example of table for cumulative frequency
Making the above table 7 is the first step to draw Pareto Chart. On the process for making Pareto
Comment
Chart, 2 frequency one from the left of the graph like below so as to visualize “the
place the high
problem that need to be focused on”. Set frequency of occurrence on the left vertical axis of the
4.1 Implementation of5S-KAIZEN-TQM
chart and, set cumulative ratio of the total number of occurrences on the right vertical axis of the
chart like example shown below.
activities
need space between of and 5
Comment 3
Chapter 4:
Change the color used for Chapter into Orange
43
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
There is free tool for making Pareto Chart available on Internet, and it is recommended to use
those tools for making you work easier and simpler. Reference: http://www.vertex42.com/
ExcelTemplates/pareto-chart.html
Pareto rule:
In terms of quality improvement, the Pareto chart tells us that a large majority of problems (80%)
are produced by a few key causes (20%). This technique helps to identify the top 20% of causes
that needs to be addressed to resolve the 80% of the problems.
Target setting:
In Step 2, the current situation is clarified with numbers, and now, it is easy for us to set “target”.
“Target” means how much can the problem (gap) be reduced, minimized or improved. Using
the example from Step 2, only the “giving wrong injectable medicine” and “giving wrong inhale
medicine”accounts for 80.6% of the problem. Which means if we could reduce or avoid those two
major incidents, majority of the problems will be solved or reduced.
Well, how can we set the target? At the first time, probably 30% to 50% of reduction from the
current situation is valid. At the same time, it is better to set the time frame for the KAIZEN
activity. Use of the Pareto chart by choosing the first or the first and second most frequent causes
will make the calculation of the target easy.
Once the top 20% of the causes that are (representing 80% of cases) identified, then tools like the
Ishikawa diagram (Fish-bone Analysis) can be used to identify the root causes of the problems.
Also the application of the Pareto analysis in risk management allows management to focus on
the 20% of the risks that have the most impact on the project.
44
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
First procedure of root cause analysis is to list “Guessing causes”, and then focus on “Possible
causes”. Finally, identify “Root causes” from the “Possible causes”. How to narrow down from
“Guessing causes” to “Root causes” is simply ask and repeat “why-because”, minimum of five
times.
Let’s use the example of “giving wrong medicine is reduced”. Based on the situation analysis
and result of Pareto chart, the main incidents that need to be tackled with are “giving wrong
injectable medicine” and “giving wrong inhaling medicine”. Therefore, it is necessary to develop
two (2) fishbone diagram for “giving wrong injectable medicine” and “giving wrong inhaling
medicine”.
Head of “fish” will be the identified contributing factor, not KAIZEN theme and need to find root
causes for one contributing factor and another. Let’s pick up “giving wrong injectable medicine”
as example. Diagram 31 is the example of Fishbone analysis to identify root causes of “giving
wrong injectable medicine”
Easy way of making “Fishbone analysis” is to start categorizing causes into groups. Categorization
of issues into groups will help us to identify causes smoothly. There are few ways for grouping;
(a) MSHEL grouping
Grouping issues into 5 groups called “MSHEL” (M: caused by Management, S: caused
by Software, H: caused by Hardware, E: caused by Environment, and L: caused by Life
(human).
(b) 4M grouping
Grouping issues into 4 groups called “4M” (Man, Machine, Material, Method)
Category or group can be increased according to the needs and nature of problem. Most important
thing is to observe trend and movement of problems.
For finding root causes, ask, “Why it is happening- because...” 5 times for each possible cause
and extend branches from each possible cause until it is embodied. Finally, circle the identified
root cause in red.
45
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Free tool for making fishbone analysis diagram is available on Internet. Using those tools will
make you work easier and simpler. Reference: http://www.vertex42.com/ExcelTemplates/
fishbone-diagram.html
Step 4: Identify Countermeasures for solving KAIZEN theme
After root causes analysis, next step is to think of the ways to eliminate the root causes. Therefore,
it is necessary to come-up with countermeasures for eliminating or reducing those root causes.
In this process, two QC tools are used to select countermeasures. One is “Tree diagram ”, which
is used to identify possible countermeasures.
Other one is “Matrix diagram”, which is useful for checking feasibility of those identified
countermeasures. Feasibility of identified countermeasures should be evaluated in terms of 1)
importance, 2) Urgency, 3) Difficulty, 4) Time consumption, 5) Resource availability.
How to make Tree diagram
List the identified “root causes” in Step 3 on the left end. Then, start brainstorm countermeasures
with team members. If the countermeasures are identified, connect the line with each “root causes”
systematically (1st line countermeasures). Then, brainstorm again to come up with realistic
countermeasures and branch them from 1st line countermeasures (2nd line countermeasures).
Note that it is not always one countermeasure for one root cause. Therefore, if more counter
measures identified for a root cause, branch line and connect like in the diagram 32.
How to make Matrix diagram
After development of the Tree diagram, feasibility of identified countermeasures needs to be
looked at with Matrix diagram. As mentioned in the above, the following terms are used to
evaluate the feasibility of countermeasures; 1) Importance, 2) Urgency, 3) Difficulty, 4) Time
consumption, 5) Resource availability.
WIT or KAIZEN team must have agreed set of evaluation scale for feasibility check before making
Matrix diagram. Then, evaluate feasibility of each countermeasure through discussion among
team members and mark according to the agreed scale like example showing below:
46
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
The example showed in the above use the scale from 0 to 3. Each countermeasure is evaluated
using the scale. Note that explanation of evaluation scale is very important to reduce confusion in
and out side of the team. For instance, “0” has negative meaning and “3” has positive meaning.
For example, if a countermeasure got “0” point in “importance”, which means that counter
measures is “less important”. If a countermeasure got 3 points in “Difficulty”, it means that
counter measures is “not difficult to implement”.
The countermeasures that got more than 11 points out of 15 (Cutoff line is the above 70%) are
selected as feasible countermeasures.
47
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Develop check list and Ward In- By Dec.15 At the Reduce Checklist and Develop
handing over note, and charge and ward miscommunication handing over
communicate between WIT leader note
shift well
Develop instruction Head of By Nov.10 At the Reduce taking wrong Medicine Develop
and check sheet with Pharmacy ward injectable handling
Pharmacy department and Ward instructions
in-charge
After development of the implementation plan, it should be displayed on the staff notice
board at department/section level. Information sharing is important to remind WIT members
to implement and monitor KAIZEN activities on time and share progress in the department/
section.
Verification of effects:
The following actions need to be taken in Step 5:
• Collect baseline data for each countermeasure
- Ex. “Knowledge is improved through training”
- Pre-assessment of training need to be done and the results must be analyzed
• Develop Monitoring check sheet based on “action plan” of each countermeasure
• Use the check sheet to observe “effects” of countermeasures during the implementation of
countermeasures
Step 6: Check effectiveness of the countermeasures
After the implementation of identified countermeasures, effectiveness of the countermeasures
must be measured. As used in Step 2, “Pareto Chart” is useful for measuring effectiveness of
countermeasures and easy to make comparison between before and after KAIZEN activities.
