WO2006091640A3 - Apparatus for monitoring pressure using capillary tubing - Google Patents
Apparatus for monitoring pressure using capillary tubing Download PDFInfo
- Publication number
- WO2006091640A3 WO2006091640A3 PCT/US2006/006208 US2006006208W WO2006091640A3 WO 2006091640 A3 WO2006091640 A3 WO 2006091640A3 US 2006006208 W US2006006208 W US 2006006208W WO 2006091640 A3 WO2006091640 A3 WO 2006091640A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- downhole
- tube
- pressure
- monitoring pressure
- capillary tubing
- Prior art date
Links
- 238000012544 monitoring process Methods 0.000 title abstract 4
- 238000004519 manufacturing process Methods 0.000 abstract 4
- 238000004140 cleaning Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Geophysics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Measuring Fluid Pressure (AREA)
Abstract
An apparatus for monitoring the pressure in a gas well at a downhole location is disclosed. The apparatus uses a capillary tube connecting a downhole monitoring assembly with a pressure gauge or gauges at the wellhead. The downhole monitoring assembly and capillary tube are located externally to the production tube so as not to block the production tube for cleaning or other uses. A passage from the interior of the production tube passes gas to the capillary tube in order to measure the pressure at the downhole end of the production tube.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US65585405P | 2005-02-23 | 2005-02-23 | |
US60/655,854 | 2005-02-23 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2006091640A2 WO2006091640A2 (en) | 2006-08-31 |
WO2006091640A3 true WO2006091640A3 (en) | 2007-11-22 |
Family
ID=36927974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2006/006208 WO2006091640A2 (en) | 2005-02-23 | 2006-02-22 | Apparatus for monitoring pressure using capillary tubing |
Country Status (2)
Country | Link |
---|---|
US (1) | US20060185840A1 (en) |
WO (1) | WO2006091640A2 (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7954547B2 (en) * | 2008-09-03 | 2011-06-07 | Encana Corporation | Gas flow system |
CN103726833A (en) * | 2013-12-10 | 2014-04-16 | 中国科学院力学研究所 | Ground data collection system for capillary tube testing |
CN103742128B (en) * | 2013-12-18 | 2016-08-31 | 中国科学院力学研究所 | A kind of system for testing pressure of capillary tube of coal bed gas |
NO342376B1 (en) | 2015-06-09 | 2018-05-14 | Wellguard As | Apparatus for detecting fluid leakage, and related methods |
US10858928B2 (en) | 2018-08-21 | 2020-12-08 | Baker Hughes, A Ge Company, Llc | Gauge assembly and method of delivering a gauge assembly into a wellbore |
IT201900012879A1 (en) * | 2019-07-25 | 2021-01-25 | Dab Pumps Spa | DEVICE FOR DETECTION OF THE LEVEL OF A WELL / TANK AND IMMERSION ELECTRIC PUMP WITH THIS DEVICE |
US11885215B2 (en) | 2021-01-14 | 2024-01-30 | Halliburton Energy Services, Inc. | Downhole pressure/temperature monitoring of ESP intake pressure and discharge temperature |
CN116006159B (en) * | 2021-10-22 | 2024-09-24 | 中国石油化工股份有限公司 | Monitoring device for gas storage monitoring well and application method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6257332B1 (en) * | 1999-09-14 | 2001-07-10 | Halliburton Energy Services, Inc. | Well management system |
US6464004B1 (en) * | 1997-05-09 | 2002-10-15 | Mark S. Crawford | Retrievable well monitor/controller system |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2620740A (en) * | 1949-09-24 | 1952-12-09 | Garrett Oil Tools Inc | Valve |
US2832566A (en) * | 1953-04-10 | 1958-04-29 | Exxon Research Engineering Co | Method for maintaining level of drilling fluid |
US3096819A (en) * | 1959-05-22 | 1963-07-09 | Champion Chemicals Inc | Method and composition for preventing corrosion |
US3712129A (en) * | 1970-06-02 | 1973-01-23 | Cities Service Oil Co | Simplified wellbore pressure testing apparatus |
US3895527A (en) * | 1973-11-08 | 1975-07-22 | Sperry Sun Well Surveying Co | Method and apparatus for measuring pressure related parameters in a borehole |
US3980136A (en) * | 1974-04-05 | 1976-09-14 | Big Three Industries, Inc. | Fracturing well formations using foam |
US4414846A (en) * | 1982-02-09 | 1983-11-15 | Jack Schrenkel | Gas well monitoring device |
US5033550A (en) * | 1990-04-16 | 1991-07-23 | Otis Engineering Corporation | Well production method |
