Nothing Special   »   [go: up one dir, main page]

Najma (4B+G+M+7) Commercial Building-Revised BL - Update 25.07.2015 Najma (4B+G+M+7) Commercial Building - Revised BL - Update 25.07.2015

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14
At a glance
Powered by AI
The document outlines the schedule and progress of a commercial building construction project with details on milestones, tasks, timelines and percentage completion.

Some of the major milestones in the project include completion of sub-structure, super-structure, roof slabs, external works and project completion.

The different stages of work involved are sub-structure, blockworks, MEP works, finishes, painting, superstructure, roofing, facades, landscaping etc with breakdown of tasks under each.

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.

2015
Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Key Milestones
No Level

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

254 15-Feb-15 A 23-May-16

30.66%

40.26%

0.76

MayJun
23-May-16, Najma (4

389

251 15-Feb-15 A 23-May-16

0%

0%

0.00

23-May-16, Key Miles

389

251 15-Feb-15 A 23-May-16

0%

0%

0.00

389
Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015

Mar

Apr

23-May-16, No Level
Project Start

INI 100

Project Start

0 15-Feb-15 A

100%

100%

0.00

MLS50

Completion up to Casting Concrete of B2 Ceiling Slab (B1 Slab)

28-Apr-15 A

100%

100%

0.00

MLS20

End of Sub-Structure

28-May-15 A

100%

100%

0.00

End of Sub-Structure

MLS60

Casting Concrete of B1 Ceiling Slab (GF Slab)

28-May-15 A

100%

100%

0.00

Casting Concrete of B1 Ceiling Slab (GF Slab)

MLS70

Casting Concrete of GF Ceiling Slab (MEZ. Slab)

05-Jul-15 A

100%

100%

0.00

MLS80

Casting Concrete of Mez Ceiling Slab (1F Slab)

29-Jul-15

0%

100%

0.00

MLS90

Casting Concrete of 1FL Ceiling Slab (2F Slab)

12-Aug-15

0%

100%

0.00

MLS100

Casting Concrete of 2FL Ceiling Slab (3F Slab)

26-Aug-15

0%

100%

0.00

MLS110

Casting Concrete of 3FL Ceiling Slab (4F Slab)

09-Sep-15

0%

0%

0.00

MLS120

Casting Concrete of 4FL Ceiling Slab (5F Slab)

23-Sep-15

0%

0%

0.00

MLS130

Casting Concrete of 5FL Ceiling Slab (6F Slab)

11-Oct-15

0%

0%

0.00

MLS150

Casting Concrete of 6FL Ceiling Slab (7F Slab)

25-Oct-15

0%

0%

0.00

MLS160

Casting Concrete of 7FL Ceiling Slab (ROOF Slab)

08-Nov-15

0%

0%

0.00

MLS30

End of Super-Structure

19-Nov-15

0%

0%

0.00

End of Super-Structure

MLS190

Casting Concrete of Roof Top Slab

19-Nov-15

0%

0%

0.00

Casting Concrete of Roof Top Slab

MLS40

Project Completion

23-May-16

0%

0%

0.00

Project Completion

384

254 15-Feb-15 A 23-May-16

30.66%

40.26%

0.76

23-May-16, B.O.Q. C

384

254 15-Feb-15 A 23-May-16

30.66%

40.26%

0.76

23-May-16, No Level

356

254 15-Feb-15 A 23-May-16

28.54%

37.82%

0.75

Preliminaries

B.O.Q. COST LOADING


No Level
BOQ 1

Preliminaries

BOQ 2

Earthworks

81

0 15-Feb-15 A 28-May-15 A

100%

100%

1.00

BOQ 3

SUBSTRUCTURE

81

0 15-Feb-15 A 28-May-15 A

100%

100%

1.00

BOQ 5

Waterproofing - Substructure

BOQ 4

Blockworks

160

70

130 25-Apr-15 A

0 15-Feb-15 A 23-May-15 A
29-Dec-15

BOQ 10

M.E.P

229

208 27-Apr-15 A

BOQ 8

Finishes - Floor, Wall & Ceiling

225

206 28-Apr-15 A

BOQ 9

Painting & Decoration

266

Completion up to Casting Concrete of B2 Ceiling Slab (B1 Slab)

Casting Concrete of GF Ceiling Slab (MEZ. Slab)


Casting Concrete of Mez Ceiling Slab (1F Slab)
Casting Concrete of 1FL Ceiling Slab (2F Slab)
Casting Concrete of 2FL Ceiling Slab (3F Slab)
Casting Concrete of 3FL Ceiling Slab (4F Slab)
Casting Concrete of 4FL Ceiling Slab (5F Slab)
Casting Concrete of 5FL Ceiling Slab (6F Slab)
Casting Concrete of 6FL Ceiling Slab (7F Slab)
Casting Concrete of 7FL Ceiling Slab (ROOF Slab)

Earthworks
SUBSTRUCTURE
Waterproofing - Substructure

100%

100%

1.00

18.5%

39.13%

0.47

30-Mar-16

9%

23.48%

0.38

M.E.P

28-Mar-16

8.27%

20.8%

0.40

Finishes - Floor, Wall & Ceiling

235 07-May-15 A 01-May-16

11.57%

22.39%

0.52

Blockworks

Painting & Decoration


SUPERSTRUCTURE

BOQ 3a

SUPERSTRUCTURE

139

118 28-May-15 A 14-Dec-15

14.82%

38.57%

0.38

BOQ 5a

Waterproofing - Roof & Wet Area

114

114 13-Sep-15

28-Jan-16

0%

0%

0.00

BOQ 11

Lift

71

71 06-Dec-15

29-Feb-16

0%

0%

0.00

BOQ 6

Carpentry and Joinery

100

100 07-Dec-15

04-Apr-16

0%

0%

0.00

Carpentry and Joinery

BOQ 7

Metal and Glazing

88

88 02-Jan-16

14-Apr-16

0%

0%

0.00

Metal and Glazing

BOQ 12

External Works

68 28-Feb-16

17-May-16

0%

0%

0.00

144 22-Mar-15 A 13-Jan-16

0%

0%

0.00

0%

0%

0.00

68
249

Engineering
Civil
ENG160

Submission & Approval of B1 Strc. Drawings

ENG250

Submission & Approval of Masonry Shop Drawings

ENG170

113

21 06-Apr-15 A

18-Aug-15

Waterproofing - Roof & Wet Area


Lift

External Works
13-Jan-16, Engineering
18-Aug-15, Civil

0 06-Apr-15 A

13-Apr-15 A

100%

100%

0.00

14

0 11-Apr-15 A

18-Apr-15 A

100%

100%

0.00

Submission & Approval of Masonry Shop Drawings

Submission & Approval of GF Strc. Drawings

0 29-Apr-15 A

21-May-15 A

100%

100%

0.00

Submission & Approval of GF Strc. Drawings

ENG180

Submission & Approval of Mez Strc. Drawings

0 07-May-15 A 16-May-15 A

100%

100%

0.00

Submission & Approval of Mez Strc. Drawings

ENG190

Submission & Approval of 1FL Strc. Drawings

0 13-May-15 A 02-Jun-15 A

100%

100%

0.00

ENG200

Submission & Approval of 2FL Strc. Drawings

0 16-May-15 A 14-Jun-15 A

100%

100%

0.00

Submission & Approval of 2FL Strc. Drawings

ENG210

Submission & Approval of 3FL Strc. Drawings

0 19-May-15 A 16-Jun-15 A

100%

100%

0.00

Submission & Approval of 3FL Strc. Drawings

ENG220

Submission & Approval of 4FL Strc. Drawings

0 23-May-15 A 20-Jun-15 A

100%

100%

0.00

ENG230

Submission & Approval of 5FL Strc. Drawings

0 27-May-15 A 24-Jun-15 A

100%

100%

0.00

ENG530

Submission & Approval of 6FL Strc. Drawings

0 28-Jun-15 A

18-Jul-15 A

100%

100%

0.00

ENG560

Submission & Approval of 7FL Strc. Drawings

7 26-Jul-15

02-Aug-15

0%

100%

0.00

ENG570

Submission & Approval of Roof Strc. Drawings

7 03-Aug-15

10-Aug-15

0%

100%

0.00

ENG240

Submission & Approval of Top Roof Strc. Drawings

7 11-Aug-15

18-Aug-15

0%

28.57%

0.00

158

77 19-Apr-15 A

27-Oct-15

0%

0%

0.00

0 19-Apr-15 A

100%

100%

0.00

Arch.
ENG10

Qualify & Award Painting Sub-contractor

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

26-Apr-15 A
Page 1 of 14

Submission & Approval of B1 Strc. Drawings

Submission & Approval of 1FL Strc. Drawings

Submission & Approval of 4FL Strc. Drawings


Submission & Approval of 5FL Strc. Drawings
Submission & Approval of 6FL Strc. Drawings
Submission & Approval of 7FL Strc. Drawings
Submission & Approval of Roof Strc. Drawings
Submission & Approval of Top Roof Strc. Drawings
27-Oct-15, Arch.
Qualify & Award Painting Sub-contractor
Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

ENG400

Submission & Approval of Painting Materials

ENG540

Qualify & Award Suspended Ceiling Sub-contractor

ENG420

Submission & Approval of Suspended Ceiling Materials

ENG20

14

0 27-Apr-15 A

20-Jun-15 A

100%

100%

0.00

0 29-Apr-15 A

10-May-15 A

100%

100%

0.00

14

0 11-May-15 A 25-May-15 A

100%

100%

0.00

Qualify & Award Tiling Sub-contractor

0 18-May-15 A 23-Jun-15 A

100%

100%

0.00

ENG30

Qualify & Award Aluminum & Glazing Sub-contractor

0 18-May-15 A 04-Jun-15 A

100%

100%

0.00

ENG410

Submission & Approval of Tiling Materials

ENG50

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

Apr

Qualify & Award Suspended Ceiling Sub-contractor


Submission & Approval of Suspended Ceiling Materials
Qualify & Award Tiling Sub-contractor
Qualify & Award Aluminum & Glazing Sub-contractor

21

6 20-May-15 A 02-Aug-15

70%

100%

0.00

Qualify & Award Wooden Doors Sub-contractor

5 23-May-15 A 26-Aug-15

30%

100%

0.00

Qualify & Award Wooden Doors Sub-contractor

ENG60

Qualify & Award Steel Doors Sub-contractor

5 23-May-15 A 26-Aug-15

30%

100%

0.00

Qualify & Award Steel Doors Sub-contractor

ENG140

Qualify & Award Handrails Sub-contractor

0 25-May-15 A 08-Jun-15 A

100%

0%

0.00

ENG260

Submission & Approval of Tiling Shop Drawings

14

10 23-Jun-15 A

12-Aug-15

30%

100%

0.00

Submission & Approval of Tiling Shop Drawings

ENG270

Submission & Approval of Suspended Ceiling Shop Drawings

14

14 26-Jul-15

10-Aug-15

0%

42.86%

0.00

Submission & Approval of Suspended Ceiling Shop Drawings

ENG450

Submission & Approval of Aluminum & Glazing Materials

15

15 26-Jul-15

11-Aug-15

0%

100%

0.00

Submission & Approval of Aluminum & Glazing Materials

ENG280

Submission & Approval of Aluminum & Glazing Shop Drawings

15

15 12-Aug-15

29-Aug-15

0%

100%

0.00

ENG70

Qualify & Award Lighting Sub-contractor

14

14 20-Aug-15

06-Sep-15

0%

78.57%

0.00

Qualify & Award Lighting Sub-contractor

ENG290

Submission & Approval of Doors Shop Drawings

10

10 26-Aug-15

07-Sep-15

0%

40%

0.00

Submission & Approval of Doors Shop Drawings

ENG440

Submission & Approval of Wooden Doors

15

15 26-Aug-15

13-Sep-15

0%

26.67%

0.00

ENG430

Submission & Approval of Light Fixtures

14

14 06-Sep-15

22-Sep-15

0%

0%

0.00

ENG40

Qualify & Award Epoxy Flooring Sub-contractor

7 09-Sep-15

17-Sep-15

0%

0%

0.00

Qualify & Award Epoxy Flooring Sub-contractor

ENG550

Submission & Approval of Sanitary Fixture

14

14 09-Sep-15

29-Sep-15

0%

0%

0.00

Submission & Approval of Sanitary Fixture

ENG460

Submission & Approval of Handrails Materials

10

10 15-Oct-15

27-Oct-15

0%

0%

0.00

144 22-Mar-15 A 13-Jan-16

0%

0%

0.00

249

MEP

MayJun

Submission & Approval of Painting Materials

Submission & Approval of Tiling Materials

Qualify & Award Handrails Sub-contractor

Submission & Approval of Aluminum & Glazing Shop Drawings

Submission & Approval of Wooden Doors


Submission & Approval of Light Fixtures

Submission & Approval of Handrails Materials


13-Jan-16, MEP

ENG80

Qualify & Award Elec. Works Sub-contractor

14

0 22-Mar-15 A 06-Apr-15 A

100%

100%

0.00

Qualify & Award Elec. Works Sub-contractor

ENG90

Qualify & Award ELV. Works Sub-contractor

14

0 22-Mar-15 A 06-Apr-15 A

100%

100%

0.00

Qualify & Award ELV. Works Sub-contractor

ENG100

Qualify & Award FF & FA Sub-contractor

14

0 22-Mar-15 A 06-Apr-15 A

100%

100%

0.00

Qualify & Award FF & FA Sub-contractor

ENG110

Qualify & Award HVAC Sub-contractor

14

0 22-Mar-15 A 06-Apr-15 A

100%

100%

0.00

Qualify & Award HVAC Sub-contractor

ENG120

Qualify & Award Elevators Sub-contractor

14

0 22-Mar-15 A 06-Apr-15 A

100%

100%

0.00

Qualify & Award Elevators Sub-contractor

ENG130

Qualify & Award Plum. & Drain. Sub-contractor

14

0 22-Mar-15 A 06-Apr-15 A

100%

100%

0.00

Qualify & Award Plum. & Drain. Sub-contractor

ENG470

Submission & Approval of Elevators

21

0 25-Apr-15 A

25-May-15 A

100%

100%

0.00

ENG480

Submission & Approval of Elec. Materials

30

9 25-Apr-15 A

04-Aug-15

70%

100%

0.00

Submission & Approval of Elec. Materials

ENG490

Submission & Approval of ELV Materials

30

9 25-Apr-15 A

04-Aug-15

70%

100%

0.00

Submission & Approval of ELV Materials

ENG500

Submission & Approval of FF & FA Materials

30

9 25-Apr-15 A

04-Aug-15

70%

100%

0.00

Submission & Approval of FF & FA Materials

ENG510

Submission & Approval of HVAC Materials

30

9 25-Apr-15 A

04-Aug-15

70%

100%

0.00

ENG520

Submission & Approval of Plum. & Drain. Materials

21

3 25-Apr-15 A

29-Jul-15

85%

100%

0.00

ENG590

Submission & Approval of MEP Shop Drawings @ B4

10

0 25-Apr-15 A

10-May-15 A

100%

100%

0.00

ENG580

Submission & Approval of MEP Shop Drawings @ B3

10

0 09-May-15 A 23-May-15 A

100%

100%

0.00

ENG300

Submission & Approval of MEP Shop Drawings @ B2

10

0 24-May-15 A 20-Jun-15 A

100%

100%

0.00

ENG310

Submission & Approval of MEP Shop Drawings @ B1

10

1 14-Jun-15 A

26-Jul-15

90%

100%

0.00

ENG320

Submission & Approval of MEP Shop Drawings @ GF

10

3 21-Jun-15 A

04-Aug-15

75%

40%

0.00

ENG330

Submission & Approval of MEP Shop Drawings @ Mez

10

10 10-Aug-15

22-Aug-15

0%

0%

0.00

ENG340

Submission & Approval of MEP Shop Drawings @ 1FL

10

10 27-Aug-15

08-Sep-15

0%

0%

0.00

ENG350

Submission & Approval of MEP Shop Drawings @ 2FL

10

10 14-Sep-15

29-Sep-15

0%

0%

0.00

ENG360

Submission & Approval of MEP Shop Drawings @ 3FL

10

10 05-Oct-15

17-Oct-15

0%

0%

0.00

ENG370

Submission & Approval of MEP Shop Drawings @ 4FL

10

10 22-Oct-15

03-Nov-15

0%

0%

0.00

ENG380

Submission & Approval of MEP Shop Drawings @ 5FL

10

10 09-Nov-15

21-Nov-15

0%

0%

0.00

ENG600

Submission & Approval of MEP Shop Drawings @ 6FL

10

10 26-Nov-15

08-Dec-15

0%

0%

0.00

ENG610

Submission & Approval of MEP Shop Drawings @ 7FL

10

10 14-Dec-15

27-Dec-15

0%

0%

0.00

ENG390

Submission & Approval of MEP Shop Drawings @ Roof

10

10 02-Jan-16

13-Jan-16

0%

0%

0.00

157

123 11-May-15 A 21-Dec-15

0%

0%

0.00

Submission & Approval of MEP Shop Drawings @ Roo


21-Dec-15, Procurement

123

123 18-May-15 A 21-Dec-15

0%

0%

0.00

21-Dec-15, Arch.

