WO1982003103A1 - Systeme de construction de batiments de grande hauteur - Google Patents

Systeme de construction de batiments de grande hauteur Download PDF

Info

Publication number
WO1982003103A1
WO1982003103A1 PCT/AU1982/000023 AU8200023W WO8203103A1 WO 1982003103 A1 WO1982003103 A1 WO 1982003103A1 AU 8200023 W AU8200023 W AU 8200023W WO 8203103 A1 WO8203103 A1 WO 8203103A1
Authority
WO
WIPO (PCT)
Prior art keywords
mould
ground floor
shutters
building
floor plan
Prior art date
Application number
PCT/AU1982/000023
Other languages
English (en)
Inventor
John William Roach
Original Assignee
John William Roach
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by John William Roach filed Critical John William Roach
Priority to AU82014/82A priority Critical patent/AU8201482A/en
Publication of WO1982003103A1 publication Critical patent/WO1982003103A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/18Devices for suspending or anchoring form elements to girders placed in ceilings, e.g. hangers

Definitions

  • This invention relates to a method of casting a multi-storey building, to apparatus for carrying out the method and to buildings constructed by the method.
  • the object of the present invention is to provide an improved method of casting in situ a multi-storey building which overcomes the difficulties inherent in prior art methods and which permits the rapid construction of a multi-storey building using the minimum of skilled labour.
  • the invention further provides apparatus for casting in situ a multi-storey building comprising:-
  • Fig. 1 is a front elevational schematic view of apparatus according to one embodiment of the invention for casting a multi-storey building in situ
  • Fig. 2 is a view similar to Fig. 1 showing the mould fixed in position ready for pouring and the primary lifting rig being moved into the next location by the secondary lifting rig.
  • Fig. 3 is a partial side elevation view corresponding to Fig. 1 showing the top portion of the lifting rigs.
  • Fig. 4 is a front elevational view of a stabiliser member secured to the top of each cast wall, and,
  • Fig. 5 is a side elevational view of a nulti-storey building cast in situ using the method of the invention.
  • the apparatus shown in Figs. 1 and 2 includes a core or mould 10, a primary lifting rig 11 and' a secondary lifting rig 12.
  • Each mould 10 defines the walls of its room or space and appropriate openings for doors and windows are provided by utilising steel block outs which extend between adjacent moulds.
  • a screeder 13 At the bottom of each mould 10 there is a screeder 13 for finishing-off the cast floor.
  • the primary lifting rig 11 has four corner legs 14 which are positioned on top of the previously cast walls or beams so that the rig straddles the space or room.
  • Each lifting rig 11 has a truss assembly 15 connected to the upper end of each leg 14.
  • Support brackets 16 secured to the legs 14 and to the truss assembly 15 carry chains 17 which are secured to brackets 18 at the top of the mould 10.
  • Each chain 17 has a manually operated lifting block 19 for raising the mould 10 to the next floor level as shown in Fig. 1. This can be modified by using a winch instead of the chain and block.
  • the secondary lifting rig 12 is attached to the top of the mould by lugs 20 and is thus raised whenever the mould is raised.
  • the top of legs 20 are connected by a top plate or member 21 which has at each end pulleys 22.
  • a lifting cable 23 extends from the top of each leg 14 around the pulley 20 to winch 24 on the primary rig 11 whereby the primary lifting rig 11 may be raised as shown in Fig. 2.
  • a locator bar or stabiliser member 25 is bolted to the top of each corner of each room or space and when in position, the mould 10 is bolted thereto as shown in Figs. 2 and 4.
  • ground floor is established to a very accurate level and smoothness with the aid of a mechanical bridge screed.
  • a grid showing the ground floor plan of the building is then set out and a mould 10 is accurately set into position for every room or space of the ground floor plan.
  • Reinforcing and services are located in the wall or column cavities defined by adjacent moulds.
  • the external faces of the building can be formed with simple steel shutters supported vertically off the internal wall moulds and spaced at the desired wall thickness with cast in spacer pieces.
  • the moulds are drawn vertically by the pr imary lifting rigs w.hich are located directly on top of two of the cast walls or beams as shown in Fig. 3 the base of the primary lifting rig 11 has a channel member 26 which extends between the vertical legs 14.
  • the underneath of the beam mould section is releasably hinged attached such that when the mould is to be lifted the underneath section is hinged open so that the mould slides over the concrete beam.
  • the wall or column mould is positioned at the next floor level and adjustable cast in stabiliser brackets 25 are bolted to the inner faces of the mould and connected to the top of the cast wall or beam by a heavy duty insert cast in during the previous concrete pour.
  • Each mould is aligned and located accurately to a tolerance of plus or minus 2 millimetres and then locked tightly into position onto the stabiliser brackets.
  • the legs of the primary lifting rig are then raised clear of the room or space defined by the mould by the secondary lifting rig which, as stated before, is connected to the mould.
  • a soffit 30 is placed in position and can be supported by truss assembly 31.
  • the truss assemblies 31 are bolted onto the previously cast walls columns where predetermined transverse holes have been cast for this purpose.
  • Each soffit 30 includes a grid work of flat interconnecting panels approximately 1 metre by 500 millimetres in size when viewed in a plan. These units are connected to one another and supported therebeneath.
  • Both the supports and the soffits contain central key units 32 ( in the case of the soffits) which are wedge shaped to allow for ease of dismantling against the reverse slope of the walls or beams rising from the taper of the core moulds 10.
  • a cornice former which will ensure that a 80 ⁇ 80 millimetre fillet is formed around the ceiling to wall joint in each room or space.
  • Services are then positioned and concrete then poured to finish the first floor.
  • the concrete is first placed into the soffit and finished off to a very accurate level with an integral vibrating bridge screeder which is winched across the toes of the wall or beam mould. After the floor concrete has cured sufficiently the wall or column and beam voids are then filled with concrete and accurately screeded off at the top.
  • each mould 10 is tapered from the bottom to the top of the mould on all faces so as to assist its movement from one floor to the next. This gives rise to a slight inward taper in the wall columns and beam structures which may typically be approximately 5° off the vertical.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Procede et dispositif permettant de couler sur place des elements d'un batiment a plusieurs etages. Les parois, les piliers et les poutres, ainsi que les dalles de plancher de chaque niveau sont coules en une operation en utilisant des moules (10). Apres la prise du ciment une installation de levage secondaire (12) leve l'installation de levage primaire (11) jusqu'au niveau suivant et l'installation de levage primaire (11) souleve ensuite les moules (10) jusqu'au niveau suivant, ce procede pouvant etre repete jusqu'a ce qu'on atteigne le nombre d'etages desire.
PCT/AU1982/000023 1981-03-06 1982-03-08 Systeme de construction de batiments de grande hauteur WO1982003103A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU82014/82A AU8201482A (en) 1981-03-06 1982-03-08 High rise system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU789481 1981-03-06
AU7894/81810306 1981-03-06

Publications (1)

Publication Number Publication Date
WO1982003103A1 true WO1982003103A1 (fr) 1982-09-16

Family

ID=3698565

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU1982/000023 WO1982003103A1 (fr) 1981-03-06 1982-03-08 Systeme de construction de batiments de grande hauteur

Country Status (1)

Country Link
WO (1) WO1982003103A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2141475A (en) * 1982-12-02 1984-12-19 Lend Lease Method and lining system for erecting buildings
WO1990009497A1 (fr) * 1989-02-08 1990-08-23 Lubeca Construction Systems Pty. Ltd. Systeme de construction d'immeuble
NL1015984C2 (nl) * 2000-08-22 2002-02-25 Molenaar Betonindustrie B V Steen voor toepassing bij het stellen van bekistingen in de betonbouw.

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1701113A (en) * 1927-05-09 1929-02-05 Will E Keller Method of and apparatus for pouring concrete walls and floors of steel and concrete frame buildings
FR884182A (fr) * 1941-07-18 1943-08-04 Gutehoffnungshuette Oberhausen Appareil de coffrage roulant pour bétonner simultanément des murs et des plafonds d'édifices quelconques, en particulier de maisons d'habitation construites en ligne, à plusieurs étages
GB1086524A (en) * 1963-09-26 1967-10-11 Leonidas Georges Papaiconomou Improvements in or relating to framework for casting concrete structures
DE1684430A1 (de) * 1966-08-09 1969-12-04 Siemens Bauunion Gmbh Verfahren zum Errichten hoher Betonbauten,z.B. von Wohnhochhaeusern

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1701113A (en) * 1927-05-09 1929-02-05 Will E Keller Method of and apparatus for pouring concrete walls and floors of steel and concrete frame buildings
FR884182A (fr) * 1941-07-18 1943-08-04 Gutehoffnungshuette Oberhausen Appareil de coffrage roulant pour bétonner simultanément des murs et des plafonds d'édifices quelconques, en particulier de maisons d'habitation construites en ligne, à plusieurs étages
GB1086524A (en) * 1963-09-26 1967-10-11 Leonidas Georges Papaiconomou Improvements in or relating to framework for casting concrete structures
DE1684430A1 (de) * 1966-08-09 1969-12-04 Siemens Bauunion Gmbh Verfahren zum Errichten hoher Betonbauten,z.B. von Wohnhochhaeusern

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2141475A (en) * 1982-12-02 1984-12-19 Lend Lease Method and lining system for erecting buildings
WO1990009497A1 (fr) * 1989-02-08 1990-08-23 Lubeca Construction Systems Pty. Ltd. Systeme de construction d'immeuble
NL1015984C2 (nl) * 2000-08-22 2002-02-25 Molenaar Betonindustrie B V Steen voor toepassing bij het stellen van bekistingen in de betonbouw.

Similar Documents

Publication Publication Date Title
CA2227258C (fr) Dispositif et processus pour mouler des boites de beton de grandes dimensions
AP1026A (en) Precast concrete panels for construction of a building.
US20020059763A1 (en) Pre-fabricated bathroom
US4408434A (en) Multi-storey building and a prefabricated panel for such a building
US3182374A (en) Method of and apparatus for molding concrete buildings monolithically
WO1982003103A1 (fr) Systeme de construction de batiments de grande hauteur
US3920780A (en) Method of erecting a multi-story building and apparatus
KR100361047B1 (ko) 건축물 구축용 거푸집
CN111424968A (zh) 扶壁柱筒仓的滑模施工法
EP0054026B1 (fr) Coffrage perdu pour le coulage de planchers en beton
CN114657940B (zh) 胶合板模现浇重力式堤防挡墙砼的支模体系及施工方法
CN215859084U (zh) 承插式木制楼梯模板
TWI632273B (zh) 凹字型建築物施工方法
GB2065192A (en) Method of constructing a multi- storey building
US4455270A (en) Construction process including slab sliding support and comprising simultaneous wall erection
CN110185254A (zh) 一种组合式铝合金模板系统及其应用方法
EP0096051B1 (fr) Coulage en serie d'elements en beton
CN210597670U (zh) 一体化铝模吊模浇筑止水混凝土坎结构
KR100363008B1 (ko) 보강철근이부착된데크플레이트(합성데크)를사용한슬래브,벽분리타설식대형거푸집공법
SU1357520A1 (ru) Способ возведени многоэтажного здани подращиванием этажей
JPH0730626B2 (ja) バルコニ−スラブ施工装置
RU1805193C (ru) Способ возведени здани , сооружени
CN112942417A (zh) 预制混凝土导墙支架
SU1067174A1 (ru) Скольз ша опалубка
CN113463853A (zh) 一种上人屋面施工方法