WO1997031320A1 - Strategic management system - Google Patents
Strategic management system Download PDFInfo
- Publication number
- WO1997031320A1 WO1997031320A1 PCT/AU1997/000104 AU9700104W WO9731320A1 WO 1997031320 A1 WO1997031320 A1 WO 1997031320A1 AU 9700104 W AU9700104 W AU 9700104W WO 9731320 A1 WO9731320 A1 WO 9731320A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- computer system
- organisation
- plan
- organisational
- performance
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
Definitions
- the present invention relates to improvements in systemising a range of management processes that are undertaken in the normal course of operating a business, organisation or a network of businesses or organisations.
- known systems may allow a manager in an organisation to undertake the formation of a strategic or business unit plan in isolation and without reference to any planning undertaken by colleagues elsewhere in the organisation or without reference to the strategic direction of the organisation.
- existing systems are based on the collection and analysis of retrospective information and are therefore only capable of developing organisational plans based on past data and are therefore retrospective in their management approach.
- a computer system for performance measurement and planning comprising: organisation planning means for the entering, aligning and linking a number of different organisational plans; indicator determination means for determining a series of indicators for said organisational plan; benchmarking means for benchmarking said indicators against internal or external measurements or targets; and wherein said organisational planning means, said indicator determination means and said benchmarking means are interlinked into a single co-ordinated system.
- a computer based framework which provides a fully integrated or linked approach to organisational planning, the measurement of performance and the undertaking of benchmarking of current organisational performance with other business units, organisations or groups of organisations.
- all levels of an organisation are interlinked and use a consistent planning structure based on shared information.
- the workings of all levels of an organisation are networked together as are the business unit plans and measurement procedures to be conducted with reference to the overall strategy and all other tasks being undertaken by the organisation.
- measures throughout a plan hierarchy may be related to a common set of Key Result Areas.
- Business Objectives and their actions, where defined, may be linked to a common set of Strategic Objectives, and each objective may be in turn linked to a set of Strategic Objectives. This assists in developing a consistent approach to achieving the overall aims of an organisation and in promoting a strategic management approach within the organisation.
- system of the present invention is preferably capable of capturing performance data in real time thereby permitting a manager to upgrade and amend plans and other documents so that they are always current.
- organisational planning can be undertaken based on current data and the plans developed based on prospective views of an organisation. This introduces the concept of continuous planning as part of strategic management behaviour.
- the present invention preferably provides that any assumptions made during the planning process can be analysed to examine the possibility that they may prove incorrect and thereby provide an assessment of the likely impacts and actions that will be required of an organisation as a result of the impact of an invalid assumption.
- the present invention also includes the identification of both responsibility and authority lines and accountability lines for specific actions.
- the present invention allows for the flexibility to change organisational design and adopt to whatever configuration is needed to suit their changing needs including support of hierarchical, flattened and matrix organisation structures.
- the indicator determination means includes means for determining a series of indicators for said organisational plan and graphically representing those measures, analysing those measures or modelling those measures to provide measurement information of past events or leading information about future events or alternatives available to the organisation.
- the preferred embodiment of the present invention is designed to operate on a general purpose computer or a desktop personal computer either operating in isolation or included in a network of computers.
- the present invention could be implemented on a wide range of computers utilising standard and widely accepted programming languages and graphical user interfaces in the normal manner and in a way that data may be retrieved to produce reports or a text, graphical or in any another form.
- the preferred embodiment of the present invention provides for a strategic management system that systemises and integrates the planning, measurement, project and benchmarking activities throughout an organisation, group or network. It further preferably provides a comprehensive and logical approach to understanding an organisation and how it functions, both in isolation and as an integral part of a large organisation. As a result, management is able to determine, integrate and direct strategy, in addition to directing change and performance within and external to the organisation.
- the system is capable of either enforcing or optionally sharing information in any form of operational structure.
- it is omni-directional and has a capacity to share and transfer information between plans. Further, it has the capacity for information to be accessed through a series of security checks.
- Information is able to be shared securely amongst a wider range of people within the organisation and for that information to be transferred within a hierarchical, matrix, linear or non-directional form.
- the system is capable of being used in whole or in part and is flexible in the demands that it makes of the user. Similarly, it is flexible in satisfying the needs of the user and can be adapted to provide as much or as little functionality as is required. Further many parts of the system are non- reliant on other parts of the systems. In this regard the user is able to access and utilise as much or as little of the system as is required without limiting the desired functionality. In this regard the level of flexibility available to users allows the user to be self-determining in the quantity of the system that is accessed at any point in time or over time.
