Nothing Special   »   [go: up one dir, main page]

WO2021203253A1 - 数据的传输方法、装置、设备及计算机可读存储介质 - Google Patents

数据的传输方法、装置、设备及计算机可读存储介质 Download PDF

Info

Publication number
WO2021203253A1
WO2021203253A1 PCT/CN2020/083608 CN2020083608W WO2021203253A1 WO 2021203253 A1 WO2021203253 A1 WO 2021203253A1 CN 2020083608 W CN2020083608 W CN 2020083608W WO 2021203253 A1 WO2021203253 A1 WO 2021203253A1
Authority
WO
WIPO (PCT)
Prior art keywords
base station
channel occupancy
channel
occupancy indication
uplink
Prior art date
Application number
PCT/CN2020/083608
Other languages
English (en)
French (fr)
Inventor
董贤东
Original Assignee
北京小米移动软件有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京小米移动软件有限公司 filed Critical 北京小米移动软件有限公司
Priority to CN202080000669.4A priority Critical patent/CN113767669B/zh
Priority to PCT/CN2020/083608 priority patent/WO2021203253A1/zh
Publication of WO2021203253A1 publication Critical patent/WO2021203253A1/zh

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/16Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation

Definitions

  • This application relates to the field of wireless communication technology. Specifically, this application relates to a data transmission method, device, device, and computer-readable storage medium.
  • TX1 will send data to RX1. Before sending, TX1 will do a clear channel assessment (CCA, Clear Channel Assessment). At this time, TX2 is sending data to RX2, and the signal it sends will cause interference to the reception of RX1, but because TX1 is far away from TX2, the interference from TX2 will not be detected during CCA, so TX1 will occupy the channel to send to RX1 data. In this case, the data reception of RX1 is subject to strong interference from TX2. For TX1, TX2 is a hidden node.
  • CCA Clear Channel Assessment
  • a new air interface signal, channel role indication (CUI, The Channel Usage Indication signal is similar to the RTS (Request to Send, request to send frame)/CTS (Clear to Send, channel clear frame) signal in 802.11.
  • CUI-T Channel Usage Indication for Transmission
  • CUI-R Channel Usage Indication for Reception
  • the channel function indication signal used for transmission If other surrounding nodes that want to send data listen to the CUI-T signal, the channel function indication signal used for transmission, then backoff will not be performed; on the contrary, if they listen to the channel function indication signal CUI-R signal used for reception, then backoff will be performed .
  • the solution to hidden nodes in the prior art requires the sending end to perform CUI-T/CUI-R handshake with the receiving end after occupying the channel through the LBT process to start data transmission, which wastes part of the transmission resources.
  • this application proposes a data transmission method, device, electronic equipment, and computer-readable storage medium to solve the problem of hidden node interference and how to save transmission resources.
  • this application provides a data transmission method applied to a base station, including:
  • the channel occupancy indication is used to instruct the neighboring nodes of the base station not to send data
  • the channel occupancy indication includes at least one of the following information:
  • the starting position of the uplink transmission The duration information of the uplink transmission; the identity of the base station.
  • the method before sending the channel occupancy indication, the method further includes:
  • the interference value is less than the preset energy detection threshold, it is determined to send the channel occupancy indication.
  • the method before sending the channel occupancy indication, the method further includes:
  • the downlink control information DCI scheduling instruction is sent to the UE to enable the UE to perform uplink data transmission at the position of the first time-frequency resource indicated by the DCI scheduling instruction, and the first time-frequency resource includes the physical uplink shared channel PUSCH.
  • the method before sending the channel occupancy indication, the method further includes:
  • the second time-frequency resource includes a physical uplink shared channel for configuration authorization CG-PUSCH.
  • the method further includes:
  • the base station In response to not receiving the uplink information sent by the UE through the CG-PUSCH resource for N consecutive times, the base station does not send the channel occupancy indication before the time domain resource of the N+1th CG-PUSCH, and N is a positive integer.
  • N is configured through RRC layer signaling or predetermined by protocol.
  • the DCI scheduling instruction indicates that the PUSCH is the first priority.
  • the CG-PUSCH is configured as the second priority through RRC layer signaling.
  • sending the channel occupancy indication includes:
  • the method for determining the sending timing of the channel occupancy indication includes at least one of the following:
  • the channel occupancy indication is sent on a periodically configured channel before the start of the uplink transmission and is closest to the start time of the uplink transmission, and the periodically configured channel includes at least one of a broadcast channel and a downlink control channel.
  • this application provides a data transmission method applied to UE, including:
  • the channel occupancy indication includes at least one of the following:
  • the starting position of the uplink data The duration information of the uplink data; the identity of the base station.
  • the UE when the UE does not receive the channel occupation indication sent by the base station, the UE does not send uplink data to the base station.
  • this application provides a data transmission device, which is applied to a base station, and includes:
  • the first processing module is configured to send a channel occupancy indication before the start of uplink transmission, and the channel occupancy indication is used to instruct neighboring nodes of the base station not to send data;
  • the second processing module is used to receive uplink data sent by the UE.
  • this application provides a data transmission device, which is applied to a UE, and includes:
  • the third processing module is used to receive the channel occupation indication sent by the base station, and the channel occupation indication is used to instruct the UE to perform uplink transmission;
  • the fourth processing module is used to send uplink data to the base station.
  • this application provides a base station, including: a processor, a memory, and a bus;
  • Bus used to connect the processor and memory
  • Memory used to store operation instructions
  • the processor is configured to execute the data transmission method of the first aspect of the present application by invoking the operation instruction.
  • this application provides a UE, including: a processor, a memory, and a bus;
  • Bus used to connect the processor and memory
  • Memory used to store operation instructions
  • the processor is configured to execute the data transmission method of the second aspect of the present application by invoking the operation instruction.
  • the present application provides a computer-readable storage medium storing a computer program, and the computer program is used to execute the data transmission method of the first aspect of the present application.
  • the present application provides a computer-readable storage medium storing a computer program, and the computer program is used to execute the data transmission method of the second aspect of the present application.
  • the base station sends a channel occupancy indication before the start of the uplink transmission, and the channel occupancy indication is used to instruct the neighboring nodes of the base station not to send data; to receive the uplink data sent by the user equipment UE.
  • the base station sends a channel occupancy indication before the start of the transmission of the UE's uplink data, instructing the neighboring nodes of the base station to back off, that is, instructing the neighboring nodes of the base station not to send data, and instructing the UE to transmit the uplink data, so that the UE After the channel is occupied, the UE does not need to send a channel occupancy indication to the base station, and the UE can directly start the transmission of uplink data, thereby solving the problem of hidden node interference and saving transmission resources.
  • Fig. 1 is a schematic diagram of hidden nodes in the prior art
  • FIG. 2 is a schematic diagram of a network architecture provided by an embodiment of this application.
  • FIG. 3 is a schematic flowchart of a data transmission method provided by an embodiment of this application.
  • FIG. 5 is a schematic flowchart of another data transmission method provided by an embodiment of this application.
  • FIG. 6 is a schematic structural diagram of a data transmission device provided by an embodiment of the application.
  • FIG. 7 is a schematic structural diagram of another data transmission device provided by an embodiment of the application.
  • FIG. 8 is a schematic structural diagram of a base station provided by an embodiment of this application.
  • FIG. 9 is a schematic structural diagram of a UE provided by an embodiment of the application.
  • the sender In the standard discussion and design of R16 NR-U (NR-Unlicensed, unlicensed spectrum based on the new air interface), the sender usually needs to perform clear channel assessment (CCA, Clear Channel Assessment) before sending data to evaluate the channel
  • CCA Clear Channel Assessment
  • the interference level in. If the interference is lower than the energy detection threshold (the threshold is specified by the communication protocol), the sender considers the channel to be idle, and the sender can occupy the channel to send data. If the interference level is higher than the detection threshold, the sender considers the channel to be busy, and the sender will not be able to occupy the channel to send data. This is the channel access mechanism (LBT, Listen Before Talk) that listens first and speaks later.
  • LBT Listen Before Talk
  • PUSCH Physical Uplink Shared Channel
  • RRC Radio Resource Control
  • DCI Downlink Control Information
  • the network architecture includes a base station 110, a UE 120 and multiple nodes 130.
  • the base station 110 is deployed in the access network.
  • the base station 110 is deployed in the access network NG-RAN (New Generation-Radio Access Network) in the 5G system.
  • NG-RAN New Generation-Radio Access Network
  • the base station 110 and the UE 120 or between the base station 110 and multiple nodes 130 communicate with each other through a certain air interface technology, for example, may communicate with each other through cellular technology.
  • An embodiment of the present application provides a data transmission method, which is applied to a base station.
  • a schematic flowchart of the method is shown in FIG. 3, and the method includes:
  • S101 Send a channel occupancy indication before the start of uplink transmission, where the channel occupancy indication is used to instruct neighboring nodes of the base station not to send data.
  • the base station is a base station of an unlicensed spectrum cell
  • the unlicensed spectrum cell refers to a cell that allows the UE to use an unlicensed frequency band (or called an unlicensed spectrum) to communicate with the base station.
  • the types of base stations include various forms of macro base stations, micro base stations, relay stations, and access points.
  • the channel occupancy indication includes at least one of the following:
  • the starting position of the uplink transmission The duration information of the uplink transmission; the identity of the base station.