Procurement
Arch.

Submission & Approval of Elevators

Submission & Approval of HVAC Materials


Submission & Approval of Plum. & Drain. Materials
Submission & Approval of MEP Shop Drawings @ B4
Submission & Approval of MEP Shop Drawings @ B3
Submission & Approval of MEP Shop Drawings @ B2
Submission & Approval of MEP Shop Drawings @ B1
Submission & Approval of MEP Shop Drawings @ GF
Submission & Approval of MEP Shop Drawings @ Mez
Submission & Approval of MEP Shop Drawings @ 1FL
Submission & Approval of MEP Shop Drawings @ 2FL
Submission & Approval of MEP Shop Drawings @ 3FL
Submission & Approval of MEP Shop Drawings @ 4FL
Submission & Approval of MEP Shop Drawings @ 5FL
Submission & Approval of MEP Shop Drawings @ 6FL
Submission & Approval of MEP Shop Drawings @ 7FL

PRO40

Procurement & Delivery of Sanitary Fixtures

60

45 18-May-15 A 08-Dec-15

25%

0%

0.00

PRO20

Procurement & Delivery of Suspended Ceiling Materials

45

45 26-Jul-15

15-Sep-15

0%

13.33%

0.00

Procurement & Delivery of Suspended Ceiling Materials

PRO10

Procurement & Delivery of Tiling Materials

45

45 19-Aug-15

14-Oct-15

0%

0%

0.00

Procurement & Delivery of Tiling Materials

PRO60

Procurement & Delivery of Aluminum & Glazing Materials

50

50 30-Aug-15

29-Oct-15

0%

4%

0.00

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 2 of 14

Procurement & Delivery of Sanitary Fixtures

Procurement & Delivery of Aluminum & Glazing Materials


Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

Apr

PRO50

Procurement & Delivery of Wooden & Steel Doors

50

50 13-Sep-15

14-Nov-15

0%

0%

0.00

PRO30

Procurement & Delivery of Light Fixtures

30

30 22-Sep-15

31-Oct-15

0%

0%

0.00

PRO160

Procurement & Delivery of BMU

60

60 11-Oct-15

21-Dec-15

0%

0%

0.00

Procurement & Delivery of BMU

PRO70

Procurement & Delivery of Handrails

30

30 27-Oct-15

01-Dec-15

0%

0%

0.00

137

117 11-May-15 A 12-Dec-15

0%

0%

0.00

Procurement & Delivery of Handrails


12-Dec-15, MEP

MEP

MayJun

Procurement & Delivery of Wooden & Steel Doors


Procurement & Delivery of Light Fixtures

PRO90

Procurement & Delivery of Elevators

110

88 11-May-15 A 08-Nov-15

20%

51.4%

0.00

PRO100

Procurement & Delivery of Fire Fighting Materials

60

45 16-May-15 A 29-Sep-15

25%

76.67%

0.00

Procurement & Delivery of Fire Fighting Materials

PRO110

Procurement & Delivery of Fire Alarm Materials

60

45 16-May-15 A 29-Sep-15

25%

76.67%

0.00

Procurement & Delivery of Fire Alarm Materials

PRO120

Procurement & Delivery of ELV Materials

60

45 16-May-15 A 29-Sep-15

25%

76.67%

0.00

Procurement & Delivery of ELV Materials

PRO140

Procurement & Delivery of HVAC Materials

70

56 17-May-15 A 12-Oct-15

20%

65.71%

0.00

Procurement & Delivery of HVAC Materials

PRO130

Procurement & Delivery of Plum. & Drain. Materials

45

34 18-May-15 A 06-Sep-15

25%

100%

0.00

Procurement & Delivery of Plum. & Drain. Materials

PRO80

Procurement & Delivery of Electrical Long Lead Items

110

99 20-Jun-15 A

01-Dec-15

10%

41.44%

0.00

Procurement & Delivery of Electrical Long Lead Items

PRO170

Procurement & Delivery of Fire Fighting Pump Set

120

108 21-Jun-15 A

12-Dec-15

10%

38.02%

0.00

Procurement & Delivery of Fire Fighting Pump Set

PRO180

Procurement & Delivery of Exhaust & Ventilation Fans

120

108 21-Jun-15 A

12-Dec-15

10%

38.02%

0.00

PRO190

Procurement & Delivery of Generator

72

72 05-Aug-15

31-Oct-15

0%

63.89%

0.00

PRO150

Procurement & Delivery of Domestic & Fire Tanks

65

65 06-Sep-15

24-Nov-15

0%

16.13%

0.00

0%

0%

0.00

Sub-Structure
PREVIOUS WORKS
PREV 120

Previous Works up to Casting B2 Ceiling Slab (B1 Slab)

1st Basement

Procurement & Delivery of Elevators

Procurement & Delivery of Exhaust & Ventilation Fans


Procurement & Delivery of Generator
Procurement & Delivery of Domestic & Fire Tanks
28-May-15 A, Sub-Structure

88

0 15-Feb-15 A 28-May-15 A

63

0 15-Feb-15 A 28-Apr-15 A

0%

0%

0.00

28-Apr-15 A, PREVIOUS WORKS

63

0 15-Feb-15 A 28-Apr-15 A

100%

100%

0.00

25

0 29-Apr-15 A

28-May-15 A

0%

0%

0.00

Previous Works up to Casting B2 Ceiling Slab (B1 Slab)


28-May-15 A, 1st Basement

SUB260

B1_R.W Steel Fixing

0 29-Apr-15 A

03-May-15 A

100%

100%

0.00

B1_R.W Steel Fixing

SUB190

B1_V.E Steel Fixing (Columns & Cores)

0 29-Apr-15 A

03-May-15 A

100%

100%

0.00

B1_V.E Steel Fixing (Columns & Cores)

SUB210

B1_V.E Embeded MEP Conduits & Sleeves

0 30-Apr-15 A

02-May-15 A

100%

100%

0.00

B1_V.E Embeded MEP Conduits & Sleeves

SUB270

B1_R.W One Side Shuttering

0 02-May-15 A 23-May-15 A

100%

100%

0.00

B1_R.W One Side Shuttering

SUB220

B1_V.E Shuttering (Columns & Cores)

0 04-May-15 A 07-May-15 A

100%

100%

0.00

B1_V.E Shuttering (Columns & Cores)

SUB280

B1_R.W Concrete Casting

0 05-May-15 A 23-May-15 A

100%

100%

0.00

SUB250

B1_V.E Casting Concrete (Columns & Cores)

0 06-May-15 A 09-May-15 A

100%

100%

0.00

SUB290

B1_Ceiling Slab Formwork

0 09-May-15 A 13-May-15 A

100%

100%

0.00

SUB300

B1_Ceiling Slab Steel Fixing

0 12-May-15 A 26-May-15 A

100%

100%

0.00

SUB310

B1_Ceiling Slab Embeded MEP Conduits & Sleeves

0 13-May-15 A 23-May-15 A

100%

100%

0.00

SUB320

B1_Ceiling Slab Concrete Casting

0 28-May-15 A 28-May-15 A

100%

100%

0.00

Super-Structure
Ground Floor

143

97 28-May-15 A 19-Nov-15

0%

0%

0.00

12

0 28-May-15 A 05-Jul-15 A

0%

0%

0.00

B1_R.W Concrete Casting


B1_V.E Casting Concrete (Columns & Cores)
B1_Ceiling Slab Formwork
B1_Ceiling Slab Steel Fixing
B1_Ceiling Slab Embeded MEP Conduits & Sleeves
B1_Ceiling Slab Concrete Casting
19-Nov-15, Super-Structure
05-Jul-15 A, Ground Floor

SUP10

GF_V.E Steel Fixing (Columns & Cores)

0 28-May-15 A 13-Jun-15 A

100%

100%

0.00

GF_V.E Steel Fixing (Columns & Cores)

SUP20

GF_V.E Embeded MEP Conduits & Sleeves

0 31-May-15 A 31-May-15 A

100%

100%

0.00

GF_V.E Embeded MEP Conduits & Sleeves

SUP30

GF_V.E Shuttering (Columns & Cores)

0 01-Jun-15 A

20-Jun-15 A

100%

100%

0.00

GF_V.E Shuttering (Columns & Cores)

SUP40

GF_V.E Casting Concrete (Columns & Cores)

0 02-Jun-15 A

28-Jun-15 A

100%

100%

0.00

SUP50

GF_Ceiling Slab Formwork

0 04-Jun-15 A

05-Jul-15 A

100%

100%

0.00

GF_Ceiling Slab Formwork

SUP60

GF_Ceiling Slab Steel Fixing

0 08-Jun-15 A

05-Jul-15 A

100%

100%

0.00

GF_Ceiling Slab Steel Fixing

SUP70

GF_Ceiling Slab Embeded MEP Conduits & Sleeves

0 09-Jun-15 A

05-Jul-15 A

100%

100%

0.00

GF_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP80

GF_Ceiling Slab Concrete Casting

0 11-Jun-15 A

05-Jul-15 A

100%

100%

0.00

35

3 13-Jun-15 A

29-Jul-15

0%

0%

0.00

GF_Ceiling Slab Concrete Casting


29-Jul-15, Mezz Floor

Mezz Floor

GF_V.E Casting Concrete (Columns & Cores)

SUP100

Mez_V.E Steel Fixing (Columns & Cores)

0 13-Jun-15 A

06-Jul-15 A

100%

100%

0.00

Mez_V.E Steel Fixing (Columns & Cores)

SUP110

Mez_V.E Embeded MEP Conduits & Sleeves

0 14-Jun-15 A

05-Jul-15 A

100%

100%

0.00

Mez_V.E Embeded MEP Conduits & Sleeves

SUP120

Mez_V.E Shuttering (Columns & Cores)

0 23-Jun-15 A

06-Jul-15 A

100%

100%

0.00

Mez_V.E Shuttering (Columns & Cores)

SUP130

Mez_V.E Casting Concrete (Columns & Cores)

0 24-Jun-15 A

11-Jul-15 A

100%

100%

0.00

SUP140

Mez_Ceiling Slab Formwork

1 25-Jun-15 A

26-Jul-15

80%

100%

0.00

SUP150

Mez_Ceiling Slab Steel Fixing

2 11-Jul-15 A

28-Jul-15

20%

100%

0.00

Mez_Ceiling Slab Steel Fixing

SUP160

Mez_Ceiling Slab Embeded MEP Conduits & Sleeves

2 12-Jul-15 A

27-Jul-15

20%

100%

0.00

Mez_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP170

Mez_Ceiling Slab Concrete Casting

Mez_Ceiling Slab Concrete Casting


12-Aug-15, 1st Floor

1st Floor

1 28-Jul-15

29-Jul-15

0%

100%

0.00

12

12 29-Jul-15

12-Aug-15

0%

0%

0.00

SUP190

1FL_V.E Steel Fixing (Columns & Cores)

3 29-Jul-15

02-Aug-15

0%

100%

0.00

SUP200

1FL_V.E Embeded MEP Conduits & Sleeves

1 01-Aug-15

02-Aug-15

0%

100%

0.00

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 3 of 14

Mez_V.E Casting Concrete (Columns & Cores)


Mez_Ceiling Slab Formwork

1FL_V.E Steel Fixing (Columns & Cores)


1FL_V.E Embeded MEP Conduits & Sleeves
Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

SUP210

1FL_V.E Shuttering (Columns & Cores)

2 02-Aug-15

04-Aug-15

0%

100%

0.00

1FL_V.E Shuttering (Columns & Cores)

SUP220

1FL_V.E Casting Concrete (Columns & Cores)

2 03-Aug-15

05-Aug-15

0%

100%

0.00

1FL_V.E Casting Concrete (Columns & Cores)

SUP230

1FL_Ceiling Slab Formwork

3 05-Aug-15

09-Aug-15

0%

100%

0.00

1FL_Ceiling Slab Formwork

SUP240

1FL_Ceiling Slab Steel Fixing

3 08-Aug-15

11-Aug-15

0%

100%

0.00

1FL_Ceiling Slab Steel Fixing

SUP250

1FL_Ceiling Slab Embeded MEP Conduits & Sleeves

2 09-Aug-15

11-Aug-15

0%

100%

0.00

1FL_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP260

1FL_Ceiling Slab Concrete Casting

1 11-Aug-15

12-Aug-15

0%

100%

0.00

12

12 12-Aug-15

26-Aug-15

0%

0%

0.00

1FL_Ceiling Slab Concrete Casting


26-Aug-15, 2nd Floor

2nd Floor
SUP280

2FL_V.E Steel Fixing (Columns & Cores)

3 12-Aug-15

16-Aug-15

0%

100%

0.00

2FL_V.E Steel Fixing (Columns & Cores)

SUP290

2FL_V.E Embeded MEP Conduits & Sleeves

1 15-Aug-15

16-Aug-15

0%

100%

0.00

2FL_V.E Embeded MEP Conduits & Sleeves

SUP300

2FL_V.E Shuttering (Columns & Cores)

2 16-Aug-15

18-Aug-15

0%

100%

0.00

2FL_V.E Shuttering (Columns & Cores)

SUP310

2FL_V.E Casting Concrete (Columns & Cores)

2 17-Aug-15

19-Aug-15

0%

100%

0.00

2FL_V.E Casting Concrete (Columns & Cores)

SUP320

2FL_Ceiling Slab Formwork

3 19-Aug-15

23-Aug-15

0%

100%

0.00

2FL_Ceiling Slab Formwork

SUP330

2FL_Ceiling Slab Steel Fixing

3 22-Aug-15

25-Aug-15

0%

100%

0.00

2FL_Ceiling Slab Steel Fixing

SUP340

2FL_Ceiling Slab Embeded MEP Conduits & Sleeves

2 23-Aug-15

25-Aug-15

0%

100%

0.00

2FL_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP350

2FL_Ceiling Slab Concrete Casting

1 25-Aug-15

26-Aug-15

0%

100%

0.00

12

12 26-Aug-15

09-Sep-15

0%

0%

0.00

2FL_Ceiling Slab Concrete Casting


09-Sep-15, 3rd Floor

3rd Floor

Apr

SUP370

3FL_V.E Steel Fixing (Columns & Cores)

3 26-Aug-15

30-Aug-15

0%

100%

0.00

3FL_V.E Steel Fixing (Columns & Cores)

SUP380

3FL_V.E Embeded MEP Conduits & Sleeves

1 29-Aug-15

30-Aug-15

0%

100%

0.00

3FL_V.E Embeded MEP Conduits & Sleeves

SUP390

3FL_V.E Shuttering (Columns & Cores)

2 30-Aug-15

01-Sep-15

0%

100%

0.00

3FL_V.E Shuttering (Columns & Cores)

SUP400

3FL_V.E Casting Concrete (Columns & Cores)

2 31-Aug-15

02-Sep-15

0%

100%

0.00

3FL_V.E Casting Concrete (Columns & Cores)

SUP410

3FL_Ceiling Slab Formwork

3 02-Sep-15

06-Sep-15

0%

0%

0.00

3FL_Ceiling Slab Formwork

SUP420

3FL_Ceiling Slab Steel Fixing

3 05-Sep-15

08-Sep-15

0%

0%

0.00

3FL_Ceiling Slab Steel Fixing

SUP430

3FL_Ceiling Slab Embeded MEP Conduits & Sleeves

2 06-Sep-15

08-Sep-15

0%

0%

0.00

3FL_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP440

3FL_Ceiling Slab Concrete Casting

1 08-Sep-15

09-Sep-15

0%

0%

0.00

12

12 09-Sep-15

23-Sep-15

0%

0%

0.00

3FL_Ceiling Slab Concrete Casting


23-Sep-15, 4th Floor

4th Floor
SUP460

4FL_V.E Steel Fixing (Columns & Cores)

3 09-Sep-15

13-Sep-15

0%

0%

0.00

4FL_V.E Steel Fixing (Columns & Cores)

SUP470

4FL_V.E Embeded MEP Conduits & Sleeves

1 12-Sep-15

13-Sep-15

0%

0%

0.00

4FL_V.E Embeded MEP Conduits & Sleeves

SUP480

4FL_V.E Shuttering (Columns & Cores)

2 13-Sep-15

15-Sep-15

0%

0%

0.00

4FL_V.E Shuttering (Columns & Cores)

SUP490

4FL_V.E Casting Concrete (Columns & Cores)

2 14-Sep-15

16-Sep-15

0%

0%

0.00

4FL_V.E Casting Concrete (Columns & Cores)

SUP500

4FL_Ceiling Slab Formwork

3 16-Sep-15

20-Sep-15

0%

0%

0.00

4FL_Ceiling Slab Formwork

SUP510

4FL_Ceiling Slab Steel Fixing

3 19-Sep-15

22-Sep-15

0%

0%

0.00

4FL_Ceiling Slab Steel Fixing

SUP520

4FL_Ceiling Slab Embeded MEP Conduits & Sleeves

2 20-Sep-15

22-Sep-15

0%

0%

0.00

4FL_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP530

4FL_Ceiling Slab Concrete Casting

1 22-Sep-15

23-Sep-15

0%

0%

0.00

12

12 23-Sep-15

11-Oct-15

0%

0%

0.00

4FL_Ceiling Slab Concrete Casting


11-Oct-15, 5th Floor

5th Floor

MayJun

SUP550

5FL_V.E Steel Fixing (Columns & Cores)

3 23-Sep-15

30-Sep-15

0%

0%

0.00

5FL_V.E Steel Fixing (Columns & Cores)

SUP560

5FL_V.E Embeded MEP Conduits & Sleeves

1 29-Sep-15

30-Sep-15

0%

0%

0.00

5FL_V.E Embeded MEP Conduits & Sleeves

SUP570

5FL_V.E Shuttering (Columns & Cores)

2 30-Sep-15

03-Oct-15

0%

0%

0.00

5FL_V.E Shuttering (Columns & Cores)

SUP580

5FL_V.E Casting Concrete (Columns & Cores)

2 01-Oct-15

04-Oct-15

0%

0%

0.00

5FL_V.E Casting Concrete (Columns & Cores)

SUP590

5FL_Ceiling Slab Formwork

3 04-Oct-15

07-Oct-15

0%

0%

0.00

SUP600

5FL_Ceiling Slab Steel Fixing

3 06-Oct-15

10-Oct-15

0%

0%

0.00

5FL_Ceiling Slab Steel Fixing

SUP610

5FL_Ceiling Slab Embeded MEP Conduits & Sleeves

2 07-Oct-15

10-Oct-15

0%

0%

0.00

5FL_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP620

5FL_Ceiling Slab Concrete Casting

1 10-Oct-15

11-Oct-15

0%

0%

0.00

12

12 11-Oct-15

25-Oct-15

0%

0%

0.00

5FL_Ceiling Slab Concrete Casting


25-Oct-15, 6th Floor

6th Floor

5FL_Ceiling Slab Formwork

SUP630

6FL_V.E Steel Fixing (Columns & Cores)

3 11-Oct-15

14-Oct-15

0%

0%

0.00

6FL_V.E Steel Fixing (Columns & Cores)

SUP720

6FL_V.E Embeded MEP Conduits & Sleeves

1 13-Oct-15

14-Oct-15

0%

0%

0.00

6FL_V.E Embeded MEP Conduits & Sleeves

SUP730

6FL_V.E Shuttering (Columns & Cores)

2 14-Oct-15

17-Oct-15

0%

0%

0.00

6FL_V.E Shuttering (Columns & Cores)

SUP740

6FL_V.E Casting Concrete (Columns & Cores)

2 15-Oct-15

18-Oct-15

0%

0%

0.00

6FL_V.E Casting Concrete (Columns & Cores)

SUP750

6FL_Ceiling Slab Formwork

3 18-Oct-15

21-Oct-15

0%

0%

0.00

SUP760

6FL_Ceiling Slab Steel Fixing

3 20-Oct-15

24-Oct-15

0%

0%

0.00

6FL_Ceiling Slab Steel Fixing

SUP770

6FL_Ceiling Slab Embeded MEP Conduits & Sleeves

2 21-Oct-15

24-Oct-15

0%

0%

0.00

6FL_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP780

6FL_Ceiling Slab Concrete Casting

1 24-Oct-15

25-Oct-15

0%

0%

0.00

12

12 25-Oct-15

08-Nov-15

0%

0%

0.00

6FL_Ceiling Slab Concrete Casting


08-Nov-15, 7th Floor

3 25-Oct-15

28-Oct-15

0%

0%

0.00

7th Floor
SUP790

7FL_V.E Steel Fixing (Columns & Cores)

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 4 of 14

6FL_Ceiling Slab Formwork

7FL_V.E Steel Fixing (Columns & Cores)


Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

Apr

MayJun

SUP800

7FL_V.E Embeded MEP Conduits & Sleeves

1 27-Oct-15

28-Oct-15

0%

0%

0.00

7FL_V.E Embeded MEP Conduits & Sleeves

SUP810

7FL_V.E Shuttering (Columns & Cores)

2 28-Oct-15

31-Oct-15

0%

0%

0.00

7FL_V.E Shuttering (Columns & Cores)

SUP820

7FL_V.E Casting Concrete (Columns & Cores)

2 29-Oct-15

01-Nov-15

0%

0%

0.00

7FL_V.E Casting Concrete (Columns & Cores)

SUP830

7FL_Ceiling Slab Formwork

3 01-Nov-15

04-Nov-15

0%

0%

0.00

SUP840

7FL_Ceiling Slab Steel Fixing

3 03-Nov-15

07-Nov-15

0%

0%

0.00

7FL_Ceiling Slab Steel Fixing

SUP850

7FL_Ceiling Slab Embeded MEP Conduits & Sleeves

2 04-Nov-15

07-Nov-15

0%

0%

0.00

7FL_Ceiling Slab Embeded MEP Conduits & Sleeves

SUP860

7FL_Ceiling Slab Concrete Casting

1 07-Nov-15

08-Nov-15

0%

0%

0.00

10

10 08-Nov-15

19-Nov-15

0%

0%

0.00

7FL_Ceiling Slab Concrete Casting


19-Nov-15, Roof

Roof

7FL_Ceiling Slab Formwork

SUP640

RF_V.E Steel Fixing (Columns & Cores)

2 08-Nov-15

10-Nov-15

0%

0%

0.00

RF_V.E Steel Fixing (Columns & Cores)

SUP650

RF_V.E Embeded MEP Conduits & Sleeves

1 10-Nov-15

11-Nov-15

0%

0%

0.00

RF_V.E Embeded MEP Conduits & Sleeves

SUP660

RF_V.E Shuttering (Columns & Cores)

1 11-Nov-15

12-Nov-15

0%

0%

0.00

RF_V.E Shuttering (Columns & Cores)

SUP670

RF_V.E Casting Concrete (Columns & Cores)

1 12-Nov-15

14-Nov-15

0%

0%

0.00

RF_V.E Casting Concrete (Columns & Cores)

SUP680

RF_Top Slab Formwork

2 14-Nov-15

16-Nov-15

0%

0%

0.00

RF_Top Slab Formwork

SUP690

RF_Top Slab Steel Fixing

2 16-Nov-15

18-Nov-15

0%

0%

0.00

RF_Top Slab Steel Fixing

SUP700

RF_Top Slab Embeded MEP Conduits & Sleeves

1 17-Nov-15

18-Nov-15

0%

0%

0.00

RF_Top Slab Embeded MEP Conduits & Sleeves

SUP710

RF_Top Slab Concrete Casting

1 18-Nov-15

19-Nov-15

0%

0%

0.00

RF_Top Slab Concrete Casting

275

212 25-Apr-15 A

04-Apr-16

0%

0%

0.00

15-Dec-15

Internal Finishing

182

119 25-Apr-15 A

0%

0%

0.00

IFIN B4 20

B4_Masonry Works

0 25-Apr-15 A

29-Apr-15 A

100%

100%

0.00

IFIN B4 30

B4_Plaster Works

0 28-Apr-15 A

05-May-15 A

100%

100%

0.00

IFIN B4 10

B4_Ceiling Initial Painting

10

0 07-May-15 A 20-May-15 A

100%

100%

0.00

IFIN B4 40

B4_Columns & Walls Initial Painting

10

0 30-May-15 A 02-Jun-15 A

IFIN B4 50

B4_Kerb Stone & Interlock Paving

IFIN B4 60

B4_Ceiling Final Painting

IFIN B4 70

B4_Columns & Walls Final Painting

IFIN B4 80

B4_Floor Screed & Epoxy

IFIN B4 90

B4_Fixing Doors

4th Basement

3rd Basement

04-Apr-16, Internal Finishing


15-Dec-15, 4th Basement
B4_Masonry Works
B4_Plaster Works
B4_Ceiling Initial Painting

100%

100%

0.00

7 26-Jul-15

02-Aug-15

0%

100%

0.00

10

10 02-Nov-15

14-Nov-15

0%

0%

0.00

B4_Ceiling Final Painting

7 05-Nov-15

14-Nov-15

0%

0%

0.00

B4_Columns & Walls Final Painting

20

20 14-Nov-15

07-Dec-15

0%

0%

0.00

7 07-Dec-15

15-Dec-15

0%

0%

0.00

185

37 29-Apr-15 A

30-Dec-15

0%

0%

0.00

B4_Columns & Walls Initial Painting


B4_Kerb Stone & Interlock Paving

B4_Floor Screed & Epoxy


B4_Fixing Doors
30-Dec-15, 3rd Basement

IFIN B3 20

B3_Masonry Works

0 29-Apr-15 A

05-May-15 A

100%

100%

0.00

IFIN B3 30

B3_Plaster Works

0 06-May-15 A 20-May-15 A

100%

100%

0.00

IFIN B3 10

B3_Ceiling Initial Painting

10

0 16-May-15 A 02-Jun-15 A

100%

100%

0.00

IFIN B3 40

B3_Columns & Walls Initial Painting

10

0 30-May-15 A 04-Jun-15 A

100%

100%

0.00

IFIN B3 50

B3_Kerb Stone & Interlock Paving

0 21-Jul-15 A

25-Jul-15 A

100%

100%

0.00

IFIN B3 60

B3_Ceiling Final Painting

10

10 16-Nov-15

28-Nov-15

0%

0%

0.00

B3_Ceiling Final Painting

IFIN B3 70

B3_Columns & Walls Final Painting

7 19-Nov-15

28-Nov-15

0%

0%

0.00

B3_Columns & Walls Final Painting

IFIN B3 80

B3_Floor Screed & Epoxy

20

20 28-Nov-15

22-Dec-15

0%

0%

0.00

IFIN B3 90

B3_Fixing Doors

7 22-Dec-15

30-Dec-15

0%

0%

0.00

136 14-May-15 A 13-Jan-16

0%

0%

0.00

187

2nd Basement
IFIN B2 20

B2_Masonry Works

0 14-May-15 A 25-May-15 A

100%

100%

0.00

IFIN B2 30

B2_Plaster Works

0 18-May-15 A 27-May-15 A

100%

100%

0.00

IFIN B2 10

B2_Ceiling Initial Painting

10

0 02-Jun-15 A

14-Jun-15 A

100%

100%

0.00

IFIN B2 40

B2_Columns & Walls Initial Painting

10

IFIN B2 50

B2_Kerb Stone & Interlock Paving

IFIN B2 60

B2_Ceiling Final Painting

IFIN B2 70

B2_Columns & Walls Final Painting

IFIN B2 80

B2_Floor Screed & Epoxy

IFIN B2 90

B2_Fixing Doors

1st Basement

0 21-Jun-15 A

25-Jun-15 A

100%

100%

0.00

7 03-Aug-15

10-Aug-15

0%

100%

0.00

10

10 30-Nov-15

12-Dec-15

0%

0%

0.00

7 30-Nov-15

08-Dec-15

0%

0%

0.00

20

20 12-Dec-15

05-Jan-16

0%

0%

0.00

7 05-Jan-16

13-Jan-16

0%

0%

0.00

171

152 23-Jun-15 A

27-Jan-16

0%

0%

0.00

B3_Masonry Works
B3_Plaster Works
B3_Ceiling Initial Painting
B3_Columns & Walls Initial Painting
B3_Kerb Stone & Interlock Paving

B3_Floor Screed & Epoxy


B3_Fixing Doors
13-Jan-16, 2nd Basement
B2_Masonry Works
B2_Plaster Works
B2_Ceiling Initial Painting
B2_Columns & Walls Initial Painting
B2_Kerb Stone & Interlock Paving
B2_Ceiling Final Painting
B2_Columns & Walls Final Painting
B2_Floor Screed & Epoxy
B2_Fixing Doors
27-Jan-16, 1st Basement

IFIN B1 10

B1_Masonry Works

0 23-Jun-15 A

15-Jul-15 A

100%

100%

0.00

B1_Masonry Works

IFIN B1 30

B1_Plaster Works

0 28-Jun-15 A

21-Jul-15 A

100%

100%

0.00

B1_Plaster Works

IFIN B1 20

B1_Ceiling Initial Painting

10

10 29-Jul-15

10-Aug-15

0%

100%

0.00

B1_Ceiling Initial Painting

IFIN B1 40

B1_Columns & Walls Initial Painting

10

10 29-Jul-15

10-Aug-15

0%

100%

0.00

B1_Columns & Walls Initial Painting

IFIN B1 60

B1_Kerb Stone & Interlock Paving

18-Aug-15

0%

14.29%

0.00

B1_Kerb Stone & Interlock Paving

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

7 11-Aug-15

Page 5 of 14

Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

IFIN B1 70

B1_Ceiling Final Painting

IFIN B1 50

B1_Columns & Walls Final Painting

IFIN B1 80

B1_Floor Screed & Epoxy

IFIN B1 90

B1_Fixing Doors

10

Ground Floor

10 14-Dec-15

27-Dec-15

0%

0%

0.00

7 14-Dec-15

23-Dec-15

0%

0%

0.00

20

20 27-Dec-15

19-Jan-16

0%

0%

0.00

7 19-Jan-16

27-Jan-16

0%

0%

0.00

149

149 12-Aug-15

07-Feb-16

0%

0%

0.00

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

2016
Mar

Feb

Apr

MayJun

B1_Ceiling Final Painting


B1_Columns & Walls Final Painting
B1_Floor Screed & Epoxy
B1_Fixing Doors
07-Feb-16, Ground Floor

IFIN G100

GF_Masonry Works

10

10 12-Aug-15

24-Aug-15

0%

100%

0.00

IFIN G150

GF_Plaster Works

10

10 01-Sep-15

13-Sep-15

0%

10%

0.00

IFIN G200

GF_Columns, Walls & Exposed Ceiling Initial Painting

10

10 13-Sep-15

28-Sep-15

0%

0%

0.00

IFIN G250

GF_Waterproofing & Screed Works (Wet Areas)

5 13-Sep-15

19-Sep-15

0%

0%

0.00

IFIN G300

GF_Suspended Ceiling Works

16

16 10-Oct-15

28-Oct-15

0%

0%

0.00

GF_Suspended Ceiling Works

IFIN G350

GF_Floor Tiling Works (Public Areas)

12

12 14-Oct-15

28-Oct-15

0%

0%

0.00

GF_Floor Tiling Works (Public Areas)

IFIN G400

GF_Wall Tiling Works (Wet Areas)

7 14-Oct-15

22-Oct-15

0%

0%

0.00

IFIN G450

GF_Floor Tiling Works (Wet Areas)

5 22-Oct-15

28-Oct-15

0%

0%

0.00

IFIN G500

GF_Ceiling Initial Painting

12

12 28-Oct-15

11-Nov-15

0%

0%

0.00

IFIN G550

GF_Ceiling Final Painting

15

15 16-Dec-15

04-Jan-16

0%

0%

0.00

GF_Ceiling Final Painting

IFIN G600

GF_Columns & Walls Final Painting

15

15 16-Dec-15

04-Jan-16

0%

0%

0.00

GF_Columns & Walls Final Painting

IFIN G650

GF_Ramp & Parking_Screed & Epoxy

10

10 19-Jan-16

31-Jan-16

0%

0%

0.00

IFIN G700

GF_Fixing Doors

6 31-Jan-16

07-Feb-16

0%

0%

0.00

143

143 26-Aug-15

15-Feb-16

0%

0%

0.00

Mezz Floor
IFIN M100

Mez_Masonry Works

7 26-Aug-15

03-Sep-15

0%

85.71%

0.00

IFIN M150

Mez_Plaster Works

10

10 12-Sep-15

23-Sep-15

0%

0%

0.00

IFIN M200

Mez_Columns, Walls & Exposed Ceiling Initial Painting

10

10 23-Sep-15

08-Oct-15

0%

0%

0.00

IFIN M250

Mez_Waterproofing & Screed Works (Wet Areas)

5 23-Sep-15

03-Oct-15

0%

0%

0.00

IFIN M350

Mez_Wall Tiling Works (Wet Areas)

IFIN M400

Mez_Floor Tiling Works (Public Areas)

IFIN M450

Mez_Floor Tiling Works (Wet Areas)

IFIN M300
IFIN M500

GF_Masonry Works
GF_Plaster Works
GF_Columns, Walls & Exposed Ceiling Initial Painting
GF_Waterproofing & Screed Works (Wet Areas)

GF_Wall Tiling Works (Wet Areas)


GF_Floor Tiling Works (Wet Areas)
GF_Ceiling Initial Painting

GF_Ramp & Parking_Screed & Epoxy


GF_Fixing Doors
15-Feb-16, Mezz Floor
Mez_Masonry Works
Mez_Plaster Works
Mez_Columns, Walls & Exposed Ceiling Initial Painting
Mez_Waterproofing & Screed Works (Wet Areas)

7 03-Oct-15

11-Oct-15

0%

0%

0.00

12

12 08-Oct-15

22-Oct-15

0%

0%

0.00

5 11-Oct-15

17-Oct-15

0%

0%

0.00

Mez_Suspended Ceiling Works

16

16 24-Oct-15

11-Nov-15

0%

0%

0.00

Mez_Ceiling Initial Painting

12

12 11-Nov-15

25-Nov-15

0%

0%

0.00

IFIN M550

Mez_Ceiling Final Painting

15

15 26-Dec-15

12-Jan-16

0%

0%

0.00

Mez_Ceiling Final Painting

IFIN M600

Mez_Columns & Walls Final Painting

15

15 26-Dec-15

12-Jan-16

0%

0%

0.00

Mez_Columns & Walls Final Painting

IFIN M650

Mez_Fixing Doors

6 07-Feb-16

15-Feb-16

0%

0%

0.00

137

137 09-Sep-15

22-Feb-16

0%

0%

0.00

1st Floor
IFIN 1100

1FL_Masonry Works

7 09-Sep-15

17-Sep-15

0%

0%

0.00

IFIN 1150

1FL_Plaster Works

10

10 29-Sep-15

11-Oct-15

0%

0%

0.00

IFIN 1200

1FL_Columns, Walls & Exposed Ceiling Initial Painting

10

10 11-Oct-15

22-Oct-15

0%

0%

0.00

IFIN 1250

1FL_Waterproofing & Screed Works (Wet Areas)

5 11-Oct-15

17-Oct-15

0%

0%

0.00

IFIN 1350

1FL_Wall Tiling Works (Wet Areas)

IFIN 1400

1FL_Floor Tiling Works (Public Areas)

IFIN 1450

1FL_Floor Tiling Works (Wet Areas)

IFIN 1300
IFIN 1500

Mez_Wall Tiling Works (Wet Areas)


Mez_Floor Tiling Works (Public Areas)
Mez_Floor Tiling Works (Wet Areas)
Mez_Suspended Ceiling Works
Mez_Ceiling Initial Painting

Mez_Fixing Doors
22-Feb-16, 1st Floor
1FL_Masonry Works
1FL_Plaster Works
1FL_Columns, Walls & Exposed Ceiling Initial Painting
1FL_Waterproofing & Screed Works (Wet Areas)

7 17-Oct-15

25-Oct-15

0%

0%

0.00

12

12 22-Oct-15

05-Nov-15

0%

0%

0.00

5 25-Oct-15

31-Oct-15

0%

0%

0.00

1FL_Floor Tiling Works (Wet Areas)

1FL_Suspended Ceiling Works

16

16 03-Nov-15

22-Nov-15

0%

0%

0.00

1FL_Suspended Ceiling Works

1FL_Ceiling Initial Painting

12

12 22-Nov-15

06-Dec-15

0%

0%

0.00

IFIN 1550

1FL_Ceiling Final Painting

15

15 03-Jan-16

20-Jan-16

0%

0%

0.00

1FL_Ceiling Final Painting

IFIN 1600

1FL_Columns & Walls Final Painting

15

15 03-Jan-16

20-Jan-16

0%

0%

0.00

1FL_Columns & Walls Final Painting

IFIN 1650

1FL_Fixing Doors

6 15-Feb-16

22-Feb-16

0%

0%

0.00

131

131 23-Sep-15

29-Feb-16

0%

0%

0.00

7 23-Sep-15

05-Oct-15

0%

0%

0.00

2nd Floor
IFIN 2100

2FL_Masonry Works

IFIN 2150

2FL_Plaster Works

10

10 13-Oct-15

25-Oct-15

0%

0%

0.00

IFIN 2200

2FL_Columns, Walls & Exposed Ceiling Initial Painting

10

10 25-Oct-15

05-Nov-15

0%

0%

0.00

IFIN 2250

2FL_Waterproofing & Screed Works (Wet Areas)

5 25-Oct-15

31-Oct-15

0%

0%

0.00

IFIN 2350

2FL_Wall Tiling Works (Wet Areas)

IFIN 2400

2FL_Floor Tiling Works (Public Areas)

IFIN 2450

2FL_Floor Tiling Works (Wet Areas)

IFIN 2300

2FL_Suspended Ceiling Works

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

1FL_Wall Tiling Works (Wet Areas)


1FL_Floor Tiling Works (Public Areas)

1FL_Ceiling Initial Painting

1FL_Fixing Doors
29-Feb-16, 2nd Floor
2FL_Masonry Works
2FL_Plaster Works
2FL_Columns, Walls & Exposed Ceiling Initial Painting
2FL_Waterproofing & Screed Works (Wet Areas)

7 31-Oct-15

08-Nov-15

0%

0%

0.00

12

12 05-Nov-15

19-Nov-15

0%

0%

0.00

5 08-Nov-15

14-Nov-15

0%

0%

0.00

2FL_Floor Tiling Works (Wet Areas)

16

16 17-Nov-15

06-Dec-15

0%

0%

0.00

2FL_Suspended Ceiling Works

Page 6 of 14

2FL_Wall Tiling Works (Wet Areas)


2FL_Floor Tiling Works (Public Areas)

Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

IFIN 2500

2FL_Ceiling Initial Painting

12

12 06-Dec-15

21-Dec-15

0%

0%

0.00

IFIN 2550

2FL_Ceiling Final Painting

15

15 11-Jan-16

28-Jan-16

0%

0%

0.00

IFIN 2600

2FL_Columns & Walls Final Painting

12

12 11-Jan-16

25-Jan-16

0%

0%

0.00

IFIN 2650

2FL_Fixing Doors

6 22-Feb-16

6
125

3rd Floor

29-Feb-16

0%

0%

0.00

125 11-Oct-15

07-Mar-16

0%

0%

0.00

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

2016
Mar

Feb

Apr

MayJun

2FL_Ceiling Initial Painting


2FL_Ceiling Final Painting
2FL_Columns & Walls Final Painting
2FL_Fixing Doors
07-Mar-16, 3rd Floor

IFIN 3100

3FL_Masonry Works

7 11-Oct-15

19-Oct-15

0%

0%

0.00

IFIN 3150

3FL_Plaster Works

10

10 27-Oct-15

08-Nov-15

0%

0%

0.00

IFIN 3200

3FL_Columns, Walls & Exposed Ceiling Initial Painting

10

10 08-Nov-15

19-Nov-15

0%

0%

0.00

IFIN 3250

3FL_Waterproofing & Screed Works (Wet Areas)

5 08-Nov-15

14-Nov-15

0%

0%

0.00

IFIN 3350

3FL_Wall Tiling Works (Wet Areas)

7 14-Nov-15

22-Nov-15

0%

0%

0.00

IFIN 3400

3FL_Floor Tiling Works (Public Areas)

12

12 19-Nov-15

03-Dec-15

0%

0%

0.00

IFIN 3450

3FL_Floor Tiling Works (Wet Areas)

5 22-Nov-15

28-Nov-15

0%

0%

0.00

IFIN 3300

3FL_Suspended Ceiling Works

16

16 01-Dec-15

21-Dec-15

0%

0%

0.00

IFIN 3500

3FL_Ceiling Initial Painting

12

12 21-Dec-15

04-Jan-16

0%

0%

0.00

IFIN 3550

3FL_Ceiling Final Painting

15

15 19-Jan-16

06-Feb-16

0%

0%

0.00

3FL_Ceiling Final Painting

IFIN 3600

3FL_Columns & Walls Final Painting

15

15 19-Jan-16

06-Feb-16

0%

0%

0.00

3FL_Columns & Walls Final Painting

IFIN 3650

3FL_Fixing Doors

6 29-Feb-16

07-Mar-16

0%

0%

0.00

119

119 25-Oct-15

14-Mar-16

0%

0%

0.00

4th Floor
IFIN 4100

4FL_Masonry Works

5 25-Oct-15

31-Oct-15

0%

0%

0.00

IFIN 4150

4FL_Plaster Works

10

10 08-Nov-15

19-Nov-15

0%

0%

0.00

IFIN 4200

4FL_Columns, Walls & Exposed Ceiling Initial Painting

10

10 19-Nov-15

01-Dec-15

0%

0%

0.00

IFIN 4250

4FL_Waterproofing & Screed Works (Wet Areas)

5 19-Nov-15

25-Nov-15

0%

0%

0.00

IFIN 4350

4FL_Wall Tiling Works (Wet Areas)

IFIN 4400

4FL_Floor Tiling Works (Public Areas)

IFIN 4450

4FL_Floor Tiling Works (Wet Areas)

IFIN 4300

3FL_Masonry Works
3FL_Plaster Works
3FL_Columns, Walls & Exposed Ceiling Initial Painting
3FL_Waterproofing & Screed Works (Wet Areas)
3FL_Wall Tiling Works (Wet Areas)
3FL_Floor Tiling Works (Public Areas)
3FL_Floor Tiling Works (Wet Areas)
3FL_Suspended Ceiling Works
3FL_Ceiling Initial Painting

3FL_Fixing Doors
14-Mar-16, 4th Floor
4FL_Masonry Works
4FL_Plaster Works
4FL_Columns, Walls & Exposed Ceiling Initial Painting
4FL_Waterproofing & Screed Works (Wet Areas)