Procedures for making “Pareto Chart” in Step 6 is exactly same as explained in Step2. However,
cumulative table can be combined before and after KAIZEN activities showing like a below.
48
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
The example used in this Chapter, the target set in the Step 2 was “Frequency is reduced by 50%
from the current situation”. As stated in the table above, reduction rate is 55%, and achieved the
target.
It means that the countermeasures implemented were effective. However, it is difficult to say
which countermeasures were effective to reduce the frequency of the problem.
The relationship between countermeasures and effectiveness can be defined as listed the table
10 below: Use the monitoring results and place the countermeasures according to the situation
and condition.
Table 9: Countermeasures – effectiveness relationship
Table 10: Countermeasures – effectiveness relationship
Effectiveness
1 2
It is effective and It is not effective
Implemented
need to be and need to review
standardize measures
Countermeasures
4
3
Not Implement some
Need to clarify why
implemented measures
it is effective
(Do something)
Verification
Verification of effects:
of effects:
The following actions need to be taken in Step 6:
The following actions need to taken in Step 6:
Evaluate the implementation status of the countermeasures through the monitoring check sheet
Evaluate
Conduct the implementation
situation analysis with thestatus
same of the countermeasures
method used in Step 2 forthrough the of results and
verification
monitoring
effectiveness check activities
of KAIZEN sheet
Conducting
Evaluate situation
the outcome of theanalysis with the same method was used in Step 2
countermeasures
for verification of results and effectiveness of KAIZEN activities
Collect data and compare with baseline data
Evaluate the outcome of the countermeasures
How “effects”
Collect dataareand
verified as follows;
compare with baseline data
• How “effects”
Various methodsare for
verified as follows;
measuring “effectiveness” of countermeasures
Various methods for measuring “effectiveness” of countermeasures
Qualitative and quantitative measures49 can be applied according to the
target/objectives
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
50
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
There are a few tips to make Standardized Procedure Table with 5W1H as follows;
• Period of implementation is placed in the “WHEN” column
• “Countermeasures” that showed effective results of KAIZEN are placed in the “WHY”
• Place that activities take place is placed in the “WHERE” column
column
• Output or tools used for the activity is placed in the “WHAT”
• In-charge of the activity is placed in the “WHO” column
column
• Period of implementation is placed in the “WHEN” column
• Methodology to carry out the activities is placed in the “How”
• Place that activities take place is placed in the “WHERE” column
column
• Output or tools used for the activity is placed in the “WHAT” column
• Methodology to carry out the
Format of Standardized activities is
Procedure placed
Table in the
with “How”
5W1H column
is very similar to the
Format action plan developed
of Standardized in Step
Procedure Table5.with
Therefore,
5W1H isshould not confuse
very similar and plan
to the action not to
developed
in Stepmix-up this two.
5. Therefore, Example
should of Standardized
not confuse procedures
and not to mix-up is shown
this two. Example below:
of Standardized
procedures is shown below:
Table 10: Example of Standardized procedures
Table 11: Example of Standardized procedures
Only making a standardized procedure table does not make any sense. All workers in the
Only making
department or sectiona must
standardized procedure
practice the table doesmeasures
listed standardized not makecontinuously.
any sense. All
Therefore,
workers
regular in the
monitoring department
with or section
proper checklist is an must practice
important thetolisted
for us know standardized
how the workers are
measures
practicing continuously.
and ensuring Therefore,
the standardized regular
method monitoring
in sustainable way.with proper
checklist is an important for us to know how the workers are practicing
Period of monitoring should be agreed within the team, and shared with everyone working in
and ensuring
the department the standardized method in sustainable way.
or section.
It doesItnot
does not matter
matter either either
small small
KAIZEN KAIZEN
or big90or big KAIZEN.
KAIZEN. What
The most is the most
important thing is to have
positive
3 mindset thing
important (KAIZEN
is to mind) and think
have positive of making
mindset thingsmind)
(KAIZEN betterand
continuously.
think of Continuous
rd,Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania. 2013
small changes
making things better continuously. Continuous small changes make one day.
make things better and better, and possible to make big changes
things better and better, and possible to make big changes one day.
The first large-scale attempt to introduce TQM to health sector was the National Demonstration
Project (NDP) on TQM for Health, which was put into place in 1989 in the United States. It was an
ambitious and revolutionary project aimed at making first use of the concept and methodology
of quality control for the purpose of upgrading the quality of health and medical care services.
However, The NDP successfully demonstrated that the TQM methodology is helpful for quality
enhancement in hospitals as well as in other businesses11. Based on the NDP in USA, TQM was
also tested in Japan’s health sector and made successful implementation and there are some
evidences obtained from NDP-Japan that TQM is useful for patient’s safety and medical safety.
Actual methodologies for TQM implementation are not difficult things. Vitalization of work
place needs small group activity, statistical quality control and education of staff. Then, proper
communication and information management will support the daily management of work.
Finally, cross cutting way of team activities and approaches can manage all process of organization
strategically.
9 KALUZNY, McLAUGHLIN, SIMPSON,: Applying Total Quality Management Concepts
to Public Health Organizations
10 HASEGAWA: A Study on Organizational Reinforcement through Total Quality Management
in the Health and Medical Care Sector, 2006
11 HASEGAWA: A Study on Organizational Reinforcement through Total Quality Management
in the Health and Medical Care Sector, 2006
52
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
At the beginning, consider creating good working environment to enable health workers to
be competent towards providing high quality of services. Then, consider client satisfaction
to improve clinical and non-clinical (responsiveness) issues with KAIZEN activities. Proceed
gradually to TQM stage, resource management such as financial, human resource and medical
supplies/equipment management should be considered. Moreover, patient’s safety and staff
safety issues need to be taken care of. Through all 3 steps approaches of 5S-KAIZEN-TQM,
continuous provision of high quality health services can be achieved, and service users will
recognize the health service institution as “Highly Reliable Organization” as shown in Diagram
37.
53
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Often it has been observed that those “un-cooperative staff or resistant to changes” are senior staff
of institution and usually those personnel are well experienced and skilled. Un-involvement of
experienced and skilled personnel into KAIZEN activities is inexpedient as skills and knowledge
of those personnel are very effective for quality improvement. Therefore, it is necessary to change
mindset of “un-cooperative staff or resistant” on successful implementation of CQI (KAIZEN)
activities. Here are the hints (box bellow) for how to change mindset of un-cooperative or resistant
staff:
• Show example and explain effectiveness and necessity of 5S using data, pictures
etc.
• Remove “unnecessary work” from current workflow,
• Remove variability of work (Equalization/Leveling)
• Make work procedure clear and develop Standard Operating Procedures (SOPs)
• Explain what we can do if 5S is introduced,
Once resistance to “change” is reduced, managers should aim to build mutual understanding and
communication mechanism between management and other workers. As previously mentioned,
QIT and WIT are very important for development of this mechanism. To run the communication
mechanism, it is important to respect humanity and keep hash out until you have consensus
between management and other workers.
For successful implementation of 5S-KAIZEN-TQM and other QIPs, changing the attitude of all
health workers is cornerstone. Staff should be encouraged to perform 5S in their mind and brain
as summarized in boxes (a) and (b).
