17-FRAMO Subm Cargo Pump-Planned Mainte Syst
17-FRAMO Subm Cargo Pump-Planned Mainte Syst
17-FRAMO Subm Cargo Pump-Planned Mainte Syst
No. 17 1997
Revised June 2005
Service Bulletin
Keep you up to date with the latest news from Frank Mohn Services AS
system on board will keep your cargo pumping system in proper condition.
Framo cargo pumping system is an important part of the Ships Quality Assurance System, ISO 9002.
General
For all ships trading world-wide, it will in the near future be required to have an approved Quality Assurance System ISO 9002 on board. An important part of your ships QA System will be a Planned Maintenance System for all the equipment on board, i.e. job specications, carried out by, approved by, inspection intervals as well as a separate record book for logging of results. There is no doubt that a properly maintained system will reduce operation costs and obtain a safe and sound ship.
Job Specications:
Carried out by/Approved by: can vary from ship to ship, but it is a must that the responsibilities are clearly dened. Inspection intervals: can vary according to type of ship and trade and your own experience.
Portable Pump
Function, Capacity, Drill test
Hydr. System
Air vent points: 1: on end of ring line 2: on lter box 3: on Cargo Pump 4: on hydr. tank
Job Specications
Drawing No. Maintenance instruction No. Carried out by Approved by
Date Inspection intervals when operated Running hours based Every 3rd month Annually Condition based
Diesel engine
Hydr. oil
Purging routine 1000-010-4 Pump man Chief Ofcer See purging routine X Pump man Chief Ofcer Pump man Chief Ofcer Recommended clearance less than 1 mm X Pump man Chief Ofcer Eng.
643-4-5
Eng.
Eng.
Eng.
Pump man
Pump man
Eng.
Eng.
Eng.
Chief Eng.
Chief Eng.
Chief Eng.
Chief Eng.
Chief Eng.
Chief Eng.
Chief Eng.
Chief Eng.
Chief Eng.
X X
X X X
X X
X X
X X X X X X X X X
NB!
The above Maintenance System is for guidance only. The equipment on each Framo ship may be different from ship to ship. Framo can, however, be consulted to work out a specic maintenance plan for your ship or you have to use the information in your Framo Service Manual together with your experience. Please dont forget auxiliary equipment such as: Ballast Pumps, Tank Washing Pumps, Bow Thruster Motor, etc.
For further information please contact our Framo Service Ofces worldwide.