7 25-Nov-15

03-Dec-15

0%

0%

0.00

12

12 01-Dec-15

15-Dec-15

0%

0%

0.00

5 03-Dec-15

09-Dec-15

0%

0%

0.00

4FL_Suspended Ceiling Works

16

16 13-Dec-15

02-Jan-16

0%

0%

0.00

IFIN 4500

4FL_Ceiling Initial Painting

12

12 02-Jan-16

16-Jan-16

0%

0%

0.00

IFIN 4550

4FL_Ceiling Final Painting

15

15 27-Jan-16

15-Feb-16

0%

0%

0.00

4FL_Ceiling Final Painting

IFIN 4600

4FL_Columns & Walls Final Painting

15

15 27-Jan-16

15-Feb-16

0%

0%

0.00

4FL_Columns & Walls Final Painting

IFIN 4650

4FL_Fixing Doors

6 07-Mar-16

14-Mar-16

0%

0%

0.00

113

113 08-Nov-15

21-Mar-16

0%

0%

0.00

4FL_Fixing Doors
21-Mar-16, 5th Floor

5th Floor
IFIN 5100

5FL_Masonry Works

5 08-Nov-15

14-Nov-15

0%

0%

0.00

IFIN 5150

5FL_Plaster Works

10

10 22-Nov-15

03-Dec-15

0%

0%

0.00

IFIN 5200

5FL_Columns, Walls & Exposed Ceiling Initial Painting

10

10 03-Dec-15

15-Dec-15

0%

0%

0.00

IFIN 5250

5FL_Waterproofing & Screed Works (Wet Areas)

5 03-Dec-15

09-Dec-15

0%

0%

0.00

IFIN 5350

5FL_Wall Tiling Works (Wet Areas)

IFIN 5400

5FL_Floor Tiling Works (Public Areas)

IFIN 5450

5FL_Floor Tiling Works (Wet Areas)

IFIN 5300

4FL_Wall Tiling Works (Wet Areas)


4FL_Floor Tiling Works (Public Areas)
4FL_Floor Tiling Works (Wet Areas)
4FL_Suspended Ceiling Works
4FL_Ceiling Initial Painting

5FL_Masonry Works
5FL_Plaster Works
5FL_Columns, Walls & Exposed Ceiling Initial Painting
5FL_Waterproofing & Screed Works (Wet Areas)

7 09-Dec-15

19-Dec-15

0%

0%

0.00

12

12 15-Dec-15

30-Dec-15

0%

0%

0.00

5 19-Dec-15

24-Dec-15

0%

0%

0.00

5FL_Suspended Ceiling Works

16

16 28-Dec-15

16-Jan-16

0%

0%

0.00

IFIN 5500

5FL_Ceiling Initial Painting

12

12 16-Jan-16

30-Jan-16

0%

0%

0.00

IFIN 5550

5FL_Ceiling Final Painting

15

15 04-Feb-16

23-Feb-16

0%

0%

0.00

5FL_Ceiling Final Painting

IFIN 5600

5FL_Columns & Walls Final Painting

15

15 04-Feb-16

23-Feb-16

0%

0%

0.00

5FL_Columns & Walls Final Painting

IFIN 5650

5FL_Fixing Doors

6 14-Mar-16

21-Mar-16

0%

0%

0.00

109

109 19-Nov-15

28-Mar-16

0%

0%

0.00

5FL_Fixing Doors
28-Mar-16, 6th Floor

6th Floor
IFIN 6100

6FL_Masonry Works

5 19-Nov-15

25-Nov-15

0%

0%

0.00

IFIN 6150

6FL_Plaster Works

10

10 09-Dec-15

22-Dec-15

0%

0%

0.00

IFIN 6200

6FL_Columns, Walls & Exposed Ceiling Initial Painting

10

10 22-Dec-15

03-Jan-16

0%

0%

0.00

IFIN 6250

6FL_Waterproofing & Screed Works (Wet Areas)

5 22-Dec-15

28-Dec-15

0%

0%

0.00

IFIN 6350

6FL_Wall Tiling Works (Wet Areas)

IFIN 6400

6FL_Floor Tiling Works (Public Areas)

IFIN 6450

6FL_Floor Tiling Works (Wet Areas)

IFIN 6300
IFIN 6500

5FL_Wall Tiling Works (Wet Areas)


5FL_Floor Tiling Works (Public Areas)
5FL_Floor Tiling Works (Wet Areas)
5FL_Suspended Ceiling Works
5FL_Ceiling Initial Painting

6FL_Masonry Works
6FL_Plaster Works
6FL_Columns, Walls & Exposed Ceiling Initial Painting
6FL_Waterproofing & Screed Works (Wet Areas)

7 28-Dec-15

05-Jan-16

0%

0%

0.00

12

12 03-Jan-16

17-Jan-16

0%

0%

0.00

5 05-Jan-16

11-Jan-16

0%

0%

0.00

6FL_Floor Tiling Works (Wet Areas)

6FL_Suspended Ceiling Works

16

16 14-Jan-16

02-Feb-16

0%

0%

0.00

6FL_Suspended Ceiling Works

6FL_Ceiling Initial Painting

12

12 02-Feb-16

17-Feb-16

0%

0%

0.00

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 7 of 14

6FL_Wall Tiling Works (Wet Areas)


6FL_Floor Tiling Works (Public Areas)

6FL_Ceiling Initial Painting


Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

Apr

MayJun

IFIN 6550

6FL_Ceiling Final Painting

15

15 17-Feb-16

06-Mar-16

0%

0%

0.00

6FL_Ceiling Final Painting

IFIN 6600

6FL_Columns & Walls Final Painting

15

15 17-Feb-16

06-Mar-16

0%

0%

0.00

6FL_Columns & Walls Final Painting

IFIN 6650

6FL_Fixing Doors

6 21-Mar-16

28-Mar-16

0%

0%

0.00

100

100 07-Dec-15

04-Apr-16

0%

0%

0.00

5 07-Dec-15

13-Dec-15

0%

0%

0.00

7th Floor

6FL_Fixing Doors
04-Apr-16, 7th Floor

IFIN 7100

7FL_Masonry Works

IFIN 7150

7FL_Plaster Works

10

10 28-Dec-15

09-Jan-16

0%

0%

0.00

IFIN 7200

7FL_Columns, Walls & Exposed Ceiling Initial Painting

10

10 09-Jan-16

20-Jan-16

0%

0%

0.00

IFIN 7250

7FL_Waterproofing & Screed Works (Wet Areas)

5 09-Jan-16

14-Jan-16

0%

0%

0.00

IFIN 7350

7FL_Wall Tiling Works (Wet Areas)

7 14-Jan-16

23-Jan-16

0%

0%

0.00

IFIN 7400

7FL_Floor Tiling Works (Public Areas)

12

12 20-Jan-16

03-Feb-16

0%

0%

0.00

IFIN 7450

7FL_Floor Tiling Works (Wet Areas)

5 23-Jan-16

28-Jan-16

0%

0%

0.00

IFIN 7300

7FL_Suspended Ceiling Works

16

16 01-Feb-16

21-Feb-16

0%

0%

0.00

IFIN 7500

7FL_Ceiling Initial Painting

12

12 21-Feb-16

06-Mar-16

0%

0%

0.00

IFIN 7550

7FL_Ceiling Final Painting

15

15 06-Mar-16

23-Mar-16

0%

0%

0.00

7FL_Ceiling Final Painting

IFIN 7600

7FL_Columns & Walls Final Painting

15

15 06-Mar-16

23-Mar-16

0%

0%

0.00

7FL_Columns & Walls Final Painting

IFIN 7650

7FL_Fixing Doors

6 28-Mar-16

04-Apr-16

0%

0%

0.00

262

208 27-Apr-15 A

30-Mar-16

0%

0%

0.00

17-Jan-16

MEP

7FL_Masonry Works
7FL_Plaster Works

7FL_Columns, Walls & Exposed Ceiling Initial Paintin


7FL_Waterproofing & Screed Works (Wet Areas)
7FL_Wall Tiling Works (Wet Areas)
7FL_Floor Tiling Works (Public Areas)
7FL_Floor Tiling Works (Wet Areas)
7FL_Suspended Ceiling Works
7FL_Ceiling Initial Painting

7FL_Fixing Doors
30-Mar-16, MEP
17-Jan-16, 4th Basement

201

147 27-Apr-15 A

0%

0%

0.00

MEP B4 160

B4_MEP_Embeded Wall Conduits & Sleeves

0 27-Apr-15 A

04-May-15 A

100%

100%

0.00

MEP B4 110

B4_FF_HL_1st Fix

0 30-May-15 A 02-Jun-15 A

100%

100%

0.00

B4_FF_HL_1st Fix

MEP B4 130

B4_Plum. & Drain_HL_1st Fix

0 31-May-15 A 03-Jun-15 A

100%

100%

0.00

B4_Plum. & Drain_HL_1st Fix

MEP B4 180

B4_FF_HL_2nd Fix

10

0 01-Jun-15 A

11-Jul-15 A

100%

100%

0.00

B4_FF_HL_2nd Fix

MEP B4 200

B4_Plum. & Drain_HL_2nd Fix

10

0 01-Jun-15 A

11-Jul-15 A

100%

100%

0.00

MEP B4 100

B4_Elec_HL_1st Fix

0 06-Jun-15 A

08-Jun-15 A

100%

100%

0.00

B4_Elec_HL_1st Fix

MEP B4 120

B4_HVAC_HL_1st Fix

0 06-Jun-15 A

08-Jun-15 A

100%

100%

0.00

B4_HVAC_HL_1st Fix

MEP B4 170

B4_Elec_HL_2nd Fix

10

0 07-Jun-15 A

11-Jun-15 A

100%

100%

0.00

B4_Elec_HL_2nd Fix

MEP B4 190

B4_HVAC_HL_2nd Fix

10

3 08-Jun-15 A

28-Jul-15

70%

100%

0.00

MEP B4 150

B4_FA_HL_1st Fix

0 21-Jun-15 A

11-Jul-15 A

100%

100%

0.00

B4_FA_HL_1st Fix

MEP B4 220

B4_FA_HL_2nd Fix

10

0 22-Jun-15 A

12-Jul-15 A

100%

100%

0.00

B4_FA_HL_2nd Fix

MEP B4 140

B4_ELV_HL_1st Fix

0 11-Jul-15 A

13-Jul-15 A

100%

100%

0.00

B4_ELV_HL_1st Fix

MEP B4 210

B4_ELV_HL_2nd Fix

10

0 14-Jul-15 A

25-Jul-15 A

100%

100%

0.00

MEP B4 230

B4_Plum. & Drain_HL_3rd Fix

7 06-Sep-15

14-Sep-15

0%

100%

0.00

MEP B4 240

B4_FF_HL_3rd Fix

12

12 30-Sep-15

13-Oct-15

0%

0%

0.00

B4_FF_HL_3rd Fix

MEP B4 250

B4_ELV_HL_3rd Fix

10

10 30-Sep-15

11-Oct-15

0%

0%

0.00

B4_ELV_HL_3rd Fix

MEP B4 260

B4_FA_HL_3rd Fix

10

10 30-Sep-15

11-Oct-15

0%

0%

0.00

B4_FA_HL_3rd Fix

MEP B4 280

B4_HVAC_HL_3rd Fix

12

12 13-Oct-15

26-Oct-15

0%

0%

0.00

MEP B4 270

B4_Elec_HL_3rd Fix

12

12 31-Oct-15

14-Nov-15

0%

0%

0.00

MEP B4 290

B4_Installation of Exhaust & Ventilation Fans

15

15 31-Dec-15

17-Jan-16

0%

0%

0.00

162 07-May-15 A 03-Feb-16

0%

0%

0.00

4th Basement

210

3rd Basement

B4_MEP_Embeded Wall Conduits & Sleeves

B4_Plum. & Drain_HL_2nd Fix

B4_HVAC_HL_2nd Fix

B4_ELV_HL_2nd Fix
B4_Plum. & Drain_HL_3rd Fix

B4_HVAC_HL_3rd Fix
B4_Elec_HL_3rd Fix
B4_Installation of Exhaust & Ventilation Fans
03-Feb-16, 3rd Basement

MEP B3 160

B3_MEP_Embeded Wall Conduits & Sleeves

0 07-May-15 A 16-May-15 A

100%

100%

0.00

MEP B3 110

B3_FF_HL_1st Fix

0 02-Jun-15 A

05-Jul-15 A

100%

100%

0.00

B3_FF_HL_1st Fix

MEP B3 130

B3_Plum. & Drain_HL_1st Fix

0 02-Jun-15 A

05-Jul-15 A

100%

100%

0.00

B3_Plum. & Drain_HL_1st Fix

MEP B3 150

B3_FA_HL_1st Fix

0 02-Jun-15 A

05-Jul-15 A

100%

100%

0.00

B3_FA_HL_1st Fix

MEP B3 180

B3_FF_HL_2nd Fix

10

0 03-Jun-15 A

15-Jul-15 A

100%

100%

0.00

MEP B3 200

B3_Plum. & Drain_HL_2nd Fix

10

0 03-Jun-15 A

21-Jul-15 A

100%

100%

0.00

MEP B3 120

B3_HVAC_HL_1st Fix

0 06-Jun-15 A

28-Jun-15 A

100%

100%

0.00

B3_HVAC_HL_1st Fix

MEP B3 100

B3_Elec_HL_1st Fix

0 07-Jun-15 A

28-Jun-15 A

100%

100%

0.00

B3_Elec_HL_1st Fix

MEP B3 170

B3_Elec_HL_2nd Fix

10

0 09-Jun-15 A

11-Jul-15 A

100%

100%

0.00

MEP B3 190

B3_HVAC_HL_2nd Fix

10

3 09-Jun-15 A

28-Jul-15

70%

100%

0.00

MEP B3 220

B3_FA_HL_2nd Fix

10

0 21-Jun-15 A

12-Jul-15 A

100%

100%

0.00

B3_FA_HL_2nd Fix

MEP B3 140

B3_ELV_HL_1st Fix

0 11-Jul-15 A

13-Jul-15 A

100%

100%

0.00

B3_ELV_HL_1st Fix

MEP B3 210

B3_ELV_HL_2nd Fix

10

0 14-Jul-15 A

25-Jul-15 A

100%

100%

0.00

MEP B3 230

B3_Plum. & Drain_HL_3rd Fix

7 14-Sep-15

22-Sep-15

0%

42.86%

0.00

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 8 of 14

B3_MEP_Embeded Wall Conduits & Sleeves

B3_FF_HL_2nd Fix
B3_Plum. & Drain_HL_2nd Fix

B3_Elec_HL_2nd Fix
B3_HVAC_HL_2nd Fix

B3_ELV_HL_2nd Fix
B3_Plum. & Drain_HL_3rd Fix
Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

MEP B3 250

B3_ELV_HL_3rd Fix

10

10 12-Oct-15

22-Oct-15

0%

0%

0.00

B3_ELV_HL_3rd Fix

MEP B3 260

B3_FA_HL_3rd Fix

10

10 12-Oct-15

22-Oct-15

0%

0%

0.00

B3_FA_HL_3rd Fix

MEP B3 240

B3_FF_HL_3rd Fix

12

12 14-Oct-15

27-Oct-15

0%

0%

0.00

MEP B3 280

B3_HVAC_HL_3rd Fix

12

12 27-Oct-15

09-Nov-15

0%

0%

0.00

MEP B3 270

B3_Elec_HL_3rd Fix

12

12 14-Nov-15

28-Nov-15

0%

0%

0.00

MEP B3 290

B3_Installation of Exhaust & Ventilation Fans

15

15 18-Jan-16

03-Feb-16

0%

0%

0.00

212

177 01-Jun-15 A

22-Feb-16

0%

0%

0.00

2nd Basement

B3_Elec_HL_3rd Fix
B3_Installation of Exhaust & Ventilation Fans
22-Feb-16, 2nd Basement