54
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Doing 5S of the mind and brain is very important for changing your attitude in positive way and
accelerates 5S implementation appropriately.
Tips for successful 5S implementation (b)
On top of improvement of the work environment with 5S implementation; then other QIPs can
now come in to improve various aspects of quality in health services, patient and staff safety. Re-
assessment is done using the 5S-KAIZEN M&E sheet (Annex 2) to maintain 5S-KAIZEN practices,
and also other tools such as the Hospital Performance and Self Assessment Tool (HPSAT), IPC
checklist can be used as a more comprehensive tool covering the technical issues.
It is important for all health workers to know that 5S-KAIZEN-TQM should be implemented
continuously even other QIPs are introduced. This will facilitate quick realization of outcome
and impact of quality improvement activities introduced in health facility. The implementation
of relationship between 5S-KAIZEN-TQM and other QIPs is shown in Diagram 38.
55
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
56
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Chapter 5:
5S tools that will be described in this chapter are; 1) Alignment, 2) Numbering/Alphabetical coding, 3)
Red tag, 4) Safety signs, 5) Color coding, 6) Sign board/Mapping, 7) Labeling, 8) Symbols, 9) X-Y axis, 10)
Zone, and 11) 5S corner. Additionally, Visual control method is also explained in this chapter.
57
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Open register file with alphabetical code Patient’s medical record with numbering
Some safety signs are internationally recognized and can be applied in health facilities. Therefore,
it is recommended to use common safety signs. If there are no internationally / nationally
recognized safety signs for particular items or areas, health facility can develop own safety
designs. The picture below shows some examples of common safety signs.
58
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Color coding for cleaning tools Color coded waste bin for waste segregation
59
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
5.1.7. Labeling
This tool is used for S2; “SET” activities. This is used for visual communication to identify items
and organize them properly for quick finding, proper storage as well as management of items.
Labeling can be standardized for easy finding of items and proper storage place for each items.
5.1.8. Symbols
This tool is used for S2; “SET” and S4; “STANDARDIZE” activities. This is used for visual
communication to make everyone to understand the meaning of something by marks/symbols
without or minimum explanation.
60
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
X
Organized notice board with X-Y axis Organized notice board with X-Y axis
5.1.10. Zone
This tool is used for S2; “SET” and S4; “STANDARDIZE” activities. This is used to identify or
recognize the proper location or storage of items. This helps people to understand “Where it is
supposed to be kept or parked”.
Stretcher and wheelchair parking with zoning Place for waste bins with zoning
61
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
5.1.11. 5S Corner
This is effective for S5; “SUSTAIN” activities. Utilize existing notice board or establish new notice
board apart from existing notice board. There are three types of 5S corner:
1) 5S corner for all hospital staff at administration block
2) 5S corner for visitors (patients, care taker etc.) at OPD waiting room, corridor
3) 5S corner for all departments/wards staff at each department/ward
On the 5S corner, the following information is displayed;
• 5S posters,
• Pictorial progress report,
• Implementation progress chart/table
• Monitoring and Evaluation information (target areas, schedule, method)
• Training information (target personnel, schedule, venue, topics)
• QIT/WIT Meeting information (schedule, venue, agenda)
• Mission statement on quality improvement
• Information on waste bin color coding and type of waste
Table 13: clarifies what kind of information should be displayed on which type of 5S corner:
Information on 5S corner Types of 5S corner
Administration OPD Dept./Ward
Waiting/Corridor
5S posters Y Y Y
Pictorial progress report Y Y Y
Implementation progress Y NA Y
chart/table
Evaluation information Y NA Y
Training information Y NA Y
QIT/WIT meeting Y NA Y
information
Mission statement on quality Y Y Y
improvement
Information on waste bin Y Y Y
color coding and type of
waste
Y: necessary to display NA: Not applicable
62
5.2. Use of 5S tools for enhancement of Visual
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Actual items:
• Designate a location (position) for each item.
• Indicate quantity (or maximum level of inventory)
• Distinguish item from each other.
• Specify form (document).
Analog items:
• Colors
• Shapes (contour)
• Symbols
• Characters (verbal)
• Numbers
• Graphs/tables
The following table 14 shows the example of usage of 5S tools that will help to enhance visual
control within a health facility. It is reminded that all tools require an agreed set of rules. Often color
coding and symbols have international rules or regulation that are well known by people. In that
case, it is better to use rules that are adopted by majority of people.
63
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
All the rules must be informed to all staff in the health facility and everyone must follow the
rules. Displaying the rules on 5S corner or notice board is helpful for everyone to remind the
meaning of colors or symbols. Table 14 shows how 5S tools can be used for visual control.
64
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
However, Visual control can be applied much more in hospital setting. For example, process of
doctor’s consultation can be developed using flow chart or diagram, which can instruct visitors
how to see a doctor. This can reduce time for verbal explanation to guide patients and visitors
following proper procedures. Not only for patients and visitors but it can used for staff to follow
different procedures such as hand washing, management of medical waste, sterilization of
operation and treatment tools and equipment and so on.
65
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Visualization of work processes can also help health managers and workers to understand work
relation with other sections and departments. Moreover, it will help to review all processes and
improve procedures for cost and time reduction to get services or outputs.
66
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Chapter 6:
The left vertical axis is the frequency of occurrence, but it can alternatively represent cost or
another important unit of measure. The right vertical axis is the cumulative percentage of the total
number of occurrences, total cost, or total of the particular unit of measure. Because the reasons
are in decreasing order, the cumulative function is a concave function. To take the example above,
in order to lower the amount of late arriving by 80%, it is sufficient to solve the first three issues.
The purpose of the Pareto chart is to highlight the most important among a (typically large) set
of factors. In quality control, it often represents the most common sources of defects, the highest
occurring type of defect, or the most frequent reasons for customer complaints, and so on.
67
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Causes in a cause and effect diagram are frequently arranged into major categories. While these
categories can be anything, you will often see: manpower, methods, materials, and machinery
used in manufacturing sector. On the other hand, equipment, process, people, materials,
environment and management are often used in social or service sector.
68
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
6.5. Histogram
Histogram is a graphical display of tabular frequencies and density of the data similar to bar
chart. Each bar is erected over an interval, with an area equal to the frequency of the interval.
The height of a bar is also equal to the frequency density of the interval. The total area of the
histogram is equal to the number of data. The histogram visualizes the trend of the data such as
average, median, mode and out-layers.
14
12
10
8
6
4
2
0
69
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
70
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Chapter 7:
7.1. Introduction
Monitoring and evaluation (M & E) is an integral component of quality improvement in health
services. Health managers, in-charges of hospitals/departments, program managers/staff, and
other health workers; they need to know about M & E. In this case they need not to be experts of it
but just the basics of M & E are adequate; including data collection, processing, analysis, and use.
The knowledge about M & E helps health workers in the health sector to effectively monitor
and evaluate their health facilities or program; and hence strengthens the performance. This
chapter aims at highlighting the M & E essentials for the implementation of 5S-KAIZEN-TQM,
as a foundation of all other QI approaches in the country.
