Nothing Special   »   [go: up one dir, main page]

US7693607B2 - Protection and control system for electric power networks with signal and command interfaces at the primary equipment - Google Patents

Protection and control system for electric power networks with signal and command interfaces at the primary equipment Download PDF

Info

Publication number
US7693607B2
US7693607B2 US11/470,867 US47086706A US7693607B2 US 7693607 B2 US7693607 B2 US 7693607B2 US 47086706 A US47086706 A US 47086706A US 7693607 B2 US7693607 B2 US 7693607B2
Authority
US
United States
Prior art keywords
brick
ied
field data
ieds
bricks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active, expires
Application number
US11/470,867
Other versions
US20080065270A1 (en
Inventor
Bogdan Z. Kasztenny
Dale Finney
Jeffrey Mazereeuw
Ioan Marusca
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GE Infrastructure Technology LLC
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Priority to US11/470,867 priority Critical patent/US7693607B2/en
Assigned to GENERAL ELECTRIC COMPANY reassignment GENERAL ELECTRIC COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MARUSCA, IOAN, FINNEY, DALE, KASZTENNY, BOGDAN Z., MAZEREEUW, JEFFREY
Priority to JP2007222110A priority patent/JP5144993B2/en
Priority to AU2007214320A priority patent/AU2007214320B2/en
Priority to EP07115372.0A priority patent/EP1898509B1/en
Priority to BRPI0703797-0A priority patent/BRPI0703797A/en
Priority to KR1020070090264A priority patent/KR101341683B1/en
Priority to MX2007010938A priority patent/MX2007010938A/en
Priority to CN2007101536092A priority patent/CN101141080B/en
Publication of US20080065270A1 publication Critical patent/US20080065270A1/en
Publication of US7693607B2 publication Critical patent/US7693607B2/en
Application granted granted Critical
Assigned to GE INFRASTRUCTURE TECHNOLOGY LLC reassignment GE INFRASTRUCTURE TECHNOLOGY LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GENERAL ELECTRIC COMPANY
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/05Details with means for increasing reliability, e.g. redundancy arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • H02J13/00017Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus using optical fiber
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00019Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using optical means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00036Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers
    • H02J13/0004Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers involved in a protection system
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/18Systems supporting electrical power generation, transmission or distribution using switches, relays or circuit breakers, e.g. intelligent electronic devices [IED]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses

Definitions

  • the field of the invention generally relates to the commercial and industrial production of electrical power and, more particularly, to a system and method for protecting and controlling electric power networks.
  • a typical power distribution grid generally includes a power plant, a transmission substation, high voltage transmission lines, and a power substation.
  • the power plant's spinning generator outputs three-phase alternating-current (AC) electrical power, which leaves the generator and enters the transmission substations.
  • Transformers at the transmission substation substantially boost the generator voltage to a high voltage sufficient to transmit the electrical power over long distances via the high voltage transmission lines. Before the transmitted electrical power is used by homes or industry, it passes through a power substation.
  • a power substation generally includes transformers that step the generator voltages down to distribution voltages; one or more distribution “busses” that split the stepped-down distribution voltages off in multiple directions; and a variety of circuit breakers and disconnect switches that can be configured to disconnect the power substation (or a portion thereof) from the power grid or to disconnect one or more distribution lines from the power substation.
  • this primary equipment e.g., the transformers, circuit breakers, disconnect switches, distribution busses, and the like, that are components of an electrical power substation
  • the switchyard is located in an area of the power substation known as the switchyard.
  • a typical layout of a power substation separates the primary equipment described above from the protection and control equipment that interfaces with and manages it. Thus, while the primary equipment typically resides in the switchyard, the protection and control equipment typically resides in a separate control house.
  • IEDs Intelligent Electronic Devices
  • An example of a conventional IED is the Model D25 Multifunction IED for Substation Control manufactured by the General Electric Company of Schenectady, N.Y. This unit monitors voltage difference, phase angle difference, and slip frequency. It also functions as a programmable logic controller, substation local area network node, and an IED gateway. Many IED's communicate using the Supervisory Control and Data Acquisition (SCADA) protocol.
  • SCADA Supervisory Control and Data Acquisition
  • IED's manage the substation's power output by monitoring data from sensors associated with the primary equipment.
  • IED's are often configured to issue commands to one or more pieces of primary equipment if voltage, current, and/or frequency anomalies are detected. These commands may instruct one or more pieces of primary equipment to operate in a pre-determined manner (e.g., to trip a circuit breaker).
  • a disadvantage of separating conventional IEDs from their managed pieces of primary equipment is that miles of copper wiring are needed to interconnect the primary equipment with the conventional IEDs.
  • a medium-voltage to high voltage power substation has upwards of tens of thousands of terminations and millions of terminations, respectively, e.g., the connections made when the ends of control cables are attached to termination racks located at the control house.
  • Another disadvantage is the significant cost associated with building or retrofitting such systems, due to the millions of wire terminations involved. The majority of this cost relates to the design, installation, testing, and documentation of the control wiring.
  • IEC International Electrotechnical Commission
  • 61850 Communication Networks and Systems in Substations
  • IEC 61850 Communication Networks and Systems in Substations
  • Preliminary approaches at implementing this standard and reducing the impact of copper wiring fail to provide specific teachings or a solid, workable architecture.
  • Such approaches, and the standard itself leave numerous gaps yet to be filled in.
  • a detailed discussion of the drawbacks associated with IEC 61850 specifically, and the disadvantages associated with prior approaches generally, is provided in a paper by B. Kasztenny, J. Whatley, E. Udren, J. Burger, D. Finney, M. Adamiak, entitled “Unanswered Questions about IEC 61850—What needs to happen to realize the vision?”, Proceedings of the 32nd Annual Western Protective Relay Conference, Spokane, Wash., Oct. 25-27, 2005.
  • a solution is thus needed that provides a new power substation architecture, new protection and control equipment, and/or a new method of operating a power substation.
  • the technology disclosed herein overcomes the disadvantages associated with the related art and meets the needs discussed above by providing a new power station architecture that, among other advantages: reduces or eliminates the need for the millions of copper wire terminations associated with conventional power substation architecture; significantly reduces the cost of building or retrofitting a power substation; eliminates use of extra devices to relay control data from IEDs to primary equipment; eliminates the external time synchronization of master and slave devices; and provides economical use of redundant field devices. Additionally, an embodiment of a method disclosed herein provides, among other advantages, internal, on-the-fly time synchronization for one or more pieces of primary equipment or control equipment.
  • the new power substation architecture locates one or more new devices for interfacing one or more pieces of primary equipment to IEDs (hereinafter, these new devices are referred to as “bricks”) in the switchyard.
  • Each “brick” may be connected directly to the copper circuitry of a piece of primary equipment, and connected directly to a fiber-optic patch panel.
  • the fiber-optic patch panel may be connected with one or more SCADA IED's located in the control house.
  • the connections between each brick and piece of primary equipment are shorter, simpler, less variable, and less labor intensive compared with conventional methods of wiring a power substation.
  • each brick converts analog input signals: e.g., currents, voltages, and the like, into digital representations, and can execute commands generated by the protection and control system, such as, but not limited to, tripping and reclosing one or more circuit breakers.
  • the new power substation architecture does not use extra devices, such as Ethernet switches, to move data about. Additionally, such sharing reduces the total amount of (and costs of installing/maintaining) power substation protection and control equipment.
  • a technical effect afforded by an embodiment of the invention is the generation and output of a virtual synchronization signal used to synchronize each brick with its processing (master) IED (or IEDs).
  • An embodiment of the invention may provide a system for protection, control, and monitoring of delivery of electric power.
  • the system may include an input/output interface device (hereinafter “brick”) coupled with a piece of primary equipment and configured to receive field data from the piece of primary equipment.
  • an intelligent electronic device (“IED”) may be coupled with the brick.
  • the IED may be configured to receive the field data from the brick.
  • a patch panel may be coupled with the brick and configured to route the field data to the IED.
  • a first communication link may couple the brick and the patch panel.
  • a second communication link may couple the patch panel and the IED.
  • Another embodiment of the invention may provide a method for operating a power substation.
  • the method may include receiving at an input/output interface device (hereinafter, “brick”) field data signals from one or more types of primary equipment.
  • the method may further include sending the field data signals to one or more intelligent electronic devices (“IEDs”).
  • IEDs intelligent electronic devices
  • the method may yet further include receiving at the brick binary commands derived from the field data signals.
  • the method may further include operating outputs in accordance with the received binary commands.
  • FIG. 1 is a schematic diagram of a power substation architecture configured according to an embodiment of the invention
  • FIG. 2 is a block diagram illustrating an embodiment of a brick
  • FIG. 3 is a block diagram illustrating an embodiment of an intelligent electronic device (“IED”);
  • FIG. 4 is a schematic diagram of an embodiment of a protection and control system for a sample electric power network with signal and command interfaces at one or more pieces of control equipment;
  • FIG. 5 is a flowchart illustrating an embodiment of a method of operating a power substation
  • FIG. 6 is a schematic diagram illustrating an embodiment of communications routing among three bricks and three IEDs.
  • FIG. 7 is a schematic diagram illustrating an embodiment of power substation architecture having redundant bricks for one or more IEDs.
  • FIG. 1 is a schematic diagram of a power substation architecture 100 configured according to an embodiment of the invention.
  • two fiber-optic patch panels 130 and 140 are disposed between a switchyard 150 and a relay control house 160 .
  • the switchyard 150 comprises one or more pieces of primary equipment, such as, but not limited to, the high voltage apparatus 102 .
  • Each piece of primary equipment may be directly connected to at least one new device (called a “brick”) for interfacing the primary equipment to one or more IEDs.
  • a bricks 104 and 116 are connected to the high voltage apparatus 102 .
  • Brick 104 together with bricks 106 , 108 , 110 , 112 , and 114 , is point-to-point connected to the fiber-optic patch panel 130 via outdoor fiber-optic patch cables 180 .
  • brick 116 together with bricks 118 , 120 , 122 , and 124 , is connected to the fiber-optic patch panel 140 via outdoor fiber-optic patch cables 181 .
  • the bricks may be powered using a pair of copper wires embedded in a fiber-optic patch cable.
  • the fiber-optic patch panel 130 is connected to processing units 190 via interior fiber-optic patch cables 170 .
  • the fiber-optic patch panel 140 is connected to the processing units (e.g., “IEDs”) 190 via interior fiber-optic patch cables 171 .
  • the IEDs 190 are each connected, via communications links 195 , to higher-level protection and control equipment, such as, but not limited to a computer database, a human-interface terminal, and the like.
  • Each type of higher-level protection and control equipment may be configured to communicate using the SCADA protocol described above.
  • Each of the IEDs 190 may include a computer processor and a data bus linking the computer processor with at least a memory, and a communication port.
  • each of the IEDs 190 (and/or each type of higher-level protection and control equipment) operates machine-executable code stored in the memory may be accessed and processed by the computer processor so that a first signal (or first data) input to each of the IEDs 190 (and/or each type of higher-level protection and control equipment) is output as a second signal (or second data) that may be used by other components of the power substation architecture to maintain a desired voltage level for a power substation (or a component thereof).
  • a successful architecture 100 for deploying fiber-based protection and control schemes must meet strict reliability criteria required for a given power system.
  • embodiments of the invention accomplish this by providing redundancy and by keeping the total number of system components low.
  • Embodiments of the invention provide redundancy using a low number of system components by using bricks and configuring the bricks to serve multiple IEDs. This contrasts with the conventional methodology of using one or more input/output subsystems per IED. It further contrasts with the conventional methodology of using an Ethernet switch to share data among IEDs, which configuration reduces reliability and generates configuration, security, data traffic, and other problems.
  • embodiments of the invention provide field data to all IEDs via direct point-to-point radial, multi-fiber connections, utilizing pre-fabricated multi-fiber, patch cables having pre-terminated, high-density connections.
  • each IED may be served independently from a brick.
  • FIG. 2 is a block diagram of an embodiment of a brick 200 .
  • the brick 200 includes a plurality of inputs 202 , 204 , and 206 , to receive analog and binary signals from the primary equipment. These include current signals 202 from current transformers or equivalent instruments such as low-energy electronic transformers, voltage signals 204 from voltage transformers or equivalent instruments such as low-energy electronic transformers, and signals 206 indicating events such as, but not limited to, circuit breaker position (open or closed), low gas pressure, spring charge failure, and the like.
  • the brick 200 also includes a plurality of outputs 208 to send binary commands to its associated primary equipment. Non-limiting examples of such commands include a “Trip” command and a “Reclose” command.
  • the “Trip” command causes a circuit breaker, for instance, to shut off a particular circuit if voltage, current, or other anomaly is detected.
  • the “Reclose” command causes the circuit breaker to turn on a circuit that was previously turned off.
  • the brick 200 includes a plurality of fiber-optic communications ports 210 , 212 , 214 , 216 that may be integrated into a single high-density connector (not shown). This connector may be configured to receive a multi-fiber optical cable configured to provide an independent communications path with one or more IEDs.
  • FIG. 3 is a block diagram of an embodiment of a protection and control IED 300 .
  • the protection and control (IED) 300 includes a plurality of fiber-optic communications ports 302 , 303 , 304 , and 305 that may also be integrated into a single high-density connector (not shown). This connector may be configured to receive a multi-fiber optical cable configured to provide an independent communications path with multiple bricks.
  • the IED 300 may be powered exclusively, or redundantly, using a pair of copper wires embedded in a fiber-optic patch cable.
  • FIG. 4 is a schematic diagram of an embodiment of another substation architecture 400 .
  • an exemplary embodiment of an electric power substation architecture 400 is depicted with four transmission lines 401 , 402 , 403 , and 404 ; two busses 405 , 406 ; and six circuit breakers 407 , 408 , 409 , 410 , 411 , and 412 .
  • Each transmission line 401 , 402 , 403 , and 404 includes one voltage transformer 413 , 414 , 415 , and 416 , respectively.
  • Each circuit breaker 407 , 408 , 409 , 410 , 411 , and 412 includes two current transformers.
  • circuit breaker 407 includes current transformers 417 , 418 .
  • Circuit breaker 408 includes current transformers 419 , 420 .
  • Circuit breaker 409 includes current transformers 421 , 422 .
  • Circuit breaker 410 includes current transformers 423 , 424 .