- the increased synergism and awareness of the organisation and how it functions, both in isolation and as an integral part of a large group, provides a basis for the members of the organisation to work cooperatively towards best practice.
- the preferred embodiment allows the organisation to choose the degree of management or autonomy and flexibility that suits its particular culture and corporate objectives. A resulting increase in strategic awareness and strategic behaviour through increased awareness often results.
- the preferred embodiment supports strategic learning and other changed management and improvement initiatives that may be operating within the organisation.
- senior managers set the overall direction for an organisation. However, people at all levels have a valid and essential role in participating in planning and contributing to the development of strategic and business objectives.
- Performance indicators are structured in the context of the organisation's overall strategy and objectives. Indicators of both financial and non-financial performance are preferably utilised to focus the organisation on areas central to its overall success.
- the embodiment of the invention encourages continuous improvement by using internal and external benchmarks to ensure an organisation is focused on the best industry practice as measured in accordance with those benchmarks for the organisation's core processes and activities.
- the preferred embodiment can assist organisations to establish and communicate clear strategic objectives and effective measures of performance.
- the benchmarking capability supplements the communication process and ensures that managers are constantly aware of internal performance and how it compares with best industry practice.
- the preferred embodiment can include or result in the following advantageous features:
- the preferred embodiment provides an integrated and holistic approach that links strategy, objectives, processes and measurement with implementation structures.
- the identification of assumptions and risks and the analysis of the impact of invalid assumptions and project management are treated as integral parts of the planning and performance measurement processes in a prospective way.
- the measurement of per ormance through key result areas and indicators provides a balance between financial and non-financial performance measures and allows cross-functional measures for supporting performance gap analysis. Utilization of the cross- functional indicators eliminates conflicting measures across an organisation.
- the benchmarking process is treated as integral part of strategic management, and the focus is on continuous improvement including identifying the gap between actual and best practice performance.
- Analysis tools can be used while viewing plan.
- the development of plans may emanate from the objectives and needs from originating business units or from support units with the intention of achieving a "grand plan" for the organisation that considers the objectives and resource requirements of all parts of the organisation. This may be achieved in a way that is either individually based or consensus driven.
- the system has the flexibility for the organisation and/or its parts to define the methods for establishing plans and developing performance measurement and benchmarking protocols.
- An organisation can model information and develop alternative routes to improving performance by considering a series of interrelationships between performance measures within the organisation, business unit, team or at an individual level.
- the system can accommodate a variable range of complexity in the interrelationship and reports these interrelationships graphically or in narrative forms. Further, it can provide interpretative information as to the range of possible outcomes and relate these outcomes to a range of planning options. The system can then interpret these in the context of the impact of the outcome on the overall objectives of the organisation and provide a gauge as to the likelihood of the overall objective, whether at a business or strategic level, being met.
- Fig. 1 illustrates one form of construction of an entity interrelationship in accordance with the preferred embodiment
- Fig. 2 illustrates the overall organisational perspective utilised in the planning mode of the preferred embodiment
- Fig. 3 illustrates a table of planning sections and work areas to be constructed in each planning section in accordance with the preferred embodiment
- Fig. 4 illustrates one form of user interface for the entry of objectives into the planning database,-
- Fig. 5 illustrates one form of user interface for the entry of measure of data into the planning database of the preferred embodiment
- Fig. 6 illustrates a form of user interface for the entry of funding details into the plan database of the preferred embodiment
- Fig. 7 illustrates the process of risk analysis utilised in the preferred embodiment
- Fig. 8 illustrates the process of locking information from one plan work area to another plan work area.
- the preferred embodiment of the present invention is implemented on a network personal computer utilising standard operating systems, language and user interfaces.
- the embodiment can be ideally implemented in Microsoft's Visual C++ (Trade Mark) utilising a standard windowing systems such as Microsoft Windows NT (Trade Mark) or Microsoft Windows 95 (Trade Mark) .
- the preferred embodiment is best implemented by means of a number of large adaptable database and various user interface programs which are constructed, in the normal manner to create, view and modify the contents of the database.
- an "entity database” is created of entities within an organisational hierarchy.
- the entity database is designed to have entities added and deleted at any time and for each new entity to be provided or added to the database.
- the entity database is constructed or amended only by a user having privileged access (such as a network administrator) .
- a user is prompted, by means of the user interface, for various details on the entity.
- the details can include prompts for the name of the entity, a description of the entity's nature and function, a entity type description which can for example, include such descriptions as business unit, company, department, division, joint venture, team, individual etc.