71
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
• Assists to better the human condition in terms of safe working environment, and improved
health status.
• Puts up a system for transparent accountability.
The 5S-monitoring sheet in annex-1 should be used to monitor 5S activities. The result of
monitoring should be shared between QIT and WIT for further improvement. QIT should use
“Action plan”(see format in annex-2) and see “how many activities are achieved out of the target”.
Once you move to KAIZEN process, number of KAIZEN memo and achievement of KAIZEN
plan will also be used for evaluation of QIPs.
72
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
MoHSW and Regional Health Management Teams (RHMTs) organize consultation visit to
the hospitals that are implementing 5S-KAIZEN-TQM approaches every 6 months. During
the consultation visit, a team of experts obtains information from Hospital Management Team
(HMT), Quality Improvement Team (QIT) and Work Improvement Team (WIT) on the following
points:
• Implementation structure,
• Dissemination and training activities,
• Internal monitoring and evaluation activities
• Dialogue between HMT and QIT, QIT and WITs
• Budget of 5S-KAIZEN-TQM approaches implementation
• Changes and improvement
Consultation visit team is also evaluating progress of 5S-KAIZEN-TQM practices with
standardized 5S-KAIZEN M&E sheet, which is developed by MoHSW and JICA (see Annex 2).
73
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Consultation visit team organizes feedback session, and the results of evaluation are presented
to QIT and WITs for further improvement. Note that guideline for Consultation visit is also
available for the people implement the Consultation visit.
NOTE:
At health facility level, the QIT and HMT will be providing supportive supervision to the
implementing areas using coaching and mentoring skills. The RHMTs will be providing
supportive supervision with coaching and mentoring on 5S-KAIZEN-TQM approaches
to Regional Referral Hospital and build capacity of CHMTs; while CHMTs will be
providing supportive supervision with coaching and mentoring on the approaches to
district hospitals, health centers and dispensaries. As rollout continues, challenging areas
identified during the external consultation (monitoring) visit will be addressed by using
national facilitators in the nearby regions to work as mentors.
This is called “Progress Report Meeting on 5S-KAIZEN-TQM approaches” and all 5S-KAIZEN
implementing hospitals are invited to present their progress of activities. In the past, power
point presentation, lectures, discussion and practice methodologies were used for training and
rolling out of the approach. However, sudden increase of number of the hospitals implementing
5S-KAIZEN, different style will be applied for smooth implementation of PRM
74
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
7.6.3.2. WIT
Work Improvement Team (WIT) has responsibility for conducting monitoring and
evaluation of day-to-day 5S practices and KAIZEN activities that are suggested and
executed within their work place. Process of 5S + KAIZEN activities must be documented
and share the results within the department/sections. The WIT will also communicate
the results to the hospital QIT; and WIT should develop their own checklist to suit their
work environment.
75
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
From the past experiences, information, pictures were often destroyed by computer
viruses. Therefore, it is strongly recommended that all records shall be kept in compact
disks (CDs) with proper mention of date and years. Then, keep them in file cabinet,
where every QIT member access. The CDs must be handled appropriately to avoid
damage. Also, the HMT and QIT, should make efforts to ensure that all computers have
up-to-date antiviruses for safety of documents stored.
76
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
People often confused between “Recognition” and “Competition”. They are two different issues.
“Recognition” is a process and continuously implemented to recognize achievement for certain
level of performance and maintenance of the condition. However, “Competition” is to compete
level of performance among teams, groups or individuals, and ranking of competitors make
difference of benefits.
Aims of introducing “Recognition” scheme into health facility are to increase; motivation of health
workers to continue good practices, increase productivity and safety, improve dialogue between
management and health workers, reactivate professionalism, strengthen teamwork and so on.
On the other hand, aims of introducing “Competition” scheme into health facility are; energizing
health workers, increase performance, enhancing creativity to come up with innovative ideas,
cultivate ownership and leadership and so on.
Team approach and individual approach can be applied for both “Recognition” scheme and
“Competition” scheme. For example, a team that shows high performance is rewarded, and also
among the team, staff who contributed most receives award individually or everyone of the team
member, gets small gift.
Criteria used for “Recognition” and “Competition” should be separated. After development of
criteria for both schemes, criteria must be shared with all staff working in your health facility.
Results of contest or verification are also opened to all staff. This will reduce envy of team
awarded or rewarded.
Internal monitoring and evaluation results, number of KAIZEN suggestions and its
implementation, request for internal verification can also be used for both “Competition” and
“Recognition” schemes.
77
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
78
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
79
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Annex 1
For
Developed by……………………………
Date…………………………….
2. Institutional Analysis
Overall situation of the facility:
3. Problem Statement
4. Goal
5. Objectives
80
7.
Activity for
improvement
Target
Resources input
1
81
20….
2 3
4
127
Time Frame
20….
2 3
4
Responsibility
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Annex 2
5S-KAIZEN M&E Sheet
Date:
Ver. 2012-September / /
HOSPITAL: DEPARTMENT:
AWA
Very well
poorly
Poorly
Fairly
RD
Very
Well
DESCRIPTION
MAR
KS
LEADERSHIP
1 Role & Commitment of Management, Sustainability of 5-S activity, Training Program for
Middle Mgt., Setting up 5-S Committees, 5-S Campaigns.
Commitment, knowledge, Awareness on 5S among
1.1 1 2 3 4 5
Managers and health workers
5S progress meeting, monitoring evaluation conducted
1.2 1 2 3 4 5
by WIT and recorded in minutes
Evidence of trainings conducted for Managers and
1.3 1 2 3 4 5
health workers
TOTAL Full mark 15
Acquired marks / 15 x 100 =
SEIRI – (SORTING) “Sasambua”
2 Clutter free Environment in Premises, Inside Offices, Work Place, etc. Evidence of
removal of unwanted items should be evident all around.
Unwanted items removed from Premises, Offices, Work
2.1 1 2 3 4 5
Places including drawers, cabinets and shelves
2.2 Walls are free of old posters, calendars, pictures 1 2 3 4 5
Notice Boards – Current Notices with removal
2.3 1 2 3 4 5
instructions
Color cording for waste disposal maintained and
2.4 1 2 3 4 5
standards followed
TOTAL Full mark 20 0
Acquired marks / 20 x 100 = 0
SEITON – (SETTING / ORGANISATION) “Seti”
3 Ability to find whatever is required with the least possible delay, evidence of eliminating
the waste of time throughout the Institute/Organization.
Photographic evidence of Pre 5-S Implementation and
3.1 1 2 3 4 5
afterwards
Visual Control methods adopted to prevent mix-up of
3.2 1 2 3 4 5
items (files, equipment, tools etc.)
Directional Boards from hospital entrance to all facilities
3.3 under your section/departments (office, wards, 1 2 3 4 5
Laboratory etc.) and corridors are clearly marked
All machines/Rooms/Toilets/Switches/fans regulators
3.4 1 2 3 4 5
etc. have identification labels
All items are arranged according to ‘Can See’, ‘Can Take
3.5 1 2 3 4 5
Out’ & ‘Can Return’ principle
3.6 X-axis, Y-axis alignment is evident everywhere 1 2 3 4 5
TOTAL Full mark 30 0
Acquired marks / 30 x 100 = 0
4 SEISO – (SHINING / CLEANLINESS) “Safisha”
The Cleanliness all round the Institution should have been carried out according to the
5-S Concepts.