B2_MEP_Embeded Wall Conduits & Sleeves

0 01-Jun-15 A

04-Jun-15 A

100%

100%

0.00

B2_Elec_HL_1st Fix

0 20-Jun-15 A

30-Jun-15 A

100%

100%

0.00

B2_Elec_HL_1st Fix

MEP B2 110

B2_FF_HL_1st Fix

0 20-Jun-15 A

05-Jul-15 A

100%

100%

0.00

B2_FF_HL_1st Fix

MEP B2 120

B2_HVAC_HL_1st Fix

0 20-Jun-15 A

05-Jul-15 A

100%

100%

0.00

B2_HVAC_HL_1st Fix

MEP B2 130

B2_Plum. & Drain_HL_1st Fix

0 20-Jun-15 A

05-Jul-15 A

100%

100%

0.00

B2_Plum. & Drain_HL_1st Fix

MEP B2 140

B2_ELV_HL_1st Fix

0 20-Jun-15 A

13-Jul-15 A

100%

100%

0.00

B2_ELV_HL_1st Fix

MEP B2 170

B2_Elec_HL_2nd Fix

10

0 21-Jun-15 A

11-Jul-15 A

100%

100%

0.00

B2_Elec_HL_2nd Fix

MEP B2 180

B2_FF_HL_2nd Fix

10

0 21-Jun-15 A

21-Jul-15 A

100%

100%

0.00

MEP B2 210

B2_ELV_HL_2nd Fix

10

0 22-Jun-15 A

25-Jul-15 A

100%

100%

0.00

MEP B2 150

B2_FA_HL_1st Fix

0 29-Jun-15 A

11-Jul-15 A

100%

100%

0.00

MEP B2 190

B2_HVAC_HL_2nd Fix

10

4 30-Jun-15 A

29-Jul-15

60%

100%

0.00

MEP B2 200

B2_Plum. & Drain_HL_2nd Fix

10

1 05-Jul-15 A

26-Jul-15

90%

100%

0.00

MEP B2 220

B2_FA_HL_2nd Fix

10

0 05-Jul-15 A

22-Jul-15 A

100%

100%

0.00

MEP B2 230

B2_Plum. & Drain_HL_3rd Fix

7 22-Sep-15

04-Oct-15

0%

0%

0.00

MEP B2 250

B2_ELV_HL_3rd Fix

10

10 24-Oct-15

03-Nov-15

0%

0%

0.00

B2_ELV_HL_3rd Fix

MEP B2 260

B2_FA_HL_3rd Fix

10

10 24-Oct-15

03-Nov-15

0%

0%

0.00

B2_FA_HL_3rd Fix

MEP B2 240

B2_FF_HL_3rd Fix

12

12 28-Oct-15

10-Nov-15

0%

0%

0.00

MEP B2 280

B2_HVAC_HL_3rd Fix

12

12 10-Nov-15

23-Nov-15

0%

0%

0.00

MEP B2 270

B2_Elec_HL_3rd Fix

12

12 28-Nov-15

12-Dec-15

0%

0%

0.00

MEP B2 290

B2_Installation of Exhaust & Ventilation Fans

15

15 04-Feb-16

22-Feb-16

0%

0%

0.00

202

179 29-Jun-15 A

10-Mar-16

0%

0%

0.00

B2_MEP_Embeded Wall Conduits & Sleeves

B2_FF_HL_2nd Fix
B2_ELV_HL_2nd Fix
B2_FA_HL_1st Fix
B2_HVAC_HL_2nd Fix
B2_Plum. & Drain_HL_2nd Fix
B2_FA_HL_2nd Fix
B2_Plum. & Drain_HL_3rd Fix

B2_FF_HL_3rd Fix
B2_HVAC_HL_3rd Fix
B2_Elec_HL_3rd Fix

B2_Installation of Exhaust & Ventilation Fans


10-Mar-16, 1st Basement

MEP B1 100

B1_MEP_Embeded Wall Conduits & Sleeves

0 29-Jun-15 A

02-Jul-15 A

100%

100%

0.00

MEP B1 110

B1_Elec_HL_1st Fix

3 10-Aug-15

13-Aug-15

0%

100%

0.00

B1_Elec_HL_1st Fix

MEP B1 120

B1_FF_HL_1st Fix

3 10-Aug-15

13-Aug-15

0%

100%

0.00

B1_FF_HL_1st Fix

MEP B1 130

B1_HVAC_HL_1st Fix

3 10-Aug-15

13-Aug-15

0%

100%

0.00

B1_HVAC_HL_1st Fix

MEP B1 140

B1_Plum. & Drain_HL_1st Fix

3 10-Aug-15

13-Aug-15

0%

100%

0.00

B1_Plum. & Drain_HL_1st Fix

MEP B1 150

B1_ELV_HL_1st Fix

3 10-Aug-15

13-Aug-15

0%

100%

0.00

B1_ELV_HL_1st Fix

MEP B1 160

B1_FA_HL_1st Fix

3 10-Aug-15

13-Aug-15

0%

100%

0.00

B1_FA_HL_1st Fix

MEP B1 170

B1_Elec_HL_2nd Fix

7 13-Aug-15

22-Aug-15

0%

100%

0.00

B1_Elec_HL_2nd Fix

MEP B1 180

B1_FF_HL_2nd Fix

7 13-Aug-15

22-Aug-15

0%

100%

0.00

B1_FF_HL_2nd Fix

MEP B1 190

B1_HVAC_HL_2nd Fix

7 13-Aug-15

22-Aug-15

0%

100%

0.00

B1_HVAC_HL_2nd Fix

MEP B1 200

B1_Plum. & Drain_HL_2nd Fix

7 13-Aug-15

22-Aug-15

0%

100%

0.00

B1_Plum. & Drain_HL_2nd Fix

MEP B1 210

B1_ELV_HL_2nd Fix

7 13-Aug-15

22-Aug-15

0%

100%

0.00

B1_ELV_HL_2nd Fix

MEP B1 220

B1_FA_HL_2nd Fix

7 13-Aug-15

22-Aug-15

0%

100%

0.00

B1_FA_HL_2nd Fix

MEP B1 230

B1_Plum. & Drain_HL_3rd Fix

7 04-Oct-15

12-Oct-15

0%

0%

0.00

MEP B1 260

B1_ELV_HL_3rd Fix

10

10 04-Nov-15

15-Nov-15

0%

0%

0.00

B1_ELV_HL_3rd Fix

MEP B1 270

B1_FA_HL_3rd Fix

10

10 04-Nov-15

15-Nov-15

0%

0%

0.00

B1_FA_HL_3rd Fix

MEP B1 280

B1_FF_HL_3rd Fix

12

12 11-Nov-15

24-Nov-15

0%

0%

0.00

MEP B1 300

B1_HVAC_HL_3rd Fix

12

12 24-Nov-15

07-Dec-15

0%

0%

0.00

MEP B1 290

B1_Elec_HL_3rd Fix

12

12 12-Dec-15

27-Dec-15

0%

0%

0.00

MEP B1 240

B1_FF_Installation & Testing of Fire Tanks

25

25 30-Dec-15

28-Jan-16

0%

0%

0.00

MEP B1 250

B1_Plum_Installation & Testing of Domestic Tanks

20

20 30-Dec-15

23-Jan-16

0%

0%

0.00

MEP B1 310

B1_FF Installation & Testing of Fire Fighting Pumps

30

30 18-Jan-16

22-Feb-16

0%

0%

0.00

MEP B1 320

B1_Installation of Exhaust & Ventilation Fans

15

15 23-Feb-16

10-Mar-16

0%

0%

0.00

148

148 18-Aug-15

11-Feb-16

0%

0%

0.00

12

12 18-Aug-15

01-Sep-15

0%

100%

0.00

MEP G 100

GF_MEP_Embeded Wall Conduits & Sleeves

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 9 of 14

MayJun

B3_HVAC_HL_3rd Fix

MEP B2 100

Ground Floor

Apr

B3_FF_HL_3rd Fix

MEP B2 160

1st Basement

2016
Mar

Feb

B1_MEP_Embeded Wall Conduits & Sleeves

B1_Plum. & Drain_HL_3rd Fix

B1_FF_HL_3rd Fix
B1_HVAC_HL_3rd Fix
B1_Elec_HL_3rd Fix
B1_FF_Installation & Testing of Fire Tanks
B1_Plum_Installation & Testing of Domestic Tanks

B1_FF Installation & Testing of Fire Fighting

B1_Installation of Exhaust & Ventilation F


11-Feb-16, Ground Floor
GF_MEP_Embeded Wall Conduits & Sleeves
Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