- the entity entry contains a description of its relationship to the other defined entities. The nature of possible relationships can be user defined in an arbitrary manner and can include colleague, competitor, customer, joint venture partner, land lord, subsidiary, employee etc.
- the entity entry includes details on the entity including such matters as addresses, phone numbers, contacts etc.
- Fig. 1 there is illustrated an example layout 1 of entities eg. 2 as defined at the end of the entity definition phase.
- entity database as shown in Fig. 1 is based around the core entity of the organisation 3.
- This entity 3 is related to external supplier, customer and competitor entities and itself includes a number of department entities each of which has a manager, a number of sections and with each section having a number of employee persons.
- the next step in the preferred embodiment is to create a plan for each desired entity within the organisation.
- FIG. 2 the overall structure of an organisation is assumed to have an overall relationship as indicated 10. This can be divided into two main perspectives being the organisational perspectives 11 and the operational perspective 12.
- the operational perspective 12 is further divided into the fields of business activities 13, support activities 14 and project activities 15.
- Each of the perspective 11, 12 are further divided into a number of plan sections eg. 16 (vision and mission) , the operation of the planned sections being described further hereinafter.
- an interactive plan database is then constructed having one current plan for each desired entity (in addition to historical plans and "work in progress” plans stored as required) .
- the plan 20 includes, for each plan section (eg. vision and mission 21) a series of work areas 22 that need to be completed for that particular plan section, with a tick at the row - column intersection meaning that the column work area is required to be completed for the particular row plan section.
- the manner of building up a plan 20 is preferably "guided" by means of a user interface. However, ideally a user can enter the details for any plan section's work areas they require and the user interface preferably provides for such an adaptive form of data entry. Taking first the plan work areas 22 for the entry of information, they are as preferably follows: To Plan
- the to plan work area differs from other areas in that it does not allow the entry of data but rather provides a list of prompts that the user should consider in working through each of the subsequent work areas for a particular plan section.
- the to plan work area provides a check list to ensure proper preparation for the entry of data into the selected plan section.
- the information could be provided via an interactive user interface and preferably is designed to be updated and amended during the life of an organisation.
- the prompts that should be considered in the planning process can be changed and accommodated to suit the needs of the user or groups of users in real time and to facilitate a highly interactive planning environment within an organisation.
- the use of amendable plans facilitates a dynamic planning environment within an organisation that promotes organisational learning and the development of a strategic management culture .
- the information that can be utilised within this task can be sourced from a variety of places and updated regularly.
- the current work area provides a location for the storage of information relating to the current position of the entity.
- this information is entered within the computer system in a free text flowing form and can include text, charts, graphic information imported from other Windows applications.
- This includes the importing of information from other plan areas and from the plans of other entities.
- Intended Work Area This area is provided in the same form as the current work area and is provided for the entry of details of the desired position at the end of the plan period.
- Key Result Areas KRA's
- the KRA's are only defined for the limited plan sections being the strategic objectives and the business objectives.
- the KRA's are designed to give the organisation a focal point for developing performance measures against the strategic and business objectives.
- KRA's include customer satisfaction, business development, revenue growth, innovation etc.
- the KRA's are preferably short and "succinct" and designed to capture, in a few words, the essence of strategic focus.
- the interface 40 includes a list of the currently defined objectives 41 with a currently selected objective having its name 42 and description 43 displayed. Means 44 is provided for adding further objectives. For each objective, a list 45 of actions required to achieve the objectives is provided with the ability to add 47, delete 48 or edit 49 the action information associated with the objective. Upon activation of the add action button 47 a further dialogue box can be provided for the addition of further actions, associated descriptions and various other relevant information such as target dates, responsibilities and authorisations as required, the information subsequently being stored with each action of a particular objective.
- the list of processes can be selected from an overall process type database which lists all the organisations business processes. A user can then select 51 processes from the overall global list which will be affected by a current objective .
- KPIs key performance indicators
- KRAs overall relevant key resource areas
- the funding work area identifies the resources required to achieve each objective.
- Fig. 6 there is illustrated one form of suitable user interface for the data entry of funding information.
- a resource list 72 is provided in addition to means for the adding 73 and deletion 74 and editing 75 of the resource details.
- Various total information can be provided and further, data entry area 77 can be provided for the adding 78 and deleting 79 of incurred expenditures.
- the risk work area is used to detail the assumptions and perceived risks for each plan section. It provides a form of scenario analysis that is preferably capable of addressing impacts of invalid assumptions and the actions required for planning for such impacts .
- the risk area preferably operates by perceiving an organisations internal and external operating environment at any point in time.
