Academia.edu no longer supports Internet Explorer.
To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to upgrade your browser.
2013
This modelling is the result of research about developing analysis of Sabour’s (2003) mathematic model using marginal analysis concept to determine optimum production rate. The case study is located at East Barito District, Central Kalimantan Province. This model is developed by adding some relevant parameters to find mathematical model of optimum production rate. The solution model is produced by integrating result of development of Sabour’s mathematical model with the cash flow model for coal open pit mining. The values of production rates is determined by literating and obtaining 4,563 ton/day. That condition will produce maximum NPV, which is USD 1,760,746,878. The solution model resulted is relevant to apply in case study area. The considerations are: the input data are the same, the value of IRR is higher than discount rate (56,58%) and also the value of NPV from solution model is higher than the value of NPV from company projection (USD 1,760,746,878: USD 1,050,031,850) Keywo...
Prosiding Temu Profesi Tahunan PERHAPI, 2020
Prosiding Teknik Pertambangan, 2016
2020
Pemodelan desain tambang ialah proses untuk mencapai (ultimate pit limit) dalam jangka waktu tertentu secara aman dan menguntungkan, urutan penambangan bulanan/tahunan, penjadwalan produksi dan waste dump. Tujuan pemodelan desain ialah untuk mempermudah penjadwalan produksi baik tahunan, bulanan hingga mingguan/harian. Sebelum pembuatan desain pit yang diperlukan adalah lebar bench,tinggi bench, kemiringan bench, lebar jalan angkut, serta peta situasi. Tahapan pembuatan desain pit diawali dari pembuatan boundary pit, pembuatan project and offset, pembuatan triangles, pembuatan intersection pit design dengan peta situasi, pembuatan clip world, pembuatan cross section, pembuatan plotting, serta perhitungan reserves. Produksi batubara pada pit Barat bulan April 2019 sebesar 264.000,000 ton serta dengan menggunakan software Minescape 4.119 sebesar 298.240,390 ton dan SR yang didapat 5:1 yang artinya 5 volume overburden dan 1 volume tonase batubara.
Jurnal GEOSAPTA
PT Global Indonesia Mandiri (GIM) merupakan perusahaan yang bergerak dalam bidang penambangan batubara, Di dalam melakukan kegiatan penambangannya PT Global Indonesia Mandiri memerlukan desain tambang sebagai pedoman atau pegangan agar dapat mencapai sasaran dan tujuannya. PT GIM untuk memenuhi sasaran dan tujuannya itu maka memerlukan design pit dan perhitungan cadangannya sebagai pedoman. Hal yang diperlukan untuk itu di antaranya adalah ; perhitungan sumberdaya, permodelan endapan batubara, design pit, perhitungan cadangan tertambang dan penentuan batas pit limit yang dalam hal ini adalah batas IUP PT Global Indonesia Mandiri sehingga didapat kondisi dan gambaran untuk perencanaan tambang yang baik. Perhitungan sumberdaya dan cadangan batubara, permodelan endapan batubara dan penentuan batas penambangan mengacu pada batas IUP PT Global Indonesia Mandiri serta perancangan pit mengacu kepada data rekomendasi geoteknik yang telah ditentukan perusahaan.Hasil yang didapat dari penelit...
Teknik Pertambangan Unsri, 2019
ABSTRAK Pemilihan besar parameter geometri lereng tambang terbuka mempengaruhi nilai faktor keamanan (FK) lereng final. Parameter geometri lereng terdiri dari lebar, tinggi, dan sudut kemiringan lereng. Semakin besar lebar lereng semakin tinggi nilai faktor keamanan (FK) lereng. Semakin kecil lebar lereng maka semakin kecil area overburden yang perlu dikupas sehingga hasil penambangan lebih efisien. Faktor keamanan lereng dapat dianggap aman bila FK > 1,25, FK = 1-2,5 lereng kritis, FK < 1 berpotensi besar longsor. Penelitian bertujuan mendapatkan teknis optimasi dengan lebar lereng lebih kecil namun dengan nilai faktor keamanan yang aman dengan pendekatan simulasi lereng backfilling. Studi kasus penelitian dilakukan di tambang batubara Site TSBC, PT Bukit Asam Tbk., Kabupaten Muara Enim, Provinsi Sumatera Selatan. Penambangan dilakukan dengan peralatan shovel and trucks. Metode penguraian material dengan peledakan dan ripping. Geometri lereng final direncanakan dengan parameter lebar berm 15 m, tinggi 8 m, dan sudut kemiringan lereng 45°. Pengolahan data dilakukan menggunakan perangkat lunak minescape 5.7, rocscience slide 6.0, AutoCAD 2014. Estimasi total menunjukkan luasan area penghematan antara lereng final berm 10 dan 15 sebesar 8,79%. Perhitungan nilai FK dilakukan pada section A1 lowwall utara, B2 sidewall timur, dan C1 sidewall barat. Hasil perhitungan menunjukkan, section A1 berm 10 dan 15 memiliki nilai FK < 1,25. Sedangkan section B2 dan C1 antara berm 10 dan 15, FK > 1,25. FK > 1,25 berada pada ketinggian backfilling 48 muntuk keadaan statik, dan 72 m untuk keadaan pseudo-statik. Kata-kata kunci: optimasi, faktor keamanan, lereng, backfilling Selection of geometry parameters of open pit slopes affects the value of the final slope safety factor (FK). The geometry parameters of the slope consist of width, height, and slope angle. The greater the width of the slope the higher the value of the safety factor (FK) of the slope. The smaller the width of the slope, the