Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

CERN Document Server 2,032 ჩანაწერია ნაპოვნი  1 - 10შემდეგიდასასრული  ჩანაწერთან გადასვლა: ძიებას დასჭირდა 0.71 წამი. 
1.
Findings of the Physics Beyond Colliders ECN3 Beam Delivery Task Force / Ahdida, Claudia (CERN) ; Bartosik, Hannes (CERN) ; Bernhard, Johannes (CERN) ; Brugger, Markus (CERN) ; Calviani, Marco (CERN) ; Colinet, Antoine (CERN) ; Esposito, Luigi Salvatore (CERN) ; Franqueira Ximenes, Rui (CERN) ; Fraser, Matthew Alexander (CERN) ; Gautheron, Fabrice (University of Patras (GR)) et al.
The ECN3 Beam Delivery Task Force was mandated by the PBC Study Group to assess the technical feasibility of increasing the proton beam intensity to the ECN3 hall of the North Area to satisfy the demands of a compelling set of PBC experimental physics proposals. This report summarises the findings of the Task Force that converge on a technically feasible solution with an implementation timeline that could exploit and build upon the investment already foreseen as part of Phase 1 of the NA-CONS project, and take the SPS complex into a new intensity frontier for Fixed Target physics in Run4..
CERN-PBC-REPORT-2023-001.- Geneva : CERN, 06 - 43. PBC ECN3 TF Final Report: PDF;
2.
Investigating the feasibility of delivering higher intensity proton beams to ECN3 at the CERN SPS North Area / Fraser, M A (CERN) ; Brugger, M (CERN) ; Ahdida, C (CERN) ; Arduini, G (CERN) ; Arrutia Sota, P A (CERN) ; Bartosik, H (CERN) ; Bernhard, J (CERN) ; Calviani, M (CERN) ; Colinet, A (CERN) ; Esposito, L S (CERN) et al.
Initiated through the Physics Beyond Colliders (PBC) Study Group there is a strong interest from the scientific community to exploit the full intensity potential of the Super Proton Synchrotron (SPS) at CERN for Fixed Target physics experiments before the end of this decade. With the ECN3 cavern in the North Area (NA) identified as a suitable candidate location for a future high-intensity experimental facility compatible with a large variety of experiments, the new PBC ECN3 Beam Delivery Task Force was mandated to assess the feasibility of delivering a slow extracted beam of up to 4x10^19 protons per year at 400 GeV. [...]
2023 - 4 p. - Published in : JACoW IPAC 2023 (2023) MOPA084 Fulltext: PDF;
In : 14th International Particle Accelerator Conference (IPAC 2023), Venice, Italy, 7 - 12 May 2023, pp.MOPA084
3.
Post-LS3 Experimental Options in ECN3 / Ahdida, Claudia (CERN) ; Arduini, Gianluigi (CERN) ; Balazs, Kincso (CERN) ; Bartosik, Hannes (CERN) ; Bernhard, Johannes (CERN) ; Boyarsky, Alexey (Leiden University (NL)) ; Brod, Joachim (University of Cincinnati) ; Brugger, Markus (CERN) ; Calviani, Marco (CERN) ; Ceccucci, Augusto (CERN) et al.
The Experimental Cavern North 3 (ECN3) is an underground experimental cavern on the CERN Prévessin site. ECN3 currently hosts the NA62 experiment, with a physics programme devoted to rare kaon decays and searches of hidden particles approved until Long Shutdown 3 (LS3). [...]
CERN-PBC-REPORT-2023-003.- Geneva : CERN, 2023 - 80. Fulltext: PDF;
4.
SPS Operation and Future Proton Sharing Scenarios for the ECN3 facility / Prebibaj, Tirsi (Goethe University Frankfurt (DE)) ; Arduini, Gianluigi (CERN) ; Bartosik, Hannes (CERN) ; Fraser, Matthew Alexander (CERN)
In the framework of the Physics Beyond Colliders (PBC) study, a future high intensity facility at the existing ECN3 experimental hall of the North Area (NA) complex is under study. A task force is investigating ECN3 intensity upgrade scenarios concerning beam delivery and related infrastructure, considering solutions compatible with consolidation plans and post-LS3 experimental scenarios. [...]
CERN-PBC-Notes-2023-001.- Geneva : CERN, 2023 - 23. CERN-PBC-Notes-2023-001: PDF;
5.