Apr

MayJun

MEP G 110

GF_Elec_HL_1st Fix

3 28-Sep-15

01-Oct-15

0%

0%

0.00

GF_Elec_HL_1st Fix

MEP G 120

GF_FF_HL_1st Fix

3 28-Sep-15

01-Oct-15

0%

0%

0.00

GF_FF_HL_1st Fix

MEP G 130

GF_HVAC_HL_1st Fix

3 28-Sep-15

01-Oct-15

0%

0%

0.00

GF_HVAC_HL_1st Fix

MEP G 140

GF_Plum. & Drain_HL_1st Fix

3 28-Sep-15

01-Oct-15

0%

0%

0.00

GF_Plum. & Drain_HL_1st Fix

MEP G 150

GF_ELV_HL_1st Fix

3 28-Sep-15

01-Oct-15

0%

0%

0.00

GF_ELV_HL_1st Fix

MEP G 160

GF_FA_HL_1st Fix

3 28-Sep-15

01-Oct-15

0%

0%

0.00

GF_FA_HL_1st Fix

MEP G 170

GF_Elec_HL_2nd Fix

7 01-Oct-15

10-Oct-15

0%

0%

0.00

GF_Elec_HL_2nd Fix

MEP G 180

GF_FF_HL_2nd Fix

7 01-Oct-15

10-Oct-15

0%

0%

0.00

GF_FF_HL_2nd Fix

MEP G 190

GF_HVAC_HL_2nd Fix

7 01-Oct-15

10-Oct-15

0%

0%

0.00

GF_HVAC_HL_2nd Fix

MEP G 200

GF_Plum. & Drain_HL_2nd Fix

7 01-Oct-15

10-Oct-15

0%

0%

0.00

GF_Plum. & Drain_HL_2nd Fix

MEP G 210

GF_ELV_HL_2nd Fix

7 01-Oct-15

10-Oct-15

0%

0%

0.00

GF_ELV_HL_2nd Fix

MEP G 220

GF_FA_HL_2nd Fix

7 01-Oct-15

10-Oct-15

0%

0%

0.00

GF_FA_HL_2nd Fix

MEP G 260

GF_ELV_HL_3rd Fix

10

10 16-Nov-15

26-Nov-15

0%

0%

0.00

GF_ELV_HL_3rd Fix

MEP G 270

GF_FA_HL_3rd Fix

10

10 16-Nov-15

26-Nov-15

0%

0%

0.00

GF_FA_HL_3rd Fix

MEP G 240

GF_FF_HL_3rd Fix

7 25-Nov-15

02-Dec-15

0%

0%

0.00

MEP G 250

GF_HVAC_HL_3rd Fix

7 08-Dec-15

15-Dec-15

0%

0%

0.00

MEP G 230

GF_Elec_HL_3rd Fix

7 27-Dec-15

04-Jan-16

0%

0%

0.00

MEP G 280

GF_Elec_Installation of Sub-Station Equipment & Generator

30

30 07-Jan-16

11-Feb-16

0%

0%

0.00

GF_Elec_Installation of Sub-Station Equipment

MEP G 290

GF_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 31-Jan-16

06-Feb-16

0%

0%

0.00

140

140 29-Aug-15

14-Feb-16

0%

0%

0.00

GF_Plum. & Drain_HL_3rd Fix (Sanitary Fixture


14-Feb-16, Mezz Floor

12

12 29-Aug-15

12-Sep-15

0%

33.33%

0.00

Mezz Floor

GF_FF_HL_3rd Fix
GF_HVAC_HL_3rd Fix
GF_Elec_HL_3rd Fix

MEP M 160

Mez_MEP_Embeded Wall Conduits & Sleeves

MEP M 100

Mez_Elec_HL_1st Fix

3 08-Oct-15

12-Oct-15

0%

0%

0.00

Mez_Elec_HL_1st Fix

MEP M 110

Mez_FF_HL_1st Fix

3 08-Oct-15

12-Oct-15

0%

0%

0.00

Mez_FF_HL_1st Fix

MEP M 120

Mez_HVAC_HL_1st Fix

3 08-Oct-15

12-Oct-15

0%

0%

0.00

Mez_HVAC_HL_1st Fix

MEP M 130

Mez_Plum. & Drain_HL_1st Fix

3 08-Oct-15

12-Oct-15

0%

0%

0.00

Mez_Plum. & Drain_HL_1st Fix

MEP M 140

Mez_ELV_HL_1st Fix

3 08-Oct-15

12-Oct-15

0%

0%

0.00

Mez_ELV_HL_1st Fix

MEP M 150

Mez_FA_HL_1st Fix

3 08-Oct-15

12-Oct-15

0%

0%

0.00

Mez_FA_HL_1st Fix

MEP M 170

Mez_Elec_HL_2nd Fix

10

10 12-Oct-15

24-Oct-15

0%

0%

0.00

Mez_Elec_HL_2nd Fix

MEP M 180

Mez_FF_HL_2nd Fix

10

10 12-Oct-15

24-Oct-15

0%

0%

0.00

Mez_FF_HL_2nd Fix

MEP M 190

Mez_HVAC_HL_2nd Fix

10

10 12-Oct-15

24-Oct-15

0%

0%

0.00

Mez_HVAC_HL_2nd Fix

MEP M 200

Mez_Plum. & Drain_HL_2nd Fix

10

10 12-Oct-15

24-Oct-15

0%

0%

0.00

Mez_Plum. & Drain_HL_2nd Fix

MEP M 210

Mez_ELV_HL_2nd Fix

10

10 12-Oct-15

24-Oct-15

0%

0%

0.00

Mez_ELV_HL_2nd Fix

MEP M 220

Mez_FA_HL_2nd Fix

10

10 12-Oct-15

24-Oct-15

0%

0%

0.00

Mez_FA_HL_2nd Fix

MEP M 260

Mez_ELV_HL_3rd Fix

10

10 28-Nov-15

08-Dec-15

0%

0%

0.00

Mez_ELV_HL_3rd Fix

MEP M 270

Mez_FA_HL_3rd Fix

10

10 28-Nov-15

08-Dec-15

0%

0%

0.00

Mez_FA_HL_3rd Fix

MEP M 240

Mez_FF_HL_3rd Fix

7 03-Dec-15

10-Dec-15

0%

0%

0.00

Mez_FF_HL_3rd Fix

MEP M 250

Mez_HVAC_HL_3rd Fix

7 16-Dec-15

24-Dec-15

0%

0%

0.00

MEP M 230

Mez_Elec_HL_3rd Fix

7 04-Jan-16

12-Jan-16

0%

0%

0.00

MEP M 280

Mez_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 07-Feb-16

14-Feb-16

0%

0%

0.00

134

134 12-Sep-15

21-Feb-16

0%

0%

0.00

1st Floor

Mez_MEP_Embeded Wall Conduits & Sleeves

Mez_HVAC_HL_3rd Fix
Mez_Elec_HL_3rd Fix

Mez_Plum. & Drain_HL_3rd Fix (Sanitary Fixtu


21-Feb-16, 1st Floor

MEP 1160

1FL_MEP_Embeded Wall Conduits & Sleeves

12

12 12-Sep-15

29-Sep-15

0%

0%

0.00

MEP 1100

1FL_Elec_HL_1st Fix

3 22-Oct-15

26-Oct-15

0%

0%

0.00

1FL_Elec_HL_1st Fix

MEP 1110

1FL_FF_HL_1st Fix

3 22-Oct-15

26-Oct-15

0%

0%

0.00

1FL_FF_HL_1st Fix

MEP 1120

1FL_HVAC_HL_1st Fix

3 22-Oct-15

26-Oct-15

0%

0%

0.00

1FL_HVAC_HL_1st Fix

MEP 1130

1FL_Plum. & Drain_HL_1st Fix

3 22-Oct-15

26-Oct-15

0%

0%

0.00

1FL_Plum. & Drain_HL_1st Fix

MEP 1140

1FL_ELV_HL_1st Fix

3 22-Oct-15

26-Oct-15

0%

0%

0.00

1FL_ELV_HL_1st Fix

MEP 1150

1FL_FA_HL_1st Fix

3 22-Oct-15

26-Oct-15

0%

0%

0.00

1FL_FA_HL_1st Fix

MEP 1170

1FL_Elec_HL_2nd Fix

7 26-Oct-15

03-Nov-15

0%

0%

0.00

1FL_Elec_HL_2nd Fix

MEP 1180

1FL_FF_HL_2nd Fix

7 26-Oct-15

03-Nov-15

0%

0%

0.00

1FL_FF_HL_2nd Fix

MEP 1190

1FL_HVAC_HL_2nd Fix

7 26-Oct-15

03-Nov-15

0%

0%

0.00

1FL_HVAC_HL_2nd Fix

MEP 1200

1FL_Plum. & Drain_HL_2nd Fix

7 26-Oct-15

03-Nov-15

0%

0%

0.00

1FL_Plum. & Drain_HL_2nd Fix

MEP 1210

1FL_ELV_HL_2nd Fix

7 26-Oct-15

03-Nov-15

0%

0%

0.00

1FL_ELV_HL_2nd Fix

MEP 1220

1FL_FA_HL_2nd Fix

7 26-Oct-15

03-Nov-15

0%

0%

0.00

1FL_FA_HL_2nd Fix

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 10 of 14

1FL_MEP_Embeded Wall Conduits & Sleeves

Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

2016
Mar

Feb

MEP 1260

1FL_ELV_HL_3rd Fix

10

10 09-Dec-15

21-Dec-15

0%

0%

0.00

MEP 1270

1FL_FA_HL_3rd Fix

10

10 09-Dec-15

21-Dec-15

0%

0%

0.00

1FL_FA_HL_3rd Fix

MEP 1240

1FL_FF_HL_3rd Fix

7 12-Dec-15

20-Dec-15

0%

0%

0.00

1FL_FF_HL_3rd Fix

MEP 1250

1FL_HVAC_HL_3rd Fix

7 26-Dec-15

02-Jan-16

0%

0%

0.00

MEP 1230

1FL_Elec_HL_3rd Fix

7 12-Jan-16

20-Jan-16

0%

0%

0.00

MEP 1280

1FL_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 15-Feb-16

21-Feb-16

0%

0%

0.00

128

128 29-Sep-15

28-Feb-16

0%

0%

0.00

2nd Floor

1FL_Elec_HL_3rd Fix

1FL_Plum. & Drain_HL_3rd Fix (Sanitary Fix


28-Feb-16, 2nd Floor

2FL_MEP_Embeded Wall Conduits & Sleeves

12

12 29-Sep-15

13-Oct-15

0%

0%

0.00

MEP 2110

2FL_Elec_HL_1st Fix

3 05-Nov-15

09-Nov-15

0%

0%

0.00

2FL_Elec_HL_1st Fix

MEP 2120

2FL_FF_HL_1st Fix

3 05-Nov-15

09-Nov-15

0%

0%

0.00

2FL_FF_HL_1st Fix

MEP 2130

2FL_HVAC_HL_1st Fix

3 05-Nov-15

09-Nov-15

0%

0%

0.00

2FL_HVAC_HL_1st Fix

MEP 2140

2FL_Plum. & Drain_HL_1st Fix

3 05-Nov-15

09-Nov-15

0%

0%

0.00

2FL_Plum. & Drain_HL_1st Fix

MEP 2150

2FL_ELV_HL_1st Fix

3 05-Nov-15

09-Nov-15

0%

0%

0.00

2FL_ELV_HL_1st Fix

MEP 2160

2FL_FA_HL_1st Fix

3 05-Nov-15

09-Nov-15

0%

0%

0.00

2FL_FA_HL_1st Fix

MEP 2170

2FL_Elec_HL_2nd Fix

7 09-Nov-15

17-Nov-15

0%

0%

0.00

2FL_Elec_HL_2nd Fix

MEP 2180

2FL_FF_HL_2nd Fix

7 09-Nov-15

17-Nov-15

0%

0%

0.00

2FL_FF_HL_2nd Fix

MEP 2190

2FL_HVAC_HL_2nd Fix

7 09-Nov-15

17-Nov-15

0%

0%

0.00

2FL_HVAC_HL_2nd Fix

MEP 2200

2FL_Plum. & Drain_HL_2nd Fix

7 09-Nov-15

17-Nov-15

0%

0%

0.00

2FL_Plum. & Drain_HL_2nd Fix

MEP 2210

2FL_ELV_HL_2nd Fix

7 09-Nov-15

17-Nov-15

0%

0%

0.00

2FL_ELV_HL_2nd Fix

MEP 2220

2FL_FA_HL_2nd Fix

7 09-Nov-15

17-Nov-15

0%

0%

0.00

2FL_FA_HL_2nd Fix

MEP 2240

2FL_FF_HL_3rd Fix

7 21-Dec-15

28-Dec-15

0%

0%

0.00

MEP 2260

2FL_ELV_HL_3rd Fix

10

10 22-Dec-15

02-Jan-16

0%

0%

0.00

2FL_ELV_HL_3rd Fix

MEP 2270

2FL_FA_HL_3rd Fix

10

10 22-Dec-15

02-Jan-16

0%

0%

0.00

2FL_FA_HL_3rd Fix

MEP 2250

2FL_HVAC_HL_3rd Fix

7 03-Jan-16

10-Jan-16

0%

0%

0.00

MEP 2230

2FL_Elec_HL_3rd Fix

7 20-Jan-16

28-Jan-16

0%

0%

0.00

MEP 2280

2FL_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 22-Feb-16

28-Feb-16

0%

0%

0.00

122

122 13-Oct-15

06-Mar-16

0%

0%

0.00

2FL_MEP_Embeded Wall Conduits & Sleeves

2FL_FF_HL_3rd Fix

2FL_HVAC_HL_3rd Fix
2FL_Elec_HL_3rd Fix

2FL_Plum. & Drain_HL_3rd Fix (Sanitary F


06-Mar-16, 3rd Floor

MEP 3100

3FL_MEP_Embeded Wall Conduits & Sleeves

12

12 13-Oct-15

27-Oct-15

0%

0%

0.00

MEP 3110

3FL_Elec_HL_1st Fix

3 19-Nov-15

23-Nov-15

0%

0%

0.00

3FL_Elec_HL_1st Fix

MEP 3120

3FL_FF_HL_1st Fix

3 19-Nov-15

23-Nov-15

0%

0%

0.00

3FL_FF_HL_1st Fix

MEP 3130

3FL_HVAC_HL_1st Fix

3 19-Nov-15

23-Nov-15

0%

0%

0.00

3FL_HVAC_HL_1st Fix

MEP 3140

3FL_Plum. & Drain_HL_1st Fix

3 19-Nov-15

23-Nov-15

0%

0%

0.00

3FL_Plum. & Drain_HL_1st Fix

MEP 3150

3FL_ELV_HL_1st Fix

3 19-Nov-15

23-Nov-15

0%

0%

0.00

3FL_ELV_HL_1st Fix

MEP 3160

3FL_FA_HL_1st Fix

3 19-Nov-15

23-Nov-15

0%

0%

0.00

3FL_FA_HL_1st Fix

MEP 3170

3FL_Elec_HL_2nd Fix

7 23-Nov-15

01-Dec-15

0%

0%

0.00

3FL_Elec_HL_2nd Fix

MEP 3180

3FL_FF_HL_2nd Fix

7 23-Nov-15

01-Dec-15

0%

0%

0.00

3FL_FF_HL_2nd Fix

MEP 3190

3FL_HVAC_HL_2nd Fix

7 23-Nov-15

01-Dec-15

0%

0%

0.00

3FL_HVAC_HL_2nd Fix

MEP 3200

3FL_Plum. & Drain_HL_2nd Fix

7 23-Nov-15

01-Dec-15

0%

0%

0.00

3FL_Plum. & Drain_HL_2nd Fix

MEP 3210

3FL_ELV_HL_2nd Fix

7 23-Nov-15

01-Dec-15

0%

0%

0.00

3FL_ELV_HL_2nd Fix

MEP 3220

3FL_FA_HL_2nd Fix

7 23-Nov-15

01-Dec-15

0%

0%

0.00

3FL_FA_HL_2nd Fix

MEP 3240

3FL_FF_HL_3rd Fix

7 29-Dec-15

05-Jan-16

0%

0%

0.00

MEP 3260

3FL_ELV_HL_3rd Fix

10

10 03-Jan-16

13-Jan-16

0%

0%

0.00

3FL_ELV_HL_3rd Fix

MEP 3270

3FL_FA_HL_3rd Fix

10

10 03-Jan-16

13-Jan-16

0%

0%

0.00

3FL_FA_HL_3rd Fix

MEP 3250

3FL_HVAC_HL_3rd Fix

7 11-Jan-16

18-Jan-16

0%

0%

0.00

MEP 3230

3FL_Elec_HL_3rd Fix

7 28-Jan-16

06-Feb-16

0%

0%

0.00

MEP 3280

3FL_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 29-Feb-16

06-Mar-16

0%

0%

0.00

118

118 25-Oct-15

13-Mar-16

0%

0%

0.00

4th Floor

3FL_MEP_Embeded Wall Conduits & Sleeves

3FL_FF_HL_3rd Fix

3FL_HVAC_HL_3rd Fix
3FL_Elec_HL_3rd Fix

3FL_Plum. & Drain_HL_3rd Fix (Sanitary


13-Mar-16, 4th Floor

MEP 4100

4FL_MEP_Embeded Wall Conduits & Sleeves

12

12 25-Oct-15

08-Nov-15

0%

0%

0.00

MEP 4110

4FL_Elec_HL_1st Fix

3 01-Dec-15

05-Dec-15

0%

0%

0.00

4FL_Elec_HL_1st Fix

MEP 4120

4FL_FF_HL_1st Fix

3 01-Dec-15

05-Dec-15

0%

0%

0.00

4FL_FF_HL_1st Fix

MEP 4130

4FL_HVAC_HL_1st Fix

3 01-Dec-15

05-Dec-15

0%

0%

0.00

4FL_HVAC_HL_1st Fix

MEP 4140

4FL_Plum. & Drain_HL_1st Fix

3 01-Dec-15

05-Dec-15

0%

0%

0.00

4FL_Plum. & Drain_HL_1st Fix

MEP 4150

4FL_ELV_HL_1st Fix

3 01-Dec-15

05-Dec-15

0%

0%

0.00

4FL_ELV_HL_1st Fix

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 11 of 14

MayJun

1FL_HVAC_HL_3rd Fix

MEP 2100

3rd Floor

Apr

1FL_ELV_HL_3rd Fix

4FL_MEP_Embeded Wall Conduits & Sleeves

Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

2016
Mar

Feb

Apr

MayJun

MEP 4160

4FL_FA_HL_1st Fix

3 01-Dec-15

05-Dec-15

0%

0%

0.00

MEP 4170

4FL_Elec_HL_2nd Fix

7 05-Dec-15

13-Dec-15

0%

0%

0.00

4FL_Elec_HL_2nd Fix

MEP 4180

4FL_FF_HL_2nd Fix

7 05-Dec-15

13-Dec-15

0%

0%

0.00

4FL_FF_HL_2nd Fix

MEP 4190

4FL_HVAC_HL_2nd Fix

7 05-Dec-15

13-Dec-15

0%

0%

0.00

4FL_HVAC_HL_2nd Fix

MEP 4200

4FL_Plum. & Drain_HL_2nd Fix

7 05-Dec-15

13-Dec-15

0%

0%

0.00

4FL_Plum. & Drain_HL_2nd Fix

MEP 4210

4FL_ELV_HL_2nd Fix

7 05-Dec-15

13-Dec-15

0%

0%

0.00

4FL_ELV_HL_2nd Fix

MEP 4220

4FL_FA_HL_2nd Fix

7 05-Dec-15

13-Dec-15

0%

0%

0.00

4FL_FA_HL_2nd Fix

MEP 4240

4FL_FF_HL_3rd Fix

7 06-Jan-16

13-Jan-16

0%

0%

0.00

MEP 4260

4FL_ELV_HL_3rd Fix

10

10 14-Jan-16

25-Jan-16

0%

0%

0.00

4FL_ELV_HL_3rd Fix

MEP 4270

4FL_FA_HL_3rd Fix

10

10 14-Jan-16

25-Jan-16

0%

0%

0.00

4FL_FA_HL_3rd Fix

MEP 4250

4FL_HVAC_HL_3rd Fix

7 19-Jan-16

26-Jan-16

0%

0%

0.00

4FL_HVAC_HL_3rd Fix

MEP 4230

4FL_Elec_HL_3rd Fix

7 06-Feb-16

15-Feb-16

0%

0%

0.00

MEP 4280

4FL_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 07-Mar-16

13-Mar-16

0%

0%

0.00

111

111 08-Nov-15

19-Mar-16

0%

0%

0.00

5th Floor

4FL_FA_HL_1st Fix

4FL_FF_HL_3rd Fix

4FL_Elec_HL_3rd Fix

4FL_Plum. & Drain_HL_3rd Fix (Sanita


19-Mar-16, 5th Floor

MEP 5100

5FL_MEP_Embeded Wall Conduits & Sleeves

12

12 08-Nov-15

22-Nov-15

0%

0%

0.00

MEP 5110

5FL_Elec_HL_1st Fix

3 15-Dec-15

20-Dec-15

0%

0%

0.00

5FL_Elec_HL_1st Fix

MEP 5120

5FL_FF_HL_1st Fix

3 15-Dec-15

20-Dec-15

0%

0%

0.00

5FL_FF_HL_1st Fix

MEP 5130

5FL_HVAC_HL_1st Fix

3 15-Dec-15

20-Dec-15

0%

0%

0.00

5FL_HVAC_HL_1st Fix

MEP 5140

5FL_Plum. & Drain_HL_1st Fix

3 15-Dec-15

20-Dec-15

0%

0%

0.00

5FL_Plum. & Drain_HL_1st Fix

MEP 5150

5FL_ELV_HL_1st Fix

3 15-Dec-15

20-Dec-15

0%

0%

0.00

5FL_ELV_HL_1st Fix

MEP 5160

5FL_FA_HL_1st Fix

3 15-Dec-15

20-Dec-15

0%

0%

0.00

5FL_FA_HL_1st Fix

MEP 5170

5FL_Elec_HL_2nd Fix

7 20-Dec-15

28-Dec-15

0%

0%

0.00

5FL_Elec_HL_2nd Fix

MEP 5180

5FL_FF_HL_2nd Fix

7 20-Dec-15

28-Dec-15

0%

0%

0.00

5FL_FF_HL_2nd Fix

MEP 5190

5FL_HVAC_HL_2nd Fix

7 20-Dec-15

28-Dec-15

0%

0%

0.00

5FL_HVAC_HL_2nd Fix

MEP 5200

5FL_Plum. & Drain_HL_2nd Fix

7 20-Dec-15

28-Dec-15

0%

0%

0.00

5FL_Plum. & Drain_HL_2nd Fix

MEP 5210

5FL_ELV_HL_2nd Fix

7 20-Dec-15

28-Dec-15

0%

0%

0.00

5FL_ELV_HL_2nd Fix

MEP 5220

5FL_FA_HL_2nd Fix

7 20-Dec-15

28-Dec-15

0%

0%

0.00

5FL_FA_HL_2nd Fix

MEP 5240

5FL_FF_HL_3rd Fix

7 16-Jan-16

24-Jan-16

0%

0%

0.00

MEP 5260

5FL_ELV_HL_3rd Fix

10

10 26-Jan-16

06-Feb-16

0%

0%

0.00

MEP 5270

5FL_FA_HL_3rd Fix

10

10 26-Jan-16

06-Feb-16

0%

0%

0.00

MEP 5250

5FL_HVAC_HL_3rd Fix

7 27-Jan-16

03-Feb-16

0%

0%

0.00

MEP 5230

5FL_Elec_HL_3rd Fix

7 15-Feb-16

23-Feb-16

0%

0%

0.00

MEP 5280

5FL_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 13-Mar-16

19-Mar-16

0%

0%

0.00

101

101 25-Nov-15

24-Mar-16

0%

0%

0.00

6th Floor

5FL_MEP_Embeded Wall Conduits & Sleeves

5FL_FF_HL_3rd Fix
5FL_ELV_HL_3rd Fix
5FL_FA_HL_3rd Fix
5FL_HVAC_HL_3rd Fix
5FL_Elec_HL_3rd Fix

5FL_Plum. & Drain_HL_3rd Fix (Sani


24-Mar-16, 6th Floor

MEP 6100

6FL_MEP_Embeded Wall Conduits & Sleeves

12

12 25-Nov-15

09-Dec-15

0%

0%

0.00

MEP 6110

6FL_Elec_HL_1st Fix

3 03-Jan-16

06-Jan-16

0%

0%

0.00

6FL_Elec_HL_1st Fix

MEP 6120

6FL_FF_HL_1st Fix

3 03-Jan-16

06-Jan-16

0%

0%

0.00

6FL_FF_HL_1st Fix

MEP 6130

6FL_HVAC_HL_1st Fix

3 03-Jan-16

06-Jan-16

0%

0%

0.00

6FL_HVAC_HL_1st Fix

MEP 6140

6FL_Plum. & Drain_HL_1st Fix

3 03-Jan-16

06-Jan-16

0%

0%

0.00

6FL_Plum. & Drain_HL_1st Fix

MEP 6150

6FL_ELV_HL_1st Fix

3 03-Jan-16

06-Jan-16

0%

0%

0.00

6FL_ELV_HL_1st Fix

MEP 6160

6FL_FA_HL_1st Fix

3 03-Jan-16

06-Jan-16

0%

0%

0.00

6FL_FA_HL_1st Fix

MEP 6170

6FL_Elec_HL_2nd Fix

7 06-Jan-16

14-Jan-16

0%

0%

0.00

6FL_Elec_HL_2nd Fix

MEP 6180

6FL_FF_HL_2nd Fix

7 06-Jan-16

14-Jan-16

0%

0%

0.00

6FL_FF_HL_2nd Fix

MEP 6190

6FL_HVAC_HL_2nd Fix

7 06-Jan-16

14-Jan-16

0%

0%

0.00

6FL_HVAC_HL_2nd Fix

MEP 6200

6FL_Plum. & Drain_HL_2nd Fix

7 06-Jan-16

14-Jan-16

0%

0%

0.00

6FL_Plum. & Drain_HL_2nd Fix

MEP 6210

6FL_ELV_HL_2nd Fix

7 06-Jan-16

14-Jan-16

0%

0%

0.00

6FL_ELV_HL_2nd Fix

MEP 6220

6FL_FA_HL_2nd Fix

7 06-Jan-16

14-Jan-16

0%

0%

0.00

6FL_FA_HL_2nd Fix

MEP 6240

6FL_FF_HL_3rd Fix

7 24-Jan-16

01-Feb-16

0%

0%

0.00

MEP 6250

6FL_HVAC_HL_3rd Fix

7 04-Feb-16

13-Feb-16

0%

0%

0.00

6FL_HVAC_HL_3rd Fix

MEP 6260

6FL_ELV_HL_3rd Fix

10

10 07-Feb-16

18-Feb-16

0%

0%

0.00

6FL_ELV_HL_3rd Fix

MEP 6270

6FL_FA_HL_3rd Fix

10

10 07-Feb-16

18-Feb-16

0%

0%

0.00

6FL_FA_HL_3rd Fix

MEP 6230

6FL_Elec_HL_3rd Fix

7 23-Feb-16

02-Mar-16

0%

0%

0.00

MEP 6280

6FL_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 19-Mar-16

24-Mar-16

0%

0%

0.00

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 12 of 14

6FL_MEP_Embeded Wall Conduits & Sleeves

6FL_FF_HL_3rd Fix

6FL_Elec_HL_3rd Fix

6FL_Plum. & Drain_HL_3rd Fix (San


Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

7th Floor

91

91 13-Dec-15

30-Mar-16

0%

0%

0.00

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

Apr
MayJun
30-Mar-16, 7th Floor

MEP 7100

7FL_MEP_Embeded Wall Conduits & Sleeves

12

12 13-Dec-15

28-Dec-15

0%

0%

0.00

MEP 7110

7FL_Elec_HL_1st Fix

3 20-Jan-16

24-Jan-16

0%

0%

0.00

7FL_Elec_HL_1st Fix

MEP 7120

7FL_FF_HL_1st Fix

3 20-Jan-16

24-Jan-16

0%

0%

0.00

7FL_FF_HL_1st Fix

MEP 7130

7FL_HVAC_HL_1st Fix

3 20-Jan-16

24-Jan-16

0%

0%

0.00

7FL_HVAC_HL_1st Fix

MEP 7140

7FL_Plum. & Drain_HL_1st Fix

3 20-Jan-16

24-Jan-16

0%

0%

0.00

7FL_Plum. & Drain_HL_1st Fix

MEP 7150

7FL_ELV_HL_1st Fix

3 20-Jan-16

24-Jan-16

0%

0%

0.00

7FL_ELV_HL_1st Fix

MEP 7160

7FL_FA_HL_1st Fix

3 20-Jan-16

24-Jan-16

0%

0%

0.00

7FL_FA_HL_1st Fix

MEP 7170

7FL_Elec_HL_2nd Fix

7 24-Jan-16

01-Feb-16

0%

0%

0.00

7FL_Elec_HL_2nd Fix

MEP 7180

7FL_FF_HL_2nd Fix

7 24-Jan-16

01-Feb-16

0%

0%

0.00

7FL_FF_HL_2nd Fix

MEP 7190

7FL_HVAC_HL_2nd Fix

7 24-Jan-16

01-Feb-16

0%

0%

0.00

7FL_HVAC_HL_2nd Fix

MEP 7200

7FL_Plum. & Drain_HL_2nd Fix

7 24-Jan-16

01-Feb-16

0%

0%

0.00

7FL_Plum. & Drain_HL_2nd Fix

MEP 7210

7FL_ELV_HL_2nd Fix

7 24-Jan-16

01-Feb-16

0%

0%

0.00

7FL_ELV_HL_2nd Fix

MEP 7220

7FL_FA_HL_2nd Fix

7 24-Jan-16

01-Feb-16

0%

0%

0.00

7FL_FA_HL_2nd Fix

MEP 7240

7FL_FF_HL_3rd Fix

7 01-Feb-16

10-Feb-16

0%

0%

0.00

MEP 7250

7FL_HVAC_HL_3rd Fix

7 14-Feb-16

21-Feb-16

0%

0%

0.00

7FL_HVAC_HL_3rd Fix

MEP 7260

7FL_ELV_HL_3rd Fix

10

10 20-Feb-16

01-Mar-16

0%

0%

0.00

7FL_ELV_HL_3rd Fix

MEP 7270

7FL_FA_HL_3rd Fix

10

10 20-Feb-16

01-Mar-16

0%

0%

0.00

7FL_FA_HL_3rd Fix

MEP 7230

7FL_Elec_HL_3rd Fix

7 02-Mar-16

10-Mar-16

0%

0%

0.00

MEP 7280

7FL_Plum. & Drain_HL_3rd Fix (Sanitary Fixtures)

5 24-Mar-16

30-Mar-16

0%

0%

0.00

86

86 06-Dec-15

17-Mar-16

0%

0%

0.00

Miscellaneous Items

7FL_MEP_Embeded Wall Conduits & Sleeves

7FL_FF_HL_3rd Fix

7FL_Elec_HL_3rd Fix

7FL_Plum. & Drain_HL_3rd Fix (S


17-Mar-16, Miscellaneous Items
13-Mar-16, Roof

82

82 06-Dec-15

13-Mar-16

0%

0%

0.00

MISC200

Roof Parapets

7 06-Dec-15

14-Dec-15

0%

0%

0.00

MISC190

Equipment Bases

7 14-Dec-15

23-Dec-15

0%

0%

0.00

MISC210

Roof Masonry Works

5 23-Dec-15

29-Dec-15

0%

0%

0.00

Roof Masonry Works

MISC220

Roof Plaster Works

5 29-Dec-15

04-Jan-16

0%

0%

0.00

Roof Plaster Works

MISC180

Roof Waterproofing & Screed

21

21 04-Jan-16

28-Jan-16

0%

0%

0.00

MISC230

Roof Painting Works

7 28-Jan-16

06-Feb-16

0%

0%

0.00

MISC240

Installation of AC Outer Units

7 06-Feb-16

15-Feb-16

0%

0%

0.00

Installation of AC Outer Units

MISC250

Installation of Water Tanks

10

10 06-Feb-16

18-Feb-16

0%

0%

0.00

Installation of Water Tanks

MISC340

Installation of BMU

30

30 06-Feb-16

13-Mar-16

0%

0%

0.00

86

86 06-Dec-15

17-Mar-16

0%

0%

0.00

Roof

Risers & Stairs

Roof Parapets
Equipment Bases

Roof Waterproofing & Screed


Roof Painting Works

Installation of BMU
17-Mar-16, Risers & Stairs

MISC300

Installation & Testing of Elevators

60

60 06-Dec-15

16-Feb-16

0%

0%

0.00

MISC290

MEP Risers

30

30 24-Jan-16

29-Feb-16

0%

0%

0.00

MISC260

Stair Tiling

15

15 03-Feb-16

22-Feb-16

0%

0%

0.00

MISC270

Hanrdrails for Stairs

21

21 22-Feb-16

17-Mar-16

0%

0%

0.00

Hanrdrails for Stairs

MISC280

Shafts Snagging Works

15

15 29-Feb-16

17-Mar-16

0%

0%

0.00

131

131 14-Dec-15

17-May-16

0%

0%

0.00

Shafts Snagging Works


17-May-16, External F

120

120 14-Dec-15

04-May-16

0%

0%

0.00

External Finishing
Facades

Installation & Testing of Elevators


MEP Risers
Stair Tiling

04-May-16, Facades

EFIN10

Erection of External Scaffolding

15

15 14-Dec-15

02-Jan-16

0%

0%

0.00

EFIN70

Curtain Walls & Glazing

58

58 02-Jan-16

10-Mar-16

0%

0%

0.00

Curtain Walls & Glazing

EFIN20

External Plaster

30

30 22-Feb-16

28-Mar-16

0%

0%

0.00

External Plaster

EFIN50

Installation of Aluminum Windows

30

30 10-Mar-16

14-Apr-16

0%

0%

0.00

Installation of Aluminum Window

EFIN30

External Painting 1st Stage

14

14 28-Mar-16

13-Apr-16

0%

0%

0.00

External Painting 1st Stage

EFIN40

External Painting Final Stage

15

15 13-Apr-16

01-May-16

0%

0%

0.00

External Painting Final Stag

EFIN80

Scaffolding Removal

7 26-Apr-16

04-May-16

0%

0%

0.00

68

68 28-Feb-16

17-May-16

0%

0%

0.00

Scaffolding Removal
17-May-16, Land Scap

Hard Landscaping & Bounda

Land Scape

Erection of External Scaffolding

EFIN100

Hard Landscaping & Boundary Wall

50

50 28-Feb-16

26-Apr-16

0%

0%

0.00

EFIN90

Green Areas

15

15 30-Apr-16

17-May-16

0%

0%

0.00

30

30 18-Apr-16

23-May-16

0%

0%

0.00

Green Areas
23-May-16, Handing

30

30 18-Apr-16

23-May-16

0%

0%

0.00

23-May-16, No Level

15

15 18-Apr-16

05-May-16

0%

0%

0.00

Handing Over
No Level
MISC310

Final Testing & Comessioning

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Page 13 of 14

Final Testing & Comession


Date
28-May-15

Revision
Rev. 02

Checked

Approved

Najma (4B+G+M+7) Commercial Building- Revised BL - Update 25.07.2015


Activity ID

Activity Name

P 106 - MONTHLY UPDATE - JULY 2015

Original Remaining Start


Duration
Duration

Finish

Performance
% Complete

Schedule %
Complete

SPI
Feb

MISC320

De-mobilization of Temporary Site Facilities

MISC330

Handing Over to Authorities

Remaining Level of Effort

Actual Work

Critical Remaining Work

Primary Baseline

Remaining Work

Milestone

Mar

Apr

May

2015
Jun
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

2016
Mar

Apr

MayJun

3 04-May-16

08-May-16

0%

0%

0.00

De-mobilization of Tempo

15

15 05-May-16

23-May-16

0%

0%

0.00

Handing Over to Auth

Page 14 of 14