Jenbacher

Documentation

Technical Instruction No.: 1000-0041

Requirements for the arrangement surface of GE Jenbacher plants

1. Purpose: ___________________________________________________________1 2. General: ___________________________________________________________1 3. Arrangement surface: ________________________________________________1


3.1 3.2 3.2.1 3.2.2 3.2.3 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.4 Load-bearing capacity of the arrangement surface: Size of the arrangement surface: Modules: Container trailer: Container: Flatness requirements for the arrangement surface: Modules: Container trailer: Container: If the contractor intends to use a grouting compound to meet the flatness criteria, the following minimum requirements should be met: Surface treatment of the arrangement surface: 1 1 1 2 2 2 2 2 2 2 2

1. Purpose:
This Technical Instruction describes the requirements for the arrangement surface of GE Jenbacher plants in terms of flatness, dimensions and load-bearing capacity

2. General:
The particular advantages of our basic engine conception are the high speed and the special balance of the moved masses. Based on these characteristics, the requirements in terms of the static and dynamic load-bearing capacity of the arrangement surface are minimal. However, because of the specially designed frame construction of our elastic module bearings (engine and generator), very strict requirements have been laid down in terms of the flatness of the arrangement surface.

3. Arrangement surface:
3.1 Load-bearing capacity of the arrangement surface: The arrangement surface must be capable of withstanding the static and dynamic loads of GE Jenbacher plants. Static load Dynamic load 3.2 = = Plant weight 3% of plant weight

Size of the arrangement surface: The arrangement surface can be either a pedestal, a paved surface or the engine-room floor.

3.2.1 Modules: The standard size of the arrangement surface is (frame length +200 mm [7,874 in]) x (frame width +200mm [7,874 in]). If an oil collection tray is used as an option, make sure that the dimensions of the arrangement surface at least match those of the oil collection tray.

Author:

Doku./Beck (BAL07) 1000-0041_EN.doc

Checked: Index:

Dokumentation f1

Date: 2002-06 Page No.: 1 / 2

EN

Jenbacher
Documentation

Technical Instruction No.: 1000-0041

Requirements for the arrangement surface of GE Jenbacher plants

3.2.2 Container trailer: The standard size of the arrangement surface is (trailer length +200 mm) x (trailer width +200 mm). 3.2.3 Container: The container arrangement surface can be either a strip or a slab foundation. The surface dimensions are contained in the foundation plan or the a base-frame drawing. 3.3 Flatness requirements for the arrangement surface:

3.3.1 Modules: Contrary to the standards formulated and valid at this time, it has been agreed that the flatness requirement for the arrangement surface of the installation will be increased to 1.5mm measured across the entire arrangement surface. 3.3.2 Container trailer: The trailer is arranged horizontally (check using a spirit level). Use support plates if required!

3.3.3 Container: The containers are normally supplied with support plates to enable the container to be arranged horizontally. 3.3.4 If the contractor intends to use a grouting compound to meet the flatness criteria, the following minimum requirements should be met: a) b) c) Minimum amount of swelling 0.1% Volume stability Resistance to pressure

The minimum resistance to pressure should be 25 N/mm after 24 hours and 55 N/mm after 28 days. After 56 and 90 days respectively, there should be no noticeable reduction in the resistance to pressure. Any remaining unevenness can be compensated by inserting plates between the module arrangement surface and the Sylomer strips. The shim plate thickness must correspond to the deviation (between the plant arrangement surface and the sylomer strips) plus 2 mm. 3.4 Surface treatment of the arrangement surface: It is advisable to make the arrangement surface oil- and water-resistant by applying a protective coating. Many grout products are already water- and oil-resistant, in which case a protective coating is not required.

Author:

Doku./Beck (BAL07) 1000-0041_EN.doc

Checked: Index:

Dokumentation f1

Date: 2002-06 Page No.: 2 / 2