  • the channel occupancy indicator can carry the start position of the uplink transmission and the time length of the uplink transmission, and is used to notify the neighboring nodes of the base station of the specific period of backoff, that is, the base station notifies the neighboring nodes of the base station to No data will be sent during the specific time period.
  • the channel occupancy indicator may carry the identification ID of the base station, for example, a physical cell ID, and the physical cell ID is used to indicate the source of the channel occupancy indicator.
  • the UE as the sender can use the channel occupancy indication as feedback information of the base station.
  • the UE determines that the reception interference of the base station is low, and the UE can send uplink data to the base station; when the UE does not receive the channel occupancy indication sent by the base station, the UE determines that the reception interference of the base station is large , The UE will not send uplink data to the base station.
  • the neighboring node includes a transmitting end other than the base station and the UE.
  • the types of neighboring nodes include various handheld devices with wireless communication functions, vehicle-mounted devices, wearable devices, computing devices, or other processing devices connected to wireless modems, as well as various forms of base stations, User Equipment (UE), Mobile Station (MS), terminal device (terminal device), etc.
  • UE User Equipment
  • MS Mobile Station
  • terminal device terminal device
  • S102 Receive uplink data sent by user equipment UE.
  • the base station sends a channel occupancy indication before the start of the uplink transmission, and the channel occupancy indication is used to instruct the neighboring nodes of the base station not to send data; to receive the uplink data sent by the user equipment UE.
  • the base station sends a channel occupancy indication before the start of the transmission of the UE's uplink data, instructing the neighboring nodes of the base station to back off, that is, instructing the neighboring nodes of the base station not to send data, and instructing the UE to transmit the uplink data, so that the UE After the channel is occupied, the UE does not need to send a channel occupancy indication to the base station, and the UE can directly start the transmission of uplink data, thereby solving the problem of hidden node interference and saving transmission resources.
  • the method before sending the channel occupancy indication, the method further includes:
  • the interference value is less than the preset energy detection threshold, it is determined to send the channel occupancy indication
  • the interference value is not less than the preset energy detection threshold, it is determined not to send the channel occupancy indication.
  • the base station before the UE starts to send uplink data, the base station performs idle channel detection to determine the interference value; when the interference value is less than the preset energy detection threshold, the base station detects that the surrounding channels are idle, then the base station Send a channel occupancy indication to the UE and the neighboring nodes of the base station. After receiving the channel occupancy indication, the neighboring node of the base station will back off, that is, the neighboring node will not send data; when the interference value is not less than the preset energy detection threshold, the base station Detecting that the surrounding channels are busy, that is, the neighboring node is sending data, and the neighboring node that is sending data is a hidden node, the base station does not send a channel occupancy indication to the UE and neighboring nodes.
  • the energy detection threshold that is, the energy detection threshold, can be agreed upon by the communication protocol or defined by the base station.
  • Neighboring nodes include transmitters other than base stations and UEs.
  • the method before sending the channel occupancy indication, the method further includes:
  • the method before sending the channel occupancy indication, the method further includes:
  • the second time-frequency resource includes CG-PUSCH (Configured Grant Physical Uplink Shared Channel, configure the authorized physical uplink shared channel).
  • the UE’s uplink transmission is divided into two methods.
  • One method is dynamic scheduling. Uplink transmission is performed at the frequency resource location, and the time-frequency resource may be PUSCH.
  • the base station pre-configures periodic time-frequency resources through RRC layer signaling, and the UE can periodically send uplink data on these configured time-frequency resources.
  • the periodic time-frequency resource is CG-PUSCH. Therefore, the base station does not need the UE to use CUI-T or other function signals to specifically notify the base station, and the base station can know when the UE will initiate uplink transmission.
  • the uplink transmission of the UE is dynamically scheduled by the base station in advance through DCI or pre-configured semi-statically. Therefore, the base station can determine when the UE will initiate the uplink transmission. For the uplink transmission of the UE, the base station The channel occupancy indication will be sent before the start of the uplink transmission to notify the neighboring nodes of the base station to back off. After the UE occupies the channel, it does not need to send any channel occupancy indication to the base station, and can directly start the uplink data transmission.
  • the method further includes:
  • the base station In response to not receiving the uplink information sent by the UE through the CG-PUSCH resource for N consecutive times, the base station does not send the channel occupancy indication before the time domain resource of the N+1th CG-PUSCH, and N is a positive integer.
  • N is configured through RRC layer signaling or predetermined by protocol.
  • the UE has periodically configured resources, for example, CG-PUSCH.
  • the base station sends RRC layer signaling to the UE to enable the UE to periodically transmit uplink data on the CG-PUSCH indicated by the RRC layer signaling; but the UE has no uplink data to be transmitted, and the base station sends the channel occupation to the UE
  • the base station did not receive the uplink data sent by the UE.
  • the base station responded that it did not receive the uplink data sent by the UE through the CG-PUSCH resource for N consecutive times. Before the N+1th time domain resource of the CG-PUSCH, the base station did not Send a channel occupancy indication.
  • the DCI scheduling instruction indicates that the PUSCH is the first priority.
  • the first priority is high priority
  • the URLLC uplink service uses the high priority PUSCH for scheduling.
  • the CG-PUSCH is configured as the second priority through RRC layer signaling.
  • the second priority is high priority.
  • sending the channel occupancy indication includes:
  • the method for determining the sending timing of the channel occupancy indication includes at least one of the following:
  • the channel occupancy indication is sent on the periodically configured channel before the start of the uplink transmission and closest to the start time of the uplink transmission, and the periodically configured channel includes at least one of a broadcast channel and a downlink control channel.
  • the transmission timing of the channel occupancy indicator is determined according to the time interval between the transmission timing of the channel occupancy indicator and the uplink transmission start time, which is predetermined or configured by the upper layer, and the transmission timing is included in the start of the transmission of the uplink data.
  • M is a positive integer.
  • the base station when the base station needs to send a channel occupancy indication on a certain periodically configured channel, the base station can send the channel occupancy indication on the periodically configured channel before the start of uplink transmission and the closest to the start time of the uplink transmission. instruct.
  • the channel can be a broadcast channel, a downlink control channel, and so on.
  • the embodiment of the present application provides another data transmission method, which is applied to the UE.
  • the flow diagram of the method is shown in Fig. 4, and the method includes:
  • S201 Receive a channel occupancy indication sent by a base station, where the channel occupancy indication is used to instruct the UE to perform uplink transmission.
  • the base station sends a channel occupancy indication before the start of uplink transmission to notify neighboring nodes of the base station to back off.
  • the UE receives the channel occupancy indication sent by the base station, and after occupying the channel, it does not need to send any channel occupancy indication to the base station, and can directly send uplink data to the base station.
  • S202 Send uplink data to the base station.
  • the channel occupancy indication includes at least one of the following:
  • the starting position of the uplink transmission The duration information of the uplink transmission; the identity of the base station.
  • the UE when the UE does not receive the channel occupation indication sent by the base station, the UE does not send uplink data to the base station.
  • the UE receives the channel occupation indication sent by the base station, and the channel occupation indication is used to instruct the UE to perform uplink transmission; and send uplink data to the base station.
  • the base station sends a channel occupancy indication before the start of the transmission of the UE's uplink data, instructing the neighboring nodes of the base station to back off, that is, instructing the neighboring nodes of the base station not to send data, and instructing the UE to transmit the uplink data, so that the UE After the channel is occupied, the UE does not need to send a channel occupancy indication to the base station, and the UE can directly start the transmission of uplink data, thereby solving the problem of hidden node interference and saving transmission resources.
  • the embodiment of the present application provides yet another data transmission method.
  • the schematic flowchart of the method is shown in FIG. 5, and the method includes:
  • the base station sends a DCI scheduling instruction or RRC layer signaling to the UE.
  • the UE performs uplink transmission at a certain time-frequency resource location after receiving the DCI scheduling instruction sent by the base station.
  • the time-frequency resource may be PUSCH; or the base station uses RRC layer signaling to pre-configure periodic Time-frequency resources.
  • the UE can periodically send uplink data on these configured time-frequency resources.
  • the periodic time-frequency resource is CG-PUSCH.
  • S302 The base station performs idle channel detection and determines the interference value.
  • the base station judges whether the interference value is less than the preset energy detection threshold. When the interference value is less than the preset energy detection threshold, the base station detects that the channel around the base station is idle, and then goes to step S303 for processing; when the interference value is not less than the preset energy detection threshold Energy detection threshold. The base station detects that there is a node in each node adjacent to the base station that is sending data, then the base station does not send a channel occupancy indication to the UE and each node.
  • the base station sends a channel occupation indication to the UE and each node.
  • each node adjacent to the base station receives the channel occupancy indication, each node does not send data.
  • S305 The UE sends uplink data to the base station on the time-frequency resource indicated by the DCI scheduling instruction or RRC layer signaling according to the channel occupation indication.