  • Circuit breaker 411 includes current transformers 425 , 426 .
  • Circuit breaker 412 includes current transformers 427 , 428 .
  • the substation architecture 400 further includes six protection and control IEDs 431 , 432 , 433 , 434 , 435 , 436 , and two patch panels 437 , 438 located inside the control house 440 .
  • the substation architecture 400 also includes ten interface devices (e.g., “bricks”) 441 , 442 , 443 , 444 , 445 , 446 , 447 , 448 , 449 , and 450 located adjacent to predetermined pieces of primary equipment.
  • ten interface devices e.g., “bricks”
  • the substation architecture 400 further includes multiple communication links (illustratively, but not limited to, communication links 1 , 2 , 3 , 4 , 5 , 6 , 7 , 8 , 9 , and 10 ) coupling together the above-referenced bricks, patch panels, and IEDs.
  • multiple communication links (illustratively, but not limited to, communication links 1 , 2 , 3 , 4 , 5 , 6 , 7 , 8 , 9 , and 10 ) coupling together the above-referenced bricks, patch panels, and IEDs.
  • a multi-fiber optical cable (or one or more elements thereof) may be used to form the communication links.
  • a separate physical access may be provided for the part of the patch panel interfacing with the high density fiber cables linking the IEDs and the bricks, and a separate physical access may be provided for the part that cross-connects the fiber pairs between the IEDs and the bricks.
  • Each brick may receive (and/or digitize) at least one of analog signals, binary signals, and a combination thereof.
  • analog signals include alternating voltages and currents supplied by transformers, low-energy analog signals supplied by instrument transformers, and analog outputs from temperature, and pressure, motion, and other sensors, among others.
  • binary signals include circuit breaker position, disconnect and grounding switch position, and alarm or status indication from other sensors and devices, among others.
  • the IED 432 receives digitized current signals and binary signals from Brick 441 and Brick 443 , and receives digitized voltage signals from brick 442 .
  • the IED 432 also sends digitized command signals to Brick 441 and Brick 442 .
  • the IED 432 may include multiple independent communication ports. Thus, data transfer between IED 422 and the brick 441 may occur via a first independent communication port, and data transfer between the IED 432 and the brick 442 may occur via a second independent communication port.
  • the multiple communication ports of the IED 432 may be connected to the fiber-optic patch panel 437 through a single multi-fiber communication link 12 .
  • the communication link 12 may terminate at the fiber-optic patch panel 437 using a plurality of pre-terminated fiber-pair connectors.
  • a single pair of fibers may be dedicated for communication with each brick that require communication with IED 432 .
  • communications with three bricks 441 , 442 , 443 ) is required.
  • a first pair of fibers of the multi-fiber communication link 12 is dedicated for communication with brick 441
  • a second pair of fibers is dedicated for communication with brick 442
  • a third pair of fibers is dedicated for communication with brick 443 .
  • FIG. 5 is a flowchart illustrating an embodiment of a method 500 of operating a power substation.
  • the steps of method 500 may be performed in any suitable order, and variants of the method 500 may include one or more steps in addition to the ones shown in FIG. 5 and described herein.
  • the method 500 may begin at step 501 , when a brick receives and digitizes current signals from one or more current transformers.
  • the same or different brick may also receive and digitize voltage signals from one or more voltage transformers.
  • the same or different brick may receive and digitize binary signals from one or more binary inputs from a circuit breaker, or other type of primary equipment.
  • the brick (or bricks) sends the received and digitized current, voltage, and binary signal data to one or more IEDs.
  • the brick (or bricks) receive binary commands from the IEDs.
  • the brick (or bricks) receive binary commands from the IEDs.
  • the IEDs may derive these binary commands from the digitized current, voltage, and binary signal data previously received from the brick (or bricks).
  • the brick (or bricks) operate outputs (e.g., cause actions to be performed) in accordance with the received binary commands. Thereafter, the method 500 may end.
  • the step 506 of operating outputs may include issuing command signals that include: open/close commands for circuit breakers and disconnect switches; lower/rise commands for transformer tap changers; and other commands suitable for operating power substation primary equipment.
  • the command signals may be transmitted to the primary equipment via solid-state switches that interface with the direct current (“DC”) control circuitry of the primary equipment.
  • DC direct current
  • FIG. 6 is a block diagram illustrating an embodiment of communication path routing 600 among three IEDs 631 , 632 , 633 , a fiber-optic patch panel 637 , and three bricks 641 , 642 , 643 .
  • each IED 631 , 632 , 633 and each brick 641 , 642 , 643 has four independent communications ports Com-1, Com-2, Com-3, and Com-4.
  • On each brick a port is dedicated for communications with a single IED.
  • a port is dedicated for communication with a single brick.
  • the connection between each device (e.g., each brick and each IED) and the patch panel 637 has a dedicated fiber pair for each IED-Brick association.
  • IED 631 is linked with bricks 641 and 642 .
  • the communication port Com-1 of IED 631 is linked with the communication port Com-1 of brick 641
  • communication port Com-2 of IED 631 is linked with the communication port Com-1 of brick 642 .
  • IED 632 is linked with each of bricks 641 , 642 , and 643 .
  • communication port Com-1 of IED 632 is linked with the communication port Com-2 of brick 642 .
  • the communication port Com-2 of IED 632 is linked with the communication port Com-2 of brick 641 .
  • the communication port Com-3 of IED 632 is linked with the communication port Com-1 of brick 643 .
  • IED 633 is linked with each of bricks 642 and 643 .
  • the communication port Com-1 of IED 633 is linked with the communication port Com-3 of brick 642 .
  • the communication port Com-2 of IED 633 is linked with the communication port Com-2 of the brick 643 . It is understood that many other configurations of connections between the IEDs 631 , 632 , 633 , and the bricks 641 , 642 , 643 are possible within the scope of the claimed invention.
  • each brick receives a clock signal from each of the IEDs it serves.
  • a brick serving multiple IEDs will therefore receive multiple clock signals. Examples of this are the brick 441 in FIG. 4 , which serves IEDs 431 , 432 , and the brick 642 in FIG. 6 , which serves IEDs 631 , 633 .
  • each IED independently generates its own clock signal, and each brick linked to an IED synchronizes the data transfer using the clock signal generated by that same IED.
  • each brick transmits/receives data to/from the IEDs asynchronously, and uses a phase lock loop on each direct 1:1 communication connection with the IEDs.
  • the phase lock loop establishes a virtual synchronous sample and hold signal for each of the served IEDs, and then re-samples the data to obtain versions of the data that are synchronous with each of the served IEDs.
  • This feature improves system reliability by eliminating a single external clock (e.g., a single point of failure) and lowers the cost of synchronizing each data transfer (e.g., no need to distribute an external clock signal to all bricks simultaneously).
  • the IEDs may be equipped with a timing input signal, such as a IRIG-B input signal, and may decode this signal to synchronize their clocks with the absolute time reference in the substation or across substations, such as when using Global Positioning System clocks.
  • IRIG-B is a standard format for encoding and distributing a time signal from a master clock to one or more receiving devices; it stands for Inter Range Instrumentation Group mod B—a standard originally created by the U.S. military and now used by private industry.
  • each IED is configured to communicate date and time information to one or more associated bricks to provide for accurate time stamping of the brick's (or bricks') digital field data.
  • FIG. 7 is a schematic diagram illustrating an embodiment of power substation architecture 700 having redundant bricks 751 , 752 for one or more IEDs 731 .
  • two bricks 751 , 752 may be connected to the primary equipment 760 to provide redundant signal measurement and control.
  • the primary equipment 760 may include a circuit breaker, a current transformer, a voltage transformer, and the like.
  • each of bricks 751 , 752 receives and digitizes at least one of current, voltage, and binary signals from primary equipment 760 , and synchronously transfers the digitized signals to the IED 731 .
  • the IED 731 compares the digitized signals received from each of the bricks 751 , 752 to ensure integrity of data and to guard against a failure of either brick 751 or 752 .
  • the IED may be configured to apply extra checks to identify an intact set of digital field data upon detecting an inconsistency between a first digital field data received from the brick 751 and second digital field data received from the second brick 752 .
  • the IED may be further configured to switchover permanently to the intact set of digital field data and to continue to operate despite a failure of the brick 751 or the second brick 752 .
  • two copies of data obtained from monitored primary equipment are transmitted to each IED.
  • This increases reliability beyond conventional protection and control systems, but still keeps the total number of parts in the system low by allowing multiple IEDs to share the data.
  • an average of three conventional IEDs would be needed to monitor a given piece of primary equipment in a power substation switchyard.
  • This means that three input/output subsystems would be needed to process the signals delivered to the control house via copper wires. Yet, none of these subsystems would be redundant.
  • an embodiment of the invention provides the input/output interface using only two redundant bricks, which are placed in the switchyard for a given piece of primary equipment.
  • an embodiment of the invention reduces the total number of parts for the input/output subsystems by 2 ⁇ 3 while adding full redundancy to the overall system.
  • Embodiments of the invention preserve conventional approaches to the engineering of electrical power protection and control systems.
  • these embodiments preserve the concept of protection zones.
  • one IED master
  • the primary equipment e.g., transmission line, transformer, capacitor bank, busbar, etc.
  • Using the bricks described above permits this to occur despite differences in the way that field signals are generated (e.g., current, voltage, binary, and the like).
  • Embodiments of the invention provide interoperability in the following way: A brick need not have an independent firmware. Instead, it may accept a computer software code download from each of its master IED(s). Multiple code implementations, each tailored to the requirements of its master IED(s) can therefore co-exist on a single brick. This mitigates interoperability concerns associated with multiple firmware versions and therefore removes the need for testing.
  • the bricks may be entirely maintained by their associated IED(s) in terms of updating their operating code and other parameters as necessary without the need for a human operator of the power substation to interact with the bricks as separate devices.
  • the IED may validate and update, if necessary, the computer software code that controls functionality of only the given brick.
  • one or more bricks may be mounted directly to a piece of primary equipment or in a vicinity of the piece of primary equipment.
  • a user may lock the system comprised of bricks and IED(s) by acknowledging a given configuration of physical devices is valid and should be stored in a computer memory and considered normal for subsequent operation of the system.
  • the valid configuration of bricks and IED(s) may be represented by a unique identifier such as a serial number, or a by similar method.
  • the IED may check for a unique identification designation of the brick, and may alters the IED's functionality based on the positive or negative result of the check, for example by issuing an alarm, inhibiting some functions, or automatically switching to a test mode.
  • a function generates outputs through the evaluation or processing of inputs. When a function is inhibited, the outputs are forced to a predetermined default state.
  • association between the brick and the IED comprises physical connections as compared to an addressing or equivalent scheme.
  • two or more IEDs may use a shared brick to facilitate communication between them.
  • a sending IED may include a data item of interest in a packet destined for the shared brick.
  • the brick may copy the received data item of interest in its outgoing packages to some or all the other connected IEDs.
  • some or all copper-based signals provided to the bricks may be provided by rugged multi-pin connectors.
  • a shorting cap may be provided to short out alternating current signals at the IED connectors to allow continuous operation of the power system with a brick being removed, which otherwise would leave the current signal path open.
  • the bricks may be installed and pre-tested off-site by the manufacturer of the power system apparatus or a refurbishment shop before delivering the power system apparatus to an installation site.
  • the IEDs and fiber patch panels may be mounted in the control house and pre-tested prior to the delivery of the control house to an installation site.
  • Embodiments of the invention are not limited to using fiber media. Rather, the fiber media described above may be replaced by electrical or wireless media.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Emergency Protection Circuit Devices (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A system for protection, control, metering, and monitoring of the delivery of electrical power is disclosed. Embodiments of the system provide input/output devices called bricks to receive analog and binary field data from primary equipment located in a power substation switchyard. The bricks are linked via fiber-optic patch cables and patch panels with one or more intelligent electronic devices (“IEDs”). In operation, the bricks convert the received binary and/or analog field data into digital signals, and transmit the digital signals synchronously to their associated IEDs using clock signals provided by each IED to the individual bricks. The bricks may accept a computer software code download from each of its master IED(s). Multiple code implementations, each tailored to the requirements of its master IED(s) can therefore co-exist on a single brick.