128
34.1
rd Floors,
,Edition Walls, Windows,
Implementation Toilets,
Guidelines forChange Rooms in Approaches in Tanzania. 2013
5S-KAIZEN-TQM 1 2 3 4 5
working order & clean
4.2 82
Cleaning responsibility Maps and Schedules displayed 1 2 3 4 5
4.3 Waste bin strategy is implemented 1 2 3 4 5
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
The Cleanliness all round the Institution should have been carried out according to the
5-S Concepts.
Floors, Walls, Windows, Toilets, Change Rooms in
4.1 1 2 3 4 5
working order & clean
4.2 Cleaning responsibility Maps and Schedules displayed 1 2 3 4 5
4.3 Waste bin strategy is implemented 1 2 3 4 5
4.4 Use of adequate cleaning tools is evident 1 2 3 4 5
Storage of cleaning tools – Brooms/Maps/Other
4.5 1 2 3 4 5
equipment
Machines/Equipment/Tools/Furniture at a high level
4.6 1 2 3 4 5
of Cleanliness & maintenance schedules displayed
TOTAL Full mark 30 0
Acquired marks / 30 x 100 = 0
SEIKETSU – (STANDARDIZATION) “ Sanifisha”
5 High level of Standardization in all activities carried out in SEIRI, SEITON and SEISO and
the evidence of
such standards being practiced all around.
Adopt 5-S procedures & standardized on Check list,
5.1 1 2 3 4 5
Labels Corridors/Isles & Gangways
Standardization of Maintenance/Storage of
5.2 Files/Records / Orderliness in Keeping 1 2 3 4 5
Furniture/Equipment in Offices/Workplaces, etc.
Standardized check lists for common Administrative
5.3 1 2 3 4 5
Procedures in hospital and department
TOTAL Full mark 15 0
Acquired marks / 15 x 100 = 0
SHITSUKE – (SUSTAIN / SELF DISCIPLINE) “Shikilia”
6 Evidence of an disciplined approach to all 5-S activities through proper Training &
Development, which shows the sustainability in the long term.
Evidence of regular training program for all categories
6.1 1 2 3 4 5
of Employees in the section
Evidence of WIT Activities & promotion of Kaizen
6.2 1 2 3 4 5
Schemes
6.3 Evidence in carrying out Internal Audits by WIT 1 2 3 4 5
Evidence of Self Discipline among visitors to the
6.4 1 2 3 4 5
Institution
6.5 Evidence of Self-Discipline in the overall Institution 1 2 3 4 5
TOTAL Full mark 25 0
Acquired marks / 25 x 100 = 0
GRAND TOTAL for 5S activities Full mark 135
Productivity/Services
7 Measures how efficiently inputs to Output are used to produce goods & services with
better management techniques and work methods.
Evidence of methods & systems adopted to improve
7.1 1 2 3 4 5
productivity/employee
Efficiency and effectiveness, use of innovative method
7.2 1 2 3 4 5
to increase and sustain productivity
Evidence in the use of 5S Process to increase 129
7.3
3rd ,Edition 1 in2Tanzania.
Implementation Guidelines for 5S-KAIZEN-TQM Approaches 3 42013 5
Productivity
TOTAL Full mark15 0
Acquired marks / 15 x 100 = 0
Quality
8 Goal is to create satisfied customers by doing 100% right work, responding speedily to
requirements every time thus gaining trust & confidence.
Communication plans are evident for Implementation
8.1 1 2 3 4 5
of Quality Improvement
Evidence of fewer rejects, less wastage, less rework
8.2 1 2 3 4 5
through 5S Process
The Quality in the Process of the Manufacture/Service
8.3 1 2 3 4 5
by 5S implementation
TOTAL
83 Full mark 15 0
Acquired marks / 15 x 100 = 0
requirements every time thus gaining trust & confidence.
Communication plans are evident for Implementation
8.1 1 2 3 4 5
of Quality
3rd Edition Improvement
Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Evidence of fewer rejects, less wastage, less rework
8.2 1 2 3 4 5
through 5S Process
The Quality in the Process of the Manufacture/Service
8.3 1 2 3 4 5
by 5S implementation
TOTAL Full mark 15 0
Acquired marks / 15 x 100 = 0
Cost
9 The intrinsic cost of providing products/services to declared standards by a given
specified process right first time and every time
Evidence in reduction in cost of materials, Labor,
9.1 Energy, Overheads lowering of defects etc. by 1 2 3 4 5
introducing 5S concept
Tangible cost advantages through 5S methods in
9.2 1 2 3 4 5
waste control
Evidence of lowering Inventory Cost by the use of 5S
9.3 1 2 3 4 5
Methods
TOTAL Full mark 15 0
Acquired marks / 15 x 100 = 0
Safety
10 The overall safety to Employees, Visitors and Property is evidently displayed by the use
of 5S Process
Evidence of the effect of safety measured by less
10.1 1 2 3 4 5
accidents occurred in the year
Methods applied in Machinery & Equipment on safety
10.2 1 2 3 4 5
measures
Methods applied to protect the Employees/Visitors on
10.3 1 2 3 4 5
accident
Evidence of Safety Measures applied in providing an
10.4 1 2 3 4 5
excellent health service
10.5 Evidence knowledge and skills of employee on safety 1 2 3 4 5
TOTAL Full mark 25 0
Acquired marks / 25 x 100 = 0
Delivery
11 Evidence in the reduction of the delivery time of the Product/Service by the
implementation of 5S Process
11.1 Evidence of timely delivery of Products/Services 1 2 3 4 5
Overall effect to health facility by reducing delivery
11.2 1 2 3 4 5
time 130
3rd,Edition Implementation
Evidence Guidelines
of employee for 5S-KAIZEN-TQM
participation to reduce the Approaches in Tanzania. 2013
11.3 1 2 3 4 5
delivery time
11.4 Evidence of Just In Time in the hospital 1 2 3 4 5
TOTAL Full mark 20 0
Acquired marks / 20 x 100 = 0
Morale
12 Evidence in the overall Institution/Organization in improving the Morale by the
implementation of 5S Process
12.1 Level of morale displayed by Managers & Workers 1 2 3 4 5
Evidence of projects carried out by the employees to
12.2 1 2 3 4 5
display high level of Morale
12.3 Evidence of 5S - KAIZEN mindset or TQM culture 1 2 3 4 5
TOTAL Full mark 15 0
Acquired marks / 15 x 100 = 0
5S Organization, Work Improvement Team (WIT)
13
Role &Activities of WIT,
13.1 Member of WIT are actively working 1 2 3 4 5
13.2 WIT's activities are carried out according schedule 1 2 3 4 5
13.3 Evidence of regular WIT and QIT meeting 1 2 3 4 5
TOTAL Full mark 15 0
84 Acquired marks / 15 x 100 = 0
Empowerment of hospital staff through 5S, KAIZEN, TQM
14
13
Role &Activities of WIT,
13.1 MemberImplementation
3rd Edition Guidelines
of WIT are actively for 5S-KAIZEN-TQM Approaches
working 1 2 in 3 Tanzania,
4 5 2013
13.2 WIT's activities are carried out according schedule 1 2 3 4 5
13.3 Evidence of regular WIT and QIT meeting 1 2 3 4 5
TOTAL Full mark 15 0
Acquired marks / 15 x 100 = 0
Empowerment of hospital staff through 5S, KAIZEN, TQM
14
Opportunity and environment for empowerment for hospital staff by themselves
Evidence of learning opportunity for 5S, KAIZEN,
14.1 1 2 3 4 5
TQM
Seminar and Training on 5S-KAIZEN-TQM are
14.2 1 2 3 4 5
conducted for WIT members
TOTAL Full mark 10 0
Acquired marks / 10 x 100 = 0
GRAND TOTAL for 5S activities Full mark 140 0
131
3rd,Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania. 2013
85
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Annex 3
Annex 3: M&E sheet for the progress of 5S activities points to be
observed
M&E sheet for the progress of 5S activities points to be observed
DESCRIPTION Points to be observed
5S LEADERSHIP OF HOSPITAL / DEPERTMENT MANAGEMENT
1 Role & Commitment of Management, Sustainability of 5-S activity, Training Program for Middle Mgt., Setting up
5-S Committees, 5-S Campaigns.
Observe 5S implementation and attitude of staff, and make some
Commitment, knowledge, Awareness on
1.1
5S among Managers and health workers
questions to section in-charge and staff for checking their knowledge 高橋 志津
and commitment on 5S
5S progress meeting, monitoring and Ask section in-charge and staff to show us minutes of meeting and Commen
1.2 evaluation conducted by WIT and other record on 5S activities. Check the contents of records and judge
A@
recorded in minutes whether records are kept well and accessible or not.
Evidence of trainings conducted for Ask section in-charge and staff to show us training
1.3
Managers and health workers report/manual/material for internal training
training.
高橋 志津
SEIRI – (SORTING) “Sasambua”
Commen
2 Clutter free Environment in Premises, Inside Offices, Work Place, etc. Removal of unwanted items should be
evident all around. LQ
Unwanted items removed from Premises,
Observe mentioned places and check whether unnecessary items are
2.1 Offices, Work Places including drawers, FN&
removed or not.
cabinets and shelves
Walls are free of old posters, calendars, Observe walls, doors and notice boards whether old posters, calendars, %5:!
2.2
pictures picture are removed from them.
R'!
Observe and check the information displayed on the notice board. It is
Notice Boards – Current Notices with
2.3 also important to check if period of display and its instruction are given
removal instructions
or not.
Observe if Color-coding for waste disposal are applied and check if the D!7
Color coding for waste disposal
2.4 instruction of colors and usage for each color are given and shared by
maintained and standards followed $1.2
all the staff.
&
SEITON – (SETTING / ORGANISATION) “Seti”
3 Ability to find whatever is required with the least possible delay, evidence of eliminating the waste of time D!?
throughout the Institute/Organization.
Observe and check whether the section displays or keeps pictures of
Photographic evidence of Pre 5-S
3.1 before 5S or not. If you ask and answer is “Pictures are kept by QIT”,
Implementation and afterwards
do not mark more than 3 (Fairly implemented)
Observe and check whether the section is using “visual control
Visual Control methods adopted to
method” or not. Note that labeling and symbol are not a “visual control
3.2 prevent mix-up of items (files,
method” unless they are designed to manage or control certain
equipment, tools etc.)
operations/processed items
Directional Boards from hospital entrance
Observe and check whether directional boards to the section are
3.3 to all facilities (office, wards, Laboratory
displayed or not at corridors and entrance
etc.) and corridors are clearly marked
All Observe and check whether all
3.4 machines/Rooms/Toilets/Switches/fans machines/Rooms/Toilets/Switches/fans regulators etc. are labeled or
regulators etc. have identification labels not
All items are arranged according to ‘Can
Observe and check whether items, equipment etc. are arranged
3.5 See’, ‘Can Take Out’ & ‘Can Return’
properly to minimize time for searching items with proper workflow
principle
Observe and check the arrangement of tools and equipment on
X-axis, Y-axis alignment is evident
3.6 working bench, furniture and papers & posters on notice boards are
everywhere
aligned on X-Y axis.
Evidence in the use of 5S Process to Observe and check whether the section is practicing S1, S2 and S3 for
7.3
increase Productivity sustaining clean and conducive working environment for productivity
Quality
8 Goal is to create satisfied customers by doing 100% right work, responding speedily to requirements every time
thus gaining trust & confidence.
Observe and check whether the section is identified how to inform
Communication plans are evident for progress of planed activities, resource usage, process of quality
8.1
Implementation of Quality Improvement 87
improvement etc. to stakeholders by using “standard ranges”, "News
letters” and so on.
Observe and check whether the section is taking measures or applied
movement”, etc.) or not
Quality
8 Goal is to create satisfied customers by doing 100% right work, responding speedily to requirements every time
thus gaining trust & confidence.
Observe and check whether the section is identified how to inform
Communication plans are evident for progress of planed activities, resource usage, process of quality
8.1
Implementation of Quality Improvement improvement etc. to stakeholders by using “standard ranges”, "News
letters” and so on.
Observe and check whether the section is taking measures or applied
Evidence of fewer rejects, less wastage, system to reduce wastes or rework by using 5S such as “ setting by
8.2
less rework through 5S Process recycling of plastic container”, “ setting by visual control for easy
inventory”, “Standardized checklist for administrative work” etc. or not
Cost
9 The intrinsic cost of providing products/services to declared standards by a given specified process right first time
and every time
Evidence in reduction in cost of materials,
Check whether the section is “cost conscious” (thinking or waste of
9.1 Labor, Energy, Overheads lowering of
time, energy, money with unnecessary movement, order etc.) or not.
defects etc. by introducing 5S concept
Check inventory book, supply order records etc.,, and observe whether
Tangible cost advantages through 5S
9.2 the section is getting advantage on cost reductions through 5S approach
methods in waste control
( especially S1, S2, and S4) or not
Observe and check whether the section’s store is well organized and
arranged with proper labeling and has inventory list. It is also need to
Evidence of lowering Inventory Cost by
9.3 be checked whether the section is conducting inventory of stock
the use of 5S Methods
regularly or not. If there is not record of inventory, do not mark more
than 3 (Fairly implemented)
Safety
10
The overall safety to Employees, Visitors and Property is evidently displayed by the use of 5S Process
10.1
Evidence of the effect of safety measured
by less accidents occurred in the year
134 low
Ask the staff to show you incident reports. If the incident reports is not
existing, mark
3rd,Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania. 2013
Observe and check whether the section developed SOP for machines
Methods applied in Machinery &
10.2 and equipment, applied danger marks and symbols around machines
Equipment on safety measures
and equipment, or not
Observe and check whether the section has standing protection gears
Methods applied to protect the
10.3 such as gloves, aprons, goggles etc., and applied warning signs and
Employees/Visitors on accident
symbols, or not
Observe and check whether the section introduced safety measures for
Evidence of Safety Measures applied in provision of health care, such as prevention of needle poking, earth
10.4
providing an excellent health service wire with ECG machine, proper antiseptic procedure, double checking
for medication etc., or not.