  • the UE transmits uplink data on the PUSCH position indicated by the DCI scheduling instruction; or the UE periodically transmits uplink data on the CG-PUSCH indicated by the RRC layer signaling.
  • the base station sends DCI scheduling instructions or RRC layer signaling to the UE, that is, the transmission of the UE's uplink data is dynamically scheduled by the base station in advance through the DCI or pre-configured semi-statically. Therefore, the base station can determine the UE When will the uplink transmission be initiated; the base station sends a channel occupancy indication before the UE's uplink transmission starts, instructing each node not to send data, and instructing the UE to transmit uplink data, so that the UE does not need to send a channel to the base station after occupying the channel With the occupancy indication, the UE can directly start the transmission of uplink data, thereby solving the problem of interference from various hidden nodes and saving transmission resources.
  • an embodiment of the present application also provides a data transmission device applied to a base station.
  • the structure diagram of the device is shown in FIG. 6.
  • the data transmission device 40 includes a first processing module 401 and a second processing module 401.
  • the first processing module 401 is configured to send a channel occupancy indication before the start of uplink transmission, and the channel occupancy indication is used to instruct neighboring nodes of the base station not to send data;
  • the second processing module 402 is configured to receive uplink data sent by the UE.
  • the channel occupancy indication includes at least one of the following information:
  • the starting position of the uplink transmission The duration information of the uplink transmission; the identity of the base station.
  • the method before sending the channel occupancy indication, the method further includes:
  • the interference value is less than the preset energy detection threshold, it is determined to send the channel occupancy indication
  • the interference value is not less than the preset energy detection threshold, it is determined not to send the channel occupancy indication.
  • the method before sending the channel occupancy indication, the method further includes:
  • the downlink control information DCI scheduling instruction is sent to the UE to enable the UE to perform uplink data transmission at the position of the first time-frequency resource indicated by the DCI scheduling instruction, and the first time-frequency resource includes the physical uplink shared channel PUSCH.
  • the method before sending the channel occupancy indication, the method further includes:
  • the second time-frequency resource includes a physical uplink shared channel for configuration authorization CG-PUSCH.
  • the method further includes:
  • the base station In response to not receiving the uplink information sent by the UE through the CG-PUSCH resource for N consecutive times, the base station does not send the channel occupancy indication before the time domain resource of the N+1th CG-PUSCH, and N is a positive integer.
  • N is configured through RRC layer signaling or predetermined by protocol.
  • the DCI scheduling instruction indicates that the PUSCH is the first priority.
  • the CG-PUSCH is configured as the second priority through RRC layer signaling.
  • the first processing module 401 is specifically configured to send the channel occupancy indication at the determined sending timing of the channel occupancy indication
  • the method for determining the sending timing of the channel occupancy indication includes at least one of the following:
  • the channel occupancy indication is sent on the periodically configured channel before the start of the uplink transmission and closest to the start time of the uplink transmission, and the periodically configured channel includes at least one of a broadcast channel and a downlink control channel.
  • the base station sends a channel occupancy indication before the start of the uplink transmission, and the channel occupancy indication is used to instruct the neighboring nodes of the base station not to send data; to receive the uplink data sent by the user equipment UE.
  • the base station sends a channel occupancy indication before the start of the transmission of the UE's uplink data, instructing the neighboring nodes of the base station to back off, that is, instructing the neighboring nodes of the base station not to send data, and instructing the UE to transmit the uplink data, so that the UE After the channel is occupied, the UE does not need to send a channel occupancy indication to the base station, and the UE can directly start the transmission of uplink data, thereby solving the problem of hidden node interference and saving transmission resources.
  • the embodiment of the present application also provides another data transmission device, which is applied to the UE.
  • the structure diagram of the device is shown in FIG. 7.
  • the data transmission device 50 includes a third processing module 501 and a third processing module 501.
  • the third processing module 501 is configured to receive a channel occupancy indication sent by a base station, and the channel occupancy indication is used to instruct the UE to perform uplink transmission;
  • the fourth processing module 502 is configured to send uplink data to the base station.
  • the channel occupancy indication includes at least one of the following information:
  • the starting position of the uplink transmission The duration information of the uplink transmission; the identity of the base station.
  • the UE when the UE does not receive the channel occupation indication sent by the base station, the UE does not send uplink data to the base station.
  • the UE receives the channel occupancy indication sent by the base station, and the channel occupancy indication is used to instruct the UE to perform uplink transmission; and send uplink data to the base station.
  • the base station sends a channel occupancy indication before the start of the transmission of the UE's uplink data, instructing the neighboring nodes of the base station to back off, that is, instructing the neighboring nodes of the base station not to send data, and instructing the UE to transmit the uplink data, so that the UE After the channel is occupied, the UE does not need to send a channel occupancy indication to the base station, and the UE can directly start the transmission of uplink data, thereby solving the problem of hidden node interference and saving transmission resources.
  • an embodiment of the present application also provides a base station.
  • a schematic structural diagram of the base station is shown in FIG. 8.
  • the base station 6000 includes at least one processor 6001, a memory 6002, and a bus 6003. It is electrically connected to the memory 6002; the memory 6002 is configured to store at least one computer-executable instruction, and the processor 6001 is configured to execute the at least one computer-executable instruction, so as to execute any one of the embodiments of the present application or The steps of any data transmission method provided by any optional implementation manner.
  • the processor 6001 may be an FPGA (Field-Programmable Gate Array) or other devices with logic processing capabilities, such as MCU (Microcontroller Unit), CPU (Central Process Unit, central processing unit) ).
  • FPGA Field-Programmable Gate Array
  • MCU Microcontroller Unit
  • CPU Central Process Unit, central processing unit
  • the base station sends a channel occupancy indication before the start of the uplink transmission, and the channel occupancy indication is used to instruct the neighboring nodes of the base station not to send data; to receive the uplink data sent by the user equipment UE.
  • the base station sends a channel occupancy indication before the start of the transmission of the UE's uplink data, instructing the neighboring nodes of the base station to back off, that is, instructing the neighboring nodes of the base station not to send data, and instructing the UE to transmit the uplink data, so that the UE After the channel is occupied, the UE does not need to send a channel occupancy indication to the base station, and the UE can directly start the transmission of uplink data, thereby solving the problem of hidden node interference and saving transmission resources.
  • an embodiment of the present application also provides a UE.
  • a schematic structural diagram of the UE is shown in FIG. 9.
  • the base station 7000 includes at least one processor 7001, a memory 7002, and a bus 7003, and at least one processor 7001 is Electrically connected to the memory 7002; the memory 7002 is configured to store at least one computer-executable instruction, and the processor 7001 is configured to execute the at least one computer-executable instruction, so as to execute any one of the embodiments of the present application or The steps of any data transmission method provided by any optional implementation manner.
  • the processor 7001 may be an FPGA (Field-Programmable Gate Array) or other devices with logic processing capabilities, such as MCU (Microcontroller Unit), CPU (Central Process Unit, central processing unit) ).
  • FPGA Field-Programmable Gate Array
  • MCU Microcontroller Unit
  • CPU Central Process Unit, central processing unit
  • the UE receives the channel occupancy indication sent by the base station, and the channel occupancy indication is used to instruct the UE to perform uplink transmission; and send uplink data to the base station.
  • the base station sends a channel occupancy indication before the start of the transmission of the UE's uplink data, instructing the neighboring nodes of the base station to back off, that is, instructing the neighboring nodes of the base station not to send data, and instructing the UE to transmit the uplink data, so that the UE After the channel is occupied, the UE does not need to send a channel occupancy indication to the base station, and the UE can directly start the transmission of uplink data, thereby solving the problem of hidden node interference and saving transmission resources.
  • the embodiments of the present application also provide a computer-readable storage medium for storing computer software instructions used by the above-mentioned base station or UE, and storing a computer program that is used when executed by a processor. Implement the steps of any data transmission method provided in any embodiment or any optional implementation manner in the embodiments of the present application.
  • the computer-readable storage medium includes, but is not limited to, any type of disk (including floppy disk, hard disk, optical disk, CD-ROM, and magneto-optical disk), ROM (Read-Only Memory), RAM ( Random Access Memory), EPROM (Erasable Programmable Read-Only Memory), EEPROM (Electrically Erasable Programmable Read-Only Memory), flash memory, magnetic Card or light card. That is, a readable storage medium includes any medium that stores or transmits information in a readable form by a device (for example, a computer).
  • the base station sends a channel occupancy indication before the start of the transmission of the UE’s uplink data, instructing each node to back off, that is, instructing each node not to send data, and instructing the UE to transmit uplink data, so that the UE does not need to send the uplink data after occupying the channel.
  • the base station sends the channel occupancy indication, and the UE can directly start the transmission of uplink data, thereby solving the problem of interference from various hidden nodes and saving transmission resources.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本申请实施例提供了一种数据的传输方法、装置、设备及计算机可读存储介质,该方法包括:在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据;接收用户设备UE发送的上行数据。该方法实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示基站的相邻节点进行退避,即指示基站的相邻节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。