Description

BACKGROUND
1. Field of the Invention
The field of the invention generally relates to the commercial and industrial production of electrical power and, more particularly, to a system and method for protecting and controlling electric power networks.
2. Description of Related Art
A typical power distribution grid generally includes a power plant, a transmission substation, high voltage transmission lines, and a power substation. The power plant's spinning generator outputs three-phase alternating-current (AC) electrical power, which leaves the generator and enters the transmission substations. Transformers at the transmission substation substantially boost the generator voltage to a high voltage sufficient to transmit the electrical power over long distances via the high voltage transmission lines. Before the transmitted electrical power is used by homes or industry, it passes through a power substation.
A power substation generally includes transformers that step the generator voltages down to distribution voltages; one or more distribution “busses” that split the stepped-down distribution voltages off in multiple directions; and a variety of circuit breakers and disconnect switches that can be configured to disconnect the power substation (or a portion thereof) from the power grid or to disconnect one or more distribution lines from the power substation. In medium voltage to extra-high voltage substations, this primary equipment (e.g., the transformers, circuit breakers, disconnect switches, distribution busses, and the like, that are components of an electrical power substation) is located in an area of the power substation known as the switchyard.
A typical layout of a power substation separates the primary equipment described above from the protection and control equipment that interfaces with and manages it. Thus, while the primary equipment typically resides in the switchyard, the protection and control equipment typically resides in a separate control house.
Examples of protection and control equipment include microprocessor-based protective relays, meters, control switches, remote terminal units, human-machine-interface (“HMI”) terminals, and the like—often referred to as Intelligent Electronic Devices (IEDs). An example of a conventional IED is the Model D25 Multifunction IED for Substation Control manufactured by the General Electric Company of Schenectady, N.Y. This unit monitors voltage difference, phase angle difference, and slip frequency. It also functions as a programmable logic controller, substation local area network node, and an IED gateway. Many IED's communicate using the Supervisory Control and Data Acquisition (SCADA) protocol.
In operation, IED's manage the substation's power output by monitoring data from sensors associated with the primary equipment. To maintain desired voltage levels, IED's are often configured to issue commands to one or more pieces of primary equipment if voltage, current, and/or frequency anomalies are detected. These commands may instruct one or more pieces of primary equipment to operate in a pre-determined manner (e.g., to trip a circuit breaker).
A disadvantage of separating conventional IEDs from their managed pieces of primary equipment is that miles of copper wiring are needed to interconnect the primary equipment with the conventional IEDs. Often, a medium-voltage to high voltage power substation has upwards of tens of thousands of terminations and millions of terminations, respectively, e.g., the connections made when the ends of control cables are attached to termination racks located at the control house. Another disadvantage is the significant cost associated with building or retrofitting such systems, due to the millions of wire terminations involved. The majority of this cost relates to the design, installation, testing, and documentation of the control wiring. International Electrotechnical Commission (“IEC”) Standard 61850 (Communication Networks and Systems in Substations) is a proposed industry-wide basis for automation of power substations in an electric power delivery system. Preliminary approaches at implementing this standard and reducing the impact of copper wiring, however, fail to provide specific teachings or a solid, workable architecture. Such approaches, and the standard itself, leave numerous gaps yet to be filled in. A detailed discussion of the drawbacks associated with IEC 61850 specifically, and the disadvantages associated with prior approaches generally, is provided in a paper by B. Kasztenny, J. Whatley, E. Udren, J. Burger, D. Finney, M. Adamiak, entitled “Unanswered Questions about IEC 61850—What needs to happen to realize the vision?”, Proceedings of the 32nd Annual Western Protective Relay Conference, Spokane, Wash., Oct. 25-27, 2005.
A solution is thus needed that provides a new power substation architecture, new protection and control equipment, and/or a new method of operating a power substation.
BRIEF DESCRIPTION OF THE INVENTION
The technology disclosed herein overcomes the disadvantages associated with the related art and meets the needs discussed above by providing a new power station architecture that, among other advantages: reduces or eliminates the need for the millions of copper wire terminations associated with conventional power substation architecture; significantly reduces the cost of building or retrofitting a power substation; eliminates use of extra devices to relay control data from IEDs to primary equipment; eliminates the external time synchronization of master and slave devices; and provides economical use of redundant field devices. Additionally, an embodiment of a method disclosed herein provides, among other advantages, internal, on-the-fly time synchronization for one or more pieces of primary equipment or control equipment.
In an embodiment, the new power substation architecture locates one or more new devices for interfacing one or more pieces of primary equipment to IEDs (hereinafter, these new devices are referred to as “bricks”) in the switchyard. Each “brick” may be connected directly to the copper circuitry of a piece of primary equipment, and connected directly to a fiber-optic patch panel. The fiber-optic patch panel may be connected with one or more SCADA IED's located in the control house. The connections between each brick and piece of primary equipment are shorter, simpler, less variable, and less labor intensive compared with conventional methods of wiring a power substation. In an embodiment, each brick converts analog input signals: e.g., currents, voltages, and the like, into digital representations, and can execute commands generated by the protection and control system, such as, but not limited to, tripping and reclosing one or more circuit breakers.
In an embodiment where point-to-point, fiber-optic cables are used to connect each brick with one or more IEDs, the new power substation architecture does not use extra devices, such as Ethernet switches, to move data about. Additionally, such sharing reduces the total amount of (and costs of installing/maintaining) power substation protection and control equipment.
A technical effect afforded by an embodiment of the invention is the generation and output of a virtual synchronization signal used to synchronize each brick with its processing (master) IED (or IEDs).
An embodiment of the invention may provide a system for protection, control, and monitoring of delivery of electric power. The system may include an input/output interface device (hereinafter “brick”) coupled with a piece of primary equipment and configured to receive field data from the piece of primary equipment. Additionally, an intelligent electronic device (“IED”) may be coupled with the brick. The IED may be configured to receive the field data from the brick. A patch panel may be coupled with the brick and configured to route the field data to the IED. A first communication link may couple the brick and the patch panel. A second communication link may couple the patch panel and the IED.
Another embodiment of the invention may provide a method for operating a power substation. The method may include receiving at an input/output interface device (hereinafter, “brick”) field data signals from one or more types of primary equipment. The method may further include sending the field data signals to one or more intelligent electronic devices (“IEDs”). The method may yet further include receiving at the brick binary commands derived from the field data signals. The method may further include operating outputs in accordance with the received binary commands.
BRIEF DESCRIPTION OF THE DRAWINGS
The above and other aspects of various embodiments of the claimed invention will become more apparent when the following detailed description is considered together with the accompanying drawings in which:
FIG. 1 is a schematic diagram of a power substation architecture configured according to an embodiment of the invention;
FIG. 2 is a block diagram illustrating an embodiment of a brick;
FIG. 3 is a block diagram illustrating an embodiment of an intelligent electronic device (“IED”);
FIG. 4 is a schematic diagram of an embodiment of a protection and control system for a sample electric power network with signal and command interfaces at one or more pieces of control equipment;
FIG. 5 is a flowchart illustrating an embodiment of a method of operating a power substation;
FIG. 6 is a schematic diagram illustrating an embodiment of communications routing among three bricks and three IEDs; and
FIG. 7 is a schematic diagram illustrating an embodiment of power substation architecture having redundant bricks for one or more IEDs.
DETAILED DESCRIPTION OF THE INVENTION
Reference is made herein to the accompanying drawings briefly described above, which show by way of illustration various embodiments of the claimed invention. Persons of ordinary skill in the above-referenced technological field will recognize that other embodiments may be utilized, and that structural, electrical, and procedural changes may be made without departing from the scope of the claimed invention. As used herein, the singular (illustratively, “brick”) includes the plural (illustratively, “bricks”), and the plural includes the singular.
FIG. 1 is a schematic diagram of a power substation architecture 100 configured according to an embodiment of the invention. Referring to FIG. 1, two fiber- optic patch panels 130 and 140 are disposed between a switchyard 150 and a relay control house 160. The switchyard 150 comprises one or more pieces of primary equipment, such as, but not limited to, the high voltage apparatus 102. Each piece of primary equipment may be directly connected to at least one new device (called a “brick”) for interfacing the primary equipment to one or more IEDs. In FIG. 1, for example, two bricks 104 and 116 are connected to the high voltage apparatus 102. Brick 104, together with bricks 106, 108, 110, 112, and 114, is point-to-point connected to the fiber-optic patch panel 130 via outdoor fiber-optic patch cables 180. Similarly, brick 116, together with bricks 118, 120, 122, and 124, is connected to the fiber-optic patch panel 140 via outdoor fiber-optic patch cables 181. The bricks may be powered using a pair of copper wires embedded in a fiber-optic patch cable. In FIG. 1, the pieces of primary equipment associated with each of bricks 106, 108, 110, 112, 114, 118, 120, 122, and 124, are not shown, so as not to overcomplicate the drawing. Consequently, it is understood that an embodiment of the invention may comprise other types of primary equipment other than high voltage apparatus 102.
In an embodiment, the fiber-optic patch panel 130 is connected to processing units 190 via interior fiber-optic patch cables 170. Similarly, the fiber-optic patch panel 140 is connected to the processing units (e.g., “IEDs”) 190 via interior fiber-optic patch cables 171. The IEDs 190 are each connected, via communications links 195, to higher-level protection and control equipment, such as, but not limited to a computer database, a human-interface terminal, and the like. Each type of higher-level protection and control equipment may be configured to communicate using the SCADA protocol described above.
Each of the IEDs 190 (and/or each type of higher-level protection and control equipment) may include a computer processor and a data bus linking the computer processor with at least a memory, and a communication port. As each of the IEDs 190 (and/or each type of higher-level protection and control equipment) operates machine-executable code stored in the memory may be accessed and processed by the computer processor so that a first signal (or first data) input to each of the IEDs 190 (and/or each type of higher-level protection and control equipment) is output as a second signal (or second data) that may be used by other components of the power substation architecture to maintain a desired voltage level for a power substation (or a component thereof).
Referring again to FIG. 1, a successful architecture 100 for deploying fiber-based protection and control schemes must meet strict reliability criteria required for a given power system. As further explained below with reference to FIGS. 2, 4, 6, and 7, embodiments of the invention accomplish this by providing redundancy and by keeping the total number of system components low. Embodiments of the invention provide redundancy using a low number of system components by using bricks and configuring the bricks to serve multiple IEDs. This contrasts with the conventional methodology of using one or more input/output subsystems per IED. It further contrasts with the conventional methodology of using an Ethernet switch to share data among IEDs, which configuration reduces reliability and generates configuration, security, data traffic, and other problems. In contrast, embodiments of the invention provide field data to all IEDs via direct point-to-point radial, multi-fiber connections, utilizing pre-fabricated multi-fiber, patch cables having pre-terminated, high-density connections. Thus, as shown in FIG. 1 and further described below, each IED may be served independently from a brick.
FIG. 2 is a block diagram of an embodiment of a brick 200. Referring to FIG. 2 the brick 200 includes a plurality of inputs 202, 204, and 206, to receive analog and binary signals from the primary equipment. These include current signals 202 from current transformers or equivalent instruments such as low-energy electronic transformers, voltage signals 204 from voltage transformers or equivalent instruments such as low-energy electronic transformers, and signals 206 indicating events such as, but not limited to, circuit breaker position (open or closed), low gas pressure, spring charge failure, and the like. The brick 200 also includes a plurality of outputs 208 to send binary commands to its associated primary equipment. Non-limiting examples of such commands include a “Trip” command and a “Reclose” command. The “Trip” command causes a circuit breaker, for instance, to shut off a particular circuit if voltage, current, or other anomaly is detected. The “Reclose” command causes the circuit breaker to turn on a circuit that was previously turned off. The brick 200 includes a plurality of fiber- optic communications ports 210, 212, 214, 216 that may be integrated into a single high-density connector (not shown). This connector may be configured to receive a multi-fiber optical cable configured to provide an independent communications path with one or more IEDs.
FIG. 3 is a block diagram of an embodiment of a protection and control IED 300. Referring to FIG. 3, the protection and control (IED) 300 includes a plurality of fiber- optic communications ports 302, 303, 304, and 305 that may also be integrated into a single high-density connector (not shown). This connector may be configured to receive a multi-fiber optical cable configured to provide an independent communications path with multiple bricks. The IED 300 may be powered exclusively, or redundantly, using a pair of copper wires embedded in a fiber-optic patch cable.