Check whether the staffs working in the section have knowledge and
skills on safety measures for workers, visitors and patients, such as
Evidence knowledge and skills of
10.5 KYT (Danger Prediction Training) or not. If the staff cannot answer
employee on safety
safety measures, even if fire distinguisher, first aid kit etc. are observed,
do not mark more than 3 (Fairly implemented)
Delivery
11
Evidence in the reduction of the delivery time of the Product/Service by the implementation of 5S Process
Evidence of timely delivery of Observe and check whether the staffs working in the section are
11.1
Products/Services attending patients when they are demanded by patients or not
Observe and check whether the system or mechanism established by
Overall effect to health facility by the section for reducing delivery time is applied in other sections and
11.2
reducing delivery time departments or not. If the method is not well recognized by others and
QIT, do not mark more than 3 (Fairly implemented)
Observe and check whether the section established system or
Evidence of employee participation to mechanism to reduce the delivery time such as reduction of paper
11.3
reduce the delivery time work, modification of process, proper setting and arrangement of
necessary tools and equipment etc.
Observe and check whether the section understood the meaning of JIT
Evidence of Just In Time (JIT) in the and applied in their services such as medication delivery from
11.4
hospital pharmacy to ward, tool kit delivery from CSSD to OT, other supply
from central store to department etc.
Morale
12
Evidence in the overall Institution/Organization in improving the Morale by the implementation of 5S Process
Observe and check whether section in-charge and WIT members
12.1 88
Level of morale displayed by managers & obtained medical ethics thorough asking questions on customer and
workers quality of care. If the staff cannot answer correctly, do not mark more
than 3 (Fairly implemented)
necessary tools and equipment etc.
Observe and check whether the section understood the meaning of JIT
Evidence of Just In Time (JIT) in the and applied in their services such as medication delivery from
11.4 3rd Edition Implementation Guidelines
hospital
for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
pharmacy to ward, tool kit delivery from CSSD to OT, other supply
from central store to department etc.
Morale
12
Evidence in the overall Institution/Organization in improving the Morale by the implementation of 5S Process
Observe and check whether section in-charge and WIT members
Level of morale displayed by managers & obtained medical ethics thorough asking questions on customer and
12.1
workers quality of care. If the staff cannot answer correctly, do not mark more
than 3 (Fairly implemented)
Observe and check whether WIT members introduced or established
Evidence of projects carried out by the
12.2 some mechanism (such as “learning customer care”, “display monthly
employees to display high level of Morale
slogan for customer care”) for improvement morale among staff, or not.
Observe and ask staffs on actual purposes of 5S – KAIZEN approaches.
Evidence of 5S - KAIZEN mindset or
12.3 If the staff cannot answer correctly, do not mark more than 3 (Fairly
TQM culture
implemented)
5S Organization, Work Improvement Team (WIT)
13
Role &Activities of WIT
Observe and check whether WIT members are working actively on 5S
and kaizen with proper skills and knowledge. Ask WIT members on 5S
13.1 Member of WIT are actively working and roles and responsibility of WIT and if they cannot answer, do not
mark more than 3 (Fairly implemented) even the staff seems
committed.
Check WIT action plan or meeting schedules, and minutes of meeting
WIT's activities are carried out according whether135the planed schedule and actual activities are matching. If WIT
313.2
rd,Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania. 2013
schedule does not have written schedule for meeting, monitoring and other
general WIT activities, do not mark more than 3 (Fairly implemented)
Check Minutes of meeting of WIT-QIT meeting and its period. If the
Evidence of regular WIT and QIT
13.3 meeting is not held more than 3 month, do not mark more than 3
meeting
(Fairly implemented)
Empowerment of hospital staff through 5S, KAIZEN, TQM
14
Opportunity and environment for empowerment for hospital staff by themselves
Check whether staff working in the section are getting learning
Evidence of learning opportunity for 5S,
14.1 opportunities such as seminar, workshop and refresher training on
KAIZEN, TQM
5S-KAIZEN-TQM, or not
Seminar and Training on Observe and check whether staff working in the section are conducted
14.2 5S-KAIZEN-TQM are conducted for WIT internal seminar, workshop and refresher training on
members 5S-KAIZEN-TQM, or not in the past 6 months
Hospital
Department/Section/Unit/Ward
Date of Monitoring
Member of KAIZEN Team
QIT facilitator
Last date of meeting with QIT for consultation
1. Theme of KAIZEN
2. Situation analysis
Current data table Pareto chart Target set
Made correctly Made correctly Set
Made but wrongly Made but wrongly …………………………………………
Not made Not made Not set
Annex 4
Annex 4: KAIZEN Process
KAIZEN Checklist
Process Checklist
Hospital
Department/Section/Unit/Ward
Date of Monitoring
Member of KAIZEN Team
QIT facilitator
Last date of meeting with QIT for consultation
1. Theme of KAIZEN
2. Situation analysis
Current data table Pareto chart Target set
Made correctly Made correctly Set
Made but wrongly Made but wrongly …………………………………………
Not made Not made Not set
6. Effectiveness check
Comparison data table Comparison Pareto chart Target achievement
Made correctly Made correctly Achieved
Made but wrongly Made but wrongly …………………………………………
Not made Not made Not achieved
8. Suggestion
8. Suggestion Annex 5
Progress
Annex 5: Progress Report Report Format
Format
3. 5S Implementation Progress
According to your action plan, reports, which phase are you now. In the row of “Target area” fill all
departments you are targeting to implement 5S. If the 137targeted department formed Work Improvement Team
3rd,Edition Implementation
(WIT), check Guidelines
box of “WIT formed”.for 5S-KAIZEN-TQM Approaches
Then use “5S activities in Tanzania.
Monitoring 2013 to mark the progress of
Sheet”
activities to complete this section. For example, if total “leadership” score is 35 out of 75, it will be 35÷75×100 =
46.66 = 47%
Phase Preparatory, Introductory, Implementation, Maintenance
Target area(s) Establishment Self-evaluation Results
of WIT
Yes Leadership( %), Sort ( %), Set ( %), Shine
No ( %)Standardize ( %), Sustain ( %)
Yes Leadership( %), Sort ( %), Set ( %), Shine
No ( %)Standardize ( %), Sustain ( %)
Yes Leadership( %), Sort ( %), Set ( %), Shine
No ( %)Standardize ( %), Sustain ( %)
Yes Leadership( %), Sort ( %), Set ( %), Shine
No ( %)Standardize ( %), Sustain ( %)
Yes Leadership( %), Sort ( %), Set ( %), Shine
No ( %)Standardize ( %), Sustain ( %)
Yes Leadership( %), Sort ( %), Set ( %), Shine
No ( %)Standardize ( %), Sustain ( %)
Yes Leadership( %), Sort ( %), Set ( %), Shine
No ( %)Standardize ( %), Sustain ( %)
4. Challenges
In the row of “challenges”, fill the issues that QIT and HMT need to work on for implementation of QI activities.