Description

数据的传输方法、装置、设备及计算机可读存储介质 技术领域
本申请涉及无线通信技术领域,具体而言,本申请涉及一种数据的传输方法、装置、设备及计算机可读存储介质。
背景技术
现有技术中先听后说的信道接入机制(LBT,Listen Before Talk)不能解决非授权频谱通信中的隐藏节点问题。如图1所示,TX1将要给RX1发送数据,发送之前,TX1做空闲信道检测(CCA,Clear Channel Assessment)。而此时TX2正在给RX2发送数据,其发送的信号将对RX1的接收造成干扰,但是由于TX1距离TX2较远,在CCA时将检测不到来自TX2的干扰,所以TX1将占用信道向RX1发送数据。此种情况下,RX1的数据接收受到来自TX2的强干扰。对于TX1来说,TX2就是隐藏节点。
为了解决隐藏节点问题,在目前已有的一种技术方案中,在NR-U(NR-Unlicensed,基于新空口的非授权频谱)中引入一种新的空中接口信号,信道作用指示(CUI,Channel Usage Indication)信号,其作用类似802.11中的RTS(Request to Send,请求发送帧)/CTS(Clear to Send,信道清除帧)信号。发送端经过LBT过程占用信道之后,向接收端发出CUI-T(Channel Usage Indication for Transmission,用于发送的信道作用指示)信号,用于表示在接下来的数据传输过程中将作为发送端占用信道。接收端在收到CUI-T信号,将发出CUI-R(Channel Usage Indication for Reception,用于接收的信道作用指示)信号,用于表示在接下来的数据传输过程中将作为接收端占用信道。若周围的其他要发送数据的节点监听到用于发送的信道作用指示信号CUI-T信号,则不进行退避;相反,若监听到用于接收的信道作用指示信号CUI-R信号,则进行退避。
现有技术中的解决隐藏节点的办法,需要发送端在经过LBT过程占 据信道以后,与接收端进行CUI-T/CUI-R进行握手之后才能开始数据传输,浪费了部分传输资源。
发明内容
本申请针对现有的方式的缺点,提出一种数据的传输方法、装置、电子设备及计算机可读存储介质,用以解决隐藏节点干扰且如何能够节省传输资源的问题。
第一方面,本申请提供了一种数据的传输方法,应用于基站,包括:
在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据;
接收用户设备UE发送的上行数据。
在一种实现的方式中,信道占用指示,包括以下信息中的至少一项:
上行传输的起始位置;上行传输的时长信息;基站的标识。
在一种实现的方式中,在发送信道占用指示之前,还包括:
进行空闲信道检测,确定干扰值;
当干扰值小于预设的能量检测阈值,确定发送信道占用指示。
在一种实现的方式中,在发送信道占用指示之前,还包括:
向UE发送下行控制信息DCI调度指令,以用于使UE在DCI调度指令指示的第一时频资源的位置上进行上行数据的传输,第一时频资源包括物理上行共享信道PUSCH。
在一种实现的方式中,在发送信道占用指示之前,还包括:
向UE发送无线资源控制RRC层信令,以用于使UE在RRC层信令指示的第二时频资源上周期的进行上行数据的传输,第二时频资源包括配置授权的物理上行共享信道CG-PUSCH。
在一种实现的方式中,在发送信道占用指示之后,还包括:
响应于连续N次未收到UE通过CG-PUSCH资源发送的上行信息,在第N+1次CG-PUSCH的时域资源之前,基站不发送信道占用指示,N为正整数。
在一种实现的方式中,N通过RRC层信令配置或协议预定。
在一种实现的方式中,通过DCI调度指令指示PUSCH为第一优先级。
在一种实现的方式中,通过RRC层信令,配置CG-PUSCH为第二优先级。
在一种实现的方式中,发送信道占用指示,包括:
在确定出的信道占用指示的发送时机,发送信道占用指示;
确定信道占用指示的发送时机的方式,包括以下至少一项:
根据协议预定或高层配置的信道占用指示的发送时机与上行传输起始时间之间的时间间隔,确定信道占用指示的发送时机;
在上行传输开始之前的,且距离上行传输起始时间最近的周期配置的信道上发送信道占用指示,周期配置的信道包括广播信道及下行控制信道中的至少一项。
第二方面,本申请提供了一种数据的传输方法,应用于UE,包括:
接收基站发送的信道占用指示,信道占用指示用于指示UE进行上行传输;
向基站发送上行数据。
在一种实现的方式中,信道占用指示,包括以下至少一项:
上行数据的起始位置;上行数据的时长信息;基站的标识。
在一种实现的方式中,当UE没有接收到基站发送的信道占用指示,UE不向基站发送上行数据。
第三方面,本申请提供了一种数据的传输装置,应用于基站,包括:
第一处理模块,用于在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据;
第二处理模块,用于接收UE发送的上行数据。
第四方面,本申请提供了一种数据的传输装置,应用于UE,包括:
第三处理模块,用于接收基站发送的信道占用指示,信道占用指示用于指示UE进行上行传输;
第四处理模块,用于向基站发送上行数据。
第五方面,本申请提供了一种基站,包括:处理器、存储器和总线;
总线,用于连接处理器和存储器;
存储器,用于存储操作指令;
处理器,用于通过调用操作指令,执行本申请第一方面的数据的传输方法。
第六方面,本申请提供了一种UE,包括:处理器、存储器和总线;
总线,用于连接处理器和存储器;
存储器,用于存储操作指令;
处理器,用于通过调用操作指令,执行本申请第二方面的数据的传输方法。
第七方面,本申请提供了一种计算机可读存储介质,存储有计算机程序,计算机程序被用于执行本申请第一方面的数据的传输方法。
第八方面,本申请提供了一种计算机可读存储介质,存储有计算机程序,计算机程序被用于执行本申请第二方面的数据的传输方法。
本申请实施例提供的技术方案,至少具有如下有益效果:
基站在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据;接收用户设备UE发送的上行数据。如此,实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示基站的相邻节点进行退避,即指示基站的相邻节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
附图说明
为了更清楚地说明本申请实施例中的技术方案,下面将对本申请实施例描述中所需要使用的附图作简单地介绍。
图1为现有技术中隐藏节点的示意图;
图2为本申请实施例提供的一种网络架构的示意图;
图3为本申请实施例提供的一种数据的传输方法的流程示意图;
图4为本申请实施例提供的另一种数据的传输方法的流程示意图;
图5为本申请实施例提供的又一种数据的传输方法的流程示意图;
图6为本申请实施例提供的一种数据的传输装置的结构示意图;
图7为本申请实施例提供的另一种数据的传输装置的结构示意图;
图8为本申请实施例提供的一种基站的结构示意图;
图9为本申请实施例提供的一种UE的结构示意图。
具体实施方式
为使得本申请的发明目的、特征、优点能够更加的明显和易懂,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而非全部实施例。基于本申请中的实施例,本领域技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。
下面详细描述本申请的实施例,该实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本申请,而不能解释为对本申请的限制。
