ITP Tank Recertification
ITP Tank Recertification
ITP Tank Recertification
No
:
:
:
:
:
Legend
P
V
R
A
ACTIFITY
Document
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
Document Dossier
History Card
Drawing
Name Plate
Repair Procedure
WPS/PQR
Welder Certificate
Testing Procedure
Pre Inspection
:
:
:
:
:
Prepare
Verified
Review
Approval
REFERENCE DOC
VERIFY
DOCUMENT
API 650
Maintenance Procedure
API 650
API 650
API 653
API 650
API 650
API 650
API 2015
API 2015
LEVEL OF INSPECTION
OWNER
PJIT
Document Dossier
History record
As Built Drawing
Name Plate
Repair Procedure
WPS/PQR
Welder Certificates
Testing Procedure
P
P
P
P
P
P
P
P
R
R
R
R
R
R
R
R
Record
NA
P
P
V
V
MIGAS
Inspection
3
3.1 Material
3.1.1. Mill Certificate
3.1.2. Visual Inspection
3.1.3. Dimensional
3.2 Field Inspection
3.2.1. Visual Inspection
3.2.1.1. Shell
3.2.1.2. Bottom
3.2.1.3. Roof
3.2.1.4. Nozzle
3.2.1.5. Foundation
3.2.1.6. Attachment
3.2.1.7. Instrument
3.2.1.8. Fire Protection
3.2.1.9. Lighting System
Mill Certificates
Report
Report
P
P
P
R/V
V
V
API 650
SOP
Inspection Report
Inspection Report
MPI Report
UT Report
Vaccum Report
P
P
P
V
V
V
ASME SEC. V
ASME SEC. V
ASME SEC. V
Testing
4
4.1 Full Water
4.2 Settlement
API 650
API 653
FW Record
Report
P
P
H
V
Reporting
5
5.1 Executive Summary Report
5.2 Tank Certification
SK Migas 39K
SK Migas 39K
Reporting
SKPP
R
-
P
P
OWNER
_______________________
PJIT
MIGAS
______________________
______________