- the risks work area allows the construction of a hierarchical structure of assumptions and risk implications.
- the risks work area can comprise a list of assumptions with each assumption having a structure 90 as illustrated in Fig. 7.
- a user interface is provided for initially setting out the name and description of the assumption.
- an arbitrary number of new identifiable risks can be provided with again a name and description of the resultant identifiable risk also being provided.
- a means for relating the risk impacts to a list of relevant entities that will be impacted there is provided.
- a list of performance measures that may be affected by the risk should it materialise may be provided.
- each risk impact 94 there is preferably provided a means for entering a list of new risk actions 95 which allow for the entry of various actions to be taken as a result of the risks impacts including a name and description of the action, a responsible entity and an impacted plan section.
- the overall risk work area results in a hierarchical structure 90 that can include as much, or as little detail as required.
- a database of assumptions, their associated risks, their likely impacts and what actions should be taken can be constructed in advance allowing for a more holistic approach to risk assessment.
- plan sections are themselves divided into organisational and operational perspective with the organisational perspective recording the organisational profile, external environment, vision and mission, core values, strategic objectives and business objectives.
- this information can be directly inherited from the plan for an organisational entity.
- that information can be preferably transferred or shared from any other plan in the structure. Information that is transferred or shared can be done so either in whole or in part and can be transferred to a specific plan or to a number of plans.
- the entry of information into each work area is proceeded by the "to plan" section which details how to go about the entry process and what factors should be considered. This can be automated by automatically following the relationship of subordination to fill out the organisational perspective of subordinate entities.
- the organisational profile contains historical aspects of the organisation, the external environment provides an overview of the external operating environment and the factors that may impact on the organisation.
- the risks associated with the external environment assumptions that should be analysed.
- the vision and mission section 21 a concise statement of the organisations business purpose should be set out and again the risks associated with the mission assumptions should be set out.
- Revenue - sources of revenue for the organisation including sales, investment, grants, programs or funds, asset disposal.
- Markets - managing sources of revenue and managing produces and services. Entry of the details of the advertising and promotion of the organisation and its products, services, pricing, location, market research and business development is provided.
- Operations - includes activities associated with the organisation of resources for the production or the delivery or products and services.
- Logistics - includes inbound and outbound activities such as purchasing, inventory management, transport and storage.
- Research - includes all research and development activities up to the point of commercialisation. These include the development of new products and services, basic and applied research and the application of innovation to products and procedures. For some organisations such as universities and research centres, research activities may be a key product or service.
- Information Management the organisation and facilitation of information. This includes technology, systems, hardware, software, platforms, robotics, reporting protocols, data management, consultation and support .
- Asset Management managing the assets of the business required to produce revenue or provide a service. This includes acquisition and management of capital, and investment in land, buildings and equipment; including, asset utilisation, measurement, maintenance and disposal.
- Risk Management the identification and management of all categories of business and personal risk.
- plan sections for project activities including a project program, a new project plan and a new benchmark plan section area.
- the preferred embodiment treats the aggregation and funding of projects as integral to the planning and performance measurement process and applies a number of the work areas to each project activity.
- the project program plan section provides a frame work for identifying, proving and managing the organisations development and benchmark projects in line with strategy.
- the new project plan section provides a management view of the scope of work required, background to the project and an identification of those persons sponsoring the project and forming the projects with the relevant details being entered within the corresponding work areas.
- the new benchmark plan section allows for the planning of new benchmark structures to be submitted for relevant the authorisation.
- the performance measurement process can proceed for each entity by the extraction of the entity's indicators entered as part of each plan section's "measures" work area. These indicators can be collected together in a table. Preferably, a separate database of indicators is kept for each entity thereby constructing a performance database. Preferably, the performance database includes means for entering measurement data for each of the indicators where required. The performance data can be defined to be entered over arbitrary time intervals however, monthly time intervals are suitable.
- a user interface to the performance database for the construction and graphing of the entered performance figures including means for constructing derived indicators which can be constructed from an arbitrary user defined factored combination of the entity's performance indicators, with full graphing and reporting facilities being provided.
- the user interface preferably also allowing the construction of models to test, and examine hypotheses as required.
- the performance measurements and data can be written out to a file and interactively interrogated by means of standard accounting software packages such as Microsoft Excel .
- the preferred embodiment also preferably provides for the ability to benchmark one of an entity's indicators against any of the indicators of any other entity defined within the entity database. Upon entry of the data associated with each of the selected indicators, graphing and reporting functions are provided for the production of output reports highlighting the interaction of the indicators selected.
- the preferred embodiment provides only a skeleton which can be utilised and adopted by an organisation to, over time, customise the application in accordance with requirements.
- each organisation will have its own reporting and analysis requirements depending on the functions carried out by the organisation.
- the preferred embodiment however, provides an integrated planning, performance measurement and benchmarking system which can be adapted to the needs of the organisation.
- the organisation's senior management can develop, over time, a series of benchmarks and indicators which they wish to utilise as prime indicators of the organisation's performance.
- the ability to lock data so that it can not be changed or perhaps even viewed by other parties is preferably provided. It will be evident that the preferred embodiment has particular application in a networked environment where multiple users can interactively edit their own plans.
- An example of this process is illustrated in Fig. 8 wherein the revenue plan section of entity B 100 includes, as normal, a current work area where free flowing text is entered.
- a "locking" user interface can then be provided for entity B 101 to lock the contents of entity A's revenue current work area 102 into the entity B's revenue current work area 100.
- entity A can ensure that entity B is aware of all of entity A's consideration on that particular issue in formulating its own current work area.
- any updating of the entity A revenue current work area is further reflected in the entity B revenue current work area as well .
- entity B is encouraged to take a more holistic approach in its planning process.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU17602/97A AU1760297A (en) | 1996-02-22 | 1997-02-21 | Strategic management system |
EP97903149A EP0954813A1 (en) | 1996-02-22 | 1997-02-21 | Strategic management system |
CA002290594A CA2290594A1 (en) | 1996-02-22 | 1997-02-21 | Strategic management system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AUPN8221 | 1996-02-22 | ||
AUPN8221A AUPN822196A0 (en) | 1996-02-22 | 1996-02-22 | Performance measurement and planning system |
Publications (1)
Publication Number | Publication Date |
---|---|
WO1997031320A1 true WO1997031320A1 (en) | 1997-08-28 |
Family
ID=3792534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AU1997/000104 WO1997031320A1 (en) | 1996-02-22 | 1997-02-21 | Strategic management system |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0954813A1 (en) |
AU (1) | AUPN822196A0 (en) |
CA (1) | CA2290594A1 (en) |
WO (1) | WO1997031320A1 (en) |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998044441A1 (en) * | 1997-03-31 | 1998-10-08 | Bellsouth Intellectual Property Corporation | A system and method for associating services information with selected elements of an organization |
WO1999059093A1 (en) * | 1998-05-08 | 1999-11-18 | E-Talk Corporation | Performance evaluation tool and method |
WO2000000937A1 (en) * | 1998-06-30 | 2000-01-06 | Sun Microsystems, Inc. | Distributed budgeting and accounting system with secure token device access |
KR20000054653A (en) * | 2000-06-16 | 2000-09-05 | 김창수 | Commencement of an enterprise consulting and selling the article system and method thereof |
WO2001009780A1 (en) * | 1999-07-30 | 2001-02-08 | Da Vinci Innovation Pty Ltd | Management tool and method |
WO2001039027A2 (en) * | 1999-11-23 | 2001-05-31 | Accenture Llp | Decision management in a merger and acquisition environment |
GB2363223A (en) * | 1999-10-25 | 2001-12-12 | Strategic Factors Pty Ltd | Analysis method |
WO2002048935A1 (en) * | 2000-12-11 | 2002-06-20 | Skill Development Associates Ltd | Integrated business management system |
KR20030015018A (en) * | 2001-08-14 | 2003-02-20 | 박광근 | Advise system for inauguration of an enterprise |
US6571235B1 (en) | 1999-11-23 | 2003-05-27 | Accenture Llp | System for providing an interface for accessing data in a discussion database |
US6604084B1 (en) | 1998-05-08 | 2003-08-05 | E-Talk Corporation | System and method for generating an evaluation in a performance evaluation system |
US6615182B1 (en) | 1998-05-08 | 2003-09-02 | E-Talk Corporation | System and method for defining the organizational structure of an enterprise in a performance evaluation system |
WO2003077168A1 (en) * | 2002-03-12 | 2003-09-18 | Akzo Nobel Coatings International B.V. | On-line benchmarking |
US6671693B1 (en) | 1999-11-23 | 2003-12-30 | Accenture Llp | System for effectively collecting and disseminating data |
US6671692B1 (en) | 1999-11-23 | 2003-12-30 | Accenture Llp | System for facilitating the navigation of data |
WO2004053744A1 (en) * | 2002-12-10 | 2004-06-24 | Bhp Billiton Innovation Pty Ltd | Evaluation system and method |
US6901426B1 (en) | 1998-05-08 | 2005-05-31 | E-Talk Corporation | System and method for providing access privileges for users in a performance evaluation system |
US6985872B2 (en) * | 2000-10-03 | 2006-01-10 | Clicksoftware Technologies Ltd. | Method and system for assigning human resources to provide services |
US20070265899A1 (en) * | 2006-05-11 | 2007-11-15 | International Business Machines Corporation | Method, system and storage medium for translating strategic capabilities into solution development initiatives |
US7346529B2 (en) * | 2002-05-07 | 2008-03-18 | David R. Flores | Method for developing an enterprise alignment framework hierarchy by compiling and relating sets of strategic business elements |
US7716571B2 (en) | 2006-04-27 | 2010-05-11 | Microsoft Corporation | Multidimensional scorecard header definition |
US7716592B2 (en) | 2006-03-30 | 2010-05-11 | Microsoft Corporation | Automated generation of dashboards for scorecard metrics and subordinate reporting |
US7752144B1 (en) * | 1999-05-24 | 2010-07-06 | Lockheed Martin Corporation | Multi-disciplinary information engine for total ownership cost estimation of complex systems |
US7840896B2 (en) | 2006-03-30 | 2010-11-23 | Microsoft Corporation | Definition and instantiation of metric based business logic reports |
US8190992B2 (en) | 2006-04-21 | 2012-05-29 | Microsoft Corporation | Grouping and display of logically defined reports |
US8261181B2 (en) | 2006-03-30 | 2012-09-04 | Microsoft Corporation | Multidimensional metrics-based annotation |
US8321805B2 (en) | 2007-01-30 | 2012-11-27 | Microsoft Corporation | Service architecture based metric views |
US8495663B2 (en) | 2007-02-02 | 2013-07-23 | Microsoft Corporation | Real time collaboration using embedded data visualizations |
US8606588B1 (en) | 1999-11-23 | 2013-12-10 | Accenture Global Services Limited | Merger and acquisition knowledgebase |
US9058307B2 (en) | 2007-01-26 | 2015-06-16 | Microsoft Technology Licensing, Llc | Presentation generation using scorecard elements |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2242292A (en) * | 1990-03-19 | 1991-09-25 | Miyago Co Ltd | Building maintenance management system |
WO1992007318A1 (en) * | 1990-10-12 | 1992-04-30 | Iex Corporation | Method and system for planning, scheduling and managing personnel |
US5172313A (en) * | 1987-12-11 | 1992-12-15 | Schumacher Billy G | Computerized management system |
US5303166A (en) * | 1992-04-14 | 1994-04-12 | International Business Machines Corporation | Method and system for automated network benchmark performance analysis |
US5303147A (en) * | 1989-09-27 | 1994-04-12 | Hitachi, Ltd. | Computer aided planning method and system |
US5331545A (en) * | 1991-07-05 | 1994-07-19 | Hitachi, Ltd. | System and method for planning support |
US5406477A (en) * | 1991-08-30 | 1995-04-11 | Digital Equipment Corporation | Multiple reasoning and result reconciliation for enterprise analysis |
US5459656A (en) * | 1989-09-12 | 1995-10-17 | Park City Group, Inc. | Business demand projection system and method |
WO1996010793A1 (en) * | 1994-09-30 | 1996-04-11 | Yufik Yan M | Probabilistic resource allocation system with self-adaptive capability |
WO1996030852A1 (en) * | 1995-03-30 | 1996-10-03 | Hogan Systems, Inc. | Method of and system for financial institution budgeting and planning |
-
1996
- 1996-02-22 AU AUPN8221A patent/AUPN822196A0/en not_active Abandoned
-
1997
- 1997-02-21 EP EP97903149A patent/EP0954813A1/en not_active Withdrawn
- 1997-02-21 WO PCT/AU1997/000104 patent/WO1997031320A1/en not_active Application Discontinuation
- 1997-02-21 CA CA002290594A patent/CA2290594A1/en not_active Abandoned
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5172313A (en) * | 1987-12-11 | 1992-12-15 | Schumacher Billy G | Computerized management system |
US5459656A (en) * | 1989-09-12 | 1995-10-17 | Park City Group, Inc. | Business demand projection system and method |
US5303147A (en) * | 1989-09-27 | 1994-04-12 | Hitachi, Ltd. | Computer aided planning method and system |
GB2242292A (en) * | 1990-03-19 | 1991-09-25 | Miyago Co Ltd | Building maintenance management system |
WO1992007318A1 (en) * | 1990-10-12 | 1992-04-30 | Iex Corporation | Method and system for planning, scheduling and managing personnel |
US5331545A (en) * | 1991-07-05 | 1994-07-19 | Hitachi, Ltd. | System and method for planning support |
US5406477A (en) * | 1991-08-30 | 1995-04-11 | Digital Equipment Corporation | Multiple reasoning and result reconciliation for enterprise analysis |