本技术领域技术人员可以理解,除非特意声明,这里使用的单数形式“一”、“一个”、“所述”和“该”也可包括复数形式。应该进一步理解的是,本申请的说明书中使用的措辞“包括”是指存在特征、整数、步骤、操作、元件和/或组件,但是并不排除存在或添加一个或多个其他特征、整数、步骤、操作、元件、组件和/或它们的组。应该理解,当我们称元件被“连接”或“耦接”到另一元件时,它可以直接连接或耦接到其他元件,或者也可以存在中间元件。此外,这里使用的“连接”或“耦接”可以包括无线连接或无线耦接。这里使用的措辞“和/或”包括一个或更多个相关联的列出项的全部或任一单元和全部组合。
为了更好的理解及说明本申请实施例的方案,下面对本申请实施例中所涉及到的一些技术进行简单说明。
在R16 NR-U(NR-Unlicensed,基于新空口的非授权频谱)的标准讨论和设计中,发送端在发送数据之前,通常要进行空闲信道检测(CCA,Clear Channel Assessment),用来评估信道中的干扰水平。如果干扰低于能量检测门限(该门限由通信协议所规定),则发送端认为信道空闲,发 送端可以占用信道发送数据。如果干扰水平高于检测门限,则发送端认为信道繁忙,发送端将不能占用信道发送数据。这就是先听后说的信道接入机制(LBT,Listen Before Talk)。
在5G(5th-Generation,第五代移动通信技术)系统中有一类要求高可靠性和低时延的业务类型,即URLLC(Ultra-reliable and Low Latency Communications,超高可靠与低时延通信)业务,还有一类相比较而言,并不要求那么高的可靠性和低时延,但会要求较大的数据传输速率,也即eMBB(Enhanced Mobile Broadband,增强移动宽带)业务。
对于同一个UE来说,同时有URLLC业务和eMBB业务是一种常见的场景。为了支持两种业务的灵活复用,在R16的URLLC讨论中,已经确定了对于PUSCH(无论是动态调度的,还是半静态配置的)要在物理层能区分优先级。半静态配置的PUSCH(Physical Uplink Shared Channel,物理上行共享信道)是通过RRC(Radio Resource Control,无线资源控制)配置参数直接配置优先级,动态调度的PUSCH是通过物理层指示来指示优先级,例如,使用DCI(Downlink Control Information,下行控制信息)中的1bit来指示优先级。URLLC上行业务通常应该使用高优先级的PUSCH来调度。
在R17标准讨论中,将研究如何在非授权频段上部署URLLC业务。当URLLC业务部署在非授权频段上时,为了支持与eMBB业务的灵活复用,应该同样支持2种不同优先级的PUSCH调度。对于URLLC上行业务,可以使用高优先级的PUSCH来传输,对于eMBB上行业务,可以使用低优先级的PUSCH来传输。
下面以具体的实施例对本申请的技术方案以及本申请的技术方案如何解决上述技术问题进行详细说明。下面这几个具体的实施例可以相互结合,对于相同或相似的概念或过程可能在某些实施例中不再赘述。下面将结合附图,对本申请的实施例进行描述。
本申请实施例描述的网络架构以及业务场景是为了更加清楚地说明本申请实施例的技术方案,并不构成对本申请实施例提供的技术方案的限 定,本领域普通技术人员可知,随着网络架构的演变和新业务场景的出现,本申请实施例提供的技术方案对于类似的技术问题,同样适用。
本申请实施例提供的一种网络架构的示意图如图2所示,该网络架构包括:基站110、UE120和多个节点130。基站110部署在接入网中。例如,基站110部署在5G系统中的接入网NG-RAN(New Generation-Radio Access Network,新一代无线接入网)。基站110与UE120之间或基站110与多个节点130之间通过某种空口技术互相通信,例如可以通过蜂窝技术相互通信。
本申请实施例中提供了一种数据的传输方法,应用于基站,该方法的流程示意图如图3所示,该方法包括:
S101,在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据。
在一种实现的方式中,基站是非授权频谱小区的基站,非授权频谱小区是指允许UE使用非授权频段(或称为非授权频谱)与基站进行通信的小区。
在一种实现的方式中,基站的类型包括各种形式的宏基站、微基站、中继站、接入点等。
在一种实现的方式中,信道占用指示,包括以下至少一项:
上行传输的起始位置;上行传输的时长信息;基站的标识。
在一种实现的方式中,信道占用指示可以携带上行传输的起始位置和上行传输的时长信息,用于通知基站的相邻节点进行退避的具体时段,即基站通知基站的相邻节点在该具体时段内不发送数据。
在一种实现的方式中,信道占用指示可以携带基站的标识ID,例如,物理小区ID,物理小区ID用于表示该信道占用指示的来源。作为发送端的UE可以将该信道占用指示作为基站的反馈信息。当UE接收到基站发送的信道占用指示,则UE确定基站的接收干扰较小,UE可以向基站发送上行数据;当UE没有接收到基站发送的信道占用指示,则UE确定基站的接收干扰较大,UE将不向基站发送上行数据。
在一种实现的方式中,相邻节点包括除基站和UE之外的发送端。
在一种实现的方式中,相邻节点的类型包括各种具有无线通信功能的手持设备、车载设备、可穿戴设备、计算设备或连接到无线调制解调器的其它处理设备,以及各种形式的基站、用户设备(User Equipment,UE)、移动台(Mobile Station,MS)、终端设备(terminal device)等。
S102,接收用户设备UE发送的上行数据。
本申请实施例中,基站在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据;接收用户设备UE发送的上行数据。如此,实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示基站的相邻节点进行退避,即指示基站的相邻节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
在一种实现的方式中,在发送信道占用指示之前,还包括:
进行空闲信道检测,确定干扰值;
当干扰值小于预设的能量检测阈值,确定发送信道占用指示;
当干扰值不小于预设的能量检测阈值,确定不发送信道占用指示。
在一种实现的方式中,基站在UE开始进行上行数据发送之前,基站进行空闲信道检测,确定干扰值;当干扰值小于预设的能量检测阈值,基站检测到其周围的信道空闲,则基站发送信道占用指示给UE和基站的相邻节点,基站的相邻节点接收到该信道占用指示后,进行退避,即相邻节点不发送数据;当干扰值不小于预设的能量检测阈值,基站检测到其周围的信道繁忙,即相邻节点正在发送数据,正在发送数据的相邻节点为隐藏节点,则基站不发送信道占用指示给UE和相邻节点。能量检测阈值,即能量检测的门限,可以由通信协议约定或者基站自行定义。相邻节点包括除基站和UE之外的发送端。
在一种实现的方式中,在发送信道占用指示之前,还包括:
向UE发送DCI调度指令,以用于使UE在DCI调度指令指示的第一时频资源的位置上进行上行数据的传输,第一时频资源包括物理上行共享信道PUSCH。
在一种实现的方式中,在发送信道占用指示之前,还包括:
向UE发送无线资源控制RRC层信令,以用于使UE在RRC层信令指示的第二时频资源上周期的进行上行数据的传输,第二时频资源包括CG-PUSCH(Configured Grant Physical Uplink Shared Channel,配置授权的物理上行共享信道)。
