• Sprint 56 (Sep 2019), Sprint 55 (Aug 2019)
    • 1

      Steps to reproduce:

      1. Create a graph (or graph prototype) with option Show working time switched off
      2. Add the graph (or prototype) to a screen with dynamic option enabled

      Result:
      The working time is displayed in the background of the graph.

      Expected:
      The working time is not displayed in the background.

      Notes:
      If the graph is not set to dynamic, working time is not displayed.
      This works properly on the dashboards with dynamic classic graphs, only screens are affected

       

       

            averza Andrejs Verza
            kaspars.mednis Kaspars Mednis
            Team B
            Votes:
            1 Vote for this issue
            Watchers:
            6 Start watching this issue

              Created:
              Updated:
              Resolved: