Method Statement Sample Fire Alarm
Method Statement Sample Fire Alarm
Method Statement Sample Fire Alarm
6 VICTORIA ROAD, BURTON ON TRENT, DE14 2LU TEL: 01283 566977 FAX: 01283 566917 GENT 24 APPROVED ELITE SYSTEMS INTEGRATOR
METHOD STATEMENT
Fire Alarm: Site -Wide Upgrade Blocks: J, M, N, P, Q, U, V and W
COMPILED BY: Carl Gee DATE: 24th February 2011
CMS CMS
NUMBER
REVISION
FM100092
01
YES NO
BTS has not necessarily checked engineering or technical details contained herein, Acceptance with or without comments, does not relieve any Contractor of any contractual or statutory requirement in relation to the works or for the health and safety of people working thereon.
Print Name:
Date:
Task 1: Signing In
All BTS Commissioning and Installation Engineers must sit the BGS Heath and Safety Induction before they proceed with any works on site. All relevant certification will be handed into BGS at the end of the Induction i.e. CSCS Cards, IPAF, PASMA etc. BTS personnel must sign in at the Gatehouse and Estates Building on a daily basis for Health and Safety reasons, they will then report to the site Project Manager to advise them of the work being undertaken, this will continue daily throughout the duration of this project.
Stepladders
We do not permit the use of Steps or Ladders off mobile platform equipment. Steps and Ladders must be fit for use and will be used under a permit to work system. All steps and ladders must be checked before use i.e. in date safety tag, damage to rungs or framework etc. Operatives must never work from the top step or rungs
All detectors shall be tested using smoke canisters, sprayed using smoke poles, (this eliminate the chance of smoke having contact to the skin and also coming into contact with eyes). The smoke is odorless and doesnt stain building fabric. Stepladders will be used (these shall be fully certified and checked by the engineer before use). On higher levels smoke poles and access equipment shall be used due to height of the ceiling. Manual call points will be tested using special keys inserted into the bottom of the unit. Sounders/Beacons shall be operated for short periods; the sounder levels can only be dangerous if sounders are driven for long periods. The system shall be put into Commissioning mode and the sounders shall operate for maximum of 5 seconds per test.
Task 9: Deliveries
All deliveries to site will be addressed to BTS. However our engineers will ship most equipment to site.