需要说明的是,在NR-U系统中,UE的上行传输分为2种方式,一种方式是动态调度,基站提前通过DCI调度,UE在接收到基站发送的DCI调度指令之后的某个时频资源位置上进行上行传输,时频资源可以为PUSCH。另一种方式是基站通过RRC层信令,预先配置周期的时频资源,UE可以在这些配置好的时频资源上周期的发送上行数据,周期的时频资源为CG-PUSCH。因此,基站不需要UE使用CUI-T或者其他功能的信号专门通知基站,基站都可以得知UE将在何时发起上行传输。
在一种实现的方式中,UE的上行传输都是被基站提前通过DCI动态调度的或者预先半静态配置的,因此,基站能确定UE将在何时发起上行传输,对于UE的上行传输,基站将在上行传输开始之前就发送信道占用指示,通知基站的相邻节点进行退避。UE在占用信道后,不需要向基站发送任何信道占用指示,就可以直接开始进行上行数据的传输。
在一种实现的方式中,在发送信道占用指示之后,还包括:
响应于连续N次未收到UE通过CG-PUSCH资源发送的上行信息,在第N+1次CG-PUSCH的时域资源之前,基站不发送信道占用指示,N为正整数。
在一种实现的方式中,N通过RRC层信令配置或协议预定。
在一种实现的方式中,对于配置授权的上行传输,UE有周期配置的资源,例如,CG-PUSCH。基站向UE发送RRC层信令,以用于使UE在RRC层信令指示的CG-PUSCH上周期的进行上行数据的传输;但是UE没有待传输的上行数据,在基站向UE发送了信道占用指示之后,基站没有接收到UE发送的上行数据,基站响应于连续N次未收到UE通过CG-PUSCH资源发送的上行数据,在第N+1次CG-PUSCH的时域资源之前,基站不发送信道占用指示。
在一种实现的方式中,通过DCI调度指令指示PUSCH为第一优先级。
在一种实现的方式中,第一优先级为高优先级,URLLC上行业务使用高优先级的PUSCH来调度。
在一种实现的方式中,通过RRC层信令,配置CG-PUSCH为第二优先级。第二优先级为高优先级。
在一种实现的方式中,发送信道占用指示,包括:
在确定出的信道占用指示的发送时机,发送信道占用指示;
确定信道占用指示的发送时机的方式,包括以下至少一项:
根据协议预定或高层配置的信道占用指示的发送时机与上行传输起始时间之间的时间间隔,确定信道占用指示的发送时机;
在上行传输开始之前的,且距离上行传输起始时间最近的周期配置的信道上发送信道占用指示,周期配置的信道包括广播信道及下行控制信道中的至少一项。
在一种实现的方式中,根据协议预定或高层配置的信道占用指示的发送时机与上行传输起始时间之间的时间间隔,确定信道占用指示的发送时机,发送时机包括在上行数据的传输开始之前的M个符号,M为正整数。
在一种实现的方式中,当基站需要在某种周期配置的信道上发送信道占用指示,基站可以在上行传输开始之前的,且距离上行传输起始时间最近的周期配置的信道上发送信道占用指示。该信道可以是广播信道、下行控制信道等。
本申请实施例中提供了另一种数据的传输方法,应用于UE,该方法的流程示意图如图4所示,该方法包括:
S201,接收基站发送的信道占用指示,信道占用指示用于指示UE进行上行传输。
在一种实现的方式中,基站在上行传输开始之前发送信道占用指示,通知基站的相邻节点进行退避。UE接收基站发送的信道占用指示,并在占用信道后,不需要向基站发送任何信道占用指示,就可以直接向基站发送上行数据。
S202,向基站发送上行数据。
在一种实现的方式中,信道占用指示,包括以下至少一项:
上行传输的起始位置;上行传输的时长信息;基站的标识。
在一种实现的方式中,当UE没有接收到基站发送的信道占用指示,UE不向基站发送上行数据。
本申请实施例中,UE接收基站发送的信道占用指示,信道占用指示用于指示UE进行上行传输;向基站发送上行数据。如此,实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示基站的相邻节点进行退避,即指示基站的相邻节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
本申请实施例中提供了又一种数据的传输方法,该方法的流程示意图如图5所示,该方法包括:
S301,基站向UE发送DCI调度指令或RRC层信令。
在一种实现的方式中,UE在接收到基站发送的DCI调度指令之后的某个时频资源位置上进行上行传输,时频资源可以为PUSCH;或基站通过RRC层信令,预先配置周期的时频资源,UE可以在这些配置好的时频资源上周期的发送上行数据,周期的时频资源为CG-PUSCH。
S302,基站进行空闲信道检测,确定干扰值。
S303,基站判断干扰值是否小于预设的能量检测阈值,当干扰值小于预设的能量检测阈值,基站检测到基站周围的信道空闲,则转到步骤S303处理;当干扰值不小于预设的能量检测阈值,基站检测到与基站相邻的各节点中有节点正在发送数据,则基站不发送信道占用指示给UE和各节点。
S304,基站发送信道占用指示给UE和各节点。
在一种实现的方式中,与基站相邻的各节点接收到该信道占用指示后,各节点不发送数据。
S305,UE根据信道占用指示,在DCI调度指令或RRC层信令指示的时频资源上将上行数据发送给基站。
在一种实现的方式中,UE在DCI调度指令指示的PUSCH的位置上进行上行数据的传输;或UE在RRC层信令指示的CG-PUSCH上周期的进行上行数据的传输。
本申请实施例中,基站通过向UE发送DCI调度指令或RRC层信令,即UE的上行数据的传输都是被基站提前通过DCI动态调度的或者预先半静态配置的,因此,基站能确定UE将在何时发起上行传输;基站在UE的上行传输开始之前就发送信道占用指示,指示各节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
基于相同的发明构思,本申请实施例还提供了一种数据的传输装置,应用于基站,该装置的结构示意图如图6所示,数据的传输装置40,包括第一处理模块401和第二处理模块402。
第一处理模块401,用于在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据;
第二处理模块402,用于接收UE发送的上行数据。
在一种实现的方式中,信道占用指示,包括以下信息中的至少一项:
上行传输的起始位置;上行传输的时长信息;基站的标识。
在一种实现的方式中,在发送信道占用指示之前,还包括:
进行空闲信道检测,确定干扰值;
当干扰值小于预设的能量检测阈值,确定发送信道占用指示;
当干扰值不小于预设的能量检测阈值,确定不发送信道占用指示。
在一种实现的方式中,在发送信道占用指示之前,还包括:
向UE发送下行控制信息DCI调度指令,以用于使UE在DCI调度指令指示的第一时频资源的位置上进行上行数据的传输,第一时频资源包括物理上行共享信道PUSCH。
在一种实现的方式中,在发送信道占用指示之前,还包括:
向UE发送无线资源控制RRC层信令,以用于使UE在RRC层信令 指示的第二时频资源上周期的进行上行数据的传输,第二时频资源包括配置授权的物理上行共享信道CG-PUSCH。
在一种实现的方式中,在发送信道占用指示之后,还包括:
响应于连续N次未收到UE通过CG-PUSCH资源发送的上行信息,在第N+1次CG-PUSCH的时域资源之前,基站不发送信道占用指示,N为正整数。
在一种实现的方式中,N通过RRC层信令配置或协议预定。
在一种实现的方式中,通过DCI调度指令指示PUSCH为第一优先级。
在一种实现的方式中,通过RRC层信令,配置CG-PUSCH为第二优先级。
在一种实现的方式中,第一处理模块401,具体用于在确定出的信道占用指示的发送时机,发送信道占用指示;