smaller the area of overburden that needs to be peeled so that mining results are more efficient. The slope safety factor can be considered safe if FK> 1.25, FK = 1-2.5 critical slopes, FK <1 has a high potential for landslides. The aim of this research is to get technical optimization with a smaller slope width but with a safe safety factor value with a backfilling slope simulation approach. Case study research was conducted at the TSBC Site coal mine, PT Bukit Asam Tbk., Muara Enim Regency, South Sumatra Province. Mining is done with shovel and trucks equipment. Material decomposition method by blasting and ripping. Final slope geometry is planned with 15 m width, 8 m height, and 45 ° slope angle parameters. Data processing was performed using Minescape 5.7 software, Rocscience Slide 6.0, AutoCAD 2014. The total estimation shows the area of savings between the 10 and 15 final slopes of 8.79%. FK value calculation is done in section A1 of lowwall north, B2 east sidewall, and C1 west sidewall. The calculation results show, section A1 berm 10 and 15 have FK values <1.25. Whereas section B2 and C1 between berm 10 and 15, FK> 1.25. FK > 1.25 are at 48 backfilling heights of static, and 72 m for pseudo-static conditions. PENDAHULUAN Pemilihan besar parameter geometri lereng tambang terbuka mempengaruhi nilai faktor keamanan (FK) lereng final [1]. Parameter geometri lereng terdiri dari lebar, tinggi, dan sudut kemiringan lereng. Semakin besar lebar lereng semakin tinggi nilai faktor keamanan (FK) lereng [2]. Namun semakin kecil lebar lereng maka semakin
2018
Kegiatan penambangan batu gamping sebagai bahan utama semen untuk pembangunan/konstruksi yang terletak dekat dengan permukaan dilakukan dengan metode tambang terbuka (open cut) dengan metode side hill, dimulai dari permukaan menuju ke arah bawah, metode tambang terbuka erat kaitannya dengan upaya pengendalian air permukaan alamiah diantaranya air limpasan dari presipitasi yang dipengaruhi iklim.Permasalahan akibat tambang terbuka dengan metode Side Hill, adalah perubahan bentuk morfologi yang akan merubah pola aliran air permukaan mengikuti pola struktur geologi, serta merubah daerah tangkapan air permukaan menjadi lebih detail dan terdeliniasi menjadi sub‐catchment yang lebih kecil pada masing‐masing lokasi bukaan. Data pemboran Geoteknik, data topografi secara berkala dan, data klimatologi dari tahun 2009 sampai 2018 telah dikumpulkan, untuk menghitung neraca air sebagai rekomendasi teknis penyaliran air tambang.Dari hasil pengamatan dan perhitungan yang dilakukan, maka dapat diam...
2017
Analisis kestabilan lereng dilakukan pada highwall dan lowwall Pit Tania Panel 2 PT. Kaltim Prima Coal (PT. KPC) menggunakan metode probabilitas. Parameter masukkan yang digunakan meliputi nilai UCS, wet density, Geological Strength Index (GSI), nilai mi dan D (Disturbance factor). Parameter yang dilakukan uji statistik hanya nilai UCS, wet density dan GSI, sedangkan nilai mi dan D tidak dilakukan uji statistik. Nilai mi yang digunakan adalah 6 (Marinos dan Hoek, 2001), sedangkan nilai D yang digunakan menurut Hoek (2002) adalah 0,7 dan 0. Tahap selanjutnya yang dilakukan adalah tahap uji statistik yang meliputi validasi data pada setiap parameter masukkan, penentuan jenis fungsi distribusi dan uji baik suai menggunakan Metode Kolmogorov-Smirnov (K-S) agar dapat dihasilkan nilai Dmax kurang dari nilai kritis. Hasil dari tahap tersebut didapatkan nilai rata-rata, standar deviasi dan jenis fungsi distribusi yang cocok, kemudian dilakukan pengolahan data untuk menghasilkan nilai FK dan...
SPECTA Journal of Technology, 2019
Ch a n g e s in land use impacts on groundwater availability both in quality and quantity. Study of geological, hydrogeological conditions, hydrological, hydrogeological boundary conditions contribute to determine the presence of groundwater in the groundwater basin and determine the natural groundwater flow modeling patterns. Location of the study are in Muara Lawa, including the formation Pulaubalang, Pamaluan, and Balikpapan on Lampanan syncline structure. Exploration drilling results indicate, that the hydrogeological study area into the aquifer system of folded sedimentary rocks consisting of seven aquifer layers alternating between akuitar, aquifers, and the base layer in the form of akuiklud. The area bounded by the limits of the model study of surface water in two major rivers, the Lawa River (east) and the Perak River (west), as well as the groundwater divide with the highest head (north and south. The results of the analysis of the type of regional aquifers aquifer models ...
Loading Preview
Sorry, preview is currently unavailable. You can download the paper by clicking the button above.
Czech Historical Review, 2024
XIX. Türk Tarih Kongresi (3-7 Ekim 2022), 3. Cilt I. Kısım (Osmanlı Tarihi), Ankara, 2024
Short guide to thermostatic radiator valves (TRV) use
The Classical Connection, 2024
Australian Biblical Review 71 (2023): 15‒54
Genes & Immunity, 2015
Physical Review Letters, 2012
International Journal of Business and Management, 2015
Omdurman Islamic University Journal, 2020
Psicoperspectivas. Individuo y Sociedad, 2016
IEEE Transactions on Industrial Electronics, 2009