FIG. 4 is a schematic diagram of an embodiment of another substation architecture 400. Referring to FIG. 4, an exemplary embodiment of an electric power substation architecture 400 is depicted with four transmission lines 401, 402, 403, and 404; two busses 405,406; and six circuit breakers 407, 408, 409, 410, 411, and 412. Each transmission line 401, 402, 403, and 404 includes one voltage transformer 413, 414, 415, and 416, respectively. Each circuit breaker 407, 408, 409, 410, 411, and 412 includes two current transformers. For example, circuit breaker 407 includes current transformers 417,418. Circuit breaker 408 includes current transformers 419,420. Circuit breaker 409 includes current transformers 421,422. Circuit breaker 410 includes current transformers 423,424. Circuit breaker 411 includes current transformers 425,426. Circuit breaker 412 includes current transformers 427,428.
The substation architecture 400 further includes six protection and control IEDs 431, 432, 433, 434, 435, 436, and two patch panels 437,438 located inside the control house 440. The substation architecture 400 also includes ten interface devices (e.g., “bricks”) 441, 442, 443, 444, 445, 446, 447, 448, 449, and 450 located adjacent to predetermined pieces of primary equipment. The substation architecture 400 further includes multiple communication links (illustratively, but not limited to, communication links 1, 2, 3, 4, 5, 6, 7, 8, 9, and 10) coupling together the above-referenced bricks, patch panels, and IEDs. In an embodiment, a multi-fiber optical cable (or one or more elements thereof) may be used to form the communication links. In each patch panel 437,438, a separate physical access may be provided for the part of the patch panel interfacing with the high density fiber cables linking the IEDs and the bricks, and a separate physical access may be provided for the part that cross-connects the fiber pairs between the IEDs and the bricks.
Each brick may receive (and/or digitize) at least one of analog signals, binary signals, and a combination thereof. Non-limiting examples of analog signals include alternating voltages and currents supplied by transformers, low-energy analog signals supplied by instrument transformers, and analog outputs from temperature, and pressure, motion, and other sensors, among others. Non-limiting examples of binary signals include circuit breaker position, disconnect and grounding switch position, and alarm or status indication from other sensors and devices, among others.
As shown in FIG. 4, the IED 432 receives digitized current signals and binary signals from Brick 441 and Brick 443, and receives digitized voltage signals from brick 442. The IED 432 also sends digitized command signals to Brick 441 and Brick 442. The IED 432 may include multiple independent communication ports. Thus, data transfer between IED 422 and the brick 441 may occur via a first independent communication port, and data transfer between the IED 432 and the brick 442 may occur via a second independent communication port.
In an embodiment, the multiple communication ports of the IED 432 may be connected to the fiber-optic patch panel 437 through a single multi-fiber communication link 12. The communication link 12 may terminate at the fiber-optic patch panel 437 using a plurality of pre-terminated fiber-pair connectors. Within the multi-fiber communication link 12, a single pair of fibers may be dedicated for communication with each brick that require communication with IED 432. In this exemplary embodiment, communications with three bricks (441, 442, 443) is required. Thus, a first pair of fibers of the multi-fiber communication link 12 is dedicated for communication with brick 441, a second pair of fibers is dedicated for communication with brick 442, and a third pair of fibers is dedicated for communication with brick 443.
FIG. 5 is a flowchart illustrating an embodiment of a method 500 of operating a power substation. The steps of method 500 may be performed in any suitable order, and variants of the method 500 may include one or more steps in addition to the ones shown in FIG. 5 and described herein.
Referring to FIG. 5, the method 500 may begin at step 501, when a brick receives and digitizes current signals from one or more current transformers. At step 502, the same or different brick may also receive and digitize voltage signals from one or more voltage transformers. At step 503, the same or different brick may receive and digitize binary signals from one or more binary inputs from a circuit breaker, or other type of primary equipment. At step 504 the brick (or bricks) sends the received and digitized current, voltage, and binary signal data to one or more IEDs. At step 505, the brick (or bricks) receive binary commands from the IEDs. At step 505, the brick (or bricks) receive binary commands from the IEDs. The IEDs may derive these binary commands from the digitized current, voltage, and binary signal data previously received from the brick (or bricks). At step 506, the brick (or bricks) operate outputs (e.g., cause actions to be performed) in accordance with the received binary commands. Thereafter, the method 500 may end.
In an embodiment, the step 506 of operating outputs may include issuing command signals that include: open/close commands for circuit breakers and disconnect switches; lower/rise commands for transformer tap changers; and other commands suitable for operating power substation primary equipment. The command signals may be transmitted to the primary equipment via solid-state switches that interface with the direct current (“DC”) control circuitry of the primary equipment.
FIG. 6 is a block diagram illustrating an embodiment of communication path routing 600 among three IEDs 631, 632, 633, a fiber-optic patch panel 637, and three bricks 641,642, 643. Referring to FIG. 6, each IED 631, 632, 633 and each brick 641, 642, 643 has four independent communications ports Com-1, Com-2, Com-3, and Com-4. On each brick, a port is dedicated for communications with a single IED. On each IED, a port is dedicated for communication with a single brick. The connection between each device (e.g., each brick and each IED) and the patch panel 637 has a dedicated fiber pair for each IED-Brick association. For example, IED 631 is linked with bricks 641 and 642. Thus, the communication port Com-1 of IED 631 is linked with the communication port Com-1 of brick 641, and communication port Com-2 of IED 631 is linked with the communication port Com-1 of brick 642. Additionally, IED 632 is linked with each of bricks 641, 642, and 643. Thus, communication port Com-1 of IED 632 is linked with the communication port Com-2 of brick 642. The communication port Com-2 of IED 632 is linked with the communication port Com-2 of brick 641. The communication port Com-3 of IED 632 is linked with the communication port Com-1 of brick 643. Additionally, IED 633 is linked with each of bricks 642 and 643. Thus, the communication port Com-1 of IED 633 is linked with the communication port Com-3 of brick 642. The communication port Com-2 of IED 633 is linked with the communication port Com-2 of the brick 643. It is understood that many other configurations of connections between the IEDs 631,632,633, and the bricks 641, 642, 643 are possible within the scope of the claimed invention.
Referring again to FIGS. 4 and 6, each brick receives a clock signal from each of the IEDs it serves. Thus, a brick serving multiple IEDs will therefore receive multiple clock signals. Examples of this are the brick 441 in FIG. 4, which serves IEDs 431,432, and the brick 642 in FIG. 6, which serves IEDs 631,633. In an embodiment, each IED independently generates its own clock signal, and each brick linked to an IED synchronizes the data transfer using the clock signal generated by that same IED. In contrast to external clock methods used to synchronize conventional IEDs, there is no requirement in an embodiment of the invention for data synchronization between individual IEDs. Instead, data synchronization is independently carried out in each brick using the clock signal(s) received from its master IED(s), and each IED receives synchronized data from all of its bricks. Thus, in an embodiment, each brick transmits/receives data to/from the IEDs asynchronously, and uses a phase lock loop on each direct 1:1 communication connection with the IEDs.
The phase lock loop establishes a virtual synchronous sample and hold signal for each of the served IEDs, and then re-samples the data to obtain versions of the data that are synchronous with each of the served IEDs. This feature improves system reliability by eliminating a single external clock (e.g., a single point of failure) and lowers the cost of synchronizing each data transfer (e.g., no need to distribute an external clock signal to all bricks simultaneously). In one embodiment, the IEDs may be equipped with a timing input signal, such as a IRIG-B input signal, and may decode this signal to synchronize their clocks with the absolute time reference in the substation or across substations, such as when using Global Positioning System clocks. IRIG-B is a standard format for encoding and distributing a time signal from a master clock to one or more receiving devices; it stands for Inter Range Instrumentation Group mod B—a standard originally created by the U.S. military and now used by private industry. In an embodiment, each IED is configured to communicate date and time information to one or more associated bricks to provide for accurate time stamping of the brick's (or bricks') digital field data.
FIG. 7 is a schematic diagram illustrating an embodiment of power substation architecture 700 having redundant bricks 751,752 for one or more IEDs 731. Referring to FIG. 7, two bricks 751,752 may be connected to the primary equipment 760 to provide redundant signal measurement and control. The primary equipment 760 may include a circuit breaker, a current transformer, a voltage transformer, and the like. In the redundant system of FIG. 7, each of bricks 751,752 receives and digitizes at least one of current, voltage, and binary signals from primary equipment 760, and synchronously transfers the digitized signals to the IED 731. The IED 731 compares the digitized signals received from each of the bricks 751,752 to ensure integrity of data and to guard against a failure of either brick 751 or 752. The IED may be configured to apply extra checks to identify an intact set of digital field data upon detecting an inconsistency between a first digital field data received from the brick 751 and second digital field data received from the second brick 752. The IED may be further configured to switchover permanently to the intact set of digital field data and to continue to operate despite a failure of the brick 751 or the second brick 752.
Thus, in an embodiment, two copies of data obtained from monitored primary equipment are transmitted to each IED. This increases reliability beyond conventional protection and control systems, but still keeps the total number of parts in the system low by allowing multiple IEDs to share the data. For example, an average of three conventional IEDs would be needed to monitor a given piece of primary equipment in a power substation switchyard. This means that three input/output subsystems would be needed to process the signals delivered to the control house via copper wires. Yet, none of these subsystems would be redundant. In contrast, an embodiment of the invention provides the input/output interface using only two redundant bricks, which are placed in the switchyard for a given piece of primary equipment. Because these two bricks can serve three IED masters, each IED no longer needs a separate I/O subsystem. Thus, an embodiment of the invention reduces the total number of parts for the input/output subsystems by ⅔ while adding full redundancy to the overall system.
Embodiments of the invention preserve conventional approaches to the engineering of electrical power protection and control systems. In particular, these embodiments preserve the concept of protection zones. Thus, in an embodiment, one IED (master) may be deployed to protect a single zone in the primary equipment (e.g., transmission line, transformer, capacitor bank, busbar, etc.). Using the bricks described above permits this to occur despite differences in the way that field signals are generated (e.g., current, voltage, binary, and the like).
In an embodiment of a power system where multiple computer software applications are distributed over multiple protection and control devices (e.g., IEDS and bricks) precise interoperation among all of these devices is paramount. Embodiments of the invention provide interoperability in the following way: A brick need not have an independent firmware. Instead, it may accept a computer software code download from each of its master IED(s). Multiple code implementations, each tailored to the requirements of its master IED(s) can therefore co-exist on a single brick. This mitigates interoperability concerns associated with multiple firmware versions and therefore removes the need for testing. Thus, in an embodiment, the bricks may be entirely maintained by their associated IED(s) in terms of updating their operating code and other parameters as necessary without the need for a human operator of the power substation to interact with the bricks as separate devices. In another embodiment, upon establishing communication between a given brick and the IED, the IED may validate and update, if necessary, the computer software code that controls functionality of only the given brick.
In an embodiment, one or more bricks may be mounted directly to a piece of primary equipment or in a vicinity of the piece of primary equipment.
In an embodiment, during commissioning of a power substation or equivalent activity, a user may lock the system comprised of bricks and IED(s) by acknowledging a given configuration of physical devices is valid and should be stored in a computer memory and considered normal for subsequent operation of the system. The valid configuration of bricks and IED(s) may be represented by a unique identifier such as a serial number, or a by similar method.
In an embodiment, upon establishing communication between a given brick and an IED, the IED may check for a unique identification designation of the brick, and may alters the IED's functionality based on the positive or negative result of the check, for example by issuing an alarm, inhibiting some functions, or automatically switching to a test mode. A function generates outputs through the evaluation or processing of inputs. When a function is inhibited, the outputs are forced to a predetermined default state.
In an embodiment, association between the brick and the IED comprises physical connections as compared to an addressing or equivalent scheme. Additionally, two or more IEDs may use a shared brick to facilitate communication between them. In such an embodiment, a sending IED may include a data item of interest in a packet destined for the shared brick. The brick may copy the received data item of interest in its outgoing packages to some or all the other connected IEDs.
In an embodiment, some or all copper-based signals provided to the bricks may be provided by rugged multi-pin connectors. In another embodiment, a shorting cap may be provided to short out alternating current signals at the IED connectors to allow continuous operation of the power system with a brick being removed, which otherwise would leave the current signal path open.
The bricks may be installed and pre-tested off-site by the manufacturer of the power system apparatus or a refurbishment shop before delivering the power system apparatus to an installation site. In an embodiment where a control house is pre-fabricated, the IEDs and fiber patch panels may be mounted in the control house and pre-tested prior to the delivery of the control house to an installation site. Embodiments of the invention are not limited to using fiber media. Rather, the fiber media described above may be replaced by electrical or wireless media.
A detailed description of various embodiments of the invention has been provided; however, modifications within the scope of the invention will be apparent to persons having ordinary skill in the above-referenced technological field. Such persons will appreciate that features described with respect to one embodiment may be applied to other embodiments. Thus, the scope of the invention is to be properly construed with reference to the following claims.