确定信道占用指示的发送时机的方式,包括以下至少一项:
根据协议预定或高层配置的信道占用指示的发送时机与上行传输起始时间之间的时间间隔,确定信道占用指示的发送时机;
在上行传输开始之前的,且距离上行传输起始时间最近的周期配置的信道上发送信道占用指示,周期配置的信道包括广播信道及下行控制信道中的至少一项。
本申请实施例提供的数据的传输装置中未详述的内容,可参照上述实施例提供的数据的传输方法,本申请实施例提供的数据的传输装置能够达到的有益效果与上述实施例提供的数据的传输方法相同,在此不再赘述。
应用本申请实施例,至少具有如下有益效果:
基站在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据;接收用户设备UE发送的上行数据。如此,实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示基站的相邻节点进行退避,即指示基站的相邻节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
基于相同的发明构思,本申请实施例还提供了另一种数据的传输装置,应用于UE,该装置的结构示意图如图7所示,数据的传输装置50,包括第三处理模块501和第四处理模块502。
第三处理模块501,用于接收基站发送的信道占用指示,信道占用指示用于指示UE进行上行传输;
第四处理模块502,用于向基站发送上行数据。
在一种实现的方式中,信道占用指示,包括以下信息中的至少一项:
上行传输的起始位置;上行传输的时长信息;基站的标识。
在一种实现的方式中,当UE没有接收到基站发送的信道占用指示,UE不向基站发送上行数据。
本申请实施例提供的数据的传输装置中未详述的内容,可参照上述实施例提供的数据的传输方法,本申请实施例提供的数据的传输装置能够达到的有益效果与上述实施例提供的数据的传输方法相同,在此不再赘述。
应用本申请实施例,至少具有如下有益效果:
UE接收基站发送的信道占用指示,信道占用指示用于指示UE进行上行传输;向基站发送上行数据。如此,实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示基站的相邻节点进行退避,即指示基站的相邻节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
基于相同的发明构思,本申请实施例还提供了一种基站,该基站的结构示意图如图8所示,该基站6000包括至少一个处理器6001、存储器6002和总线6003,至少一个处理器6001均与存储器6002电连接;存储器6002被配置用于存储有至少一个计算机可执行指令,处理器6001被配置用于执行该至少一个计算机可执行指令,从而执行如本申请实施例中任意一个实施例或任意一种可选实施方式提供的任意一种数据的传输方法的步骤。
进一步,处理器6001可以是FPGA(Field-Programmable Gate Array,现场可编程门阵列)或者其它具有逻辑处理能力的器件,如MCU(Microcontroller Unit,微控制单元)、CPU(Central Process Unit,中央处理器)。
应用本申请实施例,至少具有如下有益效果:
基站在上行传输开始之前发送信道占用指示,信道占用指示用于指示基站的相邻节点不发送数据;接收用户设备UE发送的上行数据。如此,实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示基站的相邻节点进行退避,即指示基站的相邻节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
基于相同的发明构思,本申请实施例还提供了一种UE,该UE的结构示意图如图9所示,该基站7000包括至少一个处理器7001、存储器7002和总线7003,至少一个处理器7001均与存储器7002电连接;存储器7002被配置用于存储有至少一个计算机可执行指令,处理器7001被配置用于执行该至少一个计算机可执行指令,从而执行如本申请实施例中任意一个实施例或任意一种可选实施方式提供的任意一种数据的传输方法的步骤。
进一步,处理器7001可以是FPGA(Field-Programmable Gate Array,现场可编程门阵列)或者其它具有逻辑处理能力的器件,如MCU(Microcontroller Unit,微控制单元)、CPU(Central Process Unit,中央处理器)。
应用本申请实施例,至少具有如下有益效果:
UE接收基站发送的信道占用指示,信道占用指示用于指示UE进行上行传输;向基站发送上行数据。如此,实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示基站的相邻节点进行退避,即指示基站的相邻节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行 上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
基于相同的发明构思,本申请实施例还提供了一种计算机可读存储介质,用于储存为上述基站或UE所用的计算机软件指令,存储有计算机程序,该计算机程序用于被处理器执行时实现本申请实施例中任意一个实施例或任意一种可选实施方式提供的任意一种数据的传输方法的步骤。
本申请实施例提供的计算机可读存储介质包括但不限于任何类型的盘(包括软盘、硬盘、光盘、CD-ROM、和磁光盘)、ROM(Read-Only Memory,只读存储器)、RAM(Random Access Memory,随即存储器)、EPROM(Erasable Programmable Read-Only Memory,可擦写可编程只读存储器)、EEPROM(Electrically Erasable Programmable Read-Only Memory,电可擦可编程只读存储器)、闪存、磁性卡片或光线卡片。也就是,可读存储介质包括由设备(例如,计算机)以能够读的形式存储或传输信息的任何介质。
应用本申请实施例,至少具有如下有益效果:
实现了基站在UE的上行数据的传输开始之前就发送信道占用指示,指示各节点进行退避,即指示各节点不发送数据,指示UE进行上行数据的传输,使UE在占用信道后,不需要向基站发送信道占用指示,UE就可以直接开始进行上行数据的传输,从而解决了各隐藏节点干扰的问题,且能够节省传输资源。
本技术领域技术人员可以理解,可以用计算机程序指令来实现这些结构图和/或框图和/或流图中的每个框以及这些结构图和/或框图和/或流图中的框的组合。本技术领域技术人员可以理解,可以将这些计算机程序指令提供给通用计算机、专业计算机或其他可编程数据处理方法的处理器来实现,从而通过计算机或其他可编程数据处理方法的处理器来执行本申请公开的结构图和/或框图和/或流图的框或多个框中指定的方案。
本技术领域技术人员可以理解,本申请中已经讨论过的各种操作、方 法、流程中的步骤、措施、方案可以被交替、更改、组合或删除。进一步地,具有本申请中已经讨论过的各种操作、方法、流程中的其他步骤、措施、方案也可以被交替、更改、重排、分解、组合或删除。进一步地,现有技术中的具有与本申请中公开的各种操作、方法、流程中的步骤、措施、方案也可以被交替、更改、重排、分解、组合或删除。
以上所述仅是本申请的部分实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本申请原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本申请的保护范围。

Claims (19)

  1. 一种数据的传输方法,应用于基站,其中,包括:
    在上行传输开始之前发送信道占用指示,所述信道占用指示用于指示所述基站的相邻节点不发送数据;
    接收用户设备UE发送的上行数据。
  2. 根据权利要求1所述的方法,其中,所述信道占用指示,包括以下信息中的至少一项:
    上行传输的起始位置;上行传输的时长信息;所述基站的标识。
  3. 根据权利要求1所述的方法,其中,在发送所述信道占用指示之前,还包括:
    进行空闲信道检测,确定干扰值;
    当所述干扰值小于预设的能量检测阈值,确定发送信道占用指示。
  4. 根据权利要求1所述的方法,其中,在发送所述信道占用指示之前,还包括:
    向所述UE发送下行控制信息DCI调度指令,以用于使所述UE在所述DCI调度指令指示的第一时频资源的位置上进行上行数据的传输,所述第一时频资源包括物理上行共享信道PUSCH。
  5. 根据权利要求1所述的方法,其中,在发送所述信道占用指示之前,还包括:
    向所述UE发送无线资源控制RRC层信令,以用于使所述UE在所述RRC层信令指示的第二时频资源上周期的进行上行数据的传输,所述第二时频资源包括配置授权的物理上行共享信道CG-PUSCH。
  6. 根据权利要求5所述的方法,其中,在发送所述信道占用指示之后,还包括:
    响应于连续N次未收到所述UE通过CG-PUSCH资源发送的上行信息,在第N+1次CG-PUSCH的时域资源之前,所述基站不发送信道占用指示,N为正整数。
  7. 根据权利要求6所述的方法,其中,所述N通过所述RRC层信令 配置或协议预定。
  8. 根据权利要求4所述的方法,其中,通过所述DCI调度指令指示所述PUSCH为第一优先级。
  9. 根据权利要求5所述的方法,其中,通过所述RRC层信令,配置所述CG-PUSCH为第二优先级。
  10. 根据权利要求1所述的方法,其中,所述发送信道占用指示,包括:
    在确定出的信道占用指示的发送时机,发送信道占用指示;
    确定所述信道占用指示的发送时机的方式,包括以下至少一项:
    根据协议预定或高层配置的信道占用指示的发送时机与上行传输起始时间之间的时间间隔,确定所述信道占用指示的发送时机;
    在上行传输开始之前的,且距离所述上行传输起始时间最近的周期配置的信道上发送所述信道占用指示,所述周期配置的信道包括广播信道及下行控制信道中的至少一项。
  11. 一种数据的传输方法,应用于UE,其中,包括:
    接收基站发送的信道占用指示,所述信道占用指示用于指示所述UE进行上行传输;
    向所述基站发送上行数据。
  12. 根据权利要求11所述的方法,其中,所述信道占用指示,包括以下信息中的至少一项:
    上行传输的起始位置;上行传输的时长信息;所述基站的标识。
  13. 根据权利要求11所述的方法,其中,该方法还包括:
    当所述UE没有接收到所述基站发送的所述信道占用指示,所述UE不向所述基站发送上行数据。
  14. 一种数据的传输装置,应用于基站,其中,包括:
    第一处理模块,用于在上行传输开始之前发送信道占用指示,所述信道占用指示用于指示所述基站的相邻节点不发送数据;
    第二处理模块,用于接收UE发送的上行数据。
  15. 一种数据的传输装置,应用于UE,其中,包括:
    第三处理模块,用于接收基站发送的信道占用指示,所述信道占用指示用于指示所述UE进行上行传输;
    第四处理模块,用于向所述基站发送上行数据。
  16. 一种基站,包括:处理器;以及
    存储器,配置用于存储机器可读指令,所述指令在由所述处理器执行时,使得所述处理器执行权利要求1-10中任一项所述的数据的传输方法。
  17. 一种UE,包括:处理器;以及
    存储器,配置用于存储机器可读指令,所述指令在由所述处理器执行时,使得所述处理器执行权利要求11-13中任一项所述的数据的传输方法。
  18. 一种计算机可读存储介质,其中,存储有计算机程序,所述计算机程序用于被处理器执行时实现如权利要求1-10中任一项所述的数据的传输方法。
  19. 一种计算机可读存储介质,其中,存储有计算机程序,所述计算机程序用于被处理器执行时实现如权利要求11-13中任一项所述的数据的传输方法。
PCT/CN2020/083608 2020-04-07 2020-04-07 数据的传输方法、装置、设备及计算机可读存储介质 WO2021203253A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202080000669.4A CN113767669B (zh) 2020-04-07 2020-04-07 数据的传输方法、装置、设备及计算机可读存储介质
PCT/CN2020/083608 WO2021203253A1 (zh) 2020-04-07 2020-04-07 数据的传输方法、装置、设备及计算机可读存储介质

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2020/083608 WO2021203253A1 (zh) 2020-04-07 2020-04-07 数据的传输方法、装置、设备及计算机可读存储介质

Publications (1)

Publication Number Publication Date
WO2021203253A1 true WO2021203253A1 (zh) 2021-10-14

Family

ID=78022509

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/083608 WO2021203253A1 (zh) 2020-04-07 2020-04-07 数据的传输方法、装置、设备及计算机可读存储介质

Country Status (2)

Country Link
CN (1) CN113767669B (zh)
WO (1) WO2021203253A1 (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104125610A (zh) * 2013-04-28 2014-10-29 电信科学技术研究院 D2d通信中的数据发送方法和设备
CN107734678A (zh) * 2016-08-12 2018-02-23 中兴通讯股份有限公司 一种信息传输方法、装置和系统
US20190268933A1 (en) * 2018-02-23 2019-08-29 Qualcomm Incorporated Ota dynamic tdd with cui-r multiplexed in ul
WO2020063577A1 (en) * 2018-09-26 2020-04-02 JRD Communication (Shenzhen) Ltd. Transmission medium sharing in a wireless communications network

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10383146B2 (en) * 2014-10-10 2019-08-13 Samsung Electronics Co., Ltd. System and methods for detection of hidden nodes in cellular systems on unlicensed bands
KR20160055040A (ko) * 2014-11-07 2016-05-17 주식회사 아이티엘 Laa 기반의 무선 통신 방법 및 장치
US10341884B2 (en) * 2015-07-07 2019-07-02 Qualcomm Incorporated Channel clearance techniques using shared radio frequency spectrum band
US10652753B2 (en) * 2015-07-24 2020-05-12 Samsung Electronics Co., Ltd. Method for transmitting control signal and channel in mobile communication system using unlicensed band
WO2017031645A1 (zh) * 2015-08-21 2017-03-02 华为技术有限公司 一种退避方法、传输消息方法及装置
CN107371274B (zh) * 2016-05-13 2022-07-19 北京三星通信技术研究有限公司 传输数据的方法及设备
US11576206B2 (en) * 2016-09-30 2023-02-07 Qualcomm Incorporated Multefire autonomous uplink channel clearance signaling
EP3709756B1 (en) * 2016-10-25 2023-05-24 Telefonaktiebolaget LM Ericsson (publ) Collision avoidance adaptation for autonomous transmission systems
WO2019196034A1 (zh) * 2018-04-11 2019-10-17 北京小米移动软件有限公司 非授权小区中的数据传输方法及装置、基站和用户设备
CN110505026B (zh) * 2018-05-18 2022-03-29 华为技术有限公司 信号侦听的方法、相关设备及系统
CN110430594B (zh) * 2019-08-12 2023-06-20 展讯通信(上海)有限公司 非授权频率的测量方法和设备

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104125610A (zh) * 2013-04-28 2014-10-29 电信科学技术研究院 D2d通信中的数据发送方法和设备
CN107734678A (zh) * 2016-08-12 2018-02-23 中兴通讯股份有限公司 一种信息传输方法、装置和系统
US20190268933A1 (en) * 2018-02-23 2019-08-29 Qualcomm Incorporated Ota dynamic tdd with cui-r multiplexed in ul
WO2020063577A1 (en) * 2018-09-26 2020-04-02 JRD Communication (Shenzhen) Ltd. Transmission medium sharing in a wireless communications network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
STARENT NETWORKS; TELIASONERA: "Pseudo-CR on STa CUI usage clarification", 3GPP DRAFT; C4-082481-CUI, vol. CT WG4, 21 August 2008 (2008-08-21), Budapest, pages 1 - 4, XP050314341 *

Also Published As

Publication number Publication date
CN113767669A (zh) 2021-12-07
CN113767669B (zh) 2024-09-24

Similar Documents

Publication Publication Date Title
US11589384B2 (en) Data transmission method, terminal device, and network device
WO2016187954A1 (zh) 一种非授权频段信道占用时间的配置方法及装置
CN116889075A (zh) 用于侧行链路通信的方法和终端设备
CN111108800B (zh) 一种通信方法和装置
WO2018059179A1 (zh) 一种非授权频谱信道占用的方法及设备
WO2019085707A1 (zh) 一种上行信号传输方法、终端、网络设备及系统
US11464000B2 (en) Information indication method, terminal device, and network device
WO2020186489A1 (zh) 信道检测机制的确定方法、装置、设备及存储介质
WO2017020695A1 (zh) 一种数据传输方法和装置
WO2021056209A1 (zh) 无线通信的方法和设备
US20240251438A1 (en) Channel access method, and device and storage medium
WO2021088028A1 (zh) 一种资源配置方法及装置
CN115843115A (zh) 侧行通信的方法及装置
WO2020147814A1 (zh) 资源分配的方法和设备
WO2019141069A1 (zh) 用于管理非授权频段的信道占用时长的方法和设备
WO2022012592A1 (zh) 反馈信息传输方法、装置、终端及网络侧设备
WO2021088092A1 (zh) 信息传输方法及相关产品
CN109587818B (zh) 信息的传输方法和装置
WO2021203253A1 (zh) 数据的传输方法、装置、设备及计算机可读存储介质
WO2022205484A1 (zh) 无线通信方法、终端设备和网络设备
WO2017166249A1 (zh) 信息传输方法及装置
WO2023165468A1 (zh) 一种资源确定方法及装置
WO2023044713A1 (zh) 通信方法及装置
WO2023155586A1 (zh) 侧行链路信道接入方法及通信装置
WO2022194216A1 (zh) 信息确定方法和设备

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20930599

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20930599

Country of ref document: EP

Kind code of ref document: A1