In the row of “actions planned to be taken”, fill the countermeasures for the challenge, followed by who is
responsible of the action and necessary inputs to take the action.
4. Challenges
In the row of “challenges”, fill the issues that QIT and HMT need to work on for implementation of QI activities.
In the row of “actions planned to be taken”, fill the countermeasures for the challenge, followed by who is
responsible of the action and necessary inputs to take the action.
5. Pictorial records: Paste photos of improvement. Pick good example of5S-CQI (KAIZEN)-TQM activities’
photographs
Before After
Before After
138
3rd,Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania. 2013
Before After
Target Process
Target Product
Picture of previous condition Picture of current condition improved by 5S
92
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Annex 6-a
Target Product
Picture of previous condition Picture of current
condition
improved by 5S
93
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Annex 6-b
! !
! !
!$<4/5>#512%1)%>/$651=<%412.5#512% !$<4/5>#512%1)%4=//$2#%412.5#512%5'>/16$.%97%?@%
') OCMAA!PCQCEAA!RPSR!RPSR! ') 9?QCDADAJW?A!E?DAMCDBA!U?QCHAGIA!PCF?@C!
&) OCMAA!PCQCTBAIAGSANA! &) 9?QCNLEA!QAWLQCGI!
#) ,GPLDUCIAUCRG!U@R@S!U?QCULGILGLFA! #) =AQCRGLDB?NA!HAJLHLGKLFA!
V) -?@DLD!DUAUCRG! V) 9?@QCNLEA!PCF?@C!
4) 9?UAU?JCA!J?KA!JNCGIC!NA!E?MAGSA!EAFC! 4) /AIRGXNA!NAUAM?@ABC!
Y) /AIRGXNA!BANABCUAXC!E?D?WC@C!
Z) +AU?UADABA?!EAJA!U@AS!QCECNA!TRJHQLUL!
+2>=#<%A%;1<5#56$%5'>"4#%1)%?@% -$"/252:%97%5'>B$'$2#52:%#C5<%5.$"%
') !9?QCBCUAXC! ') 9?JLX?A!JAAGA!SA!47!
PCMAA[.QRPLD\JAXC\DAW?GC\WLDLJ\EA@AUADBC\JA@ &) 9?JLX?A!MACKA!SA!47!
EL@!HLG\HQADUL@D\JEADC]! #) 47!B?NLFC!E?MAGSA!HLEL!SAER!QAFCJA!
&) ,KAKC!SA!NAU?!CQCENA!GC!NAGAGL!U?ECMAGSA! E?DBCQCECAGA!GA!NLGFAER)!
47PCF?@C!U?UANAB?K?JCANAIRGXNA!NLGIC!ENA! V) (GANLFA!E?WAKCQCDBAGA!JANAFR!
J?KA!JM?HC)! 4) (NCDBR!U?GANADB?E?@?!5AHAG!ENA!
E?U?MAGSCA!DLJCGA!SA!47!
!
140
3rd,Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania. 2013
94
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
!""#$%&'()*(+$,+-*.)&')*"/$01++)$
2')+$ !"#$"#%$!!& 3'4+$56$789$ '()*+,--.& 9+'4$:+'#+&$ /01230.(&41305062&
;"/)+/)$"6$<()*=*)>$ 7-8-)(96-+,&,3-&0+8-1,0:2,0(+& 9+'4$ <(.0=(&>(62,*&
,.())-;& ?+4@+&$ ?(*0@30&A(.0*60&
9'&-+)$%&"(+..$ D!&,(&DE&2@,080,;& B302=0&?262+2=2&
9'&-+)$%&"#A()$ D,2+F2.F05-F&0+8-1,0:2,0(+& <(.0;*=0&C0;26(,(&
,.())-;G&B3-@=)01,G&H2I-)1&
%*()A&+$"6$B&+=*"A.$("/#*)*"/$ %*()A&+$"6$(A&&+/)$("/#*)*"/$*4B&"=+#$@>$C0$ An
& &
Pic
Re
5S
act
in
&
&
&
& Ta
2+.(&*B)*"/$"6$B&+=*"A.$("/#*)*"/$ 2+.(&*B)*"/$"6$(A&&+/)$("/#*)*"/$*4B&"=+#$@>$C0$
J-&@2++(,&:-,&1(6-&0,-61&K3-+-8-.&K-& J-&@2+&:-,&+--F-F&0,-61&P(.&@())-@,0+:&I)((F&
+--F&,3(1-&066-F02,-);L&M+F&K-& &=--9& 19-@06-+&2+F&.-F*@-&,06-&(P&@())-@,0+:&1(6-&
@)-2+)0+-11L& +-@-112.;&0,-61L&Q*.,3-.6(.-G&K-&@2+&=--9&
N&D(6-&0,-61&K-.-&60O-F&.-:2.F)-11&(P& -+(*:3&26(*+,1&(P&2))&0,-61&I;&F20);&@3-@=0+:L&
9*.9(1-&(P&,301&,.())-;L& N&M))&0,-61&2.-&9*,&2@@(.F0+:&,(&@(..-@,&K(.=0+:&
N&<(&@)-2+)0+-11& 9.(@-11&2+F&)2I-)0+:&01&2).-2F;&F(+-L&
N&A.())-;&01&=-9,&@)-2+)0+-11L&
N&B3-@=)01,&01&9*,&+-O,&,(&,3-&,.())-;L&
&
84B'()$"6$C0$ :+'&/*/-$@>$*4BD+4+/)*/-$)1*.$*#+'$
N&J-&@2+&.-F*@-&K21,-&,06-&(P&P0+F0+:& &J-& &I-)0-8-&,32,&"D&@2+&.-F*@-&,06-&2+F&
+-@-112.0-1L& K21,-&2@,0(+&I-P(.-G&I*,&K-&@2+&.-2)05-&,32,&
N&J-&@2+&.-F*@-&K21,-&2@,0(+&(P&P0+F0+:& +(KL&A3(1-&2.-&1(6-&(P&"D&I-+-P0,L&
+-@-112.0-1L& &M+FG&0P&K-&1,2+F2.F05-&(*.&K(.=G&K-&@2+&K(.=&
N&B3-@=)01,&01&1(&*1-P*)&"D&,(()&,(&=--9& -210);&2+F&(PP-.&(*.&1-.80@-1&066-F02,-);L&
+-@-112.0-1L&
N&H2I-)0+:&01&*1-P*)&"D&,(()&,(&2..2+:-&-2@3&
@(..-@,&9(10,0(+L&
N&J-&2.-&2I)-&,(&K(.=&K0,3&2&:((F&P--)0+:&
-8-.;&F2;L&
&
95
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Annex 7
Central store in MRH before Central store in MRH process Central store in MRH after 5S
5S (2007) of 5S (2007) (2008)
96
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
97
3rd Edition Implementation Guidelines for 5S-KAIZEN-TQM Approaches in Tanzania, 2013
Waste dumping point at MRH before 5S Waste dumping point at MRH after 5S
98