Claims (24)

1. A system for protection, control, and monitoring of delivery of electric power energy, said system comprising:
an input/output interface device comprising a first brick coupled with a piece of primary equipment and configured to receive field data from the piece of primary equipment;
a second brick redundantly coupled with the piece of primary equipment and configured to receive the field data from the piece of primary equipment;
at least one intelligent electronic device (“IED”) configured to receive field data from the first brick and the second brick;
a patch panel coupled with the first brick and the second brick and each of the at least one IED, the patch panel being configured to route the field data from the first brick and the second brick to selected ones of the at least one IED;
a first communication link independently coupling each of the first brick and the second brick to the patch panel; and
a second communication link independently coupling the patch panel to each of the at least one IED, wherein the first brick and the second brick are configured to transmit said field data to the selected ones of the at least one IED and to synchronize the transmission of the field data to a sampling clock signal of each of the selected ones of said at least one IED, wherein each of the at least one IED is configured to independently establish a phase lock loop across each communication link with associated ones of the first brick and second brick to provide the sampling clock signal to the first brick and the second brick.
2. The system of claim 1, wherein each of the first and second communications links is a patch cable having at least one pre-terminated high density connector on an end thereof.
3. The system of claim 2, wherein the first and second communication links are selected from the group consisting of: a fiber-optic media, an electrical media and a wireless media.
4. The system of claim 1, wherein the patch panel is located in a control house of a power substation.
5. The system of claim 1, wherein the first brick has no firmware and is configured to accept a computer software code download from at least one of the at least one IEDs.
6. The system of claim 1, wherein the field data received by the first brick includes at least one of analog signals, binary signals, and a combination thereof.
7. The system of claim 6, wherein the analog signals comprise at least one of alternating voltages and currents supplied by transformers, low-energy analog signals supplied by instrument transformers, and analog outputs from temperature, pressure, motion, and other sensors.
8. The system of claim 6, wherein the binary signals comprise at least one of circuit breaker position, disconnect and grounding switch position, and alarm or status indication from other sensors and devices.
9. The system of claim 1, wherein the first brick is further configured to receive a command signal from at least one of the at least one IEDs.
10. The system of claim 9, wherein the command signal comprises at least one of open/close commands for circuit breakers, disconnect switches, and lower/rise commands for transformer tap changers.
11. The system of claim 1, wherein the first brick is further configured to convert a digitized command signal received from at least one of the at least one IEDs into a binary command signal, and to transmit the binary command signal to the piece of primary equipment.
12. The system of claim 1, wherein the first brick is configured to convert one of a received analog field data signal and a binary field data signal into a digital field data signal, and to transmit the digital field data signal to at least one of the at least one IEDs.
13. The system of claim 12, wherein the first brick is configured to use an independent sampling clock when receiving its input field data via sampling and converting from at least one of analog field data signals and binary field data signals to digital signals.
14. The system of claim 1, wherein each of the first brick and the at least one IED has one or more independent communication ports, and wherein the first brick has a communication port dedicated to communicating with a communication port of a corresponding one of the at least one IEDs.
15. The system of claim 1, wherein each of the IEDs is configured to validate, and update if necessary, a computer software code that controls functionality of the first brick upon establishing a communication with the first brick.
16. The system of claim 1, wherein the system is configured to be locked upon receipt of an acknowledgment that a given configuration of the first brick and IED is valid, should be stored in a computer memory, and considered normal for subsequent operation of the system.
17. The system of claim 16, wherein the valid given configuration is represented by a unique identifier.
18. The system of claim 1, wherein the at least one IED is configured to compare first digital field data received from the first brick with second digital data received from the second brick to ensure integrity of the first and second digital field data.
19. The system of claim 18, wherein the at least one IED is configured to apply extra checks to identify an intact set of digital field data upon detecting an inconsistency between the first and second digital field data.
20. The system of claim 19, wherein the at least one IED is further configured to switchover permanently to the intact set of digital field data and further configured to continue to operate despite a failure of the first brick or the second brick.
21. The system of claim 1, wherein all communication between the first brick and selected ones of the at least one IED and the second brick and selected ones of the at least one IED is accomplished by direct point-to-point, multi-fiber connections without the need for an actively-switched network.
22. The system of claim 1, wherein in said patch panel a separate physical access is provided for a part of the patch panel interfacing with the first communication link, and a separate physical access is provided for a part that cross-connects fiber pairs between the first brick and the selected ones of the at least one IED.
23. The system of claim 1, wherein each of the at least one IEDs further comprises a rugged multi-pin connector.
24. The system of claim 23, further comprising a shorting cap configured to short out alternate current signals at the rugged multi-pin connector to allow continuous operation of the system with a brick removed.
US11/470,867 2006-09-07 2006-09-07 Protection and control system for electric power networks with signal and command interfaces at the primary equipment Active 2028-02-28 US7693607B2 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
US11/470,867 US7693607B2 (en) 2006-09-07 2006-09-07 Protection and control system for electric power networks with signal and command interfaces at the primary equipment
JP2007222110A JP5144993B2 (en) 2006-09-07 2007-08-29 Power network protection control system with signal and command interface in main equipment
AU2007214320A AU2007214320B2 (en) 2006-09-07 2007-08-30 Protection and control system for electric power networks with signal and command interfaces at the primary equipment
EP07115372.0A EP1898509B1 (en) 2006-09-07 2007-08-31 Protection and control system for electric power networks with signal and command interfaces at the primary equipment
MX2007010938A MX2007010938A (en) 2006-09-07 2007-09-06 Protection and control system for electric power networks with signal and command interfaces at the primary equipment.
KR1020070090264A KR101341683B1 (en) 2006-09-07 2007-09-06 Protection and control system for electric power networks with signal and command interfaces at the primary equipment
BRPI0703797-0A BRPI0703797A (en) 2006-09-07 2007-09-06 protection and control system for power supply networks with signal and control interfaces on primary equipment
CN2007101536092A CN101141080B (en) 2006-09-07 2007-09-07 Protection and control system for electric power networks with signal and command interfaces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/470,867 US7693607B2 (en) 2006-09-07 2006-09-07 Protection and control system for electric power networks with signal and command interfaces at the primary equipment

Publications (2)

Publication Number Publication Date
US20080065270A1 US20080065270A1 (en) 2008-03-13
US7693607B2 true US7693607B2 (en) 2010-04-06

Family

ID=38980930

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/470,867 Active 2028-02-28 US7693607B2 (en) 2006-09-07 2006-09-07 Protection and control system for electric power networks with signal and command interfaces at the primary equipment

Country Status (8)

Country Link
US (1) US7693607B2 (en)
EP (1) EP1898509B1 (en)
JP (1) JP5144993B2 (en)
KR (1) KR101341683B1 (en)
CN (1) CN101141080B (en)
AU (1) AU2007214320B2 (en)
BR (1) BRPI0703797A (en)
MX (1) MX2007010938A (en)

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090005915A1 (en) * 2006-02-08 2009-01-01 Abb Technology Ag Establishing switchyard zones of a high or medium voltage switchyard
US20100004792A1 (en) * 2008-07-04 2010-01-07 Sensa Control Digital, S.A. De C.V. Acquisition, control and measurement device
US20100039954A1 (en) * 2008-08-18 2010-02-18 Abb Technology Ag Analyzing communication configuration in a process control system
US20110035065A1 (en) * 2009-08-10 2011-02-10 Schweitzer Iii Edmund O Electric power system automation using time coordinated instructions
US20110251732A1 (en) * 2010-04-10 2011-10-13 Schweitzer Iii Edmund O Systems and method for obtaining a load model and related parameters based on load dynamics
CN102710025A (en) * 2012-06-14 2012-10-03 深圳市华力特电气股份有限公司 Power system communication device and method
WO2014055420A1 (en) * 2012-10-04 2014-04-10 Schweitzer Engineering Laboratories, Inc. Distributed coordinated wide-area control for electric power delivery systems
US9476922B2 (en) 2010-09-15 2016-10-25 Kabushiki Kaisha Toshiba Measuring device, protection relay, and program product
US9568516B2 (en) 2014-09-23 2017-02-14 Schweitzer Engineering Laboratories, Inc. Determining status of electric power transmission lines in an electric power transmission system
US10333291B2 (en) 2017-09-25 2019-06-25 Schweitzer Engineering Laboratories, Inc. Multiple generator ground fault detection
US10333301B2 (en) 2017-05-04 2019-06-25 Schweitzer Engineering Laboratories, Inc. Transient simulation modeling for dynamic remedial action schemes using real-time protection setting updates
US10348065B1 (en) 2015-08-10 2019-07-09 Wunderlich-Malec Engineering, Inc. Method for installation of electrical substation yard wiring
US10541100B2 (en) 2017-12-30 2020-01-21 Abb Schweiz Ag Remote power and operating device for a circuit breaker
US10630541B2 (en) 2016-07-28 2020-04-21 General Electric Technology Gmbh Systems and methods for configuration-less process bus with architectural redundancy in digital substations
US10797632B2 (en) 2018-08-21 2020-10-06 Schweitzer Engineering Laboratories, Inc. Sensitive directional element for generator protection
US10819261B1 (en) 2019-10-25 2020-10-27 Schweitzer Engineering Laboratories, Inc. Security improvements for electric power generator protection
US10896658B1 (en) 2020-04-02 2021-01-19 Schweitzer Engineering Laboratories, Inc. Virtual display
US10931097B2 (en) 2017-09-25 2021-02-23 Schweitzer Engineering Laboratories, Inc. Generator stator ground protection using third harmonic
US10951057B1 (en) 2019-10-13 2021-03-16 Schweitzer Engineering Laboratories, Inc. Reliable power module for improved substation device availability
US10992134B2 (en) 2019-05-10 2021-04-27 Schweitzer Engineering Laboratories, Inc. Load shedding system for both active and reactive power based on system perturbation
US11050234B2 (en) 2019-08-21 2021-06-29 Schweitzer Engineering Laboratories, Inc. Integration of primary protection relays for electric power delivery systems
US11056082B1 (en) 2020-09-29 2021-07-06 Schweitzer Engineering Laboratories, Inc. Waterfall display for high-speed streaming measurements
US11079436B2 (en) 2019-10-12 2021-08-03 Schweitzer Engineering Laboratories, Inc. Multiple merging unit testing system
US11108737B2 (en) 2019-07-12 2021-08-31 Schweitzer Engineering Laboratories, Inc. Secure electric power delivery system protection during cyber threats
US11114892B2 (en) 2019-10-12 2021-09-07 Schweitzer Engineering Laboratories, Inc. Electric power system transducer failure monitor and measurement recovery
US11115311B1 (en) 2020-05-18 2021-09-07 Schweitzer Engineering Laboratories, Inc. Data tunneling for testing equipment in electric power system
US11112466B2 (en) 2019-10-13 2021-09-07 Schweitzer Engineering Laboratories, Inc. Equipment failure detection in an electric power system
US11121536B2 (en) 2019-10-13 2021-09-14 Schweitzer Engineering Laboratories, Inc. Digital input electric power system panel meter
US11119128B2 (en) 2019-10-10 2021-09-14 Schweitzer Engineering Laboratories, Inc. Loopback testing of electric power protection systems
US11125821B2 (en) 2019-10-12 2021-09-21 Schweitzer Engineering Laboratories, Inc. Testing device for protective relays in electric power delivery systems
US11165238B2 (en) 2019-10-13 2021-11-02 Schweitzer Engineering Laboratories, Inc. Electrical arc event detection in an electric power system
US11258249B2 (en) 2019-10-12 2022-02-22 Schweitzer Engineering Laboratories, Inc. Primary and system protection for an electric power delivery system
US11631972B2 (en) 2020-12-16 2023-04-18 Schweitzer Engineering Laboratories, Inc. Accurate modeling of equipment overexcitation damage curves
US11662760B2 (en) 2013-03-15 2023-05-30 General Electric Technology Gmbh Wireless communication systems and methods for intelligent electronic devices
US11946966B1 (en) 2023-02-20 2024-04-02 Schweitzer Engineering Laboratories, Inc. Selective stator ground fault protection using positive-sequence voltage reference
US11962140B2 (en) 2021-10-25 2024-04-16 Schweitzer Engineering Laboratories, Inc. Coordination of protective elements in an electric power system

Families Citing this family (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2159893A1 (en) * 2008-08-29 2010-03-03 ABB Research LTD Substation automation with redundant protection
US8649131B2 (en) * 2008-09-24 2014-02-11 Abb Research Ltd. Method and device for supervising secondary circuit of instrument transformer in power system
US20100082844A1 (en) * 2008-09-30 2010-04-01 Abb Research Ltd. Field device controller adapter
JP5539997B2 (en) * 2008-10-09 2014-07-02 アレヴァ・ティー・アンド・ディー・ユー・ケー・リミテッド Method and apparatus for dynamic signal switching of merging unit in power system
CN102484394A (en) 2009-04-13 2012-05-30 Abb研究有限公司 Intelligent process interface and substation automation system
KR200467351Y1 (en) * 2009-06-01 2013-06-10 엘에스산전 주식회사 Packet recording apparatus and system the same
KR100931559B1 (en) * 2009-06-30 2009-12-14 한국전력공사 Testing method and its apparatus of the substation automation system based report
WO2011030306A1 (en) * 2009-09-09 2011-03-17 Thinkeco Power Inc. Method and system of aggregating and delivering electrical power using fiber optic cables
KR101069352B1 (en) * 2009-09-30 2011-10-06 한국전력공사 Testing apparatus and method of the client control service for substation automation
EP2497175B1 (en) 2009-11-05 2014-01-08 Alstom Technology Ltd. Method of monitoring the grading margin between time-current characteristics of intelligent electronic devices
CN101741145B (en) * 2010-01-19 2012-08-08 华北电网有限公司 Traditional switch intelligent interface device for digitized transformer substation
CN102013933B (en) * 2010-11-12 2013-10-16 石家庄科林电气股份有限公司 Method for realizing synchronous sampling by local area extension sets in smart grid
CN102480170A (en) * 2010-11-22 2012-05-30 上海市电力公司 Method for computer monitoring of auxiliary system of underground substation
US9435835B2 (en) * 2010-12-27 2016-09-06 Schweitzer Engineering Laboratories, Inc. Validation of electric power system monitoring systems
WO2012119648A1 (en) * 2011-03-09 2012-09-13 Siemens Aktiengesellschaft Power automation installation and method for operating a power automation installation
WO2012127058A1 (en) 2011-03-24 2012-09-27 Schneider Electric Energy Gmbh Merging unit and method of operating a merging unit
EP2503668B1 (en) * 2011-03-24 2020-05-13 Schneider Electric GmbH Merging unit and method of operating a merging unit
KR101252074B1 (en) * 2011-11-28 2013-04-12 인텍전기전자 주식회사 Communication method between intelligent electronic devices
MX346445B (en) 2012-06-19 2017-03-21 Aep Trans Holding Company Llc Modular substation protection and control system.
US9906408B2 (en) 2012-12-05 2018-02-27 Siemens Canada Limited Network device mounting rail for connecting removable modules
KR101809295B1 (en) 2013-01-15 2018-01-18 삼성전자주식회사 Wireless power transmitter and wireless power receiver and method for controlling each thereof
US10790701B2 (en) 2013-01-15 2020-09-29 Samsung Electronics Co., Ltd. Wireless power transmitter, wireless power receiver, and control methods thereof
EP3269022B1 (en) * 2015-03-11 2022-08-31 Hitachi Energy Switzerland AG Method and apparatus for detection of power system disturbance within digital substation
KR102014427B1 (en) * 2015-07-07 2019-08-26 엘에스산전 주식회사 Power network mom|nitering system and method thereof
CN106411790B (en) * 2016-09-29 2019-07-23 北京东土科技股份有限公司 Data transmission method based on intelligent substation Protection control system
US10311009B2 (en) * 2016-10-24 2019-06-04 Fisher-Rosemount Systems, Inc. Apparatus and methods for communicatively coupling field devices to controllers in a process control system using a distributed marshaling architecture
US10635804B2 (en) * 2017-04-26 2020-04-28 The Boeing Company Secured power and data communications for aircraft coupled to ground systems
GB2568721B (en) * 2017-11-24 2020-05-13 Ge Aviat Systems Ltd Method and apparatus for initalizing a power distribution circuit
US11128116B2 (en) * 2018-10-08 2021-09-21 Schweitzer Engineering Laboratories, Inc. Electric power system protection device with active and testing configurations
CN114069832B (en) * 2020-07-30 2023-11-17 南京南瑞继保电气有限公司 GIS intelligent system based on integration of secondary equipment
KR102508179B1 (en) * 2020-11-23 2023-03-09 한전케이디엔주식회사 IEC61850-based microgrid data analysis system and method
CN115015666B (en) * 2022-06-20 2023-02-03 国网山东省电力公司莱西市供电公司 Intelligent substation relay protection test expander and protection debugging method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4864489A (en) * 1982-11-12 1989-09-05 Fuji Electric Co., Ltd. Field instrumentation system
US5258652A (en) 1988-01-08 1993-11-02 Hitachi, Ltd. Distributed plant control system
EP1019997A1 (en) 1997-10-01 2000-07-19 Siemens Aktiengesellschaft Method for monitoring status parameters in a switching mechanism, and corresponding device
EP1191662A1 (en) 2000-09-21 2002-03-27 ABB Power Automation AG Configuration of a control system of an electrical installation
US20030200038A1 (en) 2002-04-17 2003-10-23 Schweitzer Edmund O. Protective relay with synchronized phasor measurement capability for use in electric power systems
US20040019410A1 (en) * 2002-02-25 2004-01-29 General Electric Company Protection system for power distribution systems
EP1416603A1 (en) 2002-11-01 2004-05-06 Abb Research Ltd. Protection of an electric power transmission network
US20050043861A1 (en) * 2003-08-19 2005-02-24 Thompson Michael J. Integrated protection and control system for a power system substation
EP1830450A1 (en) 2006-03-02 2007-09-05 ABB Technology AG Remote terminal unit and monitoring, protection and control of power systems

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3907998B2 (en) * 2001-02-09 2007-04-18 株式会社東芝 Substation protection control system
JP3959360B2 (en) * 2003-03-13 2007-08-15 株式会社東芝 Power system protection control system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4864489A (en) * 1982-11-12 1989-09-05 Fuji Electric Co., Ltd. Field instrumentation system
US5258652A (en) 1988-01-08 1993-11-02 Hitachi, Ltd. Distributed plant control system
EP1019997A1 (en) 1997-10-01 2000-07-19 Siemens Aktiengesellschaft Method for monitoring status parameters in a switching mechanism, and corresponding device
EP1191662A1 (en) 2000-09-21 2002-03-27 ABB Power Automation AG Configuration of a control system of an electrical installation
US20040019410A1 (en) * 2002-02-25 2004-01-29 General Electric Company Protection system for power distribution systems
US20030200038A1 (en) 2002-04-17 2003-10-23 Schweitzer Edmund O. Protective relay with synchronized phasor measurement capability for use in electric power systems
EP1416603A1 (en) 2002-11-01 2004-05-06 Abb Research Ltd. Protection of an electric power transmission network
US20050043861A1 (en) * 2003-08-19 2005-02-24 Thompson Michael J. Integrated protection and control system for a power system substation
US7027896B2 (en) 2003-08-19 2006-04-11 Schweitzer Engineering Laboratories, Inc. Integrated protection and control system for a power system substation
EP1830450A1 (en) 2006-03-02 2007-09-05 ABB Technology AG Remote terminal unit and monitoring, protection and control of power systems

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
European Search Report, Feb. 1, 2008, EP Application No. 07115372, European Patent Office in Munich.