US5303166A (en) * | 1992-04-14 | 1994-04-12 | International Business Machines Corporation | Method and system for automated network benchmark performance analysis |
WO1996010793A1 (en) * | 1994-09-30 | 1996-04-11 | Yufik Yan M | Probabilistic resource allocation system with self-adaptive capability |
WO1996030852A1 (en) * | 1995-03-30 | 1996-10-03 | Hogan Systems, Inc. | Method of and system for financial institution budgeting and planning |
Cited By (37)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998044441A1 (en) * | 1997-03-31 | 1998-10-08 | Bellsouth Intellectual Property Corporation | A system and method for associating services information with selected elements of an organization |
WO1998044440A1 (en) * | 1997-03-31 | 1998-10-08 | Bellsouth Intellectual Property Corporation | A system and method for generating an invoice to rebill charges to the elements of an organization |
US6072493A (en) * | 1997-03-31 | 2000-06-06 | Bellsouth Corporation | System and method for associating services information with selected elements of an organization |
US6125354A (en) * | 1997-03-31 | 2000-09-26 | Bellsouth Intellectual Property Corporation | System and method for generating an invoice to rebill charges to the elements of an organization |
WO1999059093A1 (en) * | 1998-05-08 | 1999-11-18 | E-Talk Corporation | Performance evaluation tool and method |
US6901426B1 (en) | 1998-05-08 | 2005-05-31 | E-Talk Corporation | System and method for providing access privileges for users in a performance evaluation system |
US6604084B1 (en) | 1998-05-08 | 2003-08-05 | E-Talk Corporation | System and method for generating an evaluation in a performance evaluation system |
US6615182B1 (en) | 1998-05-08 | 2003-09-02 | E-Talk Corporation | System and method for defining the organizational structure of an enterprise in a performance evaluation system |
WO2000000937A1 (en) * | 1998-06-30 | 2000-01-06 | Sun Microsystems, Inc. | Distributed budgeting and accounting system with secure token device access |
US6418420B1 (en) | 1998-06-30 | 2002-07-09 | Sun Microsystems, Inc. | Distributed budgeting and accounting system with secure token device access |
US7752144B1 (en) * | 1999-05-24 | 2010-07-06 | Lockheed Martin Corporation | Multi-disciplinary information engine for total ownership cost estimation of complex systems |
WO2001009780A1 (en) * | 1999-07-30 | 2001-02-08 | Da Vinci Innovation Pty Ltd | Management tool and method |
GB2363223A (en) * | 1999-10-25 | 2001-12-12 | Strategic Factors Pty Ltd | Analysis method |
US6671693B1 (en) | 1999-11-23 | 2003-12-30 | Accenture Llp | System for effectively collecting and disseminating data |
WO2001039027A3 (en) * | 1999-11-23 | 2001-12-06 | Accenture Llp | Decision management in a merger and acquisition environment |
US6671692B1 (en) | 1999-11-23 | 2003-12-30 | Accenture Llp | System for facilitating the navigation of data |
US8606588B1 (en) | 1999-11-23 | 2013-12-10 | Accenture Global Services Limited | Merger and acquisition knowledgebase |
WO2001039027A2 (en) * | 1999-11-23 | 2001-05-31 | Accenture Llp | Decision management in a merger and acquisition environment |
US6571235B1 (en) | 1999-11-23 | 2003-05-27 | Accenture Llp | System for providing an interface for accessing data in a discussion database |
KR20000054653A (en) * | 2000-06-16 | 2000-09-05 | 김창수 | Commencement of an enterprise consulting and selling the article system and method thereof |
US6985872B2 (en) * | 2000-10-03 | 2006-01-10 | Clicksoftware Technologies Ltd. | Method and system for assigning human resources to provide services |
WO2002048935A1 (en) * | 2000-12-11 | 2002-06-20 | Skill Development Associates Ltd | Integrated business management system |
KR20030015018A (en) * | 2001-08-14 | 2003-02-20 | 박광근 | Advise system for inauguration of an enterprise |
AU2003219048B2 (en) * | 2002-03-12 | 2009-02-19 | Akzo Nobel Coatings International B.V. | On-line benchmarking |
WO2003077168A1 (en) * | 2002-03-12 | 2003-09-18 | Akzo Nobel Coatings International B.V. | On-line benchmarking |
US7346529B2 (en) * | 2002-05-07 | 2008-03-18 | David R. Flores | Method for developing an enterprise alignment framework hierarchy by compiling and relating sets of strategic business elements |
WO2004053744A1 (en) * | 2002-12-10 | 2004-06-24 | Bhp Billiton Innovation Pty Ltd | Evaluation system and method |
US7716592B2 (en) | 2006-03-30 | 2010-05-11 | Microsoft Corporation | Automated generation of dashboards for scorecard metrics and subordinate reporting |