P42 T4/XTAX transmission efficiency - FLUKA / Mazzola, Giuseppe (CERN) ; Esposito, Luigi Salvatore (CERN)
The studies reported here are part of the ECN3 Beam Delivery Task Force’s mandate. Designated by the PBC Study Group, the primary objective of the Task Force is to assess the technical feasibility of increasing the proton beam intensity transported along the P42 line to the ECN3 cavern of the North Area in order to satisfy the demands of a set of PBC experimental physics proposals. [...]
CERN-PBC-Notes-2023-004.- Geneva : CERN, 2023 - 15. Fulltext: PDF;
6.
Design considerations for the BDF/SHiP production target / Franqueira Ximenes, Rui (CERN)
CERN-HI-ECN3-CONF-2024-004.- Geneva : CERN, 2024 Fulltext: PPTX;
In : 13th International Workshop on Neutrino Beams and Instrumentation (NBI 2024), Ibaraki, Japan, 7 - 10 Oct 2024, pp.CERN-HI-ECN3-CONF-2024-004
7.
Study of alternative locations for the SPS Beam Dump Facility / Aberle, Oliver (CERN) ; Ahdida, Claudia (CERN) ; Arrutia Sota, Pablo Andreas (University of Oxford (GB)) ; Balazs, Kincso (CERN) ; Bernhard, Johannes (CERN) ; Brugger, Markus (CERN) ; Calviani, Marco (CERN) ; Dutheil, Yann (CERN) ; Franqueira Ximenes, Rui (CERN) ; Fraser, Matthew Alexander (CERN) et al.
As part of the main focus of the BDF Working Group in 2021, this document reports on the study of alternative locations and possible optimisation that may accompany the reuse of existing facilities with the aim of significantly reducing the costs of the facility. [...]
CERN-ACC-NOTE-2022-0009 ; CERN-PBC-Notes-2022-002.
- 28 Feb 2022.
Full text
8.
Target systems design for a high intensity facility in the CERN's ECN3 area / Ximenes, R F (CERN) ; Grenard, J-L (CERN) ; Ruiz, J M Martin (CERN) ; Ahdida, C (CERN) ; Bernhard, J (CERN) ; Brugger, M (CERN) ; Calviani, M (CERN) ; Esposito, L (CERN) ; Fraser, M (CERN) ; Jacobsson, R (CERN) et al.
A new high intensity fixed target facility could be accommodated at CERN by fully exploiting the Super Proton Synchrotron. Multiple physics experiment proposals such as BDF/SHiP, NA62-BD, HIKE and SHADOWS are being considered. [...]
2023 - 4 p. - Published in : JACoW IPAC 2023 (2023) WEPM112 Fulltext: PDF;
In : 14th International Particle Accelerator Conference (IPAC 2023), Venice, Italy, 7 - 12 May 2023, pp.WEPM112
9.
The new ECN3 high intensity facility for the BDF/SHiP experiment and high intensity beam transfer / Fraser, Matthew Alexander (CERN)
CERN-HI-ECN3-CONF-2024-002.- Geneva : CERN, 2024 Fulltext: PPTX;
In : 13th International Workshop on Neutrino Beams and Instrumentation (NBI 2024), Ibaraki, Japan, 7 - 10 Oct 2024, pp.CERN-HI-ECN3-CONF-2024-002
10.
TT20 unsplit beam optics for dedicated ECN3 operation / Ramjiawan, Rebecca Louise (CERN) ; Velotti, Francesco Maria (CERN) ; Fraser, Matthew Alexander (CERN)
The Transfer Tunnel 20 (TT20) in the CERN North Area (NA) contains transfer lines TT21-25 to transport beam extracted from the Super Proton Synchrotron (SPS). The beam is shared between three primary production targets simultaneously using two sets of Lamberston septa magnets [...]
CERN-PBC-Notes-2023-005.- Geneva : CERN, 2023 - 10. Fulltext: PDF;

ვერ იპოვნეთ რასაც ეძებდით? სცადეთ თქვენი ძებნა სხვა სერვერებზე:
recid:2847433 ში Amazon
recid:2847433 ში CERN EDMS
recid:2847433 ში CERN Intranet
recid:2847433 ში CiteSeer
recid:2847433 ში Google Books
recid:2847433 ში Google Scholar
recid:2847433 ში Google Web
recid:2847433 ში IEC
recid:2847433 ში IHS
recid:2847433 ში INSPIRE
recid:2847433 ში ISO
recid:2847433 ში KISS Books/Journals
recid:2847433 ში KISS Preprints
recid:2847433 ში NEBIS
recid:2847433 ში SLAC Library Catalog