Cited By (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090005915A1 (en) * 2006-02-08 2009-01-01 Abb Technology Ag Establishing switchyard zones of a high or medium voltage switchyard
US8374727B2 (en) * 2006-02-08 2013-02-12 Abb Technology Ag Establishing switchyard zones of a high or medium voltage switchyard
US20100004792A1 (en) * 2008-07-04 2010-01-07 Sensa Control Digital, S.A. De C.V. Acquisition, control and measurement device
US20100039954A1 (en) * 2008-08-18 2010-02-18 Abb Technology Ag Analyzing communication configuration in a process control system
US8804547B2 (en) * 2008-08-18 2014-08-12 Abb Technology Ag Analyzing communication configuration in a process control system
US20110035066A1 (en) * 2009-08-10 2011-02-10 Schweitzer Iii Edmund O Electric power system automation using time coordinated instructions
US8682496B2 (en) 2009-08-10 2014-03-25 Schweitzer Engineering Laboratories Inc Electric power system automation using time coordinated instructions
US8275485B2 (en) * 2009-08-10 2012-09-25 Schweitzer Engineering Laboratories, Inc. Electric power system automation using time coordinated instructions
US8275486B2 (en) * 2009-08-10 2012-09-25 Schweitzer Engineering Laboratories, Inc. Electric power system automation using time coordinated instructions
US8275487B2 (en) * 2009-08-10 2012-09-25 Schweitzer Engineering Laboratories, Inc. Electric power system automation using time coordinated instructions
US20110035065A1 (en) * 2009-08-10 2011-02-10 Schweitzer Iii Edmund O Electric power system automation using time coordinated instructions
US20110035076A1 (en) * 2009-08-10 2011-02-10 Schweitzer Iii Edmund O Electric power system automation using time coordinated instructions
US20110251732A1 (en) * 2010-04-10 2011-10-13 Schweitzer Iii Edmund O Systems and method for obtaining a load model and related parameters based on load dynamics
US8706309B2 (en) * 2010-04-10 2014-04-22 Schweitzer Engineering Laboratories Inc Systems and method for obtaining a load model and related parameters based on load dynamics
US9476922B2 (en) 2010-09-15 2016-10-25 Kabushiki Kaisha Toshiba Measuring device, protection relay, and program product
CN102710025A (en) * 2012-06-14 2012-10-03 深圳市华力特电气股份有限公司 Power system communication device and method
CN102710025B (en) * 2012-06-14 2014-09-17 深圳市华力特电气股份有限公司 Power system communication device and method
WO2014055420A1 (en) * 2012-10-04 2014-04-10 Schweitzer Engineering Laboratories, Inc. Distributed coordinated wide-area control for electric power delivery systems
US9383735B2 (en) 2012-10-04 2016-07-05 Schweitzer Engineering Laboratories, Inc. Distributed coordinated electric power delivery control system using component models
US11662760B2 (en) 2013-03-15 2023-05-30 General Electric Technology Gmbh Wireless communication systems and methods for intelligent electronic devices
US9568516B2 (en) 2014-09-23 2017-02-14 Schweitzer Engineering Laboratories, Inc. Determining status of electric power transmission lines in an electric power transmission system
US10348065B1 (en) 2015-08-10 2019-07-09 Wunderlich-Malec Engineering, Inc. Method for installation of electrical substation yard wiring
US10630541B2 (en) 2016-07-28 2020-04-21 General Electric Technology Gmbh Systems and methods for configuration-less process bus with architectural redundancy in digital substations
US10333301B2 (en) 2017-05-04 2019-06-25 Schweitzer Engineering Laboratories, Inc. Transient simulation modeling for dynamic remedial action schemes using real-time protection setting updates
US10333291B2 (en) 2017-09-25 2019-06-25 Schweitzer Engineering Laboratories, Inc. Multiple generator ground fault detection
US10931097B2 (en) 2017-09-25 2021-02-23 Schweitzer Engineering Laboratories, Inc. Generator stator ground protection using third harmonic
US10541100B2 (en) 2017-12-30 2020-01-21 Abb Schweiz Ag Remote power and operating device for a circuit breaker
US10797632B2 (en) 2018-08-21 2020-10-06 Schweitzer Engineering Laboratories, Inc. Sensitive directional element for generator protection
US10992134B2 (en) 2019-05-10 2021-04-27 Schweitzer Engineering Laboratories, Inc. Load shedding system for both active and reactive power based on system perturbation
US11108737B2 (en) 2019-07-12 2021-08-31 Schweitzer Engineering Laboratories, Inc. Secure electric power delivery system protection during cyber threats
US11050234B2 (en) 2019-08-21 2021-06-29 Schweitzer Engineering Laboratories, Inc. Integration of primary protection relays for electric power delivery systems
US11119128B2 (en) 2019-10-10 2021-09-14 Schweitzer Engineering Laboratories, Inc. Loopback testing of electric power protection systems
US11258249B2 (en) 2019-10-12 2022-02-22 Schweitzer Engineering Laboratories, Inc. Primary and system protection for an electric power delivery system
US11079436B2 (en) 2019-10-12 2021-08-03 Schweitzer Engineering Laboratories, Inc. Multiple merging unit testing system
US11125821B2 (en) 2019-10-12 2021-09-21 Schweitzer Engineering Laboratories, Inc. Testing device for protective relays in electric power delivery systems
US11114892B2 (en) 2019-10-12 2021-09-07 Schweitzer Engineering Laboratories, Inc. Electric power system transducer failure monitor and measurement recovery
US11121536B2 (en) 2019-10-13 2021-09-14 Schweitzer Engineering Laboratories, Inc. Digital input electric power system panel meter
US11112466B2 (en) 2019-10-13 2021-09-07 Schweitzer Engineering Laboratories, Inc. Equipment failure detection in an electric power system
US10951057B1 (en) 2019-10-13 2021-03-16 Schweitzer Engineering Laboratories, Inc. Reliable power module for improved substation device availability
US11165238B2 (en) 2019-10-13 2021-11-02 Schweitzer Engineering Laboratories, Inc. Electrical arc event detection in an electric power system
US10819261B1 (en) 2019-10-25 2020-10-27 Schweitzer Engineering Laboratories, Inc. Security improvements for electric power generator protection
US10896658B1 (en) 2020-04-02 2021-01-19 Schweitzer Engineering Laboratories, Inc. Virtual display
US11115311B1 (en) 2020-05-18 2021-09-07 Schweitzer Engineering Laboratories, Inc. Data tunneling for testing equipment in electric power system
US11056082B1 (en) 2020-09-29 2021-07-06 Schweitzer Engineering Laboratories, Inc. Waterfall display for high-speed streaming measurements
US11631972B2 (en) 2020-12-16 2023-04-18 Schweitzer Engineering Laboratories, Inc. Accurate modeling of equipment overexcitation damage curves
US11962140B2 (en) 2021-10-25 2024-04-16 Schweitzer Engineering Laboratories, Inc. Coordination of protective elements in an electric power system
US11946966B1 (en) 2023-02-20 2024-04-02 Schweitzer Engineering Laboratories, Inc. Selective stator ground fault protection using positive-sequence voltage reference

Also Published As

Publication number Publication date
EP1898509B1 (en) 2017-10-25
JP2008067595A (en) 2008-03-21
CN101141080A (en) 2008-03-12
AU2007214320A1 (en) 2008-04-03
KR101341683B1 (en) 2013-12-20
BRPI0703797A (en) 2008-04-22
KR20080023155A (en) 2008-03-12
EP1898509A1 (en) 2008-03-12
US20080065270A1 (en) 2008-03-13
JP5144993B2 (en) 2013-02-13
AU2007214320B2 (en) 2011-12-22
CN101141080B (en) 2011-11-16
MX2007010938A (en) 2009-02-05

Similar Documents

Publication Publication Date Title
US7693607B2 (en) Protection and control system for electric power networks with signal and command interfaces at the primary equipment
US9515459B2 (en) Power supply module for modular telecontrol equipment and equipment comprising same
US9912193B2 (en) Remote terminal unit modular equipment
US7117105B2 (en) Method and apparatus for ground fault protection
CN101431230B (en) Transforming plant integrated protection system based on IEC61850
US9048697B2 (en) Intelligent process interface and substation automation system
EP1830450A1 (en) Remote terminal unit and monitoring, protection and control of power systems
CN101939894B (en) Determining a bus bar voltage
Skendzic et al. IEC 61850-9-2 process bus and its impact on power system protection and control reliability
Dolezilek et al. Integration of IEC 61850 GSE and sampled value services to reduce substation wiring
Shen et al. A fully integrated substation LAN network for protection, control and data acquisition
Iloh et al. An improved merging unit model for substation automation system based on IEC61850
HOANG et al. The Need for Speed-Why Fast Track Digital Substation Deployment?
Basha et al. Implementation of reliable high-speed islanding detection, zone interlocking, and source selection schemes using smart algorithms
Boteza et al. Automatic transfer switch using IEC 61850 protocol in smart grids
Singh et al. Solving Synchronization Challenges Using Distributed Signal Acquisition With Fiber-Optic Links
Hunt et al. Simplifying protection system design for distribution substations
Nayak et al. Study and Analysis of Protection Scheme of Digital Substation Using IEC61850-9-2 Process Bus Technology
Track The Need for Speed
Khromtsov et al. Aspects of Implementation of Digital Substation Technology in Medium Voltage Switchgear
Mirachytski Centralized Protection System in Distribution Substation
Lai et al. Integration and coordination of power system control and protection
Crompton et al. Integrated control and protection solution in 33 and 11 kV package substations
McGinn et al. Implementing Lockout Function with IEC 61850 Communications Based P&C Systems
Parker et al. Implementation of National Grid's strategy for Substation Information, Control and Protection (SICAP) within a new operational substation

Legal Events

Date Code Title Description
AS Assignment

Owner name: GENERAL ELECTRIC COMPANY,NEW YORK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KASZTENNY, BOGDAN Z.;FINNEY, DALE;MAZEREEUW, JEFFREY;AND OTHERS;SIGNING DATES FROM 20060914 TO 20060915;REEL/FRAME:018283/0570

Owner name: GENERAL ELECTRIC COMPANY, NEW YORK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KASZTENNY, BOGDAN Z.;FINNEY, DALE;MAZEREEUW, JEFFREY;AND OTHERS;REEL/FRAME:018283/0570;SIGNING DATES FROM 20060914 TO 20060915

STCF Information on status: patent grant

Free format text: PATENTED CASE

FPAY Fee payment

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552)

Year of fee payment: 8

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 12

AS Assignment

Owner name: GE INFRASTRUCTURE TECHNOLOGY LLC, SOUTH CAROLINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GENERAL ELECTRIC COMPANY;REEL/FRAME:065727/0001

Effective date: 20231110