US7840896B2 (en) | 2006-03-30 | 2010-11-23 | Microsoft Corporation | Definition and instantiation of metric based business logic reports |
US8261181B2 (en) | 2006-03-30 | 2012-09-04 | Microsoft Corporation | Multidimensional metrics-based annotation |
US8190992B2 (en) | 2006-04-21 | 2012-05-29 | Microsoft Corporation | Grouping and display of logically defined reports |
US7716571B2 (en) | 2006-04-27 | 2010-05-11 | Microsoft Corporation | Multidimensional scorecard header definition |
US20070265899A1 (en) * | 2006-05-11 | 2007-11-15 | International Business Machines Corporation | Method, system and storage medium for translating strategic capabilities into solution development initiatives |
US9058307B2 (en) | 2007-01-26 | 2015-06-16 | Microsoft Technology Licensing, Llc | Presentation generation using scorecard elements |
US8321805B2 (en) | 2007-01-30 | 2012-11-27 | Microsoft Corporation | Service architecture based metric views |
US8495663B2 (en) | 2007-02-02 | 2013-07-23 | Microsoft Corporation | Real time collaboration using embedded data visualizations |
US9392026B2 (en) | 2007-02-02 | 2016-07-12 | Microsoft Technology Licensing, Llc | Real time collaboration using embedded data visualizations |
Also Published As
Publication number | Publication date |
---|---|
EP0954813A1 (en) | 1999-11-10 |
AUPN822196A0 (en) | 1996-03-14 |
CA2290594A1 (en) | 1997-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0954813A1 (en) | Strategic management system | |
US7168045B2 (en) | Modeling business objects | |
Valiris et al. | Business analysis metrics for business process redesign | |
US20110145284A1 (en) | Presenting skills distribution data for a business enterprise | |
US20080270448A1 (en) | Business enablement method and system | |
WO2001026011A1 (en) | Method and estimator for providing operation management strategic planning | |
MXPA02001823A (en) | Structure and method of modeling integrated business and information technology frameworks and architecture in support of a business. | |
Hoffmann et al. | Calculating success: How the new workplace analytics will revitalize your organization | |
Glykas | Effort based performance measurement in business process management | |
Forster et al. | Critical success factors: an annotated bibliography | |
Naoui | Customer service in supply chain management: a case study | |
Barbalho et al. | The effect of stakeholders’ satisfaction and project management performance on transitions in a project management office | |
Otto | On the evolution of data governance in firms: The case of Johnson & Johnson consumer products North America | |
Wiegers | When telepathy won't do: Requirements engineering key practices | |
Hulthén et al. | Challenges of measuring performance of the sales and operations planning process | |
Fisher et al. | Introducing a business information system into an engineering company | |
Gore | Serving the American Public: Best Practices in Performance Measurement: Benchmarking Study Report | |
Sezenias et al. | A holistic business performance measurement framework | |
Tihinen et al. | Metrics and measurements in global software development | |
Moussa | A review of human resource information systems (HRISs) in organizations | |
Eze | Pursuing Efficient Human Resources Management using Computerized Systems | |
Ladeira | Cost Estimation Methods for Software Engineering | |
Arief | The antecedents and consequences of the use of information systems | |
Talamo et al. | “Process Approach” to External FM Service Provision | |
HAILU | ASSESSMENT OF THE BENEFITS AND CHALLENGES OF ENTERPRISE RESOURCE PLANNING (ERP) IMPLEMENTATION IN ETHIO TELECOM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ DE DK EE ES FI GB GE HU IL IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK TJ TM TR TT UA UG US UZ VN YU AM AZ BY KG KZ MD RU TJ TM |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): KE LS MW SD SZ UG AT BE CH DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF |
|
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
ENP | Entry into the national phase |
Ref document number: 2290594 Country of ref document: CA Kind code of ref document: A Ref document number: 2290594 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1997903149 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref document number: 97529667 Country of ref document: JP |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
WWP | Wipo information: published in national office |
Ref document number: 1997903149 Country of ref document: EP |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 1997903149 Country of ref document: EP |