US8112300B2 - Production optimizer for supply chain management - Google Patents
Production optimizer for supply chain management Download PDFInfo
- Publication number
- US8112300B2 US8112300B2 US11/279,557 US27955706A US8112300B2 US 8112300 B2 US8112300 B2 US 8112300B2 US 27955706 A US27955706 A US 27955706A US 8112300 B2 US8112300 B2 US 8112300B2
- Authority
- US
- United States
- Prior art keywords
- solution
- production
- population
- solutions
- optimized
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related, expires
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 232
- 238000013068 supply chain management Methods 0.000 title abstract description 32
- 238000009826 distribution Methods 0.000 claims abstract description 127
- 238000005457 optimization Methods 0.000 claims abstract description 127
- 238000000034 method Methods 0.000 claims abstract description 125
- 230000002068 genetic effect Effects 0.000 claims abstract description 31
- 238000009434 installation Methods 0.000 claims description 94
- 238000012384 transportation and delivery Methods 0.000 claims description 70
- 239000013598 vector Substances 0.000 claims description 62
- 230000004048 modification Effects 0.000 claims description 47
- 238000012986 modification Methods 0.000 claims description 47
- 238000011156 evaluation Methods 0.000 claims description 21
- 238000003860 storage Methods 0.000 claims description 13
- 239000000463 material Substances 0.000 description 25
- 239000007788 liquid Substances 0.000 description 23
- 230000008569 process Effects 0.000 description 18
- 238000012546 transfer Methods 0.000 description 18
- 239000003016 pheromone Substances 0.000 description 12
- 238000004088 simulation Methods 0.000 description 10
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 8
- 241000257303 Hymenoptera Species 0.000 description 7
- 230000006870 function Effects 0.000 description 6
- MYMOFIZGZYHOMD-UHFFFAOYSA-N Dioxygen Chemical compound O=O MYMOFIZGZYHOMD-UHFFFAOYSA-N 0.000 description 5
- 230000008901 benefit Effects 0.000 description 5
- 230000008859 change Effects 0.000 description 5
- 230000007423 decrease Effects 0.000 description 5
- 229910052757 nitrogen Inorganic materials 0.000 description 4
- 238000007781 pre-processing Methods 0.000 description 4
- 238000009402 cross-breeding Methods 0.000 description 3
- 238000013502 data validation Methods 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000035772 mutation Effects 0.000 description 3
- XKRFYHLGVUSROY-UHFFFAOYSA-N Argon Chemical compound [Ar] XKRFYHLGVUSROY-UHFFFAOYSA-N 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000012217 deletion Methods 0.000 description 2
- 230000037430 deletion Effects 0.000 description 2
- 230000002431 foraging effect Effects 0.000 description 2
- 239000007789 gas Substances 0.000 description 2
- 239000003607 modifier Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 229910052786 argon Inorganic materials 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009395 breeding Methods 0.000 description 1
- 230000001488 breeding effect Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000002716 delivery method Methods 0.000 description 1
- 238000012854 evaluation process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000001976 improved effect Effects 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 239000012488 sample solution Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 208000016261 weight loss Diseases 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/12—Computing arrangements based on biological models using genetic models
- G06N3/126—Evolutionary algorithms, e.g. genetic algorithms or genetic programming
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Definitions
- a supply chain management (SCM) problem may be described as follows: products may be produced (or obtained) from a variety of sources for a variety of costs, while at the same time, product must be distrusted to a variety of customers. Note that this is different from a traditional delivery optimization problem. In the delivery optimization scenario, a specific product must be delivered from an origin to a destination, and the essential problem is how to deliver a set of products most efficiently.
- An SCM problem may be substantially complicated, however, when the product in question is a commodity product, such as industrial liquids. In this case, the commodity product delivered to any given destination may be produced (or obtained) from any available source. Because of this, adding a production side to an SCM problem substantially complicates the optimization process.
- optimization systems are available to optimize the distribution side of an SCM problem. These systems typically identify a set of delivery routes for a set of deliveries from specified locations. Such systems are often constrained, however, by an inability to account for different production possibilities. At the same time, at least for the producer and distributor of commodity materials, energy costs often vary widely from location to location, different plants have different cost and production profiles, and clients' rates of usage of the commodity product may vary. Thus, selecting a production strategy may have a significant impact on operational costs. In fact, for the production and distribution of industrial liquids, the largest cost component of production and distribution may be the cost of power used by production plants. In such a case, a system configured to optimize the distribution of products may produce results that are far from optimal. This occurs as it is often favorable to produce materials at a production plant with very low production costs, even where this may significantly increase transportation costs for some deliveries. Current optimization systems, however, often fail to account for these scenarios.
- embodiments of the present invention relate to both the production side and distribution side of a supply chain management problem.
- embodiments of the invention may be used to optimize both the production and distribution of commodity materials such as industrial liquids.
- One embodiment of the invention includes a method of optimizing a supply chain.
- the method generally includes generating an optimized production solution for the supply chain by using a genetic algorithm optimization technique to optimize a population of seed solutions, and generating an optimized distribution solution for the optimized production solution using an ant colony optimization technique.
- the genetic algorithm optimization technique and the ant colony optimization technique may operate to quickly identify high-quality solutions to an SCM problem.
- generating an optimized production solution for the supply chain may include reading input data, wherein the input data describes a supply chain problem to be optimized; generating a population of solutions, wherein each solution in the population specifies a feasible solution for a supply chain problem to be optimized; evaluating each solution in the population and sorting the solutions in the population according to the evaluation, and performing the genetic algorithm optimization technique using the population until a termination condition specified by the input data is satisfied.
- the genetic algorithm optimization technique may be configured to “evolve” the initial population through many generations, generating new solutions and removing poor ones from the population along the say. New solutions are typically generated using by altering a solution using a selected modification technique. Any number of solution modification techniques may be used. For example, one solution modification technique includes randomly modifying a solution in the population, another technique includes modifying a solution based on a heuristic rule, and a third technique includes cross-breeding two or more solutions.
- the SCM problem to be optimized may reflect a real-world operation, the input data may come from a system status database describing the current real-world operation of a production and distribution operation. Further, the input data may be provided in a structured form, such as the widely used extensible markup language (XML) used for describing data.
- XML widely used extensible markup language
- the initial population of solutions may be generated in a variety of ways.
- the population of seed solutions may include a first group of solutions generated according to heuristic rules and a second group of solutions generated using a random process.
- generating the optimized distribution solution for the optimized production solution using the ant colony optimization technique may include initializing a plant weight vector for each production plant in the supply chain; initializing an installation vector for each delivery location in the supply chain; and generating the distribution solution, wherein the distribution solution describes one or more delivery routes from a production plant to at least one delivery location.
- components of the plant weight vector may indicate preferences for a delivery from the plant represented by the vector to a collection of installations.
- components of an installation vector may indicate a preference for a delivery route from the installation represented by the installation vector to other installations.
- FIG. 1 illustrates a supply chain optimization system, according to one embodiment of the invention
- FIG. 2 further illustrates components of the supply chain optimization system of FIG. 1 , according to one embodiment of the invention
- FIG. 3 illustrates a set of input files used by the supply chain optimization system of FIG. 1 , according to one embodiment of the invention
- FIG. 4 further illustrates components of the supply chain optimization system of FIG. 1 , according to one embodiment of the invention
- FIGS. 5-6 illustrate the operations of a production optimizer, according to one embodiment of the invention.
- FIGS. 7-9 illustrate the operations of a distribution optimizer, according to one embodiment of the invention.
- Embodiments of the invention provide a computerized optimization system that may be used to optimize the production and distribution of commodity materials.
- a supply chain optimization (SCM) problem is used to refer to the optimization of both the production and distribution of commodity materials.
- SCM supply chain optimization
- embodiments of the invention may be used to optimize the production and distribution of industrial liquids such as liquid nitrogen, liquid oxygen, liquid argon, etc.
- the term “optimization” is used herein to describe a solution to an SCM problem that is superior to other solutions, usually in terms of production costs, distribution costs, and/or other factors.
- a solution to an SCM problem refers to a description of a production and/or distribution schedule.
- An ideal solution will satisfy any operational constraints (e.g., production limits and customer requirements), while also minimizing the overall cost of production and distribution.
- embodiments of the present invention are not required to determine a truly optimal, or best, solution to an SCM problem.
- the term optimization generally refers to identifying acceptable solutions to difficult problems in a reasonable amount of time.
- the optimization system includes a software application configured to search for a high-quality solution to an optimization problem.
- the optimization system may be configured to identify plant production levels and route schedules that satisfy customer demands, while also reducing operating costs.
- optimizations that may be identified include: the reduction of power costs by shifting production among different plants, identifying a source of production and delivery route to use for each required delivery, and identifying a quantify of a commodity product to deliver at each stop along a delivery route, in order to meet obligations to customers.
- Embodiments of the invention are described herein relative to a production and distribution system used to produce and distribute both liquid (LOX or O 2 ) and liquid nitrogen (LIN or N 2 ).
- LOX or O 2 liquid
- LIN or N 2 liquid nitrogen
- embodiments of the present invention may be adapted to optimizing the production and distribution of a variety of commodity products, including optimizing the production and distribution of more (or fewer) than two materials, including materials other than O 2 or N 2 .
- FIG. 1 illustrates a supply chain optimization system 100 , according to one embodiment of the invention.
- the components illustrated in system 100 may be implemented as computer software applications configured for existing computer systems, e.g., desktop computers, server computers, laptop computers, tablet computers, and the like.
- the applications described herein, however, are not limited to any particular computing system and may be adapted to take advantage of new computing systems as they become available.
- the system 100 may be adapted for use in multi-processing environments such as a system with multiple CPUs and with distributed and parallel systems such as computing clusters or grids.
- system 100 may be executing on distributed systems communicating over computer networks including local area networks or large, wide area networks such as the Internet.
- components of system 100 may be provided as an application program (or programs) stored on computer readable media such as a CD-ROM, DVD-ROM, flash memory module, or other tangible storage media.
- routines executed to implement the embodiments of the invention may be part of an operating system or a specific application, component, program, module, object, or sequence of instructions.
- the computer program of the present invention typically is comprised of a multitude of instructions that will be translated by the native computer into a machine-readable format and hence executable instructions.
- programs are comprised of variables and data structures that either reside locally to the program or are found in memory or on storage devices.
- various programs described hereinafter may be identified based upon the application for which they are implemented in a specific embodiment of the invention. However, it should be appreciated that any particular program nomenclature that follows is used merely for convenience, and thus the invention should not be limited to use solely in any specific application identified and/or implied by such nomenclature.
- system 100 includes input module 115 , optimization module 120 , and output module 130 .
- Input module 115 may be configured to receive and process data describing a production and distribution system to be optimized (i.e., describing an SCM problem).
- input module 115 may be configured to read and process extensible markup language (XML) documents.
- XML is a widely used standard for creating markup languages used to describe the structure of data. XML allows users to define a set of markup tags and document structure. Additionally, a wide variety of XML document viewers, editors, and utilities are commercially available.
- input modules 115 module may generate a set of a set of input files describing a production and distribution scenario to be optimized.
- system databases 105 may store information regarding the current state of a production and distribution operation such as information related to production facilities, production levels, forecast demand, current production costs, client sites, client requirements, distribution facilities, and distribution costs, etc. From this information, input modules 115 may be configured to generate a set of input files describing the current state of operations using data retrieved from system databases 105 , along with user-provided settings for an evaluation module (used to evaluate solutions), and user configurations of the optimization module 120 . Additonally, input modules 115 may also be used to process “what if” scenarios 110 that describe possible production and distribution scenarios.
- users may create a what-if scenario 110 to study of the benefits obtainable by upgrading equipment, to study of the costs of adding a new customer, or to study of the benefits of adding or removing production facilities.
- a user may edit a set of input files generated from system databases to modify aspects of the current state of a production and distribution operation.
- the optimization system 100 and input modules 115 need not distinguish between an optimization problem defined using information from system database 105 and an optimization problem defined by a what if scenario 110 created by a user.
- optimization module 120 includes both a distribution optimizer 122 and a production optimizer 124 .
- the distribution optimizer may be configured to identify low-cost settings for the production facilities that satisfy operational constraints while minimizing operational costs.
- the production optimizer may be configured to identify effective distribution strategies.
- the optimization module may be configured to provide a production and distribution schedule for an upcoming time period.
- the optimization module 120 may provide a production and distraction schedule for a week long period.
- the actual time period may be specified as part of a set of input files provided to input module 115 .
- distribution optimizer 122 and production optimizer 124 may operate in conjunction with one another, each may be configured to use different optimization methods. This allows optimization modules 122 and 124 to operate using the most appropriate technique for the problem being optimized. By including both a distribution optimizer 122 and production optimizer 124 configured to use different optimization methods, embodiments of the invention may identify higher-quality solutions in a shorter time than alternative systems.
- optimization module 120 may perform examples of optimization techniques that optimization module 120 may perform include ant colony optimizers, genetic algorithms, domain-specific heuristics, and mathematical/numerical techniques (e.g., linear programming), and the like.
- the production optimizer 124 may optimize the production of commodity materials using a genetic algorithm while the distribution optimizer 122 may optimize the distribution of these materials using an ant colony technique.
- FIGS. 5-6 described below, provide an example of a genetic algorithm optimization technique that may be used by the production optimizer 124
- FIGS. 7-8 provide an example of an ant-colony optimization technique that may be used by the distribution optimizer 122 .
- Output modules 130 may be configured to generate output data organizing and presenting the results of an optimization run. For example, when the optimization module 120 completes an optimization run, output module 130 may be configured to generate a variety of reports that describe the best solution found, potential data problems, and a breakdown of costs related to the best solution found. Operation control center 135 may use these reports to implement the solution generated by optimization module 120 . Similarly, a strategy analyst 140 , may analyze reports generated by output module 130 related to a what-if scenario 110 . In one embodiment, output module may be configured to generate reports in an XML format.
- FIG. 2 further illustrates components of the supply chain optimization system 100 of FIG. 1 , according to one embodiment of the invention.
- FIG. 2 illustrates an embodiment of input module 115 that includes a user interface module 205 , a data input module 210 , a data validation module 215 , and data processing module 220 .
- User interface module 205 may allow a user to interact with the optimization system 100 .
- user interface module 205 may provide a graphical user interface that allows graphical editing of the input files describing a production and distribution scenario to be optimized, parameters associated with such a scenario, and may allow users to view results of an optimization run generated by output module 130 .
- the user interface module 205 may allow users to perform a variety of functions such as initiating an optimization run, displaying results of an ongoing or completed optimization run, and interrupting an optimization run in progress.
- data validation module 215 may be configured to validate the input data generated by input modules 210 . For example, data validation modules 215 may validate whether XML documents describing a what-if scenario 110 are well formed. If an input data file fails to conform to an XML grammar used by the optimization system 100 , the user interface module 205 may be configured to provide users with an indication of the actual problem was identified.
- preprocessing module 220 may be configured to perform any preliminary computations in order to increase the efficiency of the optimization process.
- preprocessing module 220 may be configured to generate a demand forecast for installations to which materials may be delivered.
- preprocessing module 220 may create forecasts of the requirements of consumers of the commodity materials generated by a production facility.
- the preprocessing module 220 may be configured to calculate an average daily consumption rate of a commodity material by an installation and use these rates during optimization run.
- the daily consumption rate for an installation to which materials are delivered may be computed from the input demand forecasts for each installation by subtracting a forecast tank level on the final day of the scheduling period from the forecast tank level on the first day of the scheduling period and dividing this quantity by the number of days in the scheduling period.
- FIG. 3 illustrates a set of input files 300 , according to one embodiment of the invention.
- the input files 300 may describe information related to production facilities, production levels, demand forecasts, current production costs, client sites, client requirements, distribution facilities, and distribution costs. Further, as stated, input files may be generated in an XML format.
- input files 300 may include configuration data 305 that provides general information about an optimization problem, such as settings for the optimizer, optimization techniques to use, output settings, etc.
- Facility data 310 may include data related to the production of a commodity material. That is, facility data 310 may describe the production side of an SCM problem.
- facility data 310 may include storage tank sizes, production plant capacities, production plant locations, current material in inventory, days a plant is required to be shut down or in production, and limits on splits (i.e., the relative production percentage of liquid oxygen to liquid nitrogen at a production plant). More generally, facility data 310 may include any information related to the production of a commodity material in a particular case.
- Installation data 315 and customer data 320 may describe information related to the distribution side of a production and distribution optimization problem.
- installation data may describe tank sizes, current inventory levels, constraints on delivery times, and customer data 320 may also describe delivery requirements, contractual obligations, location data, etc.
- installation data 315 and customer data 320 may include any information related to the consumers of a commodity material in a particular case.
- Depot and transport data 325 may describe available distribution resources available such as drivers, trucks, trailers, rail cars, pipelines, and any other relevant data related to the transport and delivery of commodity materials in a particular case.
- FIG. 4 further illustrates components of the supply chain optimization system 100 of FIG. 1 , according to one embodiment of the invention.
- FIG. 4 illustrates an embodiment of optimization module 115 that includes distribution optimizer 122 and production optimizer 124 , along with an optimization coordination module 405 and an simulation/evaluation module 410 .
- the arrows are included to illustrate the interaction between the optimization modules during an optimization run.
- optimization coordination module (OCM) 405 coordinates and integrates the functions of the optimizers 122 , 124 , and the evaluation module 410 .
- OCM 405 calls the distribution optimizer 122 and production optimizer 124 , and then calls the simulation module 410 with the production and optimization solutions generated by optimizers 122 and 124 .
- OCM returns the result of the simulation module 410 to the production and distribution optimization modules, creating feedback cycles used by optimizers 122 and 124 to optimize an SCM problem.
- production optimizer 124 and distribution optimizer 122 cooperate to optimize both the production side and the distribution side of an SCM problem.
- the distribution optimizer 122 may be configured to search for high-quality, feasible solutions to the problem of distributing a commodity product that may be produced or obtained from a variety of sources.
- the distribution optimizer 122 may be configured to search for solutions to the problem of distributing liquid gas to customers.
- the distribution optimizer 122 is configured to perform an ant colony optimization algorithm—an optimization technique inspired by the behavior of foraging ants.
- FIGS. 7-9 discussed below, further illustrate operations of the distribution optimizer 122 .
- Production optimizer 124 may be configured to search for high-quality, feasible solutions to the production part of the problem read in and processed by the input module 115 .
- the production optimizer 124 is configured to perform a genetic algorithm—an optimization technique inspired by the process of biological evolution—to optimize the production side of a production and distribution problem.
- a genetic algorithm may operate by modifying a collection of seed solutions (referred to as a “population”) according to specific mutation rules, to create a new “generation” of solutions from the current “population.”
- apopulation a collection of seed solutions
- genetic algorithms cause a “population” of solutions to produce better and better solutions by cross-breeding them, mutating them, and giving more child-producing opportunities to the best members of the population than to the worst ones.
- An objective function is used to evaluative new solutions generated at each generation to determine the “fitness” of new solutions.
- a genetic algorithm is an optimization technique that is sometimes characterized as “evolution on a computer.”
- FIG. 5 illustrates a method 500 for a production optimizer 124 to optimize the production side of an SCM problem, according to one embodiment of the invention.
- the method 500 begins at step 505 where the production optimizer 124 identifies termination conditions specified by input files 300 . If more than one is specified, then an optimization run may be terminated when any one of them is satisfied.
- the termination conditions may include: a maximum number of new solutions (or generations), a maximum amount of clock time spent, or finding a solution that exceeds a specified quality (i.e., a high-fitness solution).
- the user interface module 205 may allow user to manually halt an optimization run (e.g., by entering an interrupt command from a keyboard). This is not a condition included in input file 220 , but the optimization coordination module 405 may check for this condition periodically during an optimization run.
- the production optimizer 124 initializes an optimization run. This may include, for example, creating caches, and data structures used by the production optimizer 124 , setting initial production levels for production plants, identifying any critical constraints that a solution may need to provide to be feasible, etc.
- all production levels of facilities and plants may be set to an initial state using values specified by input files 300 .
- the production optimizer 124 may identify a set of urgent orders—orders for the delivery of product that should be delivered to prevent a client's storage tank from falling below a safety level.
- the urgent orders are may be used to help determine the required production levels for each production plant.
- urgent orders are used by the distribution optimizer 122 to generate a delivery schedule. Of course, for optimizing the production and distribution of other materials, different initialization actions may be performed.
- the production optimizer 124 creates a set of initial solutions for the genetic algorithm. In other words, the production optimizer 124 creates the initial “population” of solutions for the genetic algorithm to evolve through modification and breeding.
- each solution may have a structure as shown in Table I:
- production optimizer 124 may generate a first group of seed solutions (in the form shown in Table 1) based on smart heuristics.
- a heuristic is a rule of thumb that often works well to achieve a desired result, e.g., reducing cost while maintaining a desired level of production. Heuristics are often based on prior experience.
- An example of a heuristic used in the SCM system includes: “If a first plant has a lower cost of production than a second plant, including transportation costs, and if the first plant has unused capacity, try switching an order from the second plant to the first.”
- the production optimizer 124 creates multiple “smart seeds,” based on solution generation heuristics similar to those a human might use.
- the first group of solutions may include a solution with all plants set at maximum production levels, and heuristics may be used to turn down (or off) the production at plants one at a time until the total production falls below required minimums.
- Another “smart seed” may include a solution with all plants turned off, with heuristics to turn on plants one at a time, until a minimal production level is reached (e.g., turn on the plant with the lowest production cost first, and then the plant with the second lowest production cost, etc.).
- Another “smart seed” includes a solution plant with production levels set in the middle of the feasible range, so that subsequent solutions “evolved” from this smart seed may move these intermediate production levels either toward the maximum and minimum values.
- the first group may include a group of solutions specified by the input files 300 , if any. Doing so allows a user to provide sample solutions to the production optimizer 124 that are different from the smart seeds described above. For example, a production schedule used for the previous day may be useful starting point for optimizing the next day.
- the production optimizer 510 may also randomly generate a second group of solutions (that satisfy the constraints specified in the input files 300 ) to create the initial solution population. This population of solutions provides much of the diversity that allows the genetic algorithm to explore a wide variety of solutions during the early generations of the optimization process.
- the production optimizer 124 generates new solutions.
- the solution search module is configured to produce new solutions by performing a genetic algorithm using the population of initial solutions generated at step 520 .
- the genetic algorithm will operate to “evolve” the population of initial solutions over many thousands of generations, generating a new population at each generation.
- FIG. 6 described below, further illustrates an embodiment of the actions performed as part of step 520 .
- the production optimizer 124 will typically have generated many solutions.
- the best solution currently in the population computed according to the formula described above) is identified and processed.
- the solution identified as the best solution may be passed to additional optimization routines.
- the production optimizer 124 may be modify perform a series of quick checks to improve the solution identified at step 525 , when possible.
- Such post processing of the best solution found may include reducing production at plants that have overflow of product, or conversely, increasing production at plants with tank levels are below minimum levels. Additional example includes returning unused bulk transfer amounts. Bulk transferred product that has not been used by the destination plant is returned to the original plant, so the final solution only has the required bulk transfer amount (thus saving the cost of the transfer, lowering the cost of the overall solution).
- the production optimizer 124 returns the best solution in its population to the coordination module 405 .
- FIG. 6 illustrates a method 600 for optimizing the production side of an SCM problem, according to one embodiment of the invention.
- the method 600 may be performed repeatedly—tens of thousands of times, in a standard optimization run—in order to find a high-quality solution to an SCM problem.
- the production optimizer 124 generates at least one new solution from the set of solutions currently in the population.
- the initial population may be created at part of the method 500 , described above.
- a solution modification technique is selected.
- solution modification techniques are random in nature—one might randomly modify the production level of a plant by some small amount, for example. Searching for better solutions with random changes is often not as fast or effective as searching with directed heuristics. At the same time, random mutations may identify new high-quality solutions that directed heuristics will overlook.
- the production optimizer 124 may be configured to select from a number of non-heuristic (i.e., random) and heuristic (i.e., non-random) techniques to modify a solution, including the following:
- the effect of having a number of intelligent heuristics available to modify solutions currently in the population is that any of these techniques has a chance of being selected in any pass through the method 600 , and so there is no reliance on a single technique. Instead, there is a population of solutions, any of which can have any modification technique applied in an attempt to improve it.
- the production optimizer 124 By configuring the production optimizer 124 to consider hundreds of thousands of these applications, coupled with the inclusion of expert human heuristics in the set of modification techniques that may be applied, a powerful search of the space of possible solutions typically occurs during an optimization run. Thus, a optimization run is likely to convergence on a high-performance solutions to the production optimization problem.
- any of these (or other) techniques may be selected during a pass through this cycle of optimization.
- modification techniques may be selected probabilistically using default probabilities or using probabilities specified in input files 220 . Thus, although any modification technique has a chance of being chosen, some may have higher probabilities than others. Setting the probabilities is a matter of experiment and analysis of the types of solutions the optimizer produces for a given pipeline.
- one or more solutions from the current population of solutions are selected for modification according to the modification technique selected at step 605 . Once a modification technique has been selected, whether one or two solutions are required as inputs is determined. Most of the modification techniques described above require only one, but the cross-breeding modification, for example, requires two.
- solutions are chosen from the general population of solutions using a technique sometimes called a ranked roulette wheel technique.
- the technique is described as “ranked” because it sorts the solutions in the population of solutions into a list, ordered from best solution to worst. It then assigns a weight to each solution in the list. These weights decrease linearly. For example, with a decrease rate of 10 and a start weight of 100, the first 12 members of the population would have weights of 100, 90, 80, 70, 60, 50, 40, 30, 20, 10, 1, 0.5, . . . . These weights are used to bias the selection process so that the best individuals are more likely to be chosen than the worst ones.
- the metaphor is one of a roulette wheel with a slot for each member of the population.
- Each solution's slot is proportional to its weight, calculated as above.
- a computerized ball is spun, and the individual in whose slot the ball lands is chosen.
- the best individual in the population, with a weight and slot size of 100, is 100 times more likely to be chosen when a solution is required than the worst individual, with a weight and slot size of 1.
- the selected solution modification technique is used to create a new solution. That is the modification technique is used to generate the new solution from the original solution.
- Some of the modifications may be very small—change the production level a bit at one plant, for example. Some may be quite significant—shut down a plant for several days, for example.
- the schedule generated from the new solution may be simulated by simulation module 410 .
- a production solution generated by the production optimizer 124 is transformed into a schedule that also involves a distribution schedule of the commodity product produced.
- the quality (or fitness) of the simulated schedule is evaluated.
- the simulation module 410 may be configured to compute the total cost of production and distribution of product in the schedule.
- a detailed example of a fitness equation used to evaluate a combined production/distribution solution is described below for an embodiment of the invention related to the production and distribution of industrial liquids.
- the new solution may be inserted into the population.
- the production optimizer keeps a ranked order of the solutions in the population, ordered according to the fitness of each solution. Accordingly, the new solution generated in a pass through the method 600 will be placed in the population according to its fitness score.
- the worst (i.e., least fit) member of the population is removed from the population.
- the population size may remain constant during the optimization process.
- the production optimizer 124 determines whether any termination conditions are satisfied. If so, the optimization process terminates and control returns to step 525 of the method 500 . Otherwise, the method 600 is repeated to produce another new solution (i.e., the population moves through another generation).
- FIGS. 7-9 illustrate the operations of a distribution optimizer 124 , according to one embodiment of the invention.
- the distribution optimization 124 may be configured to use an ant colony optimization technique.
- Ant colony optimizers are inspired by the natural processes by which foraging ants find food, attract other ants to the food source, shorten paths to reach the food from the nest, and cease traveling on those paths when the food source is exhausted.
- ants initially wander randomly, and upon finding food return to their colony while laying down pheromone trails.
- an ant encounters an existing pheromone trail it is unlikely to continue traveling at random, but to instead follow the trail, returning and reinforcing the trail if it eventually finds food.
- the pheromone trails evaporate over time, reducing its attractive strength. The more time it takes for an ant to travel down the path and back again, the more time the pheromones have to evaporate.
- An ant colony optimizer uses “simulated ants” walking around the graph representing the problem to solve to arrive at an optimized solution.
- FIG. 7 illustrates a method 700 for the distribution optimizer 122 to perform an ant colony optimization technique, according to one embodiment of the invention.
- the distribution optimizer 122 may be configured to initialize an ant-colony to search for distribution solutions; relative to a production solution generated using the production optimizer 124 .
- distribution optimizer 122 may be configured initialize the optimization process by creating a vector of weights to represent each plant and a vector for each installation. These weights are used to represent the pheromone levels that are characteristic of ant systems.
- the first vector is an example of a plant vector. It shows how important the distribution optimizer 122 believes it is to ship to different installations from the plant that this vector is associated with.
- the vector weights shows that this plant has a preference for shipping product to the first and fourth installations in the list and has a preference to not ship the second and filth installations in the list.
- the second vector is an example of an installation vector. This vector shows how beneficial the distribution optimizer 122 believes it is to proceed from this installation to other neighboring installations when a delivery to this installation involves less than a truckload of product.
- the distribution optimizer 122 prefers a delivery to the third installation.
- the vector prohibits a delivery to the fifth, sixth, or seventh neighboring installation.
- the distribution optimizer 122 operates by modifying the weights in these vectors to generate a set of delivery routes, based bids for production delivery made by production plants.
- the distribution optimizer 122 may be configured to perform a route generation process multiple times until a termination condition is met.
- FIG. 8 illustrates a method 800 showing the operations of the distribution optimizer 122 , according to one embodiment of the invention.
- the distribution optimizer 122 is configured to optimize the distribution of industrial liquids that may be generated and supplied from a variety of production points.
- the method 800 beings at step 805 where the weights for the plant weight vectors and installation vectors are initialed.
- the weight vectors may be initialized to a set of initial values, with some bias introduced so that plants that are physically closer to a bidding plant have higher weights than those of plants that are far away.
- constraints such as days of the week or times of day that an installation may receive a delivery are read in from input files 300 .
- the distribution optimizer 122 generates routes based on the current vectors and production facilities.
- FIG. 9 described below illustrates an example of the route generation process that may be performed as part of step 805 .
- the distribution optimizer 122 may be configured to determine whether it should terminate the optimization run being performed (step 815 ). In one embodiment, termination conditions are read in during the initialization phase and are passed to the distribution optimizer 122 by the optimization coordination module 405 . For each solution generated by the genetic algorithm, the distribution optimizer 122 may be configured to produce a fixed number of routes and return the best one. For example, the distribution optimizer 122 may be configured to generate three delivery schedules and return the best one. However, the number of schedules returned may be configured as part of an optimization run, based on, among other things, the optimization problem being solved and the time available to perform an optimization run. Once the desired number of routes has been generated the algorithm returns its best solution to the optimization coordination module 405 .
- the distribution optimizer 122 determines whether to modify the weights in the vectors of weights in the plant weight vectors. In one embodiment, the distribution optimizer 122 modifies weights if it has just produced a solution that is better than any solution previously produced. To modify the weights (step 825 ), the distribution optimizer may be configured to first reduce every weight in every weight vector by an amount specified in input files 300 . The distribution optimizer 122 sums the weight reductions that have occurred as a result of this reduction. It then distributes those weights to the components of the best solution found thus far (reinforcing the “pheromone trail” of the best solution).
- the weights may be modified to gradually cause weights on ineffective solutions to die out, while gradually strengthening the weights on the effective solutions.
- the loop of steps 815 - 825 may be repeated until termination conditions are met (step 815 ) and the best solution identified by the distribution optimizer 122 is returned (step 830 ).
- FIG. 9 illustrates a method 900 for the distribution optimizer to generate a delivery schedule using an ant colony optimization technique, according to one embodiment of the invention.
- the method 900 shows the generation and optimization of delivery routes for delivering industrial liquids to a set of installations. Accordingly, the steps illustrated in method 900 are tailored to scheduling the distribution and delivery this type of commodity product. Those skilled in the art will recognize; however, that embodiments of the invention may be adapted to generate and optimize a delivery schedule for a variety of materials.
- the method 900 begins at step 905 where the distribution optimizer 122 determines whether there is an urgent installation. That is, the distribution optimizer 122 determines whether there are any more installations for which a delivery route needs to be generated. In the case of industrial liquids, for example, a delivery may not be necessary until the forecasted volume of liquid in a tank at an installation falls below a certain level. If not, the algorithm completes—it has found all the routes that it can on this round of routing.
- a delivery schedule may provide a source (plant of production), a destination (an installation), a delivery amount, a time of delivery, and a delivery method (e.g., truck, rail car, pipeline).
- a delivery method e.g., truck, rail car, pipeline.
- the particular elements of a delivery may vary depending on the SCM problem being optimized.
- a variety of techniques may be used to select from a set of installations.
- one method is the roulette wheel procedure.
- Roulette wheel procedures are described in the genetic algorithm discussion, above. Using this method, the size of each installation's slot on the roulette wheel is equal to (installation priority+1)/capacity.
- higher-priority installations are more likely to have a delivery scheduled before lower-priority installations.
- the lower the capacity of an installation the higher its probability of being selected.
- a second procedure is a greedy procedure that chooses whatever installation has the highest value of (installation priority+1)/capacity. In other words, the greedy procedure selects the installation with the highest probability of being selected by the roulette wheel process.
- Another possibility includes an equally random procedure, where the different installations each have an equal probability.
- each plant generates a bid to serve the installation selected at step 910 .
- a plant bids on the delivery by calculating (1/(delivery cost+production cost)).
- the distribution optimizer 122 may determine whether at least one bid in the set of bids made by the plants, then a bid is chosen and the algorithm proceeds to routing.
- an accepted bid may be selected using one of three procedures.
- the slots of roulette wheel may be determined using a ranking procedure that ranks the quality of the delivery route that occurs from using the plant making the bid to the installation.
- the size of each bid's slot in the roulette wheel may be equal to the “pheromone weight” in the weight vector representing the trail from the plant making the bid to the installation (raised to an exponential power), plus the adjusted bid value raised to an exponential power.
- the probability of the bid being selected is directly proportional to the pheromone weight of a given trail.
- the exponents in this equation are read in from input files, and may have a default value of 2.0.
- Varying the exponent may increase or decrease the strength of the “pheromones trails” left by other routes.
- a second, “greedy” procedure selects the bid that has the highest value probability calculated using in the roulette wheel procedure.
- a bid may be randomly selected from different bids.
- the distribution optimizer 122 when the distribution optimizer 122 generates routes, it generates one set of routes using the greedy procedure, one using the random procedure, and additional routes using the roulette wheel procedure.
- a bid attempt counter is incremented to reflect the number of times the distribution optimizer 122 has tried to find bids for this installation.
- an installation has three chances at receiving a delivery bid, and after that, the installation is placed on a missed installations list (steps 930 and 935 ). If that number is less than 3, the installation is placed back on the urgent installations list, and may be selected again at another iteration of step 905 . It may appear that if there are currently no bids for one installation, then there is no way that bids could appear when the installation is processed again. However, if the installation receives product as a result of being a secondary delivery to a delivery scheduled for another installation, then the one installation may require less product and a bid may become possible.
- the distribution optimizer 122 creates a route from the source plant with the accepted bid to the installation and notes the distance and time of the route.
- the route travel times may be determined using a fixed rate of travel, typically a historically average rate, input as part of input files 300 . However, other techniques may be used.
- the distribution optimizer 122 may be configured to identify whether any nearby customer sites may be added to the route currently being generated. For example, for the distribution of industrial liquids, if the capacity of the client tank being delivered to holds less than a full truckload of material, then the distribution optimizer 122 determines whether any other potential delivery sites are within certain radius of the installation. This radius may be provided as parameter included in input files 300 . If there is another client site within this radius that can take the remainder of the product in the truck, even if that site is not below trigger level to place it on the urgent installations list, then that site is inserted into the route in the most economical way that respects delivery time constraints (step 950 ).
- steps 945 and 950 may be repeated, until the truck is empty or there are no more candidate delivery sites to consider at which point the distribution optimizer 122 ends generating the current route (step 955 ).
- the production optimizer may be configured to optimize a production schedule and the distribution optimizer may be configured to determine an optimal distribution schedule, based on client requirements and a particular production solution.
- Simulation module 410 may be configured to compute the effects of a schedule, given as inputs the production schedule produced by the production optimizer 124 and the distribution schedule produced by the distribution optimizer 122 . Additionally, in one embodiment, the schedule simulation module 410 may be configured to “repair” these schedules during simulation if they result in unfilled orders that can be filled by increasing production levels at a particular plant. In other words, if a particular production and distribution schedules proves to be close to satisfying all orders, the solution may be modified by identifying the best plant to deliver to an installation and raising production at that plant (if possible) to fill unfilled orders.
- the simulation module 410 may be further configured to compute an evaluation score (i.e., a fitness) of a production/distribution solution.
- an evaluation score i.e., a fitness
- the following discussion provides an example of calculating an evaluation score of a production/distribution solution for an embodiment used to optimize the production and distribution of industrial liquids.
- the method of calculating a fitness score may vary.
- the simulation module 410 computes the cost of executing the solution's strategy.
- cost increases the fitness of a solution decreases.
- totalProductioncost may be computed by summing the production cost across all facilities, using their particular energy costs, production costs, and so forth.
- bulkTransferCost may be computed by summing the total cost of all the bulk transfers in the system. And each bulk transfer cost may be computed as the product of a constant and the number of miles involved in the bulk transfer.
- the constant may represent the average cost of a bulk transfer during a given period in which the bulk transfer occurs.
- some client installations may have a “red line minimum” indicating a minimum amount of material that should always be available at a given installation.
- the urgencyDeltaFactor is a global constant set by the user.
- safety count is the number of times this installation broke the safety level in the tanks during the scheduling period;
- the contribution factor is taken from a vector of values greater than or equal to 0.0 that represent the greater importance of near-term days in the scheduling window;
- the installation priority is a feature of the installation read in during the data input phase;
- the unsatisfied demand order count is a count of the unsatisfied orders; and the constant factor is the sum of the daily contribution factor for the day in question, a constant representing each demand order's contribution to the sum, and the priority of the installation.
- urgencycount safetyCount+unsatisfiedDemandOrderCount.
- urgencycount unsatisfiedDemandOrderCount.
- embodiments of the invention may be used to perform a variety of different tasks.
- the optimization system described herein may operate somewhat autonomously. Users may review solutions produced by the system 100 , and can examine output data generated by output modules 130 to see whether there have been problems with the data or with the solutions. From time to time, users may need to modify input files 300 to reflect changes in the plants or changes to the constraints used in the evaluation process.
- Another use of the system 100 includes the ability to perform a variety perform a what-if analysis. In such a case, the system 100 may provide valuable data bearing on strategic decisions, e.g., whether to approve an upgrade to existing equipment.
- the user modifies the input files 300 in order to reflect the equipment change and any related changes to the production plants (e.g., increased/decreased production capacity or production costs).
- Another example includes modifying the requirements specified by input data 300 to reflect possible changes in client usage patterns (e.g., a sudden increase/decrease in consumption of a commodity product).
- users may modify input files 300 to describe changes to the current state of a production plant. The difference in operating cost between an optimization run using the modified input files 300 and current actual operating costs may provide a strong indication to the user of the potential benefits or costs of making the equipment upgrade.
- Another use of the system 100 includes planning for change in client usage patterns. For example, a user generates multiple optimization problems, reflecting the points at which changes may occur in usage patterns. The user then analyzes the solutions produced by the system to determine whether those solutions represent a reasonable transition path in liquid gas operations. If not, the user may impose additional constraints on difficult intermediate solutions that cause them to blend with the solutions adjacent to them in time. Thus, embodiments of the invention may assist a commodity producer in transitioning from one general operational state to another operational state.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Biophysics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Evolutionary Biology (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Bioinformatics & Computational Biology (AREA)
- General Health & Medical Sciences (AREA)
- Evolutionary Computation (AREA)
- Molecular Biology (AREA)
- Physiology (AREA)
- Genetics & Genomics (AREA)
- Artificial Intelligence (AREA)
- Biomedical Technology (AREA)
- Computational Linguistics (AREA)
- Data Mining & Analysis (AREA)
- Software Systems (AREA)
- Mathematical Physics (AREA)
- Computing Systems (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Primary Health Care (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
-
- Part 1: A list of production levels for each plant, for each day of the optimization period.
- Part 2: A list of splits for each plant, for each day of the optimization period.
- Part 3: A list of bulk transfers between plants, noting the day of each transfer.
The list of production levels for each plant has values for each day that are either equal to zero (representing a plant shutdown), or that fall within minimum and maximum production level for that plant. The list of splits for each plant represents the ratio of total LIN production to total LOX at a plant for the given day. The list of bulk transfers between plants represents physical transfers of product on the dates specified inpart 3.
-
- Random Change: This modification technique generates a random mutation to one parameter in a solution.
- Shift Production: This modification technique moves production from a plant where it is expensive to a plant where it is cheaper. The modification involves increasing production at the less expensive plant and decreasing production at the more expensive plant. The shift production modifier takes into account current production prices and the effects of the shift on both plants involved. If this information were not taken into account when generating candidates for shifting production, then the modifier might shift production from inexpensive production facilities to more expensive ones—a shift highly likely to increase overall production costs.
- Reduce Production: This modification technique looks for plants that are potentially over-producing product, selects one such plant through a probabilistic decision process, and reduces that plant's production by a probabilistic amount. (e.g., plants with more expensive production costs are more likely to have production reduced than ones with less expensive production costs).
- Change a Split: This modification technique looks for a solution and where a split could be improved for some plant. It changes the split for that plant. This modification technique is useful in an embodiment used to optimize the production and distribution of industrial liquids where a plant may split production capacity between different materials.
- Change Production Level: This modification technique looks for a solution where a production level might be changed in order to improve the evaluation of the solution.
- Shut down a Production plant. This modification technique looks for solutions that include plants that might profitably be shut down on and probabilistically selects one to shut down. It uses some of the heuristics that a human production expert would use to decide which plants are candidates to be shut down (e.g., a plant with more expensive production costs is more likely to be shut down than one with less expensive production costs).
- Turn on plant. This modification technique looks for solutions that include inactive plants that might profitably be turned on. It probabilistically selects one and turns it on to create a new solution. It uses some of the reasoning that a human production expert would use to decide which plants are candidates to be turned on (e.g., a plant with more expensive production costs is less likely to be turned on than one with less expensive production costs).
- Add bulk transfer. This modification technique examines the schedule produced by the solution and determines where the addition of a bulk transfer might improve the evaluation of that solution. The heuristic will not introduce a bulk transfer that increases the overall production cost.
- Delete Bulk Transfer. This modification technique examines the schedule produced by the solution and determines where the deletion of a bulk transfer might improve the evaluation of that solution. The heuristic will not delete a bulk transfer if the deletion increases the overall production cost.
TABLE II |
Example Pheromone Weighted Vectors |
Plant Weight Vector | <5, 0.5, 2.6, 4.3, .9> | ||
Installation Vector | <1.2, 3.4, 5, 1, 0, 0, 0> | ||
cost=deliverycost+totalProductionCost+bulkTransferCost+redlinePenalty+missedinstallationPenalty.
This raw score may be used to determine a normalized fitness value between 0.0 and 1.0 by calculating the inverse of the raw “cost” score
fitness=1/(cost)
Thus, as the raw cost score increases the fitness of a solution decreases.
deliverycost=total distribution cost+early delivery penalty (if any).
That is, the delivery cost may add a penalties for an early delivery (e.g., in order to empty a truck as part of
redlinePenalty=redlineViolationVolume*RedlineViolationPenalty.
The missed installation penalty is a penalty applied for missing orders. It is computed as follows:
missedinstallationPenalty=urgencyDeltaFactor*(pwUrgencyCount+urgencycount)*missedinstallationPenalty.
pwUrgencyCount=safetycount*(dailyContributionFactor(day)+installationPriority)+unsatisfiedDemandOrderCount*constantFactor,
In this equation, safety count is the number of times this installation broke the safety level in the tanks during the scheduling period; the contribution factor is taken from a vector of values greater than or equal to 0.0 that represent the greater importance of near-term days in the scheduling window; the installation priority is a feature of the installation read in during the data input phase; the unsatisfied demand order count is a count of the unsatisfied orders; and the constant factor is the sum of the daily contribution factor for the day in question, a constant representing each demand order's contribution to the sum, and the priority of the installation.
pwUrgencyCount=unsatisfiedDemandOrderCount*constantFactor.
Finally, the urgencycount variable may be calculated (for either forecast demand or call in demand) as follows:
urgencycount=safetyCount+unsatisfiedDemandOrderCount.
For call in demand:
urgencycount=unsatisfiedDemandOrderCount.
In general, the parameters of the cost function described above tend to favor the following goals, in decreasing order of importance:
-
- meet day 0 and day 1 demand
- meet demand order demand
- meet the demands of a location with a higher priority
- find the lowest cost solution, including penalties.
Claims (27)
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/279,557 US8112300B2 (en) | 2005-04-22 | 2006-04-12 | Production optimizer for supply chain management |
RU2007143321/08A RU2458398C2 (en) | 2005-04-22 | 2006-04-18 | Production optimiser for supply chain management |
EP06744510A EP1875415A2 (en) | 2005-04-22 | 2006-04-18 | Production optimizer for supply chain management |
JP2008507184A JP5053996B2 (en) | 2005-04-22 | 2006-04-18 | Supply chain management production optimizer |
MX2007012999A MX2007012999A (en) | 2005-04-22 | 2006-04-18 | Production optimizer for supply chain management. |
KR1020077025826A KR101300297B1 (en) | 2005-04-22 | 2006-04-18 | Production optimizer for supply chain management |
CA2606133A CA2606133C (en) | 2005-04-22 | 2006-04-18 | Production optimizer for supply chain management |
AU2006238650A AU2006238650B2 (en) | 2005-04-22 | 2006-04-18 | Production optimizer for supply chain management |
PCT/IB2006/000910 WO2006111821A2 (en) | 2005-04-22 | 2006-04-18 | Production optimizer for supply chain management |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US67424005P | 2005-04-22 | 2005-04-22 | |
US11/279,557 US8112300B2 (en) | 2005-04-22 | 2006-04-12 | Production optimizer for supply chain management |
Publications (2)
Publication Number | Publication Date |
---|---|
US20060241986A1 US20060241986A1 (en) | 2006-10-26 |
US8112300B2 true US8112300B2 (en) | 2012-02-07 |
Family
ID=36999877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/279,557 Expired - Fee Related US8112300B2 (en) | 2005-04-22 | 2006-04-12 | Production optimizer for supply chain management |
Country Status (9)
Country | Link |
---|---|
US (1) | US8112300B2 (en) |
EP (1) | EP1875415A2 (en) |
JP (1) | JP5053996B2 (en) |
KR (1) | KR101300297B1 (en) |
AU (1) | AU2006238650B2 (en) |
CA (1) | CA2606133C (en) |
MX (1) | MX2007012999A (en) |
RU (1) | RU2458398C2 (en) |
WO (1) | WO2006111821A2 (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090271241A1 (en) * | 2008-04-29 | 2009-10-29 | Sas Institute Inc. | Computer-Implemented Systems And Methods For Pack Optimization |
US20120054076A1 (en) * | 2010-08-30 | 2012-03-01 | Xinmin Wu | Systems And Methods For Multi-Echelon Inventory Planning With Lateral Transshipment |
US20130066455A1 (en) * | 2011-09-09 | 2013-03-14 | Sap Ag | Demand-driven collaborative scheduling for just-in-time manufacturing |
US8688497B2 (en) | 2011-01-10 | 2014-04-01 | Sas Institute Inc. | Systems and methods for determining pack allocations |
US8788315B2 (en) | 2011-01-10 | 2014-07-22 | Sas Institute Inc. | Systems and methods for determining pack allocations |
US20140222487A1 (en) * | 2013-02-04 | 2014-08-07 | The Boeing Company | Total-Ordering In Process Planning |
CN104200271A (en) * | 2014-08-22 | 2014-12-10 | 华南农业大学 | Multi-objective optimization algorithm for engine |
US9530093B2 (en) | 2014-06-23 | 2016-12-27 | International Business Machines Corporation | Solving vehicle routing problems using evolutionary computing techniques |
US10491748B1 (en) | 2006-04-03 | 2019-11-26 | Wai Wu | Intelligent communication routing system and method |
US11403581B2 (en) | 2007-03-07 | 2022-08-02 | Blue Yonder Group, Inc. | Sentient optimization for continuous supply chain management |
US11466998B1 (en) * | 2019-02-15 | 2022-10-11 | State Farm Mutual Automobile Insurance Company | Systems and methods for dynamically generating optimal routes for management of multiple vehicles |
US11466997B1 (en) | 2019-02-15 | 2022-10-11 | State Fram Mutual Automobile Insurance Company | Systems and methods for dynamically generating optimal routes for vehicle operation management |
US20230084312A1 (en) * | 2020-02-21 | 2023-03-16 | Beijing Jingdong Zhenshi Information Technology Co., Ltd. | Route determination method, apparatus, server and storage medium for cold chain distribution |
US20230153718A1 (en) * | 2021-11-18 | 2023-05-18 | Inventec (Pudong) Technology Corporation | Scheduling device and method |
US11928699B2 (en) | 2021-03-31 | 2024-03-12 | International Business Machines Corporation | Auto-discovery of reasoning knowledge graphs in supply chains |
US12141744B1 (en) | 2021-08-13 | 2024-11-12 | C&S Wholesale Grocers, Inc. | Method and system for item tracking with real-time feedback |
Families Citing this family (50)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9729639B2 (en) * | 2001-08-10 | 2017-08-08 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US8417360B2 (en) * | 2001-08-10 | 2013-04-09 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US8914300B2 (en) | 2001-08-10 | 2014-12-16 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US20090210081A1 (en) * | 2001-08-10 | 2009-08-20 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US7797062B2 (en) * | 2001-08-10 | 2010-09-14 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US20090204237A1 (en) * | 2001-08-10 | 2009-08-13 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US20070011053A1 (en) * | 2003-07-02 | 2007-01-11 | Chin Kok Yap | Method and system for automating inventory management in a supply chain |
JP4115958B2 (en) * | 2004-03-26 | 2008-07-09 | 株式会社東芝 | Plant operation schedule optimization method and optimization system |
US20080177587A1 (en) * | 2007-01-23 | 2008-07-24 | Sonia Jean Cushing | Prioritizing orders using business factors |
US10255581B2 (en) * | 2007-03-07 | 2019-04-09 | Jda Software Group, Inc. | Fast planning heuristic for batch and interactive planning |
US8069127B2 (en) * | 2007-04-26 | 2011-11-29 | 21 Ct, Inc. | Method and system for solving an optimization problem with dynamic constraints |
US8042100B2 (en) * | 2007-08-27 | 2011-10-18 | International Business Machines Corporation | Methods, systems, and computer products for evaluating robustness of a list scheduling framework |
US8209045B2 (en) * | 2008-04-07 | 2012-06-26 | Honeywell International Inc. | System and method for discrete supply chain control and optimization using model predictive control |
US20090264225A1 (en) * | 2008-04-17 | 2009-10-22 | Lee William B | Golf tee |
US20100004941A1 (en) * | 2008-07-02 | 2010-01-07 | International Business Machines Corporation | Method and Apparatus for Generating Customized Provisioning Workflows from One Flow Models |
US20100002864A1 (en) * | 2008-07-02 | 2010-01-07 | International Business Machines Corporation | Method and System for Discerning Learning Characteristics of Individual Knowledge Worker and Associated Team In Service Delivery |
US20100004967A1 (en) * | 2008-07-02 | 2010-01-07 | International Business Machines Corporation | Method and System for Generating One Flow Models from Runtime Service Delivery Process |
US20100005469A1 (en) * | 2008-07-02 | 2010-01-07 | International Business Machines Corporation | Method and System for Defining One Flow Models with Varied Abstractions for Scalable lean Implementations |
JP5159518B2 (en) * | 2008-08-28 | 2013-03-06 | 株式会社日立製作所 | Supply plan creation device, program, and synthesis method |
US8195496B2 (en) * | 2008-11-26 | 2012-06-05 | Sap Aktiengesellschaft | Combining multiple objective functions in algorithmic problem solving |
US20110225636A1 (en) * | 2010-03-09 | 2011-09-15 | Keith Chad C | Method For Automating Onboarding Application Developers To Sales Distribution Channel |
US9124554B2 (en) | 2010-03-09 | 2015-09-01 | At&T Intellectual Property I, L.P. | Mobility network operator service delivery hub |
US8315920B2 (en) | 2010-03-09 | 2012-11-20 | At&T Intellectual Property I, L.P. | Method for automating onboarding of user generated ringback tones to sales distribution channel |
CN101916444B (en) * | 2010-08-23 | 2012-04-11 | 南京信息工程大学 | Medical cell edge detection method based on morphology and ant colony algorithm |
CA2821678C (en) | 2011-05-12 | 2017-09-05 | Ali Esmaili | Methods for improved production and distribution |
US8924320B2 (en) | 2012-02-07 | 2014-12-30 | Caterpillar Inc. | Systems and methods for forecasting using process constraints |
US8606620B2 (en) | 2012-02-07 | 2013-12-10 | Caterpillar Inc. | Systems and methods for forecasting using an attenuated forecast function |
US8676630B2 (en) | 2012-02-07 | 2014-03-18 | Caterpillar Inc. | Systems and methods for selectively updating forecast data |
US20150356479A1 (en) * | 2014-06-06 | 2015-12-10 | Honeywell International Inc. | Analytic framework for handling trade-offs between different business objectives in planning and scheduling applications |
US10753751B2 (en) | 2014-09-19 | 2020-08-25 | Arris Enterprises Llc | Systems and methods for street level routing |
US20160210683A1 (en) * | 2015-01-19 | 2016-07-21 | International Business Machines Corporation | Order Offload |
KR101720634B1 (en) * | 2015-02-27 | 2017-03-28 | 고려대학교 산학협력단 | Scheduling method and system using ant algorithm for physical distribution delivery |
US11775937B2 (en) | 2015-10-08 | 2023-10-03 | Arris Enterprises Llc | Dynamic capacity ranges for workforce routing |
US10242388B2 (en) * | 2016-01-05 | 2019-03-26 | Amobee, Inc. | Systems and methods for efficiently selecting advertisements for scoring |
US20170344933A1 (en) * | 2016-05-27 | 2017-11-30 | Caterpillar Inc. | Method and system for managing supply chain with variable resolution |
US11158017B2 (en) * | 2016-12-28 | 2021-10-26 | Sap Se | Warehouse management system |
CN107301504B (en) * | 2017-06-12 | 2018-06-15 | 合肥工业大学 | Leapfroged based on mixing-the production and transport coordinated dispatching method and system of path relinking |
US11537981B2 (en) | 2018-06-04 | 2022-12-27 | KSR Unlimited LLC | Produced physical bulk asset hauling dispatch system |
US11282022B2 (en) * | 2018-12-31 | 2022-03-22 | Noodle Analytics, Inc. | Predicting a supply chain performance |
CN111859733B (en) * | 2020-06-19 | 2023-06-27 | 江西五十铃汽车有限公司 | Method for optimizing reliability of automobile exhaust system based on ant colony algorithm |
JP7489878B2 (en) * | 2020-09-17 | 2024-05-24 | 株式会社日立製作所 | Value chain planning collaboration method, value chain planning collaboration device, and value chain planning collaboration system |
US20220156693A1 (en) * | 2020-11-17 | 2022-05-19 | Exel Inc. d/b/a DHL Supply Chain (USA) | Computerized system and method for developing optimized cargo transportation solutions |
CN112131761A (en) * | 2020-11-25 | 2020-12-25 | 晶芯成(北京)科技有限公司 | Factory dispatching method and system based on group intelligent algorithm |
US11546216B2 (en) * | 2020-12-22 | 2023-01-03 | Mellanox Technologies, Ltd. | Real time performance tuning of network devices |
US20220253769A1 (en) * | 2021-02-04 | 2022-08-11 | C3.Ai, Inc. | Constrained optimization and post-processing heuristics for optimal production scheduling for process manufacturing |
WO2023009019A1 (en) * | 2021-07-26 | 2023-02-02 | Публичное Акционерное Общество "Сбербанк России" | Method and system for calculating the quantity of a product to be delivered to replenish stocks |
JP2023118523A (en) * | 2022-02-15 | 2023-08-25 | 富士通株式会社 | Equilibrium solution search program, equilibrium solution search method, and information processing apparatus |
WO2024128968A1 (en) * | 2022-12-15 | 2024-06-20 | Grabtaxi Holdings Pte. Ltd. | Distribution channel selection method and apparatus |
CN117273318B (en) * | 2023-09-11 | 2024-05-03 | 江苏和光舒卷数字科技有限公司 | Material alignment sleeve analysis method and device |
CN118378846A (en) * | 2024-05-15 | 2024-07-23 | 德州学院 | Agricultural product supply chain collaborative optimization method based on group intelligent algorithm |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3974481A (en) | 1973-05-14 | 1976-08-10 | Societe Cybco | Machine for the finding of an optimum passage |
US4958292A (en) * | 1987-04-22 | 1990-09-18 | Toyota Jidosha Kabushiki Kaisha | Production control system for mixed production line |
US5155679A (en) * | 1989-12-18 | 1992-10-13 | Hewlett-Packard Company | Set-up optimization for flexible manufacturing systems |
US5327340A (en) * | 1990-08-23 | 1994-07-05 | Toyota Jidosha Kabushiki Kaisha | Production order determining method |
US5761381A (en) * | 1995-08-31 | 1998-06-02 | International Computers Limited | Computer system using genetic optimization techniques |
US5841659A (en) * | 1994-05-26 | 1998-11-24 | Matsushita Electric Industrial Co., Ltd. | Production plan generating method and apparatus |
US6198980B1 (en) * | 1998-11-06 | 2001-03-06 | John Costanza Institute Of Technology | System and method for designing a mixed-model manufacturing process |
US6434443B1 (en) * | 1999-05-17 | 2002-08-13 | Taiwan Semiconductor Manufacturing Company | Method for performing dynamic re-scheduling of fabrication plant |
US20020156663A1 (en) * | 2000-07-13 | 2002-10-24 | Manugistics, Inc. | Shipping and transportation optimization system and method |
US6546300B1 (en) * | 1998-12-08 | 2003-04-08 | Kabushiki Kaisha Toshiba | Production/manufacturing planning system |
US20030084011A1 (en) * | 2001-04-26 | 2003-05-01 | Honeywell International Inc. | Methods for solving the traveling salesman problem |
US20030195794A1 (en) * | 2002-04-15 | 2003-10-16 | Yasuda To-Oru | Manufacture managing method |
US20030202479A1 (en) * | 2002-04-30 | 2003-10-30 | Jian Huang | Method and system for data in a collection and route discovery communication network |
US6795742B1 (en) * | 2003-04-03 | 2004-09-21 | Renesas Technology Corp. | Production management method in a plurality of production lines |
US7072723B2 (en) * | 2002-10-23 | 2006-07-04 | Clearsight Systems Inc. | Method and system for optimization of general problems |
US7117164B2 (en) * | 2001-01-26 | 2006-10-03 | I2 Technologies Us, Inc. | System and method of demand planning for intermediate and by-products |
US7636670B2 (en) * | 2002-10-17 | 2009-12-22 | Sap Aktiengesellschaft | Method and computer program product that determine values of characteristic value combinations for use in the production of products |
US7672862B1 (en) * | 2001-04-02 | 2010-03-02 | I2 Technologies Us, Inc. | Generating a supply chain plan |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2216039C1 (en) * | 2002-12-27 | 2003-11-10 | Общество с ограниченной ответственностью "Совместное предприятие ПЕТРОКОМ" | Method for computer-aided control of enterprise material flows |
-
2006
- 2006-04-12 US US11/279,557 patent/US8112300B2/en not_active Expired - Fee Related
- 2006-04-18 CA CA2606133A patent/CA2606133C/en active Active
- 2006-04-18 JP JP2008507184A patent/JP5053996B2/en not_active Expired - Fee Related
- 2006-04-18 AU AU2006238650A patent/AU2006238650B2/en not_active Ceased
- 2006-04-18 RU RU2007143321/08A patent/RU2458398C2/en active
- 2006-04-18 WO PCT/IB2006/000910 patent/WO2006111821A2/en active Application Filing
- 2006-04-18 EP EP06744510A patent/EP1875415A2/en not_active Withdrawn
- 2006-04-18 MX MX2007012999A patent/MX2007012999A/en not_active Application Discontinuation
- 2006-04-18 KR KR1020077025826A patent/KR101300297B1/en active IP Right Grant
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3974481A (en) | 1973-05-14 | 1976-08-10 | Societe Cybco | Machine for the finding of an optimum passage |
US4958292A (en) * | 1987-04-22 | 1990-09-18 | Toyota Jidosha Kabushiki Kaisha | Production control system for mixed production line |
US5155679A (en) * | 1989-12-18 | 1992-10-13 | Hewlett-Packard Company | Set-up optimization for flexible manufacturing systems |
US5327340A (en) * | 1990-08-23 | 1994-07-05 | Toyota Jidosha Kabushiki Kaisha | Production order determining method |
US5841659A (en) * | 1994-05-26 | 1998-11-24 | Matsushita Electric Industrial Co., Ltd. | Production plan generating method and apparatus |
US5761381A (en) * | 1995-08-31 | 1998-06-02 | International Computers Limited | Computer system using genetic optimization techniques |
US6198980B1 (en) * | 1998-11-06 | 2001-03-06 | John Costanza Institute Of Technology | System and method for designing a mixed-model manufacturing process |
US6546300B1 (en) * | 1998-12-08 | 2003-04-08 | Kabushiki Kaisha Toshiba | Production/manufacturing planning system |
US6434443B1 (en) * | 1999-05-17 | 2002-08-13 | Taiwan Semiconductor Manufacturing Company | Method for performing dynamic re-scheduling of fabrication plant |
US20020156663A1 (en) * | 2000-07-13 | 2002-10-24 | Manugistics, Inc. | Shipping and transportation optimization system and method |
US7117164B2 (en) * | 2001-01-26 | 2006-10-03 | I2 Technologies Us, Inc. | System and method of demand planning for intermediate and by-products |
US7672862B1 (en) * | 2001-04-02 | 2010-03-02 | I2 Technologies Us, Inc. | Generating a supply chain plan |
US20030084011A1 (en) * | 2001-04-26 | 2003-05-01 | Honeywell International Inc. | Methods for solving the traveling salesman problem |
US20030195794A1 (en) * | 2002-04-15 | 2003-10-16 | Yasuda To-Oru | Manufacture managing method |
US20030202479A1 (en) * | 2002-04-30 | 2003-10-30 | Jian Huang | Method and system for data in a collection and route discovery communication network |
US7636670B2 (en) * | 2002-10-17 | 2009-12-22 | Sap Aktiengesellschaft | Method and computer program product that determine values of characteristic value combinations for use in the production of products |
US7072723B2 (en) * | 2002-10-23 | 2006-07-04 | Clearsight Systems Inc. | Method and system for optimization of general problems |
US6795742B1 (en) * | 2003-04-03 | 2004-09-21 | Renesas Technology Corp. | Production management method in a plurality of production lines |
Non-Patent Citations (44)
Title |
---|
Bell, John E.; McMullen, Patrick R.; "Ant Colony Optimization Techniques for the Vehicle Routing Problem". 2004. Advanced Engineering Informatics. vol. 18, pp. 41-48. * |
Benjaafar, Saif; El-Hafsi, Mohsen; de Vericourt, Francis. "Demand Allocation in Multiple-Product, Multiple-Facility, Make-to-Stock System". Oct. 2004. Management Science. vol. 50, Issue 10. pp. 1431-1448. * |
Benjaafar, Saifallah; Gupta, Diwakar. "Workload Allocation in Multi-Product, Multi-Facility Production Systems with Setup Times". 1999. IIE Transactions. vol. 31. pp. 339-352. * |
Bullnheimer, Bernd; Hartl, Richard F.; Strauss, Christine. "An Improved Ant System Algorithm for the Vehicle Routing Problem". 1999. Annals of Operations Research. vol. 89. pp. 319-328. * |
Bullnheimer, Bernd; Kotsis, Gabrieke; Strauss, Christine; "Parallelization Strategies for the Ant System". 1998. * |
Chitty, Darren M.; Hernandez, Marcel L. "Hybrid Ant Colony Optimisation Technique for Dynamic Vehicle Routing". 2004. GECCO 2004, LNCS 3102. pp. 48-59. * |
Choi, H.R., et al., "Multi-Agent Based Integration Scheduling system Under Supply Chain Management Environment," Lecture Notes in Computer Science, Session 3B: intelligent Systems (1) vol. 3029, Apr. 22, 2004, pp. 249-263, Retrieved from Internet: URL: http://dx.doi.org/10.1007/b97304. |
Coleman, B. Jay; Vaghefi, M. Reza. "Heijunka (?): A Key to the Toyota Production System". Fourth Quarter 1994. Production and Inventory Management Journal. vol. 35, Issue 4. pp. 31-35. * |
Cordeau, J-F.; Gendreau, M.; Laporte, G.; Potvin, J-Y; Semet, F. "A Guide to Vehicle Routing Heuristics". May 2002. The Journal of the Operational Research Society. vol. 53, Issue 5. pp. 512-522. * |
David Davis, "Using an Ant System and a Genetic Algorithm to Schedule Production and Delivery of Liquid Oxygen and Liquid Nitrogen to 10,000 Client Sites," Proceedings of GECCO/ECI'04; published in 2004. |
Davis, L.D., "Using an Ant System and a Genetic Algorithm to Schedule Production and Delivery of Liquid Oxygen and Liquid Nitrogen to 10,000 Client Sites," Gecco Session (ECI), Jun. 26, 2004, pp. 1-5, Retrieved from Internet: URL: http://www.cs.bham.ac.uk/~wbl/biblio/gecco2004/prof2.html. |
Davis, L.D., "Using an Ant System and a Genetic Algorithm to Schedule Production and Delivery of Liquid Oxygen and Liquid Nitrogen to 10,000 Client Sites," Gecco Session (ECI), Jun. 26, 2004, pp. 1-5, Retrieved from Internet: URL: http://www.cs.bham.ac.uk/˜wbl/biblio/gecco2004/prof2.html. |
Dias, Alexandre H. F.; de Vasconcelos, Joao A. "Multiobjective Genetic Algorithms Applied to Solve Optimization Problems". Mar. 2002. IEEE Transactions on Magnetics. vol. 38, Issue 2. * |
Ding, Fong-Yuen; Tolani, Ravi.; "Production Planning to Support Mixed-Model Assembly". 2003. Computers & Industrial Engineering. Issue 45. pp. 375-392. * |
Doerner, Karl; Gronalt, Manfred; Hartl, Richard F.; Reimann, Marc; Strauss, Christine; Stummer, Michael. "SavingsAnts for the Vehicle Routing Problem". Dec. 2001. * |
Doerner, Karl; Gutjahr, Walter J. "Pareto Ant Colony Optimization: A Metaheuristic Approach to Multiobjective Portfolio Selection". 2004. Annals of Operations Research. Issue 131. pp. 79-99. * |
Dorigo, Marco. Di Caro, Gianni. "Ant Algorithms for Discrete Optimization". 1999. Artificial Life. MIT Press. * |
Dorigo, Marco. Di Caro, Gianni. "The Ant Colony Optimization Meta-Heuristic". 1999. McGraw-Hill Ltd. pp. 11-32. * |
Dorigo, Marco.; Maniezzo, Vittorio; Colorni, Alberto. "The Ant System: Optimization by a Colony of Cooperating Agents". 1996. IEEE Transactions on Systems, Man and Cybernetics, Part B, vol. 26, Issue 1, pp. 1-13. * |
European Communication Pursuant to Article 94(3) for EP06744510.6, dated Apr. 9, 2009. |
Examination Report for Canadian Patent Application Serial No. 2,606,133 (S7065CA/160-46/CJL) dated Dec. 10, 2009. |
Fieldsend, Jonathan E.; "Multi-Objective Particle Swarm Optimisation Methods". Mar. 1, 2004. * |
Fonseca, Carlos M.; Fleming, Peter J.; "Genetic Algorithms for Multiobjective Optimization: Formulation, Discussion and Generalization". Jul. 1993. Genetic Algorithms: Proceedings of the Fifth International Conference. * |
Gambardella, L.M., et al., "Chapter 5: MACS-VRPTW: A Multiple Ant Colony System for Vehicle Routing Problems with Time Windows," Technical Report IDSIA, vol. 06-99, Mar. 1, 1999, pp. 1-17, Retrieved from Internet: URL:http://www.idsia.ch/idsiareport/IDSIA-06-99.ps.gz. |
Geiger, M. J.; "Genetic Algorithms for Multiple Objective Vehicle Routing". Jul. 16-20, 2001. MIC'2001-4th Metaheuristics International Conference. * |
Hu, Xiaohui; Eberhart, Russell C.; Shi, Yuhui. "Particle Swarm with Extended Memory for Multiobjective Optimization". 2003. IEEE. * |
Inman, Robert R.; Jordan, William C.; "Integrated Assembly Line Loading, Design, and Labor Planning". 1997. Journal of Manufacturing Systems. vol. 16, Issue 5. pp. 315-322. * |
Ip, W. H.; Li, Y.; Man, K. F.; Tang, K. S.; "Multi-Product Planning and Scheduling Using Genetic Algorithm Approach". 2000. Computers & Industrial Engineering. Issue 38. pp. 283-296. * |
Katayama, Hiroshi. "On a Two-Stage Hierarchical Production Planning System for Process Industries". 1996. International Journal of Production Economics. Issue 44. pp. 63-72. * |
Lee, Heungsoon Felix; Srinivasan, Mandyam M.; Yano, Candace Arai. "The Optimal Configuration and Workload Allocation Problem in Flexible Manufacturing Systems". 1991. International Journal of Flexibile Manufacturing Systems. Issue 3. pp. 213-230. * |
Lee, Z.J., "A Hybrid Algorithm Applied to Traveling Salesman Problem," IEEE Intn'l Conference on Networking, Sensing and Control, Vo. 1, Mar. 21, 2004, pp. 237-242, Retrieved from Internet: URL: http://dx.doi.org/10.1109/ICNSC.2004.1297441. |
Naso, D., et al., "Genetic Algorithms in Supply Chain Scheduling of Ready-Mixed Concrete," Report Series research in Management, ERIM Research Program: "Business Processes, Logistics and Information Systems," Oct. 2004, pp. 1-52, Retrieved from the Internet: URL: http://repub.eur.nl/publications/eco-man/jel/m/index/209731320/. |
Office Action for Chinese Patent Application Serial No. 2006800225634 (S7065CN) dated Apr. 1, 2010. |
Office Action for Russian Patent Application Serial No. 2007143321 (S7065RU (2412-147074RU/3008)) dated Apr. 5, 2010. |
Oliff, Michael D.; Burch, E. Earl. "Multiproduct Production Scheduling at Owens-Corning Fiberglas". Sep.-Oct. 1985. Interfaces. pp. 25-34. * |
PCT/IB2006/000910, International Search Report, Sep. 7, 2007, 5 pgs. |
Routroy, Srikanta; Kodali, Rambabu. "Differential Evolution Algorithm for Supply Chain Inventory Planning". Jan. 2005. Journal of Manufacturing Technology Management. vol. 16, Issue 1. * |
Schaffer, James David. "Some Experiments in Machine Learning Using Vector Evaluated Genetic Algorithms". 1984. Vanderbilt University. * |
Section "NuTech Solutions to Speak at the Gecco Conference," p. 4, Nutech Solutions Newsletter, vol. 1, No. 1, Jun. 2004, pp. 1-5, Retrieved from Internet: URL:http://www.nutechsolutions.com/newsletter/june04.pdf. |
Sheu, Jiuh-Biing. "Locating Manufacturing and Distribution Centers: An Integrated Supply Chain-Based Spatial Interaction Approach". 2003. Transportation Research Part E 39. pp. 381-397. * |
Silva, C.A., et al., "A Multi-Agent Approach for Supply Chain Management Using Ant Colony Optimization," Intn'l Conference on Systems, Man and Cybernetics, vol. 2, Oct. 10, 2010, pp. 1938-1943, Retrieved from Internet: URL: http://dx.doi.org/10.1109/ICSMC.2004.1399970. |
Silva, Carlos A.; Runkler, Thomas A.; Sousa, Joao M.; Sa da Costa, J. M. "Optimization of Logistic Processes in Supply-Chains Using Meta-heuristics". 2003. EPIA 2003, LNAI 2902. pp. 9-23. * |
Tallon, William J.; "A Comparative Analysis of Master Production Scheduling Techniques for Assemble-To-Order Products". Summer 1989. Decision Sciences. vol. 20, Issue 3. pp. 492-506. * |
Written Opinion for PCT Patent Application Serial No. PCT/IB2006/000910 (S7065 PCT) dated Oct. 22, 2007. |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10491748B1 (en) | 2006-04-03 | 2019-11-26 | Wai Wu | Intelligent communication routing system and method |
US11934987B2 (en) | 2007-03-07 | 2024-03-19 | Blue Yonder Group, Inc. | Sentient optimization for continuous supply chain management |
US11403581B2 (en) | 2007-03-07 | 2022-08-02 | Blue Yonder Group, Inc. | Sentient optimization for continuous supply chain management |
US20090271241A1 (en) * | 2008-04-29 | 2009-10-29 | Sas Institute Inc. | Computer-Implemented Systems And Methods For Pack Optimization |
US8812338B2 (en) | 2008-04-29 | 2014-08-19 | Sas Institute Inc. | Computer-implemented systems and methods for pack optimization |
US20120054076A1 (en) * | 2010-08-30 | 2012-03-01 | Xinmin Wu | Systems And Methods For Multi-Echelon Inventory Planning With Lateral Transshipment |
US8515835B2 (en) * | 2010-08-30 | 2013-08-20 | Sas Institute Inc. | Systems and methods for multi-echelon inventory planning with lateral transshipment |
US8688497B2 (en) | 2011-01-10 | 2014-04-01 | Sas Institute Inc. | Systems and methods for determining pack allocations |
US8788315B2 (en) | 2011-01-10 | 2014-07-22 | Sas Institute Inc. | Systems and methods for determining pack allocations |
US20130066455A1 (en) * | 2011-09-09 | 2013-03-14 | Sap Ag | Demand-driven collaborative scheduling for just-in-time manufacturing |
US9224121B2 (en) * | 2011-09-09 | 2015-12-29 | Sap Se | Demand-driven collaborative scheduling for just-in-time manufacturing |
US20140222487A1 (en) * | 2013-02-04 | 2014-08-07 | The Boeing Company | Total-Ordering In Process Planning |
US9672465B2 (en) | 2014-06-23 | 2017-06-06 | International Business Machines Corporation | Solving vehicle routing problems using evolutionary computing techniques |
US9679246B2 (en) | 2014-06-23 | 2017-06-13 | International Business Machines Corporation | Solving vehicle routing problems using evolutionary computing techniques |
US9536192B2 (en) | 2014-06-23 | 2017-01-03 | International Business Machines Corporation | Solving vehicle routing problems using evolutionary computing techniques |
US9530093B2 (en) | 2014-06-23 | 2016-12-27 | International Business Machines Corporation | Solving vehicle routing problems using evolutionary computing techniques |
CN104200271A (en) * | 2014-08-22 | 2014-12-10 | 华南农业大学 | Multi-objective optimization algorithm for engine |
US11466998B1 (en) * | 2019-02-15 | 2022-10-11 | State Farm Mutual Automobile Insurance Company | Systems and methods for dynamically generating optimal routes for management of multiple vehicles |
US11466997B1 (en) | 2019-02-15 | 2022-10-11 | State Fram Mutual Automobile Insurance Company | Systems and methods for dynamically generating optimal routes for vehicle operation management |
US11493345B1 (en) | 2019-02-15 | 2022-11-08 | State Farm Mutual Automobile Insurance Company | Systems and methods for dynamically generating optimal routes for vehicle delivery management |
US12112283B1 (en) | 2019-02-15 | 2024-10-08 | State Farm Mutual Automobile Insurance Company | Systems and methods for dynamically generating optimal routes and routed vehicle analytics |
US20230084312A1 (en) * | 2020-02-21 | 2023-03-16 | Beijing Jingdong Zhenshi Information Technology Co., Ltd. | Route determination method, apparatus, server and storage medium for cold chain distribution |
US11928699B2 (en) | 2021-03-31 | 2024-03-12 | International Business Machines Corporation | Auto-discovery of reasoning knowledge graphs in supply chains |
US12141744B1 (en) | 2021-08-13 | 2024-11-12 | C&S Wholesale Grocers, Inc. | Method and system for item tracking with real-time feedback |
US20230153718A1 (en) * | 2021-11-18 | 2023-05-18 | Inventec (Pudong) Technology Corporation | Scheduling device and method |
Also Published As
Publication number | Publication date |
---|---|
AU2006238650A1 (en) | 2006-10-26 |
WO2006111821A2 (en) | 2006-10-26 |
CA2606133C (en) | 2014-05-27 |
KR20080017004A (en) | 2008-02-25 |
JP2008537247A (en) | 2008-09-11 |
KR101300297B1 (en) | 2013-08-28 |
EP1875415A2 (en) | 2008-01-09 |
RU2007143321A (en) | 2009-05-27 |
US20060241986A1 (en) | 2006-10-26 |
JP5053996B2 (en) | 2012-10-24 |
AU2006238650B2 (en) | 2012-03-22 |
CA2606133A1 (en) | 2006-10-26 |
RU2458398C2 (en) | 2012-08-10 |
MX2007012999A (en) | 2007-12-13 |
WO2006111821A3 (en) | 2007-11-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8112300B2 (en) | Production optimizer for supply chain management | |
Hottung et al. | Deep learning assisted heuristic tree search for the container pre-marshalling problem | |
Aliev et al. | Fuzzy-genetic approach to aggregate production–distribution planning in supply chain management | |
Cheng et al. | Using a hybrid approach based on the particle swarm optimization and ant colony optimization to solve a joint order batching and picker routing problem | |
Drexl et al. | A survey of variants and extensions of the location-routing problem | |
Braaten et al. | Heuristics for the robust vehicle routing problem with time windows | |
Coelho et al. | The inventory-routing problem with transshipment | |
Baita et al. | A comparison of different solution approaches to the vehicle scheduling problem in a practical case | |
Laabadi et al. | The 0/1 multidimensional knapsack problem and its variants: A survey of practical models and heuristic approaches | |
Barak et al. | Energy-efficient multi-objective flexible manufacturing scheduling | |
Martin et al. | Integrated express shipment service network design with customer choice and endogenous delivery time restrictions | |
Drexl et al. | A survey of location-routing problems | |
Vaira | Genetic algorithm for vehicle routing problem | |
Liu et al. | Joint optimization of lot-sizing and pricing with backlogging | |
Rabbani et al. | A new hybrid GA-PSO method for solving multi-period inventory routing problem with considering financial decisions | |
Shaabani et al. | A matheuristic for the multi-product maritime inventory routing problem | |
Bushaj et al. | A K-means supported reinforcement learning framework to multi-dimensional knapsack | |
Rodrigues et al. | A memetic algorithm for the multi-product production routing problem | |
Bozorgirad et al. | Genetic algorithm enhancement to solve multi source multi product flexible multistage logistics network | |
Tao et al. | A differential evolution with reinforcement learning for multi-objective assembly line feeding problem | |
Wang et al. | An approximate dynamic programming algorithm for multi-period maritime fleet renewal problem under uncertain market | |
Kacprzyk | Dynamic programming with imprecise and uncertain information | |
Meier et al. | Solving inventory routing problems with the Gurobi Branch-and-Cut Algorithm | |
Kyee | Development of Two Matheuristics for Production-Inventory-Distribution Routing Problem | |
Dicky Lim | Development of two matheuristics for production-inventory-distribution routing problem/Dicky Lim Teik Kyee |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ZAAA | Notice of allowance and fees due |
Free format text: ORIGINAL CODE: NOA |
|
ZAAB | Notice of allowance mailed |
Free format text: ORIGINAL CODE: MN/=. |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20240207 |