Rate Analysis 2
Rate Analysis 2
Rate Analysis 2
47 sft
DESCRIPTION
S/N
EARTH WORKS
UNIT
RATE
CUM
31.00
CUM
51.00
CUM
58.00
CUM
73.00
CUM
91.00
CUM
62.00
76.00
CUM
94.00
CUM
4.00
10
CUM
10.00
11
Shifting of Surplus earth from the premises upto lead of 100 - 150'.
CUM
19.00
12
Shifting of Surplus earth from the premises upto lead of 150 - 200'.
CUM
28.00
13
CUM
31.00
14
CUM
26.00
17
CUM
CUM
19.00
204.00
18
Antitermite Treatment
SQM
9.00
19
SQM
96.00
CONCRETE WORKS
2
3
4
5
6
15
PCC
1
CUM
1,714.00
PCC1:3:6 Basement(RMC)
CUM
1,765.00
CUM
1,552.00
CUM
1,946.00
RCC
RMC
DESCRIPTION
S/N
UNIT
RATE
CUM
2,091.00
CUM
2,098.00
CUM
2,098.00
CUM
2,125.00
CUM
2,130.00
CUM
2,111.00
CUM
2,098.00
CUM
2,125.00
CUM
2,125.00
DESCRIPTION
S/N
UNIT
RATE
CAST IN SITU
1
RCC 1:1.5:3
Footing/Pedestal
CUM
2,992.00
RCC 1:1.5:3
Column/P.beam
CUM
3,020.00
RCC 1:1:2
CUM
3,747.00
RCC 1:1.5:3
CUM
2,992.00
CUM
2,660.00
RCC 1:1.5:3
Sloped Roof/Arches
CUM
3,072.00
RCC 1:1.5:3
Stair Case
CUM
3,048.00
RCC 1:2:4
CUM
2,604.00
Column
Beams/Slab
Cast in Situ
REINFORCEMENT
Reinforcement
MT
19,884.00
MASONRY WORKS
SQM
245.00
SQM
291.00
SQM
332.00
SQM
234.00
SQM
292.00
SQM
320.00
SQM
253.00
CUM
1,705.00
SSM in CM 1:6
CUM
1,135.00
-
PLASTERING WORKS
SQM
90.00
SQM
97.00
SQM
104.00
SQM
102.00
SQM
82.00
External plastering
SQM
128.00
Stucco Plastering
SQM
427.00
DESCRIPTION
S/N
UNIT
RATE
Waterproof plastering
SQM
119.00
POP Punning
SQM
143.00
-
SQM
498.00
SQM
623.00
Toilets waterproofing
SQM
612.00
balconies/landscape area
SQM
293.00
SQM
257.00
SQM
315.00
DESCRIPTION
S/N
UNIT
RATE
HARD FINISHES
SQM
279.00
SQM
116.00
SQM
270.00
SQM
201.00
SQM
112.00
CUM
2,275.00
CUM
2,275.00
SQM
1,096.00
SQM
2,260.00
SQM
1,016.00
SQM
2,771.00
SQM
2,208.00
SQM
4,376.00
SQM
6,418.00
SQM
1,092.00
SQM
932.00
SQM
861.00
SQM
299.00
SQM
2,060.00
SQM
2,669.00
SQM
2,164.00
SQM
945.00
Ceramic Skirting
RMT
119.00
Granite skirting
RMT
150.00
RMT
115.00
RMT
242.00
RMT
184.00
RMT
169.00
RMT
1,002.00
RMT
169.00
DESCRIPTION
S/N
UNIT
RATE
RMT
206.00
RMT
665.00
RMT
39.00
RMT
123.00
Dadoing Ceramic
SQM
565.00
SQM
2,377.00
SQM
1,374.00
SQM
179.00
SQM
3,888.00
SQM
83.00
Rmt
175.00
Lift Architraves
SQM
1,863.00
SQM
2,789.00
SQM
393.00
RMT
271.00
Coping in Balcony
RMT
720.00
Timber Flooring
SQM
Rubber Flooring
SQM
PAINTING WORKS
SQM
75.00
SQM
SQM
Tyrolean paint
SQM
SQM
SQM
44.00
Industrial Paint
Sqm
259.00
48.00
-
ALUMINIUM WORKS
Aluminium windows
SQM
Aluminium Doors
SQM
Aluminium Ventilators
SQM
10
M.S.WORKS
DESCRIPTION
S/N
UNIT
RATE
M.S.Doors
SQM
RMT
Balcony Railing
SQM
Staircase Railing
SQM
335.00
11
MISCELLANEOUS
Concrete Jally Works(B8)
SQM
2,454.00