US5152343A (en) * | 1991-05-29 | 1992-10-06 | Otis Engineering Corporation | Reeled tubing gas lift mandrel |
US5339905B1 (en) * | 1992-11-25 | 1995-05-16 | Subzone Lift System | Gas injection dewatering process and apparatus |
GB2333792B (en) * | 1995-02-09 | 1999-09-08 | Baker Hughes Inc | Downhole sensor |
US5535767A (en) * | 1995-03-14 | 1996-07-16 | Halliburton Company | Remotely actuated adjustable choke valve and method for using same |
US5775425A (en) * | 1995-03-29 | 1998-07-07 | Halliburton Energy Services, Inc. | Control of fine particulate flowback in subterranean wells |
WO2001020126A2 (en) * | 1999-09-15 | 2001-03-22 | Shell Internationale Research Maatschappij B.V. | System for enhancing fluid flow in a well |
US6873267B1 (en) * | 1999-09-29 | 2005-03-29 | Weatherford/Lamb, Inc. | Methods and apparatus for monitoring and controlling oil and gas production wells from a remote location |
EP1259701B1 (en) * | 2000-03-02 | 2006-05-24 | Shell Internationale Researchmaatschappij B.V. | Controlled downhole chemical injection |
US6405803B1 (en) * | 2000-04-14 | 2002-06-18 | Weatherford/Lamb, Inc. | Differential flow control valve |
US20040253734A1 (en) * | 2001-11-13 | 2004-12-16 | Cully Firmin | Down-hole pressure monitoring system |
-
2006
- 2006-02-22 US US11/359,677 patent/US20060185840A1/en not_active Abandoned
- 2006-02-22 WO PCT/US2006/006208 patent/WO2006091640A2/en active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6464004B1 (en) * | 1997-05-09 | 2002-10-15 | Mark S. Crawford | Retrievable well monitor/controller system |
US6257332B1 (en) * | 1999-09-14 | 2001-07-10 | Halliburton Energy Services, Inc. | Well management system |
Also Published As
Publication number | Publication date |
---|---|
WO2006091640A2 (en) | 2006-08-31 |
US20060185840A1 (en) | 2006-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2006091640A3 (en) | Apparatus for monitoring pressure using capillary tubing | |
WO2018035400A4 (en) | Method for determining characteristics of a network of hydraulic fractures | |
MX2010007520A (en) | Zonal testing with the use of coiled tubing. | |
NO20073700L (en) | Tool to prevent collapse of wear | |
NO20093451L (en) | Determination of point for sand production initiation in wellbores using residual deformation characteristics and real-time monitoring of sand production | |
WO2010001237A3 (en) | Transducer assemblies for downhole tools | |
WO2012072981A3 (en) | Fracture characterisation | |
DE602006017271D1 (en) | RLOCHS BY HYDROFORMS OF A TUBE METAL FILLING PIECE AND FILLING PIECE THEREFOR | |
MX2010008399A (en) | A method and device for making lateral openings out of a wellbore. | |
WO2007084652A3 (en) | Wet gas indication using a process fluid differential pressure transmitter | |
WO2009103971A3 (en) | Monitoring downhole production flow in an oil or gas well | |
WO2013036144A3 (en) | Retrievable pressure sensor | |
WO2010065286A8 (en) | Method and apparatus for pressure measurement using fill tube | |
GB2438343A (en) | Device for monitoring a drilling or coring operation and installation comprising such a device | |
WO2012010853A3 (en) | Real-time field friction reduction meter and method of use | |
GB2429071A (en) | Monitoring fluid pressure in a well and retrievable pressure sensor assembly for use in the method | |
WO2010141968A3 (en) | Connection between a drill pipe and a connector | |
WO2012024492A3 (en) | Methods for borehole measurements of fracturing pressures | |
WO2009023852A3 (en) | Apparatus and methods for pulse testing a formation | |
MY181932A (en) | Downhole sensor system | |
CN208605177U (en) | A kind of novel electronic pressure gauge supporting cylinder | |
WO2012120385A3 (en) | Apparatus, system and method for determining at least one downhole parameter of a wellsite | |
WO2008003072A3 (en) | Dewatering apparatus | |
WO2009139825A3 (en) | An arrangement and a method for monitoring an air flow in a drill rig | |
CN107893654A (en) | Capillary pressure measuring equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
NENP | Non-entry into the national phase |
Ref country code: DE |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC, EPO FORM 1205A, DATED 28.02.08. |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 06735742 Country of ref document: EP Kind code of ref document: A2 |