E-Line DK

Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

A N D EN ITY V IR AL

MENTAL MAN ON

IEC 60439-2

ISO 9001 14001

ME 04

www.eae.com.tr
ULA TANITIM / E.E./ A.A./ 612 40 66

Cakmakli Mahallesi, 2. Cadde, 119. Sokak, No:12 34522 Kirac-Hadimkoy-Istanbul-TURKEY Tel: +90 (212) 886 23 90 Fax: +90 (212) 886 24 20

EAE has full right to make any revisions or chances on this catalogue without any prior notice.

E AG
MENT SYSTE

Catalogue 09 / 00 - Ing. 2.000 Pcs 13/05/2008

QU

Underfloor Ducting systems for wiring management of Power, Data, Audio-Visual, Alarm, Telephone facilities for Business Centres, Bank, Offices, Conference Halls, Hotels, etc.

www.eae.com.tr

CONTENTS

General Description D Junction Box System Installation Layout D Product Selection Table B Junction Box System Installation Layout B Product Selection Table Accessories A Junction Box System Installation Layout A Product Selection Table Underfloor Ducting System Installation Coat Wire Application

2-3 4-5 6-7 8-9 10-11 12-13 14 15 16 16

E LINE DK
Underfloor Ducting Systems
E-Line Underfloor Ducting system is a modular and modern cable management system that brings solutions for any changes in connection with wiring at the time of installation or in future, and thus proves to be a good support to meet any requirement that may arise during operation. E-line Underfloor Ducting Systems ensures aesthetic, safe and reliable cable management by eliminating the wiring-related confusion caused in the working environments.
E L E K T R K

E LINE DK
Underfloor Ducting Systems
Output Junction Box
Cover that can be fitted in both directions Lockable Cable protection covers Capacity of 16 different outputs Easy to use Decorative appearance

Applicable Fields
Banks Shopping Centres Modern offices Hotels Hospitals Conference Halls Course Buildings Cinema and Theatre Halls Touristic facilities Elevated floor Similar spaces.

Accessories making it easy for socket and cable installation Robust and sound construction Junction Box Cover Set M
35 906

Output Junction Box N

96 976

Junction Box
Easy conformance to projects

Connection Junction Box K

96 977

Significant Advantages
Easy Planning Possibility of multiple outlet Easy and quick cable ducting Robust and sound construction Elasticity cable ducting Decorative appearance Easy and functional use E-Line ; adapts itself easily to any modifications or capacity increase in the working environment of the office. Access to the system is very easy. Possible needs in future are met easily thanks to wide ducts and flexible outlet boxes. Systems capacity is increased without any negative effect on decoration.

Ability of 4-directional outlets Adjustment possibility before and after alum Smooth adjustment capability up to 7-10 cm heights Fitting output box feature Robust and functional construction Fast and easy installation Output Junction Box N
96 482

Safe cable ducting

E L INE D
Junction Box System Installation Layout
E L E K T R K

Con

nec t

ion

Jun 96 ction 977 Box K

(45

0x4 50)

Out

put Jun cti 35 on Bo 821 x M

(45 0x

450 )

Out p

ut J u

nct 96 ion Bo 976 x N (4

50x

450 )

Out put J

unc t 96 ion Bo 978 x N (3

60x

360 )

Out p

ut J

unc ti 35 on Bo 820 x M (3

60x

360 )

Con nec t

ion

Jun 96 ction 979 Box K

(36 0x3 60)

E LINE B
Junction Box System Installation Layout
E L E K T R K

Out put Jun c ti o 35 n Box 818 N-

2 (3

60x 720 )

Out put Jun ct 96 ion Bo 482 x N

(36 0x3 60

Out put Jun cti 35 on Bo 819 x M

(36 0x3 60)

E LINE DK
Installation Instructions / Coat Wire Application
COAT WIRE APPLICATION;

Attachment of the Ducts

Underloor Ducting systems, in case the screed thickness is small, before pouring the screed " Rabitz wire" (thin grid wire) should be applied. In this application a thin cement mortar layer has to be poured upon the duct and then Rabitz grid shold be laid, then another cement mortar layer should be poured on the Rabitz grid, finally the regular screed should be poured, after that the application is complete.

Pull a rope suitable to the system

Attach the supplementary components to the tab of the duct

Cut the resin according to the channel width

Install the other duct to the supplementary component

Yield the resin for the duct insertion

Perform level adjustment of the junction box at the gauge

14

Install the duct into the inlet of the junction box

Perform level adjustment of the attachment at the gauge

Completing the connection

Apply smoothing alum

16

1- Pull the rope according to duct layout and alum heights described in the project. 2- Begin installation first from the junction boxes. 3- If construction conditions are suitable, smoothing alum should be applied onto the mat concrete 4- After that, perform installation of Sub Channels and Junction Boxes with water gauge. 5- If smoothing alum is not applied, ensure that the upper point of the junction box, channels and outlet windows are at the same level. 6- Initially fix the system to the ground from specific points. 7- Install the transparent plastic protective covers of the junction boxes. 8- While applying alum, ensure that the system installer electricity technician is present. 9- Install the output boxes after